ribboncutting - townnews · 2016-12-28 · construction completed at expressway park in the spring...

2
Influenced by Plan Baton Rouge II, the Downtown Greenway is a 2.75 mile pedestrian and bicycling corridor that links inner city neighborhoods and expanded DDD boundaries to downtown parks, businesses, and cultural attractions utilizing the existing BREC parks, interstate infrastructure, and public right-of-ways. Parks and Greenspaces connected by the Downtown Greenway: Downtown Greenway at North Blvd. features a separated 10’ urban bicycle path and 5’ pedestrian garden path, median crossings, specialty pavement, curb ramps, seating areas, lighting, sculpture, water fountains, bicycle racks, and lush landscaping. Over 1,000 plants have been installed to create a botanical experience inspired by Manhattan’s famous “High Line.” An economic stimulant, intending to spur new investments and redevelopment in the city’s core, as well as strengthen workforce opportunities by providing an alternative transportation source. Connects to the Mississippi River Levee Trail at the recently completed Florida Riverfront Access Point, the beginning and end of the Downtown Greenway, located at the intersection of Florida Street and River Road. The Rotary Club of Baton Rouge has also secured approximately $350,000 for an interactive sculpture to be constructed at the Florida Riverfront Access Point for their centennial celebration in 2018. Feasibility Study completed in 2010 by ABMB Engineers, Inc. and Schematic Design completed in 2012 by Spackman, Mossop, & Michaels + Tipton Associates through the EPA’s Greening America’s Capitals Program. Final design and construction plans funded though a grant provided by the Capital Area Finance Authority and completed in 2016 by Design Workshop and sub-consultants; Reich Associates, Fenstermaker, Forte & Tablada, Walter Kulash, and Chris Davala. Rotolo Consultants, Inc. was awarded and constructed the greenway at North Blvd. Owned and operated by the City of Baton Rouge/Parish of East Baton Rouge in conjunction with the Recreation & Parks Commission for the Parish of East Baton Rouge (BREC) where the Downtown Greenway enters into BREC park areas. Construction completed at Expressway Park in the spring of 2015 with a partnership between the Downtown Development District/ City-Parish of East Baton Rouge & BREC. Construction has also been completed in 2015 along Myrtle Street, connecting the Lincoln Theatre to the Downtown Greenway at Expressway Park, in a partnership with the East Baton Rouge Parish Redevelopment Authority. Construction on East Blvd./TJ Jemison Blvd. and North Blvd. Town Square expected in early 2017. Approximately $3 million in grant funding acquired through the local, state, and federal sources listed below: RIBBONCUTTING - LSU Lakes - BREC City/Brooks Park - BREC Expressway Park - North Boulevard Town Square - BREC Convention Street Park - Capitol Lakes - BREC 7th Street Park - BREC Memorial Stadium - 2011 FHWA Louisiana Recreational Trails Program ($220,000 - Expressway Park) - 2011 FHWA Louisiana Recreational Trails Program ($118,000 - Myrtle Street Connector) - 2011 DOTD Transportation Enhancement Program ($1 Million - T.J Jemison & East Blvd.) - 2012 DOTD Transportation Community & System Preservation ($1.5 Million - North Boulevard Promenade) - 2012 FHWA Louisiana Recreational Trails Program ($125,000 - Phase One) - 2012 Capital Area Finance Authority ($250,000 - Planning & Construction Documents) - 2012 EPA’s Greening America’s Capitals Program (Technical, Schematic Design Assistance) - Arsenal Park - BREC Memorial Stadium - Florida Street Riverfront Access - Mississippi River Levee Trail - South Blvd. Levee Trailhead

Upload: others

Post on 02-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RIBBONCUTTING - TownNews · 2016-12-28 · Construction completed at Expressway Park in the spring of 2015 with a partnership ... Construction has also been completed in 2015 along

Influenced by Plan Baton Rouge II, the Downtown Greenway is a 2.75 mile pedestrian and bicycling corridor that links inner city neighborhoods and expanded DDD boundaries to downtown parks, businesses, and cultural attractions utilizing the existing BREC parks, interstate infrastructure, and public right-of-ways.

Parks and Greenspaces connected by the Downtown Greenway:

Downtown Greenway at North Blvd. features a separated 10’ urban bicycle path and 5’ pedestrian garden path, median crossings, specialty pavement, curb ramps, seating areas, lighting, sculpture, water fountains, bicycle racks, and lush landscaping. Over 1,000 plants have been installed to create a botanical experience inspired by Manhattan’s famous “High Line.”

An economic stimulant, intending to spur new investments and redevelopment in the city’s core, as well as strengthen workforce opportunities by providing an alternative transportation source.

Connects to the Mississippi River Levee Trail at the recently completed Florida Riverfront Access Point, the beginning and end of the Downtown Greenway, located at the intersection of Florida Street and River Road. The Rotary Club of Baton Rouge has also secured approximately $350,000 for an interactive sculpture to be constructed at the Florida Riverfront Access Point for their centennial celebration in 2018.

