risk assessment questionnaire - po ig 8.2 b2b system
TRANSCRIPT
-
8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System
1/5
[1] Will user commit to a standardized development methodology?
Yes X
No
[2] Has user been briefed and is prepared to commit to change control?
Yes X
No
[3] How commit ted is senior user management to system?
Extremely enthusiastic X
Supportive
Neutral
[4] Prior i ty for project wi thin us er area?
High X
Low
Varied more than one branch with different priority
[5] How cri t ical wi l l system be to the user area cont inuing operat ions when com pleted?
Minor impact
Significant impact
Major impact X
[6]
Number of ou tside organizat ions involved in concurrence, approvals, and other decisions
relat ing to the s ystem?
None
1 X
Greater than 1
[7]
Number of di f ferent user branches involved in concu rrence, approvals, and other decisions
relat ing to the s ystem?
1
2 X
Greater than 2
[8]
Number of user sect ions o r subbranches invo lved in concurrence, approvals, and other
decisions relat ing to the system?
1
2 X
Greater than 2
[9] Number of unions involved in the system?
None
1
Greater than 1 X
[10] Number of us er si tes/instal lat ions involved w ith the system?
1
2-10
Greater than 10 X
[11]
What is the severi ty of procedural changes/disrupt ion in user department caused by p roposed
system?
Minor
Significant
Major X[12] Does user organizat ion have to change st ructural ly for prop osed system?
Minor
Significant X
Major
[13] Stabi l i ty of system requirements?
Requirements are stable and unlikely to change
Requirements are stable but likely to change
Requirements are unstable and open to further change X
[14] Status of cu rrent system docum entat ion?
Not applicable
Complete (may need rework) X
Acceptable but incomplete
None available
Risk Assessment Questionnaire - PO IG 8.2 B2B SystemThomsett R., Third Wave Project Management
USER ENVIRONMENT
Version Page 1/5
-
8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System
2/5
[15] What percentage of exist ing system funct ions are to be accepted on a o ne-to-one basis?
0
Less than 25%
25-50%
50-100% X
[16] Avai lable prototype o r mod el?
Similar system in existence
Subfunctions exist X
Subfunctions exist across branches
Nothing done like this before
[17] Project deadlines are?
Flexible may be established in conjunction with project team
Firm established internally but missed dates may impact user functions/operations
Fixed established by specific operations, legal requirements, direction beyond organizations control X
[18] User part icipat ion?
Fully committed expert user allocated to undertake significant project work
Significant responsibilities not full-time commitment X
Some responsibilities limited to review and approvals
[19] How k nowledgeable is user representat ive in proposed appl ication area?
Understands area and involved in previous implementation X
Some experience
Limited
[20] How know ledgeable is user in informat ion systems development?
High degree of capability
Previous exposure but limited knowledge X
First exposure
[21] What are commun ications betw een user area and IS like?
Good X
Fair
Poor
[22]
Is new user-con trolled technolog y/techniqu es (e.g., monito ring equipmen t, graphic s terminals,
cad/cam, etc.) required for th e system?
No X
Yes
[23] Is the project dependent on a single user expert?
No
Yes X
[24] Is there govern ment legislat ion that the project is dependent on to m eet deadlines?No
Yes X
[25] Is the project dependent on vendors and outside con sul tants/experts to meet deadl ines?
No
Outside experts
Vendors
Vendors and outside experts X
[1] Priority of pro ject within IS is?
High X
Medium
Low
[2] How commit ted is senior IS management to system?
Enthusiastic X
Supportive
Neutral
[3] Project team size (includin g full-t ime user profes sionals?
Less than 5
5-10
Over 10 X
[4] Total est imated development t ime in person months for system?
Less than 3 months
3-20 X
Over 20 months
[5] Estimated project development time?
Less than 3 months (elapsed)
3-6 (elapsed) X
Over 6 months (elapsed)
TEAM ENVRRONMENT
Version Page 2/5
-
8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System
3/5
[6] What is general at ti tude of user area towards c omput ing?
Good understands value of IS X
Fair some reluctance
Poor anti-information system solution
[7] How kn owledg eable is user in area of IS?
High degree of capability
Previous exposure but limited knowledge X
First exposure
[8] Project Manager (PM) availabil i ty, experience and training ?
PM with successful recent experience in managing a similar project (type and size) X
PM with successful recent experience in managing either part of a similar project or other projects
PM with knowledge but little project managerial experience
Inexperienced PM
[9] Key project ski l l and s taf f ing level requirements can be met by?
