risk based approach to product quality revf.pptx · pdf filerisk management tools and...
TRANSCRIPT
![Page 2: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/2.jpg)
© Kaizen Institute
Webinar Objectives
To demonstrate:
• How risk based approaches should be used as the means for ensuring highest level of
product quality
• ISO 9001:2015 and risk management
• The three levels of risk assessment – strategic, project, and product/process – and how
to address each one
• Understanding how tools can mitigate identified risks including, poka yoke, FMEA,
jidoka, contingency plans, root cause analysis , and differential analysis
![Page 3: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/3.jpg)
© Kaizen Institute
Agenda
The “Standard Stuff”
Big Picture Risk
• SWOT
• Hoshin kanri
• Contingency plans
Medium Picture Risk
• Product and process design and development
Detailed Picture Risk
• FMEA
• Mistake-proofing
• Root cause analysis
![Page 4: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/4.jpg)
The “Standard Stuff”
![Page 5: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/5.jpg)
© Kaizen Institute
The organization shall continually improve the effectiveness of
the QMS through the use of the quality policy, quality objectives,
audit results, analysis of data, corrective and preventive actions,
and management review.
8.5.1 of ISO 9001, 2008 Continual Improvement
![Page 6: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/6.jpg)
© Kaizen Institute
Preventive Actions
More difficult to identify (than corrective actions)
Result from a POTENTIAL nonconformity
Observed by you, or by your customer, including
• Long lead times
• Wasteful actions (the 8 process wastes)
• What the competition is doing (SWOT)
• What was assumed by the customer
• “Customer caused” problems
• Potentially not meeting company objectives/goals
• Future customer expectations, products and/or direction
• Design and development (FMEA)
![Page 7: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/7.jpg)
© Kaizen Institute
8.5.3 of ISO 9001:2008Preventive Action
Review potential nonconformities and their causes
Evaluate the need for action to prevent occurrence of nonconformities
Determine and implement action needed
Records of the results of actions taken
Review the effectiveness of the preventive action taken
“Preventive actions mitigate risks”
![Page 8: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/8.jpg)
© Kaizen Institute
“The effect of uncertainty”
Risk
![Page 9: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/9.jpg)
© Kaizen Institute
The organization shall establish
documented requirements for risk
management throughout
product realization.
ISO 13485:2003
![Page 10: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/10.jpg)
© Kaizen Institute
The organization shall review the requirements
related to the product.
This review … shall ensure that …
d) Risks
(e.g. new technology, short delivery time scale)
have been evaluated
AS 9100:2004
![Page 11: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/11.jpg)
© Kaizen Institute
And now …. ISO 9001:2015 …
“Risk” is now mentioned nine times in ISO 9001 where it was not once mentioned in
ISO 9001:2008
“Risk” is mentioned eight times in conjunction with “opportunities”
Clause 4.1 requires leadership to demonstrate leadership and commitment by d)
promoting the use of the process approach and risk-based thinking
Clause 6.1.1 of Planning is titled “Actions to address risks and opportunities”
![Page 12: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/12.jpg)
© Kaizen Institute
… even so, in ISO 9001:2008….
Corrective actions shall be appropriate
to the effects
of the nonconformities encountered
or ….
![Page 13: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/13.jpg)
© Kaizen Institute
So … not every problem or potential problem
has to be addressed…
But how does one decide what problems to address?
Assess the risk!
![Page 14: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/14.jpg)
© Kaizen Institute
Definitions
14
From ISO 31000, the international standard entitled “Risk Management – Principles
and guidelines”.
• Risk management: “coordinated activities to direct and control an organization with
regard to risk”
• Risk: “effect on uncertainty on objectives”
‐ “Note: Objectives can have different aspects (such as financial, health and safety, and
environmental goals), and can apply at different levels (such as strategic, organization-
wide, project, product and process).”
![Page 15: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/15.jpg)
© Kaizen Institute
Risk mitigation: “a systematic reduction in the extent of exposure
to a risk and/or the likelihood of its occurrence”
Definitions
15
![Page 16: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/16.jpg)
Big Picture RiskSWOT
Hoshin kanriContingency plans
![Page 17: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/17.jpg)
© Kaizen Institute
SWOT Analysis
Helpful Harmful
Internal Strengths Weaknesses
External Opportunities Threats
![Page 18: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/18.jpg)
© Kaizen Institute
SWOT
Risk Assessments (Risk = P x I)• Probability (1-5 scale)
• Impact (1-5 scale)
Risk of not doing anything to address Weaknesses and Threats
Risk of not taking advantage of Strengths and Opportunities
![Page 19: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/19.jpg)
© Kaizen Institute
Set Strategy
Based on Risk Assessment…
• Strategic policy deployment
or
• Hoshin kanri
![Page 20: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/20.jpg)
© Kaizen Institute
“Ho” = method or form
“Shin” = compass
“Kanri” = management or control
or …
A methodology for strategic direction setting
Hoshin Kanri
![Page 21: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/21.jpg)
© Kaizen Institute
Hoshin Kanri
![Page 22: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/22.jpg)
© Kaizen Institute
Definition:
A course of action to be followed
if a preferred plan fails or
an existing situation changes.
