WE BUILD TRUST Issue 15 - Q4 / 2017 RHI Newsletter Installation of Cold Box Riser Piping completed at GTG Project First product at Norilsk Bystrinsky Nickel Bystrinsky GOK TouatGaz Central Processing Facility Project YAMAL LNG started production and shipping of LNG Page 3 Partial handovers started at TACE Page 4 Page 2 Page 6 Page 3 Page 6 RHI’s President Alptekin Tizer received the ASME certificate Page 5 YAMAL LNG: Training on rescue from confined spaces containing gas, and in first aid Page 6 1. AWARD NEWS • TouatGaz Central Processing Facility Project, Algeria • Hassi R’mel SBC-N Project, Algeria 2. COMPLETED POJECTS • YAMAL LNG started production and shipping of LNG; first stage completed • First product at Norilsk Bystrinsky Nickel Bystrinsky GOK 3. NEW COLLABORATIONS • Strategic agreement with OUTOTEC 4. FIRST COMMISSIONING WORKS • Partial handovers started at TACE 5. GEOGRAPHICAL EXPANSION Hungary: Opening of RHI’s office in Budapest 6. QHSE-NO COMPROMISE • RHI’s President Alptekin Tizer received the ASME certificate 7. NEWS FROM SITES GTG Plant: • Training on safe transfer of loads in lifting operations • Installation of Cold Box Riser Piping completed YAMAL LNG Plant: Training on rescue from confined spaces containing gas, and in first aid Sibur ZapSib-2 Ethylene Plant: RHI’s President Alptekin Tizer visited the site 8 SOCIAL LIFE • 1 Special Night Party (1 Başka Gece) • Garage New Year Party • RHI Sitcom – The 3D Part Competed • RHI Participated in 39th Cross-Continental Istanbul Marathon 9. RÖNESANS HOLDING NEWS • Renaissance Construction is ranked 84th in Forbes magazine • İkitelli City Hospital PPP project is awarded “PPP Deal of the Year” in Europe 10. ANNUAL EVALUATION MEETING • New Year Message from The Board Page 7 1 Special Night Party (1 Başka Gece) RHI’s President visited Sibur ZapSib-2 Ethylene Cracker Unit (ECU) Plant

Upload: others

Post on 27-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

WE BUILD TRUSTIssue 15 - Q4 / 2017RHI Newsletter

Installation of Cold Box Riser Piping completed at GTG Project

First product at Norilsk Bystrinsky Nickel Bystrinsky GOK

TouatGaz Central Processing Facility Project

YAMAL LNG started production and shipping of LNG

Page 3

Partial handovers started at TACE

Page 4

Page 2

Page 6Page 3 Page 6

RHI’s President Alptekin Tizer received the ASME certificate

Page 5

YAMAL LNG: Training on rescue from confined spaces containing gas, and in first aid

Page 6

1. AWARD NEWS• TouatGaz Central Processing Facility Project, Algeria• Hassi R’mel SBC-N Project, Algeria

2. COMPLETED POJECTS• YAMAL LNG started production and shipping of LNG; first stage completed• First product at Norilsk Bystrinsky Nickel Bystrinsky GOK

3. NEW COLLABORATIONS• Strategic agreement with OUTOTEC

4. FIRST COMMISSIONING WORKS• Partial handovers started at TACE

5. GEOGRAPHICAL EXPANSION• Hungary: Opening of RHI’s office in Budapest

6. QHSE-NO COMPROMISE• RHI’s President Alptekin Tizer received the ASME certificate

7. NEWS FROM SITES• GTG Plant: • Training on safe transfer of loads in lifting operations• Installation of Cold Box Riser Piping completed• YAMAL LNG Plant: Training on rescue from confined spaces containing gas, and in first aid• Sibur ZapSib-2 Ethylene Plant: RHI’s President Alptekin Tizer visited the site

8 SOCIAL LIFE• 1 Special Night Party (1 Başka Gece) • Garage New Year Party• RHI Sitcom – The 3D Part Competed• RHI Participated in 39th Cross-Continental Istanbul Marathon

9. RÖNESANS HOLDING NEWS• Renaissance Construction is ranked 84th in Forbes magazine• İkitelli City Hospital PPP project is awarded “PPP Deal of the Year” in Europe

10. ANNUAL EVALUATION MEETING• New Year Message from The Board

Page 7

1 Special Night Party (1 Başka Gece)

RHI’s President visited Sibur ZapSib-2 Ethylene Cracker Unit (ECU) Plant

Page 2: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

Issue 15 - Q4 / 2017RHI NEWSLETTER

2

Award News

TOUATGAZ CENTRAL PROCESSING FACILITY PROJECT, ALGERIA

EXTANSION OF THE BOOSTING COMPRESSION FACILITIES OF HASSI R’MEL PROJECT, ALGERIA

Following its recent introduction into the country and establishment of office premises, RHI is happy to announce that it has been awarded a second contract in Algeria.

