WE BUILD TRUST Issue 20 - Q1 / 2019 RHI Newsletter Amur GPP (AGPP) Project: Visit of RHI’s President Investment of a Polypropylene Production Plant in partnership with Sonatrach and GS E&C, Turkey RHI will build an Iron and Steel Casting and Rolling Factory at JSC Uzmetkombinat, The President of Uzbekistan, Shavkat Mirziyoyev, laid the symbolic first stone. Page 2 Page 2 Page 4 Potential partnership with Indian companies Page 5 Page 3 Page 4 Celebration of 8 th Anniversary of RHI Page 7 Rönesans Holding signs an agreement with RDIF Page 8 Hassi Messaoud Crude Oil Gathering and Processing Facilities Project: Three million manhours, no LTIs Page 5 1. AWARD NEWS • RHI will build an Iron and Steel Casting and Rolling Factory at JSC Uzmetkombinat, Uzbekistan • Investment of a Polypropylene Production Plant in partnership with Sonatrach and GS E&C, Turkey 2. FIRST MILESTONE • Hassi Messaoud Crude Oil Gathering and Processing Facilities Project: substation & control building milestone completed 3. NEW FROM THE SITES • Amur GPP (AGPP) Project: Visit of RHI’s President • Gas-to-Gasoline (GTG) Plant: OHS-E Training Certificates presented to our Indian and Filipino team members • BOTAŞ Silivri, Kuzey Marmara Underground Gas Storage Expansion (III Phase) Project: Drillig activities 4. EVENTS • Potential partnership with Indian companies 5. QHSE – NO COMPROMISE • Hassi Messaoud Crude Oil Gathering and Processing Facilities Project: Three million manhours, no LTIs • RHI minimizes its environmental impact 6. SOCIAL LIFE • March 8 International Women’s Day celebrations • Basketball tournament was organized on AGPP Project Site • Celebration of 8 th Anniversary of RHI 7. RÖNESANS HOLDING NEWS • RC Construction one of “Turkey’s Employment Leaders” • Rönesans Holding signs an agreement with RDIF for joint projects • Foundations of Malatya Erman Ilıcak Science High School Laid Gas-to-Gasoline (GTG) Plant: OHS-E Training Certificates presented BOTAŞ Silivri, Kuzey Marmara Underground Gas Storage Expansion (III Phase) Project: Drillig activities

Upload: others

Post on 12-Jun-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

WE BUILD TRUSTIssue 20 - Q1 / 2019RHI Newsletter

Amur GPP (AGPP) Project: Visit of RHI’s President

Investment of a Polypropylene Production Plant in partnership with Sonatrach and GS E&C, Turkey

RHI will build an Iron and Steel Casting and Rolling Factory at JSC Uzmetkombinat, The President of Uzbekistan, Shavkat Mirziyoyev, laid the symbolic first stone.

Page 2

Page 2

Page 4

Potential partnership with Indian companies

Page 5Page 3

Page 4

Celebration of 8th Anniversary of RHI

Page 7

Rönesans Holding signs an agreement with RDIF

Page 8

Hassi Messaoud Crude Oil Gathering and Processing Facilities Project: Three million manhours, no LTIs

Page 5

1. AWARD NEWS• RHI will build an Iron and Steel Casting and Rolling Factory at JSC Uzmetkombinat, Uzbekistan• Investment of a Polypropylene Production Plant in partnership with Sonatrach and GS E&C, Turkey

2. FIRST MILESTONE• Hassi Messaoud Crude Oil Gathering and Processing Facilities Project: substation & control building milestone completed

3. NEW FROM THE SITES• Amur GPP (AGPP) Project: Visit of RHI’s President• Gas-to-Gasoline (GTG) Plant: OHS-E Training Certificates presented to our Indian and Filipino team members• BOTAŞ Silivri, Kuzey Marmara Underground Gas Storage Expansion (III Phase) Project: Drillig activities

