  • 8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System

    1/5

    [1] Will user commit to a standardized development methodology?

    Yes X

    No

    [2] Has user been briefed and is prepared to commit to change control?

    Yes X

    No

    [3] How commit ted is senior user management to system?

    Extremely enthusiastic X

    Supportive

    Neutral

    [4] Prior i ty for project wi thin us er area?

    High X

    Low

    Varied more than one branch with different priority

    [5] How cri t ical wi l l system be to the user area cont inuing operat ions when com pleted?

    Minor impact

    Significant impact

    Major impact X

    [6]

    Number of ou tside organizat ions involved in concurrence, approvals, and other decisions

    relat ing to the s ystem?

    None

    1 X

    Greater than 1

    [7]

    Number of di f ferent user branches involved in concu rrence, approvals, and other decisions

    relat ing to the s ystem?

    1

    2 X

    Greater than 2

    [8]

    Number of user sect ions o r subbranches invo lved in concurrence, approvals, and other

    decisions relat ing to the system?

    1

    2 X

    Greater than 2

    [9] Number of unions involved in the system?

    None

    1

    Greater than 1 X

    [10] Number of us er si tes/instal lat ions involved w ith the system?

    1

    2-10

    Greater than 10 X

    [11]

    What is the severi ty of procedural changes/disrupt ion in user department caused by p roposed

    system?

    Minor

    Significant

    Major X[12] Does user organizat ion have to change st ructural ly for prop osed system?

    Minor

    Significant X

    Major

    [13] Stabi l i ty of system requirements?

    Requirements are stable and unlikely to change

    Requirements are stable but likely to change

    Requirements are unstable and open to further change X

    [14] Status of cu rrent system docum entat ion?

    Not applicable

    Complete (may need rework) X

    Acceptable but incomplete

    None available

    Risk Assessment Questionnaire - PO IG 8.2 B2B SystemThomsett R., Third Wave Project Management

    USER ENVIRONMENT

    Version Page 1/5

  • 8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System

    2/5

    [15] What percentage of exist ing system funct ions are to be accepted on a o ne-to-one basis?

    0

    Less than 25%

    25-50%

    50-100% X

    [16] Avai lable prototype o r mod el?

    Similar system in existence

    Subfunctions exist X

    Subfunctions exist across branches

    Nothing done like this before

    [17] Project deadlines are?

    Flexible may be established in conjunction with project team

    Firm established internally but missed dates may impact user functions/operations

    Fixed established by specific operations, legal requirements, direction beyond organizations control X

    [18] User part icipat ion?

    Fully committed expert user allocated to undertake significant project work

    Significant responsibilities not full-time commitment X

    Some responsibilities limited to review and approvals

    [19] How k nowledgeable is user representat ive in proposed appl ication area?

    Understands area and involved in previous implementation X

    Some experience

    Limited

    [20] How know ledgeable is user in informat ion systems development?

    High degree of capability

    Previous exposure but limited knowledge X

    First exposure

    [21] What are commun ications betw een user area and IS like?

    Good X

    Fair

    Poor

    [22]

    Is new user-con trolled technolog y/techniqu es (e.g., monito ring equipmen t, graphic s terminals,

    cad/cam, etc.) required for th e system?

    No X

    Yes

    [23] Is the project dependent on a single user expert?

    No

    Yes X

    [24] Is there govern ment legislat ion that the project is dependent on to m eet deadlines?No

    Yes X

    [25] Is the project dependent on vendors and outside con sul tants/experts to meet deadl ines?

    No

    Outside experts

    Vendors

    Vendors and outside experts X

    [1] Priority of pro ject within IS is?

    High X

    Medium

    Low

    [2] How commit ted is senior IS management to system?

    Enthusiastic X

    Supportive

    Neutral

    [3] Project team size (includin g full-t ime user profes sionals?

    Less than 5

    5-10

    Over 10 X

    [4] Total est imated development t ime in person months for system?

    Less than 3 months

    3-20 X

    Over 20 months

    [5] Estimated project development time?

    Less than 3 months (elapsed)

    3-6 (elapsed) X

    Over 6 months (elapsed)

    TEAM ENVRRONMENT

    Version Page 2/5

  • 8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System

    3/5

    [6] What is general at ti tude of user area towards c omput ing?

    Good understands value of IS X

    Fair some reluctance

    Poor anti-information system solution

    [7] How kn owledg eable is user in area of IS?

    High degree of capability

    Previous exposure but limited knowledge X

    First exposure

    [8] Project Manager (PM) availabil i ty, experience and training ?

    PM with successful recent experience in managing a similar project (type and size) X

    PM with successful recent experience in managing either part of a similar project or other projects

    PM with knowledge but little project managerial experience

    Inexperienced PM

    [9] Key project ski l l and s taf f ing level requirements can be met by?