The contract for the Steel, Mechanical Equipment, Piping, Electrical and Insulation assembly work for the TouatGaz Main Process Plant in the Adrar region (an investment by Sonatrach, the petroleum and natural gas company of Algeria, together with Engie E&P of France) has been awarded to RHI Algeria by the main contractor, Tecnicas Reunidas.

The contract for the Steel, Mechanical Equipment, Piping, Painting, Fire Protection, and Insulation installation works of the Hassi R’mel Boosting Phase-3 Project in Hassi R’mel city (an investment by Sonatrach, the petroleum and natural gas company of Algeria), has been awarded to RHI by the main contractor, JGC (JALG, Algeria).

PROJECT HIGHLIGHTS:Location: Adrar, AlgeriaClient: TouatGaz (Sonatrach and Engie E&P) EPC Contractor: Tecnicas ReunidasCapacity: 12.9 MMSCMD gas + 1,900 BPD condensateTerm of Contract: 2017–2018 Contract Type: Lump Sum and Unit Rate RHI Role: General Contractor

RHI is pleased to announce its second project award in Algeria, following our recent entry to the country and establishment of an office.

RHI has been awarded a third contract in Algeria.

RENAISSANCE HEAVY INDUSTRIES SPAVilla No:1, Rue Doudou Mokhtar, Ben Aknoun, Algiers, Algeria

ALGERIA OFFICE ADDRESS

From the left: Primitovo L. Projemo Jr.-Sr Subcontract Engineer, Shunichi Nishizawa-Construction Manager, N. Celal Toroğlu-General Manager, Chan Boon-Hoe-Contract Manager, Süleyman Turan-Deputy General Manager, Gökçe Bakioğlu-Contract Supervisor, Yohei Kashiba-Engineer

Page 3: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

3

Issue 15 - Q4 / 2017RHI NEWSLETTER

Completed Projects

YAMAL LNG STARTED PRODUCTION AND SHIPPING OF LNG, 1st STAGE COMPLETED

FIRST PRODUCT AT NORISLK NICKEL BYSTRINSKY GOK

RF President Vladimir Putin launched the loading and shipping of the first gas tanker at the Yamal LNG plant on 8th December, 2017. At the official ceremony and at the President’s command, fuel pumping began into the tanks of the Christophe de Margerie.

At the ceremony RHI was represented by the President of RHI, Alptekin Tizer, the President of Renaissance Russia Holding,Avni Akvardar and the General Director of RHI in Russia and Senior Vice President, Mustafa Özakay.

In December 2017, the first heavy density product was received at the shaking tables at Bystrinsky GOK (Bystrinsky mining and processing plant). The hot commissioning operations have begun and will continue for several months, with full-scale operation expected to start by mid-2018 and design capacity to be reached by the end of 2019.

OAO Yamal LNG (“Yamal LNG”) was granted State permission to commission the main technological facilities of the first stage of the LNG plant with an annual capacity of 16.5 M tons , including the first liquefaction train, 58 gas wells, and the respective infrastructure.

From the left: Alptekin Tizer-RHI President, Avni Akvardar-Renaissance Russia Holding President, Hüseyin Özcan-REGA Executive Board Member, Gökhan Yılmaz-Project Manager, Cenk Gözek-Construction Manager

RHI implemented the first stage of the LNG Plant in partnership with GAMA Endustri Tesisleri Imalat ve Montaj A.Ş. (JV REGA). JV REGA has completed the construction of modules that amount to nearly half of all construction.

Page 4: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

4

Issue 15 - Q4 / 2017RHI NEWSLETTER

New Collaborations

STRATEGIC AGREEMENT WITH OUTOTECRHI and Outotec have signed an agreement for strategic collaboration in selected markets and technologies, in cases where both companies can find a strategic fit that will be transformed into real value-added solutions for our clients.

