Revision Date: Prepared by: Checked by: Approved by: Reason for Issue:
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Document History Continued:
Page 2 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
(Crossrail J Contents
1 Introduction 4
2 Scope of Works 4
2.1 Aims and objectives of the investigation 4
2.2 Summary of results from Crossrail archaeology works 5
3 General requirements 7
4 Specific methodology for archaeological works 7
4.2 Interfaces 7
4.3 Documentation and management 7
4.4 C503 Procedure for detailed archaeological excavation 8
4.5 C503 Procedure for archaeological general watching brief and targeted watching brief 11
5 Instructions to C257 Archaeological Contractor and Specification 12
5.1 Detailed excavation and general watching brief 12
5.2 Deliverables 13
5.3 Site Archives 13
5.4 Post-excavation 13
6 Provisional Timetable 14
Appendix A — Drawings 15
Drawing 1: Location of archaeological investigations. From C257 Fieldwork Report: C257-MLA-X-XCS-CRG02-5001 16
Drawing 2: C257 sketch phase diagram for utilities corridor archaeological work 17
Drawing 3: C138-MMD-C-DDA-C101 Z-89001 Broadqate Ticket Hall - Enabling Works Utilities Corridor Site Plan 18
Drawing 4: MCN12-007-1011 Liverpool Street Station Enabling Works Phase 2 Temporary Works Design For Utility Corridor Section B-B and Section C-C 19
Drawing 5: C138-MMD-U-DDA-C101-50052 100 Liverpool Street Sewer Proposed Diversion Plan 20
Table 1 Summary of archaeological events relating to the utilities corridor 4
Table 2 Provisional programme — utilities corridor 14
Table 3 Provisional programme- other 0503 activities 14
Figure 1 Utilities corridor sequence. 6
Figure 2 0257 planned sequence for archaeological excavation of the utilities corridor (phases 7-9) 10
Page 3 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
1Crossrail
1 Introduction
1.1.1 This document provides details of the programme of archaeological investigation required to mitigate the impact of construction of the Liverpool Street utilities corridor and other 0503 works on archaeological deposits. It is an addendum to the Written Scheme of Investigation for Liverpool Street Station (0138-MMD-T1-RST-C101-00001) and should be read in conjunction with that document.
1.1.2 The archaeological mitigation works relating to 0503 activities (comprising the construction of the utilities corridor, the sewer shafts: MHS1 (west) and MHS2 (east), 100 Liverpool Street diversion and Phase 3 utilities diversions) set out in this document supersede those in the previous WS! addendum (C138-MMD-T1-RST-C101-00004).
1.1.3 This document outlines the requirements for the Principal Contractor (0503) that will be undertaking civils works on the site in liaison with the Crossrail Project Archaeologist and the 0257 Archaeology Contractor (Museum of London Archaeology - MoLA).
2 Scope of Works
2.1 Aims and objectives of the investigation
2.1.1 The aim of archaeological mitigation is to preserve by record surviving archaeological deposits to be affected by 0503 activities (comprising the construction of the utilities corridor, the sewer shafts: MHS1 (west) and MHS2 (east), 100 Liverpool Street diversion and Phase 3 utilities diversions). The two key phases of archaeology positively identified in Crossrail evaluation (XSM10) relate to the Roman period and post-medieval burials from the Bedlam burial ground.
2.1.2 Mitigation will be achieved through a programme of archaeological investigation to be conducted by the 0257 Archaeology Contractor in liaison with the 0503 Principal Contractor in accordance with the Site-Specific Written Scheme of Investigation for Liverpool Street (C138-MMD-T1-RST-C101-00001) and the Crossrail Generic WS! (CR-XRL-T1-GST-CR001-00003) and the standards listed therein.
2.1.3 A summary of the archaeological work carried out to date and the scope of further work is set out in Table 1 below:
Table 1 Summary of archaeological events relating to the utilities corridor
Event Type Type Event Code
Progress Principal
Contractor C257 report reference
Test pit and core in basement of RailwayTavern
General watching brief
S X M10 Complete JB Riney C257-MLA-X-RGN-CRG02-50064
1.25m piles and guide walls for utilities corridor
general
Sample excavation and
watching brief
XSM10 Complete C503 C257-MLA-X-RGN-CRG02-50113
Diversion of utilities in footprint of Broadgate ticket hall and utilities corridor
General watching brief
S X M10 Complete C503 C257-MLA-X-RGN-CRG02-50113
Page 4 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Excavation of utilities corridor and MHS1 (western sewer shaft)
Trial trench evaluation
XSM10 Complete C503 C257-MLA-X-RGN-CRG02-50113
C257-MLA-X-RGN-CRG02-50064
Detailed excavation to 107mATD (up to 106mATD at the western end)
XSM10 Planned 0503 Report to be prepared on completion of fieldwork.
