Richmond Bicycle Master PlanCommunity Open House

May 14, 2014

Office of Deputy Chief Administrative Officer, Human Services900 E. Broad Street, Ste 1101 Richmond, Virginia 23219Phone: (804) 646-7141 • Email: [email protected]

Page 2: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Project Background

The Bike Master Plan is being developed by the consultant team that developed the City’s Strategic Multimodal Transportation Plan “Richmond Connects” (Michael Baker & Alta)

We needed more specific recommendations for dedicated bike infrastructure

Needed to hear from the community This will serve as the framework for future projects

as we build out a network of bikeways

Page 3: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Scope of the Bike Master Plan

Emphasis on infrastructure– Where (street or corridor)– What (type of infrastructure)– When (near, mid or long-term)

Document best practices and typical design treatments for different types of infrastructure

Prioritization of top projects based upon a variety of metrics (density, connections)

Page 4: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Draft Network Recommendations

Page 5: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Bike Lane – with parking

Page 8: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Buffered Bike Lane – with parking

Page 9: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Contraflow Bike Lane – with parking

Page 10: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Contraflow Bike Lane – without parking

Page 11: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Cycle Track (Barrier Separated Bike Lane)

Page 12: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Bike-Walk Street (Bike Boulevard)

Page 13: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Types of Bike Infrastructure

Shared-Use Paths / Greenways

Page 14: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Process for Tonight’s Open House

6 tables with maps, all are the same Each table will have a discussion facilitator We want to hear from YOU:

– What is good/bad in the recommendations?– What are key routes or corridors that have been missed?– Is the proposed facility type appropriate for the roadway in

question?– What are specific problems that we need to address (e.g.

difficult intersections, safety concerns, barriers, etc)?– Please complete a comment sheet.

Page 15: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Bell Helmets Grant

Help the Richmond Regional Ride Center win a trail building grant from Bell Helmets

We are a finalist for the East Region and need votes to win

Go online and VOTE. It only takes a minute. Really. We have a computer set up here to allow you to do

that if you’d like.

http://www.rvaridecenter.com/

Page 16: Richmond Bicycle Master Plan Community Open …...Richmond Bicycle Master Plan Community Open House May 14, 2014 Office of Deputy Chief Administrative Officer, Human Services 900 E

Thanks for Your Support and Feedback!