4. EVENTS• Potential partnership with Indian companies

5. QHSE – NO COMPROMISE• Hassi Messaoud Crude Oil Gathering and Processing Facilities Project: Three million manhours, no LTIs• RHI minimizes its environmental impact

6. SOCIAL LIFE• March 8 International Women’s Day celebrations • Basketball tournament was organized on AGPP Project Site • Celebration of 8th Anniversary of RHI

7. RÖNESANS HOLDING NEWS• RC Construction one of “Turkey’s Employment Leaders”• Rönesans Holding signs an agreement with RDIF for joint projects• Foundations of Malatya Erman Ilıcak Science High School Laid

Gas-to-Gasoline (GTG) Plant: OHS-E Training Certificates presented

BOTAŞ Silivri, Kuzey Marmara Underground Gas Storage Expansion (III Phase) Project: Drillig activities

Page 2: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

Issue 20 - Q1 / 2019RHI NEWSLETTER

2

Award News

RHI is the EPCM contractor on a project for the construction of an Iron and Steel Casting and Rolling Factory at the Uzbek Metallurgical Plant in Bekabad. On December 25, 2018, the President of the Republic of Uzbekistan signed a decree which approved the implementation of this investment project. The plant’s own funds, and loans from the Russian Gazprombank and Credit Suisse of Switzerland, will be directed to the implementation of the project.

The equipment for the project will be supplied by the Italian company, Danieli.

Under the terms of construction, industrial production will have a capacity of one million tons of steel sheets per year, with thicknesses of 2–12 millimeters. The construction period is: 2018-2020.

Rönesans Holding, which is the management company of the Ceyhan Petrochemical Industrial Zone in partnership with the Dutch company, Port of Rotterdam, will play a key role in attracting international investors who will build petrochemical plants in the industrial zone.

The first investment of the Ceyhan Petrochemical Industrial Zone will be a Polypropylene Production Plant which will be launched by a partnership between Rönesans Holding, Algeria’s national energy company Sonatrach, and the South Korean company GS E&C.

RHI will undertake the “C” part of the EPC project; GS E&C will carry out E & P. The plant, which is projected to be completed in 2023, will boast an annual production capacity of 450,000 tons. With a strategic location close to the Yumurtalık Free Zone, which is home to oil and gas pipelines, natural gas conversion and thermal power plants of BOTAŞ, the Ceyhan Petrochemical Industrial Zone will also play a prominent role in exports, thanks to its ease of access to Mersin and Iskenderun ports.

RHI WILL BUILD AN IRON AND STEEL CASTING AND ROLLING FACTORY AT JSC UZMETKOMBINAT, UZBEKISTAN

INVESTMENT OF A POLYPROPYLENE PRODUCTION PLANT IN PARTNERSHIP WITH SONATRACH AND GS E&C, TURKEY

The President of Uzbekistan, Shavkat Mirziyoyev, laid the symbolic first stone, thereby making a start to the construction of the casting-rolling complex.

The introductory meeting for the Ceyhan Petrochemical Industrial Zone, which is projected to become Turkey’s global petrochemical hub, was held in Adana on March 24, 2019.

Construction of a Polypropylene production plant in Turkey will be realized by partners RHI and GS E&C

Page 3: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

Issue 20 - Q1 / 2019RHI NEWSLETTER

3

First Milestone

HASSI MESSAOUD CRUDE OIL GATHERING AND PROCESSING FACILITIES PROJECT: SUBSTATION & CONTROL BUILDING MILESTONE COMPLETEDAs of March 31, 2019 the “Ready for Equipment Installation” milestone for the Substation & Control Building was successfully completed for the Hassi Messaoud Crude Oil Gathering and Processing Facilities Project. RHI is responsible for building works of this crude oil separation plant under EPC Contractor JGC (JALG) and the client, Sonatrach.

We have received a letter of gratitude from JGC (JALG) for our continued efforts. This great achievement would not have been possible without the devotion and hard work of our team. The project is planned to be finished early in 2020.

