DESCRIPTION
Customer Needs 1. Periodic motion 2. Walk at least 25 steps 3. Endure several trials on one charge 4. Be portable Cost of Transport (CoT)TRANSCRIPT
![Page 1: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/1.jpg)
Rimless Wheel Project
UpdateWeek 4
![Page 2: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/2.jpg)
What are we doing again? Current prototype ->• Can move down an
8 degree incline• Non-ideal
construction Our job:• Improve wheel design• Make robot autonomous
![Page 3: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/3.jpg)
Customer Needs1.Periodic motion2.Walk at least 25 steps3.Endure several trials on one
charge4.Be portable5.0.05 - 0.1 Cost of Transport
(CoT)
![Page 4: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/4.jpg)
Customer Needs, cont.6. Collect motion data
a.Angular velocityb.Angle between wheel and
frame7. Collect current/voltage data
c.Batteriesd.Actuators
![Page 5: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/5.jpg)
Specifications
![Page 6: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/6.jpg)
Risk ManagementIllness/time consuming obligations (1,3)
Effectiveness of actuation (3,3)
Lead times and Manufacturability (3,3)
Balancing weights of new components (1,3)
Material flaws (2,1) Accuracy of Sensors (2,1)
Theory -> Physical (2,3)
Technical errors (3,1)
Cost vs quality (2,3) Lag time of controls (3,1)
![Page 7: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/7.jpg)
Functional Decomposition
![Page 8: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/8.jpg)
System Block Diagram
![Page 9: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/9.jpg)
Design Ideas Outline• Frame materials • Actuation• Spring • Axle• Sensors • Batteries
![Page 10: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/10.jpg)
Design Ideas, cont.• Data storage devices • uProcs + ADC
o motor control o data acquisition
![Page 11: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/11.jpg)
Frame materials
Metals• Aluminum• Steel
Composite Materials• Fiberglass• Carbon Fiber
Frame• Plate• Truss structure
![Page 12: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/12.jpg)
CAD Drawings
![Page 13: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/13.jpg)
CAD Drawings
![Page 14: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/14.jpg)
CAD drawings
![Page 15: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/15.jpg)
Possible Invitees to SDR• Dr. Gomes• Mr. Edward Hanzlik• Mr. Leslie Moore• Dr. Slack• Dr. Sahin?
![Page 16: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/16.jpg)
Proposed Agenda
![Page 17: Rimless Wheel Project Update Week 4. What are we doing again? Current prototype -> Can move down an 8 degree incline Non-ideal construction Our job: Improve](https://reader036.vdocuments.us/reader036/viewer/2022062413/5a4d1b237f8b9ab059996120/html5/thumbnails/17.jpg)