rf operations: commissioning the rf systems and antenna conditioning j. hosea et al. nstx-u...

5
RF Operations: Commissioning the RF RF Operations: Commissioning the RF systems and antenna conditioning systems and antenna conditioning J. Hosea et al. NSTX-U NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep NSTX-U Pre-Forum Meeting 2 January 28, 2015 PPPL V1.0 Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

Upload: amos-tyler

Post on 03-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima

RF Operations: Commissioning the RF systems and RF Operations: Commissioning the RF systems and antenna conditioningantenna conditioning

J. Hosea et al.

NSTX-UNSTX-U Supported by

Culham Sci CtrYork U

Chubu UFukui U

Hiroshima UHyogo UKyoto U

Kyushu UKyushu Tokai U

NIFSNiigata UU Tokyo

JAEAInst for Nucl Res, Kiev

Ioffe InstTRINITI

Chonbuk Natl UNFRI

KAISTPOSTECH

Seoul Natl UASIPP

CIEMATFOM Inst DIFFER

ENEA, FrascatiCEA, Cadarache

IPP, JülichIPP, Garching

ASCR, Czech Rep

NSTX-U Pre-Forum Meeting 2

January 28, 2015

PPPL

V1.0

Coll of Wm & MaryColumbia UCompXGeneral AtomicsFIUINLJohns Hopkins ULANLLLNLLodestarMITLehigh UNova PhotonicsORNLPPPLPrinceton UPurdue USNLThink Tank, Inc.UC DavisUC IrvineUCLAUCSDU ColoradoU IllinoisU MarylandU RochesterU TennesseeU TulsaU WashingtonU WisconsinX Science LLC

Page 2: RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima

Overall RF system commissioning schedule for FY2015

Page 3: RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima

• Complete transmission and matching hookups:− Jan Finish loops− Feb Hookup to loops, set decouplers, − Mar Match vacuum from RFE

• Complete source assembly and testing− Feb - Mar Complete source assembly and test into dummy load− March Labview updates for power/phase, EPICs system control

• NSTX-U TC & RFE diagnostics re-commissioning− Feb - March Into MDSplus

• Prepare diagnostics for supporting HHFW studies− May Complete coaxial Langmuir probe electronic hookups and connections to

central computer (MDS plus)− May IR camera commissioning− May ORNL Reflectometer, probe, etc. reactivation− May RF probes at Bay J installation, hookup, commissioning

Research Plasma Operation14 Run Weeks

Jan. 2015 Feb. 2015 Mar. 2015 Apr. 2015 May 2015 Jun. 2015 Sep. 2015Jul. 2015 Aug 2015

Bakeout

ISTP / CommCD4

HHFW system commissioning schedule for FY2015

Page 4: RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima

Transmission line and RF probe elements

Resonant loop connections to top/bottom antenna element feeds

Coax connected Langmuir probes at Bay J top and bottom − Two probes per tile in rows 2, 3, and 4

Page 5: RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima

• Conditioning of antenna

− May - June Vacuum conditioning

Condition to maximum voltage after Boronization Condition to maximum voltage after adding Lithium

− June - July Plasma conditioning

Plasma condition to maximum power with RF only Plasma condition with RF + NB

o NB1o NB2o NB1 + NB2o Determine antenna voltage limito Set acceptable antenna/separatrix gap for each NB configuration

Research Plasma Operation14 Run Weeks

Jan. 2015 Feb. 2015 Mar. 2015 Apr. 2015 May 2015 Jun. 2015 Sep. 2015Jul. 2015 Aug 2015

Bakeout

ISTP / CommCD4

Antenna conditioning schedule for FY2015