PARTIAL HANDOVERS STARTED AT TACEFirts Commisioning Works

The TACE Turkmenistan Ethane Cracker HDPE/PP project, the construction works for which were initiated in September 2015, has reached its final phases. Although the planned date of completion for the project is February 2018, partial handover of the units to the client, Hyundai, has been initiated before the expiry of the contract term. The TACE Project comprises four main units, as follows.

1. Seawater Intake Structure (SWI)Physically completed. The structure was handed over in June 2017, and the provisional acceptance procedure was completed in September 2017.

2. Gas Separation Unit (GSU)3. High Density Polyethylene (HDPE)4. Ethane Cracker Unit (ECU)All three units are physically completed. Commissioning started in December 2017 and the provisional acceptance procedure will be executed in February 2018.

High Density Polyethylene (HDPE)

High Density Polyethylene (HDPE) Gas Seperation Unit (GSU)

Gas Seperation Unit (GSU)

Outotec is a global leader in minerals and metals processing technology, having delivered solutions in more than 80 countries.

The company designs and delivers optimized solutions for minerals and metals processing, water treatment, and waste-to-energy plants. Outotec’s HQ is in Finland, and the company has more than 4,000+ employees working in 30 countries.

ABOUT OUTOTEC

Page 5: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

Issue 15 - Q4 / 2017RHI NEWSLETTER

5

QHSE-No Compromise

RHI’S PRESIDENT ALPTEKIN TIZER RECEIVED THE ASME CERTIFICATE

The ASME Mark is accepted and relied upon by businesses and regulators in more than 100 countries.

RHI has been certified by ASME for the design, manufacture, and certification of components according to ASME Code Section-I (Power Boilers) and Section-VIII Div.1 and Div.2 (Pressure Vessels).

• Section I: Power Boilers (S-Designator) • Section VIII Div.1: Pressure Vessels (U-Designator) • Section VIII Div.2: Pressure Vessels – Alternative Rules for Pressure Vessels (U2-Designator)• Assembly of power boilers at field sites (A-Stamp)• Including repairs and alterations according to NBIC (R-Stamp)

ASME Certification is the clearest way to tell our clients, customers, supply chain, industry, and regulators that RHI is committed to quality. Even if a project we are working on does not stipulate ASME standards, the certification proves that RHI implements its quality management system and manages industrial technical aspects in line with ASME requirements.

The ASME Boiler & Pressure Vessel Code (BPVC) Certification Program conforms to the rules governing the design, fabrication, assembly, and inspection of boiler and pressure vessel components.

From the left: Rıfat Pergel-Authorized Inspector Supervisor, Alptekin Tizer-RHI President

Geographical Expansion

RHI is in the process of establishing a new office in Budapest in Hungary, in line with its strategy to pursue new territories.

RHI hopes to support Hungary in meeting its promising prospects, especially in the hydrocarbons and power sectors.

HUNGARY: OPENING OF RHI’S OFFICE IN BUDAPEST

Page 6: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

Issue 15 - Q4 / 2017RHI NEWSLETTER

6

A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe assembly activities currently in progress at the Gas-to-Gasoline (GTG) Project. In particular, the training process covers planning of the load lifting operations between the spools, at the pipe bridges and at areas where assembly is challenging due to structural difficulties, choosing accurate lifting apparatus, and safe transfer of the load from the hook of the crane to the structure where it will be assembled by using a hoist.

Training on rescue from confined spaces containing gas and first aid training has been carried out at the construction site of the YAMAL LNG Project. The confined space training was been supported with first aid training and training in rescue from heights, in order to improve the effectiveness of the emergency rescue team in emergencies.

On September 2017, 45 meters of 72-inch diameter stainless steel Cold Box Riser pipe spool, weighing 32 tons, was assembled in the Air Separation Unit (ASU) area of the Gas-to-Gasoline (GTG) Project currently under construction by RHI in Ahal Province, Turkmenistan.

During the assembly process, heavy lifting procedures were implemented due to the weight and dimensions of the spool. It was lifted to a height of 100 meters using 300-ton crawler crane.

Alptekin Tizer, the President of RHI, and the executive team paid a visit to the construction site of Sibur ZapSib-2 Ethylene Cracker Unit (ECU) in Tobolsk, Russia. It is one of the most remarkableand challenging projects planned for construction in 2019, and current progressed is at more than 30 percent completion. Details of ZapSib-2 Project: The ethylene units will receive and use ethane, propane, and n-butane as raw materials. The plant will produce 1.5 million tons of ethylene, 500,000 tons of propylene and 100,000 tons of BBF per year. These products will help to meet the demands of the plastics manufacturing industry.

