DALIA Project Doc. N°: N/A Rig Handling and Installation Procedure, CLS & CS, Total Dalia Class: 1 Phase: DE Document Type: PRO System: Discipline: WOP Revision: 01 Status: ASB Contract No: N/A Contract Type: SER Rev. Date: 6-JULY-12 Contractor document number: 101100943_REV AB Page 1 of 271 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. RIG HANDLING AND INSTALLATION PROCEDURE, CLS & CS TOTAL DALIA Rev. Status Date Revision memo Issued by Checked by Approved by 01 ASB 6-JULY-12 As Built C. Mahoney M. Meador J. Ninan 00 IFA 4-JUNE-12 Issued for Acceptance C. Mahoney M. Meador J. Ninan This document has been generated by an Electronic Document Management System. When printed it is considered as a for information only copy. The controlled copy is the screen version and it is the holder's responsibility that he/she holds the latest valid version.

Upload: carlos-gloogh

Post on 30-Dec-2015

37 views

Category:

Documents


1 download

TRANSCRIPT

  • DALIA Project Doc. N: N/A

    Rig Handling and Installation Procedure, CLS & CS, Total Dalia Class: 1 Phase: DE

    Document Type: PRO System: Discipline: WOP Revision: 01 Status: ASB

    Contract No: N/A Contract Type: SER Rev. Date: 6-JULY-12

    Contractor document number: 101100943_REV AB Page 1 of 271

    This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

    RIG HANDLING AND INSTALLATION PROCEDURE,

    CLS & CS TOTAL DALIA

    Rev. Status Date Revision memo Issued by Checked by Approved by

    01 ASB 6-JULY-12 As Built C. Mahoney M. Meador J. Ninan

    00 IFA 4-JUNE-12 Issued for Acceptance C. Mahoney M. Meador J. Ninan

    This document has been generated by an Electronic Document Management System. When printed it is considered as a for information only copy. The controlled copy is the screen version and it is the holder's responsibility that he/she holds the latest valid version.

  • DALIA Project Doc. N: N/A

    Rig Handling and Installation Procedure, CLS & CS, Total Dalia Class: 1 Phase: DE

    Document Type: PRO System: Discipline: WOP Revision: 01 Status: ASB

    Contract No: N/A Contract Type: SER Rev. Date: 6-JULY-12

    Contractor document number: 101100943_REV AB Page 2 of 271

    This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

    Table of contents

    ............................................... 3-2

    1. Rig Handling and Installation Procedure 69............

  • DALIA Project Doc. N: N/A

    Rig Handling and Installation Drawing, ENSCO DS-2, CLS & CS, Total DALIA

    Class: 2 Phase: DE

    Document Type: LAY System: Discipline: WOP Revision: 02 Status: ASB Contract No: N/A Contract Type: SER Rev. Date: 26-July-2012 Contractor document number: 101100941_REV AC Page 1 of 89

    This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

    Rig Handling and Installation Drawing, ENSCO DS-2, CLS & CS, Total Dalia

    Rev. Status Date Revision memo Issued by Checked by Approved by

    02 ASB 26-JULY-12 As Built C. Mahoney M. Meador J. Ninan

    01 AFC 14-MAY-12 Accepted for Construction C. Mahoney M. Meador J. Ninan

    00 IFA 7-MAY-10 Issued for Acceptance C. Mahoney M. Meador J. Ninan

  • DALIA Project Doc. N: N/A

    Rig Handling and Installation Drawing, ENSCO DS-2, CLS & CS, Total DALIA

    Class: 2 Phase: DE

    Document Type: LAY System: Discipline: WOP Revision: 02 Status: ASB Contract No: N/A Contract Type: SER Rev. Date: 26-July-2012 Contractor document number: 101100941_REV AC Page 2 of 89

    This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

    Table of contents

    1. Ensco DS-2 Run in Hole ................................................................................

    2. Ensco DS-2 Pull Out of Hole ........................................................................

    This document has been generated by an Electronic Document Management System. When printed it is considered as a for information only copy. The controlled copy is the screen version and it is the holder's responsibility that he/she holds the latest valid version.

    142-194

    195-269

  • 101100943 cover_no1101100943_AB_no2101100943_AB_BETWEEN2and3101093224_REV AC_no31.pdf2.pdf3.pdf4.pdf5.pdf

    101096290_REV AC_no5123

    101093609_REV AC_no6123

    101100944_REV AC_no7100978862_REV AFno81234

    Reelers, neumatic, specs, no_9101100943_AB_BETWEEN9and11101100941_REV AC_no11101100943_AB_BETWEEEN11and12101128555_REV AB_no12