Excavation of MHS2 (eastern sewer shaft)
General and targeted watching brief
XSM10 Planned 0503 Report to be prepared on completion of fieldwork.
100 Liverpool Street sewer diversion
General watching brief
XSM10 Ongoing C503 Report to be prepared on completion of fieldwork.
Phase 3 utilities diversions
General and targeted watching brief
XSM10 Planned 0503 Report to be prepared on completion of fieldwork.
Page 5 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
2.2 Summary of results from Crossrail archaeology works
2.2.1 A general watching brief on an exploratory test pit in the Railway Tavern to determine the location of a coal cellar in advance of pile design, determined that all archaeology at that location was truncated by the construction of the building in the 1870s.
2.2.2 Evaluation trial trenches 1, 1A and 2 were located partially within the northern pile line of the utilities corridor. Trial trenches 1 and 2 were excavated to the base of archaeological deposits and 1A was stopped at approximately 1.5m below ground level due to the high concentration of services restricting access.
2.2.3 Evaluation trial trench 1A exposed 20th century utilities that had truncated burials along the length of Liverpool Street within the pile line and northern part of the utilities corridor. These utilities were located adjacent to the backfilled cellars of former buildings at 1-14 Liverpool Street. Consequently the likelihood of encountering in situ burials during the excavation of the utilities corridor is very low. However, disarticulated human bone may be present in the made ground.
2.2.4 A series of pits were also excavated along the length of the 1250mm pile line to approximately 109.5mATD to remove human remains. Refer to Appendix A, Drawing 1 for the location of previous investigations.
2.2.5 An area of higher archaeological survival 600mm wide is present intermittently along the northern edge of the corridor from approximately 109.3m ATD — c. 107.8mATD, refer to Figure 1 and Drawing 2 — Appendix A.
2.2.6 Roman archaeological deposits are predicted from 107.8m ATD down to 107m ATD along the length of the corridor. Deposits deepen (to approximately 106mATD) in the western 15m of the utilities corridor towards the course of the former River Walbrook.
2.2.7 Evaluation trial trench 5 and pile line pit 1 both encountered the backfilled remains of a 20th century below ground lavatory to 108.17mATD. Roman archaeology may survive in pockets beneath the lavatory, but a tunnelled sewer that also passes beneath it has removed large areas of Roman deposits across the length of the site. The extent of the lavatory is uncertain, however, all archaeological remains in its footprint have been removed to 107.17mATD.
2.2.8 Exploratory test pits to identify existing utilities were excavated at the planned locations of the MHS1 and MHS2 at either end of the utilities corridor. At the western end (MHS1) excavation to a depth of 1.2m below ground level showed total truncation of archaeology to that depth by existing utilities. The made ground contained disarticulated human bone, inferring that the burial ground continues beyond the western edge of the Broadgate Station Ticket Hall. The test pit in the planned location of MHS2 (the eastern end) was also excavated to 1.2m below ground level, and no archaeological deposits were encountered. Additionally no disarticulated human bone was identified, which confirms that the boundary of the burial ground lies further west than MHS2.
2.2.9 The western extent of the utilities corridor and MHS1 are located in proximity to the former Walbrook channel. As such, the depth of alluvial deposits in the western end of the worksite is expected to be down to approximately 106mATD.
2.2.10In the footprint of the Broadgate ticket hall human burials survive across the majority of the site beneath a significant number of utilities. Burials are present between 111.52mATD and 109.45mATD but the upper level of the burials varies across the site.
Figure 1 Utilities corridor sequence.
Page 6 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Made ground
109.2mATD
107.8mATD
107mATD
106mATD
Walbrook Alluvium
112.3mATD Ground level
ra
\Northern pile line
Deeper alluvium in western extent of w orksiti
Natural gravel\
Southern pile line
C.) —
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
nb. The above diagram is based on the levels from the various investigations carried at the site. The diagram is not to scale and the locations of deposits are indicative.
Page 7 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
1Crossrail J 3 General requirements
3.1.1 0503 to provide the attendances and facilities required to complete the specialist archaeological works agreed in the 0503 Method Statement (C503-VIN-C-GMS-C101- 50108) and 0257 Method Statement (C257-MLA-X-GMS-C101-50001).
3.1.2 0503 will manage the Exhumation Contractor (TCS) as per the C503 Method Statement (C503-VIN-C-GMS-C101-50108), and in accordance with the Ministry of Justice Burial License.
