rf monitoring: 2012-2013

32
RF Monitoring: 2012-2013

Upload: carsyn

Post on 24-Feb-2016

48 views

Category:

Documents


1 download

DESCRIPTION

RF Monitoring: 2012-2013. RF Monitoring. RF Monitoring will still have its own guidance document for 2012-2013 http://www.tea.state.tx.us/index2.aspx?id=2147495560&menu_id=2147483703&menu_id2=2147483719. Staging Criteria for RF Monitoring. Ranking from RF Tracker Data (last year’s data) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RF Monitoring: 2012-2013

RF Monitoring:2012-2013

Page 2: RF Monitoring: 2012-2013

RF Monitoring RF Monitoring will still have its own

guidance document for 2012-2013 http://www.tea.state.tx.us/index2.asp

x?id=2147495560&menu_id=2147483703&menu_id2=2147483719

Page 3: RF Monitoring: 2012-2013

Staging Criteria for RF Monitoring1. Ranking from RF Tracker Data (last year’s data)

a) LRE Calculationb) Commensurate School Dayc) Related Services

2. Time since last RF Monitoring On-Site Review3. New Residential Facilities Present in the LEA4. 2011-2012 PBMAS SPED Stage5. History of Noncompliance in special education6. Current Escalated Oversight7. RF Tracker Data Quality

Page 4: RF Monitoring: 2012-2013

Staging “Levels”• Based on points assigned in matrix of

staging criteria (“selection rubric”– Not Staged– Stage 1– Stage 2– Stage 3– Stage 4– Stage 4A– Stage 4B

Page 5: RF Monitoring: 2012-2013

Submission Window Submission Window

(begins when staging is released in ISAM (likely in September) and ends on December 7, 2012*

Stage 1 – will complete all documents by December 7, 2012 and retain locally• Subject to submission request by TEA

Page 6: RF Monitoring: 2012-2013

PBMAS: An Evolution

Page 7: RF Monitoring: 2012-2013

Staging for PBMAS• 4 program areas

– BE/ESL– CTE– NCLB– SPED

Page 8: RF Monitoring: 2012-2013

Staging for PBMAS (cont)• Each program area has indicators• Each indicator is assigned a

performance level (“PL”) of 0, 1, 2, or 3– PL increases from 0-3 based on

variance from state “standard” or “target”• i.e., 0 = within state “standard” or “target”;

PL increases as variance increases from state “standard” or “target”

Page 9: RF Monitoring: 2012-2013

Staging for PBMAS (cont)• Based on the numbers of PLs 2 or 3

per program area, staging is assigned

• Staging is separate for each program area– Not staged– Stage 1– Stage 2– Stage 3– Stage 4

Page 10: RF Monitoring: 2012-2013

PBMAS Manual• 2012 Manual Organization

– Section I: Introduction– Section II: Components of the 2012

PBMAS– Section III: BE/ESL Indicators– Section IV: CTE Indicators– Section V: NCLB Indicators– Section VI: SPED Indicators– Section VII: Appendices

Page 11: RF Monitoring: 2012-2013

Section VI: SPED Indicators• Pages 82 – 119• 18 indicators

Page 12: RF Monitoring: 2012-2013

Name & Description of Indicator

Page 13: RF Monitoring: 2012-2013

Indicator Calculation

Page 14: RF Monitoring: 2012-2013

Minimum Size Requirements & Special Analysis

Page 15: RF Monitoring: 2012-2013

Data Source for Indicator

Page 16: RF Monitoring: 2012-2013

Additional Notes

Page 17: RF Monitoring: 2012-2013

Performance Level Assignments/ Determinations

Page 18: RF Monitoring: 2012-2013

Information regarding special analysis, etc.

Page 19: RF Monitoring: 2012-2013

Standards (if applicable to the indicator)

Page 20: RF Monitoring: 2012-2013

Major Changes for 2012-2013 One Guidance Document (regardless of

single program or integrated interventions)

http://www.tea.state.tx.us/index2.aspx?id=2147504027&menu_id=2147483703&menu_id2=2147483708

District AYP staging District AU status BE/ESL CTE NCLB/ESEA SPED*

Page 21: RF Monitoring: 2012-2013

Texas Accountability Intervention System

Page 22: RF Monitoring: 2012-2013

Changes for 2012-2013 One CIP, One CAP for PBMAS, AU, AYP

RF still separate for 2012-2013Improvement Plan Workbook

(district) data analysis needs assessment improvement plan corrective action plan (CAP), if

noncompliance is identified

Page 23: RF Monitoring: 2012-2013

Submission Window Submission Window

(begins when staging is released in ISAM (likely in September) and ends on December 7, 2012*

Submission window is same for all staged LEAs, regardless of staging “levels” or programs Note: Earlier (October 15) “submission window”

for districts who are staged for AYP/AU only

Page 24: RF Monitoring: 2012-2013

Staging and Submission

• If staged in two or more PBMAS program areas with no stage of intervention higher than a Stage 1, conduct all activities, complete CIP, and retain locally

Page 25: RF Monitoring: 2012-2013

Texas Accountability Intervention System

Page 26: RF Monitoring: 2012-2013

ISAM Updates

Page 27: RF Monitoring: 2012-2013

Hot off the Press…

Page 28: RF Monitoring: 2012-2013

Hot off the Press…

Noncompliance Module

Page 29: RF Monitoring: 2012-2013

Hot off the Press…

Noncompliance Module

Page 30: RF Monitoring: 2012-2013

Noncompliance Module

Hot off the Press…

Page 31: RF Monitoring: 2012-2013

Noncompliance Module

Hot off the Press…

Page 32: RF Monitoring: 2012-2013

32

2012-2013 SPED Monitoring TETNs

September 13, 2012

November 8, 2012

January 29, 2013

March 21, 2013

May 14. 2013All sessions will be from 1:00-3:00