Page 1: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

1

Method 1 onthe Shop Floor

Page 2: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

2

When should we use Method 1?

• Excellent starting point for most investigations.

• When something ‘unusual’ happens– This is called a Special Cause.

Page 3: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

3

How do we do the M1?Who Should be Involved?

• M1 Investigations are usually performed by a small group (1 to 3).

• We must include those colleagues who routinely work in the process!

Use DMAIC

Define

Measure

Analyze

Improve

Control

Page 4: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

4

Example: Bent Needles on a vial washer

What? Needles on Line 9 vial washer striking vials causing bent needles and chipped vials.

When? Dec 2007

Who? Operations, Maintenance, QA

Significance? 6902 vials rejected and potential for more in the future if problem is not resolved.

Desired State Eliminate the problem of chipped and/or broken vials, needle strikes and bent or

broken needles.

Page 5: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

5

Number of Needles Replaced Jan 2006 - Dec 2007

05

101520253035404550

1/1/2006 4/11/2006 7/20/2006 10/28/2006 2/5/2007 5/16/2007 8/24/2007 12/2/2007

Date

Nu

mb

er o

f N

eed

les

There were 202 needle replacements over the last two years. Of those, 120 (~60%) were outside of scheduled preventative maintenance replacements.

Page 6: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

6

The group identified several potential causes using brainstorming and Cause & Effect analysis.

Page 7: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

7

Potential Root Cause

Action to confirm

Carrier chain stretched. Inspect and measure chain, replace if needed.

Too much slop in carrier hole

Develop prototype, install & functional test.

Needle holes too big due to design update.

Review Part and drawing history.

Page 8: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

8

Confirmed Root Cause

Control Plan

Carrier chain stretched. Include measurement and replacement in PM.

Too much slop in carrier hole

New vial carriers implemented.

Needle holes too big due to design update.

New guide manifold implemented.

Page 9: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

9

What is a Yellow Belt?• A “Yellow Belt” is someone who has

demonstrated the use of the RFT Method 1 tools and received certification.

Who can apply for certification? • All Pfizer Colleagues!!!

Page 10: Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When

Right First TimeRight First Time

10

What are the Qualifications?

1. Complete M1 training.

2. Use the M1 tools to solve a problem or perform an investigation.