New From the Sites

AMUR GPP (AGPP) PROJECT: VISIT OF RHI’S PRESIDENTRHI’s President, Alptekin Tizer, visited the Amur GPP Project located in the Amur region of Russia.

Since 2014, when RHI’s HSE Committee was established and Mr. Tizer became its Head, our company has followed the principle that QHSE performance is the most critical in the execution of projects and to corporate management.

During the visit, he firstly held a meeting with the HSE site management, and then received information about the status of the plant’s construction.

Ahmet Karakaya-Project Director, Alptekin Tizer-RHI’s President, Mustafa Kemal Özakay-President, Russia/CIS, Gökhan Yilmaz-Project Manager

Page 4: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

4

Issue 20 - Q1 / 2019RHI NEWSLETTER

New From the Sites

RAO (RHI-RET Adi Ortaklığı) signed a contract with BOTAS for Kuzey Marmara Underground Storage (UGS) Project Phase-III Project at the beginning of 2018. The project covers drilling of 18 UGS wells in two platforms (DP1 & DP2), drilling two appraisal wells, plugging & abandoning of existing five wells in offshore drilling operations as well as decommissioning of existing platform and old pipe line. Moreover, designing, manufacturing and installation of 2 sets of jackets and topsides, laying 28” pipelines from platform to shore line is rest of offshore operations. On shore constructing New Surface Plant (NSP), laying and connecting land lines of offshore pipeline both to NSP and existing facility.

As per work schedule; the first appraisal well KM- 31 was spudded on February, 4th, 2019. The Jackup GSP SATURN is being utilized in the Project. Drilling services are supplied by SCHLUMBERGER. Drilling activities in KM-31 Well were performed, completed and abandoned according to approved Drilling Program under supervision of RHI Drilling Team without LTA on April, 13th, 2019. GSP SATURN has jack down and moved to the second appraisal well, KM-32. The drilling platform has been positioned, performed pre-load test and raised to drilling position. The rig up is ongoing. Possible Spud Date for KM-32 well is on 19.04.2019.

Everything required for drilling (both personnel and equipment) is located in a port and stocking area which is called “Shorebase”, managed by RHI. Personnel, water, diesel, cement & its additives, drilling fluid chemicals, service tools, drilling tubulars (Drill Collar, Drill Pipe), drilling bits, wellhead, Blowout Preventers (BOP) are stored in stocking area and they are loaded to Supply Boat to be transported to Drilling Unit when needed. Supply Boat sails to Drilling Units and loaded materials are transferred to platform by help of rig winches; unnecessary and/or previous sections’ materials are back loaded to Supply Boat and transported to and offloaded at port. Those materials

are moved to Stocking area; cleaned, maintained and stored for next operation. The Shorebase activity includes waste management. Garbages, drilling cuttings, dump drilling fluid and emptied chemical packages are sent to Shorebase after segregation of wastes according to MARPOL regulations. RHI teams have been working in shifts 24/7.

Following completion of KM-32 well operations, plugging & abandoning of existing five wells on Existing Platform will be performed and then, the existing platform will be decommissioned. DP1 & DP2 jackets and Top Sides will be manufactured on shore in order. DP1 and DP2 jackets will be completed first with an adequate gap in between due to installation periods. After installing and grouting jackets; GSP SATURN will be positioned on DP1 platform and start to drill 9 of UGS wells over the jacket. When the DP2 is ready and installed; the second drilling platform GSP JUPITER will be invited to the project to drill the remaining 9 UGS wells. In this stage; service equipment and personnel will be doubled; Shorebase activities will reach to peak level. Drilling units will temporarily stop to allow installing top sides on top of jackets. Both drilling units will continue and complete their drilling campaigns. Then, Drilling unit will be released and drilling part of the Project will completed.

The first Natural Gas to Gasoline (GTG) production plant project in the world of its scale is about to be completed in the Akhal region of Turkmenistan. On the project, where training is given a high priority, OHS-E training certificates were presented by the OHS-E Team to our Indian and Filipino team members who had successfully completed their work, before they returned to their home countries.