Contingency Plan
![Page 23: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/23.jpg)
© Kaizen Institute
Contingency Plans
• Also, gaining more focus
• Risk based
• SWOT Analysis
• Catastrophes/acts of God
• Labor unrest
• Utility/natural resource issues
• Preventive actions (of the effects)
![Page 24: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/24.jpg)
Medium Picture Risk
Product and Process
Design and Development
![Page 25: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/25.jpg)
© Kaizen Institute
The Visual Project Board
25Copyright 2011 -Technology Perspectives
Near-Term Action Item Responsible Team Member Due Date Completion
DateM / S / C Priority Comments
Create prototype parts kit Jane M. 4/27/09 M Parts missing
Draft test plan out for review Joe P. 5/1/09 5/8/09 S Complete
Complete circuit simulation Cedrick M. 5/1/09 M Need Resources!!
Order injection-mold tooling Joline Q. 5/5/09 M
Meet with key supplier Harry P. 5/10/09 C
Prepare for customer meeting Dave N. 5/10/09 S
Key Milestone Responsible Team Member
Planned Completion
Date
Actual Completion
Date
Cost Status
Schedule Status
Tech. Status Comments
Fabricate Prototype David Copperfield 6/7/09 6/7/09 Complete
Prototype Testing Oliver Twist 4/5/09 First Test Failed
Prototype Validated Tiny Tim 3/14/09 May Require Rework
Production Tooling Charles Darney 4/24/09 Supplier Issues
Test Plan Complete Sydney Carton 4/20/09 Resources Unavailable
Final Drawing Release Lucy Mannette 5/17/09
Fabricate Qual Units Charles Dickens 6/14/2009
Planned Work Project Timeline
Unplanned Work
Parking Lot
Week 1 Week 2Mon Wed Fri Mon Wed Fri
Out
Out Out
Out
Tom
Dick
Harry
Jane
Sally
Mary
Two-Week Action Plan
Risk Management
0
5
10
15
20
25
Months from Project Start
Proj
ect “
Ris
k R
atin
g”
![Page 26: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/26.jpg)
© Kaizen Institute
Risk Types
Market Risk
• Errors in volume forecast, price projection
Technical Risk
• Not planning for “discovery; number of design iterations
Schedule Risk
• Supplier/material lead times; requirement changes
Quality/Cost Risk
• Manufacturing issues; critical to quality issues
![Page 27: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/27.jpg)
© Kaizen Institute
Risk
Risk Priority Number = Probability x Impact
• Probability (1-5 scale)
• Impact (1-5 scale)
Calculate for each specifically identified risk
• Each RPN is between 1 and 25
![Page 28: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/28.jpg)
© Kaizen Institute
A Visual Tool for Managing RiskThe tool itself – the ‘Risk Burn-Down” chart
28Copyright 2011 -Technology Perspectives
ConceptFreeze
DesignFreeze
ProductLaunch
0
5
10
15
20
25
Months from Project Start
Pro
ject
“Ris
k R
atin
g”Exception:New risks identified
Target:Ave. < 12 & none
higher than 16
Target:Ave. < 8 & none higher than 12
Some risksmay carry
into production
![Page 29: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/29.jpg)
Risk Assessment Example
![Page 30: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/30.jpg)
Detailed Picture RiskFMEA
Mistake-proofingRoot cause analysis
![Page 31: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/31.jpg)
© Kaizen Institute
Detailed Picture Risk
Failure identification in product and process design and …. after the fact …
FMEA (Failure Mode and Effects Analysis)
• Design
• Process
• System
• Function
![Page 32: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/32.jpg)
© Kaizen Institute
Definition of an FMEA
An FMEA is a systematized group of activities intended to:
• Recognize and evaluate the potential failures and associated risks , and the effects of
those failures
• Identify actions that could eliminate or reduce the chance of the potential failure
occurring, or mitigate risk
• Document the potential risks of the entire process as a “living document”
![Page 33: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/33.jpg)
© Kaizen Institute
Characteristics of an FMEA
Team effort
Supplier involvement encouraged
Customer focused—voice of the customer
• Design FMEA – end user
• Process FMEA – next person down the line to the end user
Usually a “before the event” activity, however
• Strongly suggested to tie into corrective action system!