Feasibility Study completed in 2010 by ABMB Engineers, Inc. and Schematic Design completed in 2012 by Spackman, Mossop, & Michaels + Tipton Associates through the EPA’s Greening America’s Capitals Program. Final design and construction plans funded though a grant provided by the Capital Area Finance Authority and completed in 2016 by Design Workshop and sub-consultants; Reich Associates, Fenstermaker, Forte & Tablada, Walter Kulash, and Chris Davala. Rotolo Consultants, Inc. was awarded and constructed the greenway at North Blvd.

Owned and operated by the City of Baton Rouge/Parish of East Baton Rouge in conjunction with the Recreation & Parks Commission for the Parish of East Baton Rouge (BREC) where the Downtown Greenway enters into BREC park areas.

Construction completed at Expressway Park in the spring of 2015 with a partnership between the Downtown Development District/City-Parish of East Baton Rouge & BREC. Construction has also been completed in 2015 along Myrtle Street, connecting the Lincoln Theatre to the Downtown Greenway at Expressway Park, in a partnership with the East Baton Rouge Parish Redevelopment Authority.

Construction on East Blvd./TJ Jemison Blvd. and North Blvd. Town Square expected in early 2017.

Approximately $3 million in grant funding acquired through the local, state, and federal sources listed below:

R I B B O N C U T T I N G

- LSU Lakes

- BREC City/Brooks Park

- BREC Expressway Park

- North Boulevard Town Square

- BREC Convention Street Park

- Capitol Lakes

- BREC 7th Street Park

- BREC Memorial Stadium

- 2011 FHWA Louisiana Recreational Trails Program ($220,000 - Expressway Park)

- 2011 FHWA Louisiana Recreational Trails Program ($118,000 - Myrtle Street Connector)

- 2011 DOTD Transportation Enhancement Program ($1 Million - T.J Jemison & East Blvd.)

- 2012 DOTD Transportation Community & System Preservation ($1.5 Million - North Boulevard Promenade)

- 2012 FHWA Louisiana Recreational Trails Program ($125,000 - Phase One)

- 2012 Capital Area Finance Authority ($250,000 - Planning & Construction Documents)

- 2012 EPA’s Greening America’s Capitals Program (Technical, Schematic Design Assistance)

- Arsenal Park

- BREC Memorial Stadium

- Florida Street Riverfront Access

- Mississippi River Levee Trail

- South Blvd. Levee

Trailhead

Page 2: RIBBONCUTTING - TownNews · 2016-12-28 · Construction completed at Expressway Park in the spring of 2015 with a partnership ... Construction has also been completed in 2015 along

Legend

WASHINGTON

KAN

SAS G

EORG

IA

ALA

BAM

A

YK

CUT

NEK

EESS

EN

NETyyyy D

ALRYMPLE

MAIN ST

19T STH

5TH ST

FLORIDA ST

MYRTLE

JULIA

6TH ST

TSHT

4

TSD

R3

TERRACE

TSHT

01

KR

AP

CONVENTION ST

LOUISE

GOVERNMENT ST

EAST

BLV

D

SPANISH TOWN

FRANCE

HIGHLAND

LAUREL STM

AXI

MIL

IAN

EUROPE

SPAIN

HPES

OJT

NIAS

ALICE

GRACIE

LOUISIANA

THOM

AS H

DEL

PIT

AMERICA

RSN

OSNI

BO

REI

DDE

SAIN

T LO

UIS

MC CALOP

FUQUA

BRADDOCK

NAPOLEON

DN

ANI

DREF

TNI

AS

MAYFLOWER

FIG

PERKINS

APPLE

SELR

AH

CT

NIAS

IBER

VILL

E

MARY

HT21

PEAR

SMITH

HOWARD

BRICKYARD

PECAN

SAIN

T PH

ILIP

SWART

HCAE

P

NIC

HO

LSO

N

GRANDPRE

EDUCATION

ORANGE

HICKORY

UTAH

LAKELAND

WOL

AG

NU

B

CAPITOL ACCESS

UNIVERSITY

CAPITOL LAKE

SENNETTEMAGNOLIA

TSH

T9

10TH

INTERSTATE 10

TSHT

41

17TH

SWART

TSHT

61

TSHT

11 13TH ST

18TH ST

HOWARD

15TH ST

7TH ST

HT01

17TH ST

NORTH ST

11TH

TSHT

21

NA

POLE

ON

ROYA

L

TSHT

8

COTTON

ALICEALICE

SOUTH

NORTH BLVDNORTH BLVD

City ParkBrooks Park

Expressway Park

Memorial Stadium

Convention St. Park

Central Green

Lincoln Trail Connector

South Blvd. Connector

NBTS Phase II

River Road Connector (South)

Florida St/River RoadLevee Access

Start/Finish

LSU/ Farr Park

Desoto Park

Government Street Connector

Spanish Town Road Connector

Louisiana Ave Connector

River Road Connector (North)

East Blvd/Tj Jemison Blvd: Construction 2017

7th Street to Capitol Lakes: Grant Pending

Complete Downtown Greenway: Proposed

Trailheads

Start/Finish of GreenwayConnector: Completed

Connector: Construction 2017

Connector: Proposed

North Blvd: Dec 2016 Ribbon Cutting

Connector: Grant Pending

Downtown Greenway Phase Map