There is very little time left before the GTG plant begins production.

BOTAŞ, KUZEY MARMARA NATURAL GAS STORAGE EXPANSION (III PHASE) PROJECT: DRILLING ACTIVITIES

GAS-TO-GASOLINE (GTG) PLANT: OHS-E TRAINING CERTIFICATES PRESENTED TO OUR INDIAN AND FILIPINO TEAM MEMBERS

Page 5: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

Issue 20 - Q1 / 2019RHI NEWSLETTER

5

Events

QHSE – No Compromise

On March 17–20, 2019, RHI Vice President N. Celal Toroğlu visited India, where he had a number of meetings with executives of the companies regarding the following. L&T - SBL Company The detailed status was reviewed of the Zerger Natural Gas Power Plant, located in the Tsarcev district of Lebab province in Turkmenistan.

Zerger Project’s Engineering & Procurement stage is ongoing with an increased pace in BOP area. L&T’s progress as of end of March-19 in delivering engineering drawings is 10,50%, which is mostly in-line with baseline schedule.

L&T Hydrocarbon Engineering GroupMeeting with Vice President & Head Construction Services Sharad Kumar and General Manager & Head Estimation & Proposals Satheesh M. Pillai was held.

Algeria and global partnerships were discussed.

In April 2019, the Hassi Messaoud Crude Oil Gathering and Processing Facilities Project in Algeria passed a milestone of 3,000,000 man-hours without any lost time injuries (LTIs).

RHI is proud of being a part of this achivment.

The EPC work was awarded to RHI by EPC contractor JGC (JALG) in 2018. The capacity of the finished facilities will be 40,000 bbl/day.

The purpose of recycling is to prevent unnecessary use of resources and to reduce the amount of waste via waste collection at source, separately.

Recycling and reuse of materials such as iron, steel, copper, lead, paper, plastic, rubber, glass, and electronic wastes prevents the depletion of natural resources.

POTENTIAL PARTNERSHIP WITH INDIAN COMPANIES

HASSI MESSAOUD CRUDE OIL GATHERING AND PROCESSING FACILITIES PROJECT: THREE MILLION MANHOURS, NO LTIs

RHI MINIMIZES ITS ENVIRONMENTAL IMPACT

Reference Value

One ton of recycled office paper saves 17 trees, 4.100 Kwh of energy, 1.431 L of oil.

One ton of recycled plastic saves 5.774 Kwh of energy, 2.591,7 L of oil. Reference: lbre.stanford.edu

DETAILS

Sandip Chakraborty (Head, Business Development), K M Subramanian (Chief Executive), N. Celal Toroğlu (Vice President), Anjan De (Chief Operating Officer), Sandeep Kohli (Sr. Deputy General Manager)

In 2018

As Renaissance Heavy Industries

We’ve saved 9.175 trees,

2.212.901 kWh energy and 772.356 L oil

by recycling of 540 tons waste paper.

We’ve saved 2.303.849 kWh energy and 1.034.099 L oil

by recycling of 399 tons waste plastic.

Page 6: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

Issue 20 - Q1 / 2019RHI NEWSLETTER

6

Social Life

MARCH 8 INTERNATIONAL WOMEN’S DAY CELEBRATIONS Our female colleagues celebrated 8 March International Women’s Day with events held in İstanbul RHI Central Office, RHI Moscow Office. We also received the photos from our Botaş project site, Silivri, Turkey. Representing our top level managers in the celebrations of their female colleagues, RHI Russia/CIS President Mustafa Kemal Özakay, RHI Turkey Vice President Celal Toroğlu and COO Mustafa Karakuş extended their congratulations.

We wholeheartedly congratulate the beautiful, hard-working and successful RHI Women’s team once again!