    Team members full-time X

    Mix of full-time team members and part-time outside specialists

    Part-time team members and outside specialists

    [10] What proport ion of project team wi l l be brought in f rom an outside comp any?

    None X

    Less than 25%

    Over 25%

    [11] Number of team members who have worked succ essful ly together on previous projects?

    One person team

    All

    Some X

    None

    [12] How k nowledgeable is IS project team in proposed appl icat ion area?

    Has been involved in prior implementation efforts X

    Understands application area but no implementation experience

    Limited

    [13] What experience does the IS project team have with the prog ramming language/s to be used?

    Significant within the organization X

    Significant in other organization

    Little experience

    [14] What experience does the IS project team have with the database system to b e used?

    No database to be used

    Significant within the organization X

    Significant in other organization

    Little experience

    [15] What experience does the IS project team have with the data commu nicat ions?

    Data communications not to be used

    Significant within the organization X

    Significant in other organization

    Little experience

    [16] What experience does the IS project team have with the packages to be used?

    Packages not to be used

    Significant within the organization X

    Significant in other organization

    Little experience

    [17] New operat ions s ystem instal lat ion required?

    No X

    Yes

    [18] Which of the hardware is new technology to the project team?

    None or X

    CPU and/or

    Peripheral and/or

    Telecom (e.g., remote lines)

    Terminals and/or

    Other (e.g., mini, micro, etc.)

    [1] Proposal document f rom users/analyst?

    Complete X

    Acceptable but incomplete

    None

    [2] Expected operation al li fe of sys tem?

    One-off

    Short life (< 1 year operation)

    On-going function X

    SYSTEM COMPLEXITY

    Version Page 3/5

  • 8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System

    4/5

    [3] System performance is?

    Not critical or/

    Critical due to throughput/volume and/or

    Critical due to space/memory and/or

    Critical due to response time X

    [4] Current documentat ion for exist ing comp uter systems?

    Complete (may need rework)

    Acceptable but incomplete

    None available X

    [5] What percentage of exist ing funct ions are to be replaced on a one-to-one basis?

    0

    Less than 25%

    25-50%

    50-100% X

    [6] Avai lable prototype o r mod el?

    Similar system in existence X

    Subfunctions exist

    Subfunctions exist across branches

    Nothing done like this before

    [7] The software wil l be?

    Hardware independent

    Dependent on parts of hardware X

    Completely hardware dependent

    [8] Addi t ional hardware resources of a type already used for project is?Not required

    Required X

    [9] Avai labil i ty of required addi t ional hardware resources?

    Available X

    Limited

    None

    [10]

    Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical input typ es

    (e.g., uniqu e input screens, record s, transaction?)

    1-5

    5-40

    40+ X

    [11]

    Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical output types

    (e.g., uniqu e output scr eens, report layouts?)

    1-5

    5-40

    40+ X

    [12]

    Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical user v iews of

    data (e.g., unique logic al f i les, DB2 tables?)

    1-5

    5-20

    20+ X

    [13]

    Does the system h ave logical (user-dr iven) complexi ty as m easured by: Automated transfer of

    input /output to other systems?

    1-5

    5-20

    20+ X

    [14] Does the system h ave logical (user-dr iven) complexi ty as m easured by: Logical enquiry typ es?

    1-5

    5-40 X40+

    [15]

    Amount and qual i ty of data to be transferred into the system on ini t ial load as measured by

    logical user views?

    1-5 X

    5-20

    20+

    [16] Comp lexity of data element edit ing is?

    Simple X

    Complex

    Highly complex

    [17] Does data require viewing and/or update securi ty?

    No X

    Yes

    [18] Complexi ty of algori thmic processing is?

    Simple

    Complex X

    Highly complex

    Version Page 4/5

  • 8/11/2019 Risk Assessment Questionnaire - PO IG 8.2 B2B System

    5/5

    [19] The sof tware developed must interface with?

    Stand alone

    Systems under teams control

    Systems under others control

    Complex systems under teams control X

    Complex systems under others control

    [20] The sof tware wi l l consist of?

    Total outside package that meets all system requirements and/or

    Precoded in-house modules written by project team members and/or

    Precoded in-house modules written by other IS staff and/or X

    Precoded/packaged modules written by outside vendors/sources and/or

    Total outside package that meets 90% of system requirements and/or

    Only modules written for this system

    [21] What level language wi l l be used in the system?

    Very high

    High X

    Medium

    Low

    A. User environment 232

    B. Team environment60

    C. System complexity 179

    TOTAL PROJECT RISK 471

    Notes

    HIGH RISK

    LOW RISK

    MEDIUM RISK

    MEDIUM RISK

    Kowalski Consulting Sp. z o.o.

    Low risk Medium risk High risk

    User environment 32127 128223 224330

    Team environment 32110 111190 191269

    System complexity 33126 127218 219308

    Total Project Risk 96363 366631 633907

    Version Page 5/5