rib mountain, wisconsin...stimulus money funded repaving with wide shoulder all the way to marathon...

1

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rib Mountain, Wisconsin...Stimulus money funded repaving with wide shoulder all the way to Marathon \(2009\) wide shoulder construction \(2011\) redeveloped intersectionfor pedestrians
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Callout
shoulder and trail added (2010)
dcgmk1
Callout
51/29 Trail (2013)
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Callout
9 Mile Bike Area
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Callout
State Park added off-road Pedestrian path and bike shoulders to Park Rd (2010)
dcgmk1
Line
dcgmk1
Line
dcgmk1
Callout
Bike and Ped Bridge added to Rothschild (2007)
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Text Box
Existing Off Road Existing On Road Shoulder Suggested Bike Routes (Low Volume Roads w/o Special Accomodations)
dcgmk1
Callout
Stimulus money funded repaving with wide shoulder all the way to Marathon (2009)
dcgmk1
Callout
wide shoulder construction (2011)
dcgmk1
Callout
redeveloped intersectionfor pedestrians (2008)
dcgmk1
Line
dcgmk1
Line
dcgmk1
Text Box
Completed Rib Mountain Area Bike and Pedestrian Routes Last Update 10/27/15
dcgmk1
Callout
Added sidewalks on Rib Mtn Drive (2011)
dcgmk1
Callout
Missing sections on shoulder pavement added (2008)
dcgmk1
Line
dcgmk1
Callout
Park Road Trail added (2010)
dcgmk1
Callout
Sunrise bridge redecked and approaches widened (2014)
dcgmk1
Line
dcgmk1
Callout
Foxglove overpass replaced (2011)
dcgmk1
Callout
Pedestrian/bike crossing at Magnolia (2012)
dcgmk1
Callout
Rib Mtn Phase 1.5 added sidewalks and lights (2015)
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Callout
Lions Shelter (2015)
dcgmk1
Line
dcgmk1
Callout
Doepke Park Nature Trail (2015)
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line
dcgmk1
Line