GTG: TRAINING ON SAFE TRANSFER OF LOADS IN LIFTING OPERATIONS

YAMAL LNG: TRAINING ON RESCUE FROM CONFINED SPACES CONTAINING GAS AND FIRST AID

INSTALLATION of COLD BOX RISER PIPING COMPLETED AT GTG PROJECT

ALPTEKIN TIZER VISITED SIBUR ZAPSIB-2 ETHYLENE CRACKER UNIT (ECU)

News From Sites

Page 7: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

7

Issue 15 - Q4 / 2017RHI NEWSLETTER

RHI SITCOM - THE 3D PART COMPETED

1 SPECIAL NIGHT PARTY (1 BAŞKA GECE)

GARAGE NEW YEAR PARTY

Social Life

On October, 2017, Friday, RHI office employees gathered at Ortaköy Feriye restaurant.

The event, called 1 Special Night Party (1 Başka Gece), kicked off from Üsküdar with a mini-Bosporus our accompanied by entertaining traditional Turkish music. A photo-shoot was organized when the boat docked at Feriye, in order for attendees to have pleasant mementoes of this event.

Rönesans Holding employees celebrated 2018 New Year a little early, at a regular new year party which was held on 15 December 2017.

Started in 2016, the shooting of the RHI sitcom series continues. The 3D part of the series, entitled “Rise of Machines,” has been completed and presented for viewing to all of RHI’s employees

RHI PARTICIPATION IN 39th CROSS- CONTINENTAL ISTANBUL MARATHONIn November 2017, RHI joined the tens of thousands of runners who came together in Istanbul to take part in the Vodafone 39th Istanbul Marathon, which was first held in Turkey in 1979. The world’s only cross-continental race was held for the future of the children this year.

RHI’s General Manager, N. Celal Toroğlu, participated in the marathon with his wife and covered a distance of 10km, together with other members of the RHI family.

Page 8: RHI Newsletter...RHI NEWSLETTER Issue 15 - Q4 / 2017 6 A training activity was organized, to ensure safe execution of lifting operations for loads of 50 tons or more during the pipe

Issue 15 - Q4 / 2017RHI NEWSLETTER

8

Rönesans Holding News

Annual Evaluation Meeting

“Renaissance” is the registered brand name of Rönesans Holding.“Renaissance Heavy Industries” and “RHI” are registered brand names of Rönesans Endüstri Tesisleri İnşaat San. ve Tic. A.Ş.

RENAISSANCE CONSTRUCTION IS RANKED 84th IN FORBES

İKİTELLİ CITY HOSPITAL PPP PROJECT IS AWARDED THE ‘’PPP DEAL OF THE YEAR” IN EUROPE

NEW YEAR MESSAGE FROM THE BOARD

Forbes magazine has completed its rating list of the 200 largest private companies in Russia, the positions having been determined from the accounting of their revenues for 2016. Renaissance Construction maintained its position in the first half of the list, in 84th place for 2017.

İkitelli City Hospital, a public–private partnership (PPP) project carried out by Renaissance Healthcare Investment and Japanese conglomerate Sojitz, won the “PPP Deal of the Year” award for its JPY 163 billion financial closure.

The project was recognized as the “PPP Deal of the Year” in Europe at the Project Finance International (PFI) Awards organized by Thomson Reuters, one of the world’s most prestigious business media and information firms. The awards event, which is held every year by Thomson Reuters to choose the best projects in the world, will be presented at a special ceremony in London on February 7, 2018.

On December 29, 2017, RHI’s Members of the Board held the annual New Year’s Eve meeting. It was underlined that 2018 is the year where we’ll step into new fronts towards new projects. To that end, we have new regions and potential projects in Europe, Central Asia, and North Africa. Having entered Algeria in 2017, we already began collecting the fruits of our labor and accordingly we have 3 newly awarded projects with more to come. One of the announced resolutions for 2018 is to optimize our existing resources and proceed to the successful realization of our new projects in 2018.

The İkitelli City Hospital (the financial closure ceremony of which was held in June 2017 with President Recep Tayyip Erdoğan in attendance), will be one of the world’s largest hospitals. The facility is designed to cover a construction area of over one million m2 and to serve 23,600 patients per day, with a projected bed capacity of 2,700. İkitelli City Hospital will be equipped with more than 2,000 seismic isolators, to become the world’s largest seismically isolated building.

THE MOST EARTQUAKE-RESISTANT PROJECT

Alptekin TizerPresident

Kaan AlkanVice President