![Page 34: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/34.jpg)
© Kaizen Institute
Potential FMEA #Failure Mode and Effects Analysis Page of
Item (Process FMEA) Prepared by:Model # Orig. FMEA Date:Proc Resp: Key Date: Rev. FMEA Date:Core Team
Process Function & Req'ments
Potential Failure Mode
Potential Effects of
Failure
Sev
Class
Potential Causes of
Failure
Occur
Current Process
Controls - Prevention
Current Process
Controls - Detection
Detec
RPN
Recommended Actions
Responsibility & Target Date
Actions Taken
Sev
Occ
Det
RPN
Action Results
![Page 35: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/35.jpg)
© Kaizen Institute
Severity
X
Likelihood of Occurrence
X
Detectability
Risk Priority Number (RPN)
![Page 36: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/36.jpg)
© Kaizen Institute
Risk Mitigation
Definition • A systematic reduction in the extent of exposure to a risk and/or the likelihood of its
occurrence
![Page 37: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/37.jpg)
© Kaizen Institute
Mistake-Proofing
page 37
Definition• Mistake-proofing, or its Japanese equivalent poka-yoke (pronounced PO-ka yo-KAY), is
the use of any automatic device or method that either makes it impossible for an error to occur or makes the error immediately obvious once it has occurred.
Presentation name, date
![Page 38: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/38.jpg)
© Kaizen Institute
Mistake Proofing Types
BEST:
Contact
• Contact involves physical contact between two or more things (i.e. electrical outlets
use physical shape to prevent wrong voltage appliances being plugged in; guide pins
on two molds).
![Page 39: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/39.jpg)
© Kaizen Institute
Contact Device
39April 6, 2016
An example of a contactdevice using a limit switch. In this case the switch makes contactwith a metal barb sensing it’s presence. If no contact is made the process will shut down.
![Page 40: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/40.jpg)
© Kaizen Institute
Mistake Proofing Types
2ND BEST:
Performance step
• Involve monitoring steps in a process and triggering an outcome if the step is not
performed correctly.
Fixed Value
• Involve setting specific values that trigger an outcome and having the process count up
to that trigger (i.e. a weigh counter stops a process when the weight (count) is reached).
![Page 41: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/41.jpg)
© Kaizen Institute
ISO
Design and development(ISO/TS 16949) (7.3)
Production and service provision (7.5)
Monitoring and measurement of product (8.2.4)
Poll…
(autonomation)
![Page 42: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/42.jpg)
© Kaizen Institute
Jidoka
Jidoka - autonomation (automation with a human touch)
• “Autonomation” implies “autonomous operation”, a machine’s capability to operate
without human intervention
“Jidoka” means building into a production process the capability to:
• Immediately respond to production abnormalities
• Prevent the recurrence of production abnormalities
• Separate machine work from human work
![Page 43: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/43.jpg)
© Kaizen Institute
Jidoka
43 of 115
Stop the line authority to everyone
Give machines the capability of detecting, shutting down, and signaling when
abnormalities occur
When abnormalities are detected, respond immediately, in order to find the root
causes
• Allow only one defect to occur
• Keep asking why?
• Solve the problem to prevent recurrence
Give machines the capability to independently perform simple, repetitive functions,
instead of having people do them
Approach jidoka as a continuous improvement process
![Page 44: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/44.jpg)
© Kaizen Institute
Mistake-Proofing Types
3rd BEST: Making it easy to do it right
• Colors and color-coding (i.e, computer plugs and ports, zipper type plastic bags
• Symbols (i.e., icons)
• Shapes (i.e., painting tool shapes on a pegboard
• Operator-initiated auto-detection (i.e., spell check)
• Checklists, forms, procedures, and simplified work flows
• Natural mapping*
• 5S related!!
• Natural Mapping
![Page 45: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/45.jpg)
© Kaizen Institute
Natural Mappings:
![Page 46: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/46.jpg)
© Kaizen Institute
Shadow Board
![Page 47: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/47.jpg)
© Kaizen Institute
However,
FMEA and mistake-proofing will not be used everyday
and it does not always lead us to
the root causes of problems
![Page 48: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/48.jpg)
© Kaizen Institute
Everyday problems,
supplier problems,
and
customer complaints
Detailed Picture
![Page 49: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/49.jpg)
© Kaizen Institute
Differential Analysis
Is Is Not
What
Where
When
Extent
![Page 50: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/50.jpg)
© Kaizen Institute
Root Cause and the Five Whys
page 50
Root Cause Analysis must:
• Include participation by all levels of the leadership
• Include participation of those most closely involved in the processes and systems
• Be challenged by others on whether or not the root cause was arrived at and whether the
actions will eliminate or drastically reduce the problems for good
Presentation name, date
![Page 51: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/51.jpg)
© Kaizen Institute
Oftentimes, people ask “why” a problem occurred just once - this
results in blaming a person, product design, or equipment – not
the system
We must ask “why” more. Asking “why” five times is a good
guideline, but it may take 4x or 7x ….
