rfs for 750 mw spv
TRANSCRIPT
-
7/27/2019 RfS for 750 MW SPV
1/1
eference No.: SECI/2013/JNNSM/Ph-II, Batch-I/Solar PV/750MW Dated: 04.10.2013
awaharlal Nehru National Solar Mission (JNNSM), a Government of India initiative, has set an ambitious target
f installing 20,000 MW grid connected solar projects by 2022. In Phase-II (Batch-I) of the Mission, Solar PVrojects of750 MW (Aggregate capacity) shall be selected based on Viability Gap Funding (VGF). Ministry ofew and Renewable Energy (MNRE) shall publish Guidelines for implementation of the scheme which will behortly available at MNRE website: www.mnre.gov.in.
olar Energy Corporation of India (SECI), under administrative control ofMNRE has been designated as themplementing Agency for the scheme. Interested Solar Power Developers are hereby invited to participate
the Global Selection Process and obtain the RfS document as mentioned below:
fS Document:
etailed terms & conditions, scope of work, eligibility criteria, selection process, manner and place ofubmission and other relevant information are provided in the RfS document. The document can only beownloaded from the websites www.seci.gov.in and www.mnre.gov.in Please note that there will be nohysical sale of RfS documents.
rief Highlights of the RfS
Tentative
rospective Solar Power Developers are requested to remain updated for any notices/amendments/
arifications etc. to the RfS document through the websites www.seci.gov.in and www.mnre.gov.in as
o separate notification will be issued.esponse of RfS to be submitted to: Additional General Manager (PS & Contracts) Solar Energy Corporation
thf India, 4 Floor, Tower-I, NBCC Plaza, Sector-V, Pushp Vihar, Saket, New Delhi-110017; Telephone
o.: 011-71989251, 011-29564033; E-mail: [email protected]
RfS document for Selection of750 MW Grid Connected Solar
PV Projects under JNNSMPhase-II: Batch-I
From*:15/10/2013
To*:21/11/2013
29/11/2013*(15:00 Hrs)
Cost of RfSDocument and
Processing Fee
EMD
Cost of RfS (Non-refundable)` 15000/- (to be submitted in the form
of DD/Pay Order, along with the response to RfS).
Processing fee (Non-refundable): A processing fee of 1 Lakh /
Project up to 20 MW capacity and 2 lakh/ Project above 20 MW
capacity is to be submitted in the form of DD/Pay Order.(DD/Pay Order should be made in favour of "Solar Energy Corporation
of India", payable at New Delhi.)
`
`
Earnest Money @` 10 Lakh/ MW/ Project is to be submitted in the form
of Bank Guarantee along with the Response to RfS document.
DescriptionPeriod of Issue
(to be downloaded fromwww.seci.gov.in & www.mnre.gov.in)
Last date & Time of
Submission ofResponse to RfS
Request for Selection of Solar Power Developers for 750 MW Grid Connected SolarPhoto Voltaic Projects under JNNSM PHASE-II: BATCH-I.
Government of India
Ministry of New & Renewable Energy Solar Energy Corporation of IndiaA Government of India Enterprise S LAR