RHI Istanbul Office

RHI Istanbul Office

RH Silivri Kuzey Marmara Underground Gas Storage Expansion (III Phase) Plantm Site

RH Silivri Kuzey Marmara Underground Gas Storage Expansion (III Phase) Plant Site

RHI Istanbul Office

RHI Istanbul Office

RHI Moscow Office

Page 7: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

7

Issue 20 - Q1 / 2019RHI NEWSLETTER

Social LifeBASKETBALL TOURNAMENT WAS ORGANIZED ON AGPP PROJECT SITE Under the sponsorship of Renservis during two months the basketball tournament was organized by the Administrative affairs department on the Gazprom AGPP Project site that we have undertaken to build.

The matches were played after the end of the evening shifts and at the weekends, in the sports hall in Svabodniy city. Mikhail Kockarov from the Russian Basketball Federation refereed these matches.

Eight teams competed in two groups. The team calling itself the Amur Tigers became the champion in the final match.

CELEBRATION OF 8TH ANNIVERSARY OF RHI RHI, which was founded on April 1, 2011, turned eight this year.

RHI Headquarters Office personnel celebrated the 8th anniversary of RHI with a workshop activity called “what you sow is what you reap”. This event, which aimed to boost the team spirit of all of us, showed us that we can overcome all challenges only when united.

Cooking started after the congratulatory messages of RHI Deputy Head N. Celal Toroğlu, CCO Rüstem Şafak, and General Director Onur Sert.

Our colleagues, who were selected by the drawing of lots, undertook the preparation of İçli meatballs, Çiğ meatballs, Gavurdağı salad, kebap and piyaz.

The making of these dishes was followed by their tasting, in company and with pleasant conversation.

RHI Workshop, Çiğ Meatballs (Çiğ Köfte) Team

RHI Workshop, Kebap Team

RHI Workshop, Kebap Team

Page 8: RHI Newsletter€¦ · RHI Newsletter Issue 20 - Q1 / 2019 Amur GPP (AGPP) Project: Visit of RHI’s President ... Sonatrach. We have received a letter of gratitude from JGC (JALG)

Issue 20 - Q1 / 2019RHI NEWSLETTER

8“Renaissance” is the registered brand name of Rönesans Holding.

“Renaissance Heavy Industries” and “RHI” are registered brand names of Rönesans Endüstri Tesisleri İnşaat San. ve Tic. A.Ş.

RC Construction (in Turkish; RC İnşaat), which is the construction branch of Rönesans Holding, was selected from among 10 companies that provide the highest number of employees at “Turkey’s Employment Leaders” awards ceremony, organized by Capital and Ekonomist magazines.

We have 75,118 employees in 28 countries; 30,000 of them are in Turkey.

N. Celal Toroğlu, RHI’s Vice President, received this honorable award.

The Russian Direct Investment Fund (RDIF), the sovereign wealth fund of the Russian Federation, and Ronesans Holding have reached an agreement to implement a joint project to build 15 medical units at Russian universities in various regions.

Through this project, we will bring to Russia Rönesans’s rich experience in the Turkish healthcare sector, medical construction and healthcare facility management.

Another contribution to education has been made by Rönesans Education Foundation: the foundations of the Malatya Erman Ilıcak Science High School have been laid.

The foundation-laying ceremony of Malatya Erman Ilıcak Science High School was hosted by the Chairman of Rönesans Holding, Dr. Erman Ilıcak, with the participation of the National Minister of Education, Ziya Selçuk, Malatya Governor Aydın Baruş, Malatya Mayor Hacı Uğur Polat, member of Turkish Republic Education-Training Board Selçuk Pehlivanoğlu, and Malatya Provincial Director of Education Ali Tatlı.

RC CONSTRUCTION ONE OF “TURKEY’S EMPLOYMENT LEADERS”

RÖNESANS HOLDING SIGNS AN AGREEMENT WITH RDIF FOR JOINT PROJECTS

FOUNDATIONS OF MALATYA ERMAN ILICAK SCIENCE HIGH SCHOOL LAID

Rönesans Holding News