Root Cause and the Five Whys
![Page 52: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/52.jpg)
© Kaizen Institute
Root Cause and the Five Whys
Or, ask “why”, going down two paths:• “Why” did the problem occur? (typical)• “Why” did we not catch it?
By the time we get to the 4th or 5th why, we are looking squarely into management
practices or lack thereof
There may be multiple root causes
![Page 53: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/53.jpg)
© Kaizen Institute
How does it work?
Firefighting!Immediate Containment
Action Implemented
Problem Identified
Immediate Containment
Action Implemented
Define the Root Cause
Develop Solutions &
verify effectiveness
Solutions are applied across
company!
USUAL APPROACH
PREFERRED APPROACH
Problem Identified
Problem reoccurs!
Find someone to
blame!
![Page 54: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/54.jpg)
© Kaizen Institute
Identify Problem
Part polarity reversed on circuit board
Example #1
![Page 55: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/55.jpg)
© Kaizen Institute
Team members:
Team Leader – Terry
Inspector – Jane
Worker – Tammy
Worker - Joe
Quality Eng – Rob
Engineer – Sally
Determine Team
![Page 56: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/56.jpg)
© Kaizen Institute
Containment Action
(Process) Additional inspection added after this assembly process step to check for
reversed part defects
(Product) Last 10 lots of printed circuit boards were re-inspected to check for similar
errors
![Page 57: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/57.jpg)
© Kaizen Institute
Root Cause
Part reversed
Why?
![Page 58: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/58.jpg)
© Kaizen Institute
Root Cause
Part reversed
Worker not sure of correct part orientation
Why?
![Page 59: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/59.jpg)
© Kaizen Institute
Part is not marked properly
Root Cause
Part reversed
Worker not sure of correct part orientation
Why?
![Page 60: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/60.jpg)
© Kaizen Institute
Engineering ordered it that way from vendor
Part is not marked properly
Root Cause
Part reversed
Worker not sure of correct part orientation
Why?
![Page 61: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/61.jpg)
© Kaizen Institute
Design process didn’t account for possible manufacturing issues
Engineering ordered it that way from vendor
Part is not marked properly
Root Cause
Part reversed
Worker not sure of correct part orientation
![Page 62: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/62.jpg)
© Kaizen Institute
Corrective Action
Permanent —• Changed part to one that can only be placed in correct direction (mistake-proofed).
Found other products with similar problem and made same changes.
Preventive —• Required that any new parts selected must have orientation marks on them. Changed
the design process and quality planning checklist to reflect this.
![Page 63: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/63.jpg)
© Kaizen Institute
Corrective Action
Develop a form to supplement 5 Whys. Display form on a portable whiteboard
Now, implement mistake-Proofing as a permanent action
And, make the mistake-proofing process a mandatory part of the design process as
a preventive action
![Page 64: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/64.jpg)
© Kaizen Institute
AATT1155FFRRMM RReevv.. 1177 0055//1111//1111 TTOOPPSS WWoorrkk SShheeeett PPaaggee PPaaggee 11 ooff 11
Define Actual or Potential Problem
(Cut and past shaded box from Phase 1) Root Cause Analysis and Actions
WHY DID IT HAPPEN?
WHY?
WHY?
WHY?
WHY?
WHY WAS IT NOT CAUGHT?
WHY?
WHY?
WHY?
WHY?
ROOT CAUSES
Action Responsibility &
Due Date
Containment Actions: Process: Product: Permanent Actions: (Consider mistake-proofing (AT22) and other similar processes/products)
Containment Actions: Process: Product: Permanent Actions: (Consider mistake-proofing (AT22)and other similar processes/products)
Preventive Actions: (Changes to the System)
Preventive Actions: (Changes to the System)
![Page 65: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/65.jpg)
© Kaizen Institute
Risk Based Approach to Product Quality
Live by the spirit of the standards!
Use lean tools and the QMS to build a risk management system
Speak the language of risk management and deploy in practices to continuously
mitigate risks systematically!
![Page 66: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/66.jpg)
© Kaizen Institute
The video series:• 30 videos• 15 – 45 minutes each• Covering the entire array of lean, and it’s integration with quality. • State of the art video production
$100 coupon code: RISK040516www.360PerformanceCircle.com/Risk-Kaizen
“Enhancing and Sustaining Lean Improvements”How to Integrate Principles, Culture, and Tools
![Page 67: Risk Based Approach to Product Quality RevF.pptx · PDF fileRisk Management Tools and Techniques ... • Risk based • SWOT Analysis ... Risk Based Approach to Product Quality](https://reader031.vdocuments.us/reader031/viewer/2022020214/5a79fc5c7f8b9adf778bb69b/html5/thumbnails/67.jpg)
© Kaizen Institute
Lean and Quality Systems Integrator