Team members full-time X
Mix of full-time team members and part-time outside specialists
Part-time team members and outside specialists
[10] What proport ion of project team wi l l be brought in f rom an outside comp any?
None X
Less than 25%
Over 25%
[11] Number of team members who have worked succ essful ly together on previous projects?
One person team
All
Some X
None
[12] How k nowledgeable is IS project team in proposed appl icat ion area?
Has been involved in prior implementation efforts X
Understands application area but no implementation experience
Limited
[13] What experience does the IS project team have with the prog ramming language/s to be used?
Significant within the organization X
Significant in other organization
Little experience
[14] What experience does the IS project team have with the database system to b e used?
No database to be used
Significant within the organization X
Significant in other organization
Little experience
[15] What experience does the IS project team have with the data commu nicat ions?
Data communications not to be used
Significant within the organization X
Significant in other organization
Little experience
[16] What experience does the IS project team have with the packages to be used?
Packages not to be used
Significant within the organization X
Significant in other organization
Little experience
[17] New operat ions s ystem instal lat ion required?
No X
Yes
[18] Which of the hardware is new technology to the project team?
None or X
CPU and/or
Peripheral and/or
Telecom (e.g., remote lines)
Terminals and/or
Other (e.g., mini, micro, etc.)
[1] Proposal document f rom users/analyst?
Complete X
Acceptable but incomplete
None
[2] Expected operation al li fe of sys tem?
One-off
Short life (< 1 year operation)
On-going function X
SYSTEM COMPLEXITY
Version Page 3/5
-
8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System
4/5
[3] System performance is?
Not critical or/
Critical due to throughput/volume and/or
Critical due to space/memory and/or
Critical due to response time X
[4] Current documentat ion for exist ing comp uter systems?
Complete (may need rework)
Acceptable but incomplete
None available X
[5] What percentage of exist ing funct ions are to be replaced on a one-to-one basis?
0
Less than 25%
25-50%
50-100% X
[6] Avai lable prototype o r mod el?
Similar system in existence X
Subfunctions exist
Subfunctions exist across branches
Nothing done like this before
[7] The software wil l be?
Hardware independent
Dependent on parts of hardware X
Completely hardware dependent
[8] Addi t ional hardware resources of a type already used for project is?Not required
Required X
[9] Avai labil i ty of required addi t ional hardware resources?
Available X
Limited
None
[10]
Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical input typ es
(e.g., uniqu e input screens, record s, transaction?)
1-5
5-40
40+ X
[11]
Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical output types
(e.g., uniqu e output scr eens, report layouts?)
1-5
5-40
40+ X
[12]
Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical user v iews of
data (e.g., unique logic al f i les, DB2 tables?)
1-5
5-20
20+ X
[13]
Does the system h ave logical (user-dr iven) complexi ty as m easured by: Automated transfer of
input /output to other systems?
1-5
5-20
20+ X
[14] Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical enquiry typ es?
1-5
5-40 X40+
[15]
Amount and qual i ty of data to be transferred into the system on ini t ial load as measured by
logical user views?
1-5 X
5-20
20+
[16] Comp lexity of data element edit ing is?
Simple X
Complex
Highly complex
[17] Does data require viewing and/or update securi ty?
No X
Yes
[18] Complexi ty of algori thmic processing is?
Simple
Complex X
Highly complex
Version Page 4/5
-
8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System
5/5
[19] The sof tware developed must interface with?
Stand alone
Systems under teams control
Systems under others control
Complex systems under teams control X
Complex systems under others control
[20] The sof tware wi l l consist of?
Total outside package that meets all system requirements and/or
Precoded in-house modules written by project team members and/or
Precoded in-house modules written by other IS staff and/or X
Precoded/packaged modules written by outside vendors/sources and/or
Total outside package that meets 90% of system requirements and/or
Only modules written for this system
[21] What level language wi l l be used in the system?
Very high
High X
Medium
Low
A. User environment 232
B. Team environment60
C. System complexity 179
TOTAL PROJECT RISK 471
Notes
HIGH RISK
LOW RISK
MEDIUM RISK
MEDIUM RISK
Kowalski Consulting Sp. z o.o.
Low risk Medium risk High risk
User environment 32127 128223 224330
Team environment 32110 111190 191269
System complexity 33126 127218 219308
Total Project Risk 96363 366631 633907
Version Page 5/5