INTERNAL AUDIT PROCESS

Steps in conducting Internal Audit of an entity

MODULE - 4

RISK BASED INTERNAL AUDIT COURSE

www.eAuditor.in

C O N T E N T S

1. 4-phases in the internal audit process

2. Planning the internal audit

3. Field work

4. Auditing techniques for evidence gathering

5. Reporting

6. Action taken report

www.eAuditor.in

INTERNAL AUDIT PROCESS

4-phases of the internal audit process

Planning

Field work

Reporting

Implementation

www.eAuditor.in

Planning

Field work

Reporting

Implementation

PLANNING THE INTERNAL AUDIT Internal audit process

www.eAuditor.in

Phase-1

The objective is to identify the significant areas/ risks/controls that need to be reviewed and to schedule it in the Audit calendar.

Phase -1: Planning the Internal Audit

Audit universe should cover the risk universe

The significant risks are identified by looking at general & analytical documents

Once the significant areas are identified a list is prepared, project wise to be audited ie. Terms of Reference for audit

The timing of the visit & duration is in the Audit calender

www.eAuditor.in

Phase -1: Annual Plan Part of the permanent audit file

www.eAuditor.in

Step #

Process Activity Output

1 Audit Universe Defining all the entities & business units of the company which form part of the scope of Audit & putting them into categories

Stratified Audit Universe

2 Risk Assessment Identifying significant risks for each area in these entities/business units/departments

Risk register for Auditing

3 Terms of reference

For each business units/area framing the audit objectives for the year

Audit objectives

4 Scheduling Periodicity & timing of field visit during the year.

Audit calendar

Audit Universe

Risk

Assessment

Audit Objective

Audit calendar

FIELD WORK Internal audit process

www.eAuditor.in

Phase-2

The objective is to carry out the field work in a manner that the Audit objectives are met.

Phase -2: Field work generating working paper audit file

www.eAuditor.in

Step #

Process Activity Output

1 Survey of Internal Controls

Against the identified significant risks a survey is done on whether there is an appropriate control . In other words is the control well designed and on the face of it appears to be operational.

Survey results

2 Preparing the audit program

Based on the above survey an audit program is finalised. This includes detailed checklists

Check list & Working paper file (CL&WP)

3 Substantive testing

The steps are - transactions to be included in the sample - obtaining competent evidential matter - drawing conclusions.

Query sheet

4 Report writing

Based on the replies received by management on the queries, an opinion is drawn up by the auditor.

Draft Audit Report

Survey of controls

Finalising

Audit Program

Substantive testing

Report writing

Phase -2: Field work generating working paper audit file

www.eAuditor.in

Step #

Process Activity Output

1 Survey of Internal Controls

Against the identified significant risks a survey is done on whether there is an appropriate control . In other words is the control well designed and on the face of it appears to be operational.

Survey results

2 Preparing the audit program

Based on the above survey an audit program is finalised. This includes detailed checklists

Check list & Working paper file (CL&WP)

3 Substantive testing

The steps are - transactions to be included in the sample - obtaining competent evidential matter - drawing conclusions.

Query sheet

4 Report writing

Based on the replies received by management on the queries, an opinion is drawn up by the auditor.

Draft Audit Report

Survey of controls

Finalising

Audit Program

Substantive testing

Report writing

REPORTING Internal audit process

www.eAuditor.in

Phase-3

The objective is to form & convey an opinion on the reliability of internal controls

Phase-3: Reporting forming & reporting an opinion

www.eAuditor.in

Step #

Process Activity Output

1 Field audit closure

The draft report is discussed with the Project Manager and all the departmental heads. Usually this is well attended and a lively discussion on the issues take place

Audit conclusions

2 Draft report This is the stage wherein a formal reply is asked for. Draft report

3 Final report Based on the replies a final report is issued to the project and copies marked to Senior Management. ( PM, Project Director).Report extracts: are marked to the different HO departments which have an oversight in that area

Final report

4 Report summary

Based on the replies received by management on the queries, an opinion is drawn up by the auditor.

Draft Audit Report

Field audit closure

Draft report

Final report

Report summary

IMPLEMENTATION Internal audit process

www.eAuditor.in

Phase-4

The objective is to remove the deficiencies observed in the system

Phase-4: Implementation forming & reporting an opinion

www.eAuditor.in

• Implementation of observations accepted by the project management need to be reviewed before the next quarter’s Audit committee meeting so that this status can be reported in that meeting.

Action taken report

For queries mail [email protected]