rfq_spt (20110323)
DESCRIPTION
RFQ_SPT (20110323)TRANSCRIPT
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
REQUISITION (CONSTRUCTION)
for
SPHERICAL TANKS
of
JG SUMMIT NAPHTHA CRACKER PROJECT
in
BATANGAS, PHILIPPINES
Client : JG SUMMIT Petro. Corp. STE Requisition No. : STE-RFQ-SPT-02-001
Mar. 23. 2011
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
CONTENTS
1. Tank Item List
2. Scope of Work and Supply
3. General Assembly Drawings
4. Project Schedule
5. Painting Specification
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
1. Tank Item List
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
1. Tank Item List
[Base Case] – ASME SEC.VIII, Div.1
No Item Product Type Qt'y
(sets)
Unit
Capacity
Per Tank
(m3)
Size Main
Material Dia(mm) HT (mm)
(G.L to CL)
1 C-3011 Ethylene
Off-Spec Sphere 1 2,378 16,560 11,280 SA537-CL1+S5
2 C-3012 C3/LPG Sphere 1 310 8,400 7,200 SA516-70
[ Note ] : Please refer to General Assembly Dwgs. for more information in detail
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
2. Scope of Supply and Work
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
2. Scope of Supply and Work [ Classification ] : ( S ) Mark means STE’s scope ( V ) Mark means Vendor’s scope ( X ) Mark means out of STE’s scope
2.1 Scope of Supply
( S ) Tank proper
( S ) Internal and external accessories indicated on data sheets ( S ) Internal support ( S ) All parts directly welded to equipment ( S ) Clips for platform/ladder/pipe supports directly welded on tanks or tank columns ( S ) Davits for manholes ( S ) Anchor bolts, nuts & washers and templates ( S ) Platforms, stairways, walkways, ladders and handrails ( S ) Internal ladder (if required) ( S ) Fixed Water Spray System piping, nozzles to be installed on tanks ( S ) Tank support columns with bracings and fire proofing lugs ( S ) Earth lugs (A240-304) ( S ) Name plates (A240-304) with brackets ( S ) Settlement check lugs (if required) ( S ) Stilling well pipes with nozzles and pipe supports for level indicators ( S ) Bolts/nuts, clamps, gaskets for internal ( S ) Fitting for transportation (if required) ( S ) Blind flanges together with bolts, nuts and gaskets for blinded manholes and nozzles ( S ) Special tools and jigs for site assembling, operation and maintenance ( V ) Blind flanges together with bolts, nuts and proper gaskets for hydrostatic test ( V ) Painting material for tank proper and platform & stairway ( V ) Welding consumables with welding rod at shop and site ( V ) Consumables for erection including grouting ( V ) Jigs and tools for construction ( V ) Heavy Equipment for construction ( V ) Corrosion inhibitor for hydrostatic test (if required) ( V ) Test plates for welder and welding procedure qualification and production test ( S ) Spare parts for construction, pre-commissioning for blind flanges ( S ) Spare parts for commissioning and start-up for blind flanges ( S ) Spare parts for two(2) years operation for blind flanges (by option)
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
2.2 Scope of Work
( S ) Mechanical design (strength calculation, stress analysis and design) ( S ) Detail fabrication drawings (General assembly, all kinds of appurtenance drawings) ( S ) Loading data and anchor plan for foundation ( S ) Other necessary documentations including ITP, erection procedure, etc.) ( S ) Design of riser pipes, ring pipes and connector for spray nozzles ( S ) Material procurement ( S ) Mechanical guarantee ( S ) Provision for as-built drawings and documents ( S ) Fabrication at shop ( S ) Surface preparation and painting at shop as per painting specification ( V ) Site construction ( V ) PWHT (as per ASME Code) ( V ) WPS with PQR and production test ( V ) PQT and WPQT ( V ) NDE at shop and site (RT before site PWHT and UT after site PWHT) ( V ) Inspection & test at shop and site, water drainage and drying work ( V ) Touch-up painting and site as per painting specification ( V ) N2 gas charge work ( V ) Third party inspection (excluding its fee) ( S ) Submittal of packing list (packing volume, size and weight, etc.) ( S ) Packing and protection ( S ) Inland transportation in Korea ( V ) Unloading of material at site ( V ) Temporary work of utility for construction and test ( V ) Dimensional check and acceptance of foundation including minor adjustment work ( V ) Hydrostatic test at site and water drainage as “broom clean condition” ( V ) Internal cleaning to make sure (by water jet) ( V ) Settlement checking during hydrostatic test ( V ) Grouting for tank foundation ( V ) Government approval in accordance with local regulation and law ( S ) Documentation for purchaser’s government approval ( V ) Tank calibration
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
2.3 Out of Scope
( X ) Civil and tank foundation
( X ) Electrical ( X ) Instruments (level indicator, thermometers, pressure gauge and etc.) ( X ) Gas heat detection system (if required) ( X ) Connecting bolts, nuts and gaskets for companion flanges ( X ) Insulation material and Insulation work ( X ) Fire proofing on column and body ( X ) N2 gas for N2 charging ( X ) Inland transportation in Philippines ( X ) Ocean freight ( X ) Customs clearance and taxes & duties ( X ) Cabling and wiring materials for permanent ( X ) All valves including safety relief valve ( X ) Blind flanges with bolts, nuts and gaskets for test ( X ) Customs clearance and duties ( X ) Electricity for construction (will be provided to the main panel by Client) ( X ) Hydro-test water (will be supplied to the first block valve by Client)
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
3. General Assembly Drawings
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
4. Project Schedule
Project Name : Spherical Tank for JG Summit NCC Project Date : Dec. 20. 2010
1. MILESTONES
2. ENGINEERING -
-
-
3. PROCUREMENT -
-
-
4. PRE-FABRICATION -
- Upper Column Assembly
- Manhole & Nozzle Assembly
- Lower Column & Brace Fab.
-
-
5. OCEAN FREIGHT -
6. CONSTRUCTIONPreparation
- Material and Tool-Consumable Prepare of on site
- Temporary Facillties & shop welder test
Q'ty Weight
I.D(m) H(m) Set Ton
- C-3011 SPT 16.56 11.28 1 522
Erection
Welding
PWHT
Hydro. Test
Painting
- C-3012 SPT 8.40 7.20 1 75
Erection
Welding
Hydro. Test
Painting
PROJECT MASTER SCHEDULE
DESCRIPTION 2010 2011 2012 Remarks12 1 2 3 612 1 2 38 9 10 11
Strength Calculation All Item
Body Detail Drawing All Item
4 54 5 6 7
Steel Shape 405Ton
Others Material 63Ton
Accessory Detail Drawing All Item
Steel Plate 2,652Ton
Others Accessories
1st Shipment 597Ton
Shell Plate Forming 2,368Ton
Water Spray & Internal Piping
S-Tank Engineering Co.,Ltd.
Gr. Item No TypeTank Size
ERECTION STARTFABRICATION START 1ST SHIPMENT HYDRO TEST START MECHANICAL COMPLETE
TECHNICAL SPECIFICATION FOR
SPHERICAL TANKS
DATE : Aug. 11, 2010 REV. 1
S-Tank Engineering Co., Ltd.
S-TANK ENGINEERING
5. Painting Specification
PROJECT NAME : <DIC> Spherical Tank for JG Summit NCC Project
P R I C E F O R M'11. 01. 26 (Rev.0)
S-Tank Engineering Co., Ltd.
UnitCapacityof Tank
DesignPressure C.A Shell
Thickness Q'TY W/T Erection FieldPWHT
Sitepainting
SiteInspection
andTest
(ExcludingH.T
Water)
FireProofing
N2Chargin
g
TankCalibration
SubTotal( C )
Total
I.D H m^3(Ton) (Barg) (mm) (mm) SET (TON) (USD) (USD) (USD) (USD) (USD) (USD) (USD) (USD) (USD)
1 C-3011 EthyleneOff-Spec.
ASME Sec.VIII, Div.12007Ed.2009Ad.
16.56 11.28 2,378 SA537-CL1+S5 21.0 1.5 70.5~72.5 1 555
2 C-3012 C3/LPGOff-Spec.
ASME Sec.VIII, Div.12007Ed.2009Ad.
8.40 7.20 310 SA516-70 16.5 1.5 29.0 1 75
2 630 Total
RemarksITEM NO.NO Product AppliedCODE
TankSize(m) Main
Material