rio conventions project
DESCRIPTION
Rio Conventions Project. 2 nd Advisory Board Meeting 11 November 2009 Sofia. Result 1.1 Training programs. Cooperation between Sofia University and CEU Developed training program package Introductory (1 day) course Core ( 10 day ) course - Academic ( two semesters ) course. - PowerPoint PPT PresentationTRANSCRIPT
Министерство на регионалното
развитие и благоустройствот
о
Глобален екологичен
фонд
Програма за развитие на ООН
Rio Conventions Project
2nd Advisory Board Meeting11 November 2009
Sofia
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.1 Training programs
• Cooperation between Sofia University and CEU
• Developed training program package
- Introductory (1 day) course
- Core (10 day) course
- Academic (two semesters) course
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.1 Training programs
Major topics of the core course
• Session 1: Intro to SD and Rio Conventions
• Session 2: Mechanisms and Instruments for GEI integration into RD and SP
• Session 3: Good Practices for GEI integration in RD and SP
• Session 4: Impact Assessments in the context of RD and SP
• Session 5: Information procurement and GIS in the context of RD and SP.
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.1 Training programs
Approval of a Master Course by the Academic Board of Sofia University on Integration of Global Environmental Issues in Regional Development and Spatial Planning
Beginning: 2.11.2009
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.2 Training courses
Introductory course – 201 participants so far
Core Course – 115 participants so far
Academic Course – pending start in Nov, 2009
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.2 Training courses
Signing of a MoU between MRDPW, MoEW and UNDP 30.08.2008
60 experts from MRDPW
40 experts from MoEW
30 experts from municipalities and DAs
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.2 Training courses
Core course: 7 groups
Participants: 115
Period: 18.09.2008 – 22.10.2009
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.3 Indicators
Assignment “Identify and select suitable indicators for monitoring the impact of “new” regional and spatial planning policies (Aug 2008 – Aug, 2009)
- Formation of an interinstitutional expert group
- Survey of relevant data sources (NSI, ministries, Eurostat, EEA, etc.)
- 7 strategic indicators selected- Developed technical passports of the
7 indicators- Developed GIS “passports” for 3 of
the indicators
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.3 Indicators
№ Indicator Code and Domain
1. Relative share of territories subject to anthropogenic impact (infrastructure, residential areas, industrial sites)
BDV05,Biodiversity
2. Share between forest, agricultural and urbanized territories
BDV09,Biodiversity
3. Green house gasses emissions (in CO2 equivalent) per capita
CLM09,Climate change
4. Expenditures for long-term assets with ecological purpose
CMN21,General
5. Expenditures for long-term assets with ecological purpose per capita
CMN22,General
6. Share of territories subject to a high erosion risk DST01, Desertification
7. Expenditures for energy effectiveness and renewable energy sources
CMN23,General
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.3 Indicators
Technical passports content• Focal area• Context• Definition• Geographical coverage• Temporal coverage• Update frequency• Sources of information• Costs• Interpretation of the indicator• Advantages and disadvantages• Integration with GIS
GIS passports content:• Hardware equipment• Basic software and additional software• GIS information layers and databases• GIS analytical tool/s • Information architecture (data inputs, data processing and outputs)• Cost estimation
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.5 Publications
Brochure“Partnerships and
Networking”
Brochure“GIS in Regional
Development”
CD“Information base of
Regional Development “
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 1.5 Publications
Brochure
“Stimulation of Public Participation in Strategic Planning”
Two trainings:
9-10 april 2009, Veliko Turnovo
23-24 april 2009, Plovdiv
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 2.1 Institutional Changes
Job Descriptions Review: 130 job descriptions и 11 directorates, Aug – Nov 2008
Recommendations:- Developed specific recommendations- Development of Information System at
MRDPW- Better inter-departamental coordination- Periodic trainings
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 2.1 Institutional Changes
Development of methodology for MRDPW assessment of own contribution
- Selected 20 projects for a total of 20.6 euro:
3 Phare projects
2 ISPA projects
15 OPRD projects
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 2.1 Institutional Changes
Interreg IV C Regions for Sustainable Change Project
Participant: MRDPW
Selected pilot in Bulgaira: Southwestern Planning Region
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Result 2.2 Project Management
Midterm evaluation of the project
Period of the working visit of the consultants team: 3-7.11.2008
Recommendations:
- Institutionalization of results- Exit Strategy- Regional Seminar
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
Budget Completion 2006-2009
Results SPENT 2006PLANNED
2007 SPENT 2007PLANNED
2008 SPENT 2008PLANNED
2009
EXPECTED DELIVERY IN
2009PLANNED
2010
EXPECTED DELIVERY IN
2010
RESULT 1 0 95410 66748.79 135826.79 97467.05 44744 57061.42 11290 24722.74
RESULT 2 7871.21 49575 50938.36 59763.38 58430.46 29575 35954.43 35858 26805.54
RESULT 3 0 0 0 0 0 20000 16819.13 43000 46180.87
TOTAL 7871 144985 117687 195590 155897 94319 109834 90148 97709
TOTAL BUDGET GEF COMPONENT 499,000
EXPECTED DELIVERY BY 31.12.2009 г.: 399,950
DIFFERENCE TO BE SPENT IN 2010 г.: 99,050
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
FORTHCOMING ACTIVITIES IN 2010
Last group from the Core Training Course
(Suggested period: Feb-March 2010)
Best practices publication on the project
Development of a pilot GIS for MRDPW
Final Project Meeting
Final Project Evaluation
Integrating Global Environmental Issues into Bulgaria’s Regional Development Process Project
THANK YOU FOR YOUR ATTENTION!
Address: Ministry of Regional Development and Public Works17-19 Kiril i Metodii str.; fl. 6; room 601ASofia 1202, BulgariaPhone/Fax: (+359 2) 940 55 75E-mail: [email protected]