4 Specific methodology for archaeological works
4.1.1 0503 will be responsible for facilitating the following archaeological works relating to the construction of the utilities corridor:
• General watching brief at removal of modern backfill within the utilities corridor.
• Detailed archaeological excavation within the utilities corridor.
• Detailed archaeological excavation of MHS1.
• General and targeted watching brief at the excavation of MHS2.
• General watching brief at the 100 Liverpool Street sewer diversion.
• General and targeted watching brief during Phase 3 utility diversions.
4.2 Interfaces
4.2.1 0503 will have the following interfaces for the specialist archaeological works:
C257 Archaeology Contractor: Museum of London Archaeology (MoLA)
Elaine Eastbury - Contract Manager
M: 07730 646063 I E: eeastburymuseumoflondon.org.uk
Nick Elsden - Assistant Contract Manager
M: 07872 127296 I E: nelsdenmuseumoflondon.org.uk
Employers Archaeologist: Crossrail Ltd
Jay Carver — Project Archaeologist
M: 07870 191705 I E: iaycarvercrossrail.co.uk
Mike Court — Assistant Project Archaeologist
M: 07745 428117 I E: mikecourtcrossrail.co.uk
Page 8 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
1Crossrail
4.3 Documentation and management
4.3.1 0503 will organise weekly progress meetings at 1-14 Liverpool Street throughout the duration of the archaeological works. The meetings will discuss safety, progress against programme and any other matters arising in relation to the archaeological works. Attendance is required from 0503, the groundworks contractor, 0257, a representative of the Crossrail site team and a representative of the Crossrail archaeology team.
4.3.2 Upon completion of the archaeological excavation the 0257 Archaeology Contractor will issue a signed completion form countersigned by the Employers Archaeologist to 0503.
4.4 C503 Procedure for detailed archaeological excavation
4.4.1 Refer to 0257 Method Statement (C257-MLA-X-GMS-C101-50001) for the detailed excavation methodology.
4.4.2 Use of excavators or other plant within the area shown on drawing C138-MMD-C-DDA-C101 Z-89001 (Drawing 3 - Appendix A) shall only be undertaken with the agreement and under the observation of the 0257 Archaeology Contractor.
Utilities corridor (Appendix A — Drawing 3: C138-MMD-C-DDA-C101_Z-89001)
4.4.3 Refer to 0257 deposit sketch (Drawing 2 - Appendix A) for locations of the phases used in the following sequence.
4.4.4 0503 will allow for up to 10 No. archaeologists to be on site during detailed excavation.
4.4.5 The following sequence for archaeological excavation has been agreed with 0257 and is the result of a series of meetings between Crossrail, 0503 and their sub-contractors, and 0257:
Phase 1
4.4.6 0503 excavate modern material down to construction level for 1st props (109.2mATD), under general watching brief by 0257 to record the predicted upper 100mm of archaeological deposits against the northern side of the corridor.
4.4.7 If disarticulated human remains are identified in the made ground they will be removed by the 0257 Archaeology Contractor and 0503 will store them securely on site and provide them to the Exhumation Contractor in accordance with the Ministry of Justice burial license.
Phase 2
4.4.8 0503 insert first level of props at approximately 109.2mATD.
Phase 3
Page 9 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
1Crossrail
4.4.1 Where archaeological deposits have been truncated, 0503 will excavate the modern material under 0257 supervision using a smooth-edged ditching bucket down to a maximum of depth of 107.8mATD. Please note that the surface of archaeological deposits survives at different levels. The attending 0257 archaeologist will supervise the machining process during this phase.
Phase 4
4.4.2 Where archaeological deposits have not been truncated, 0257 will hand excavate and record down to a depth of approximately 107.8mATD.
4.4.3 Phases 3 and 4 will be conducted as a rolling programme of targeted watching brief along the corridor, with a safe demarcated distance between machine operations and areas for archaeological work.
Phase 5
4.4.4 0503 machine and/or hand excavate (as appropriate) any remaining modern material to approximately 107.8mATD under archaeological supervision.
Phase 6
4.4.5 0503 Insert second level of props at 107.8mATD.
4.4.6 The insertion of the second level of props creates a series of twelve/thirteen 3.2m x 2m areas along the length of the utilities corridor. These areas will be hand excavated by 0257 in two stages (Figure 2): Stage 1: areas 1, 3, 4, 6, 7, 9, 10 and 12; Stage 2:2, 5, 8 and 11. During Stage 1 the Stage 2 areas will be used for spoil removal and vice versa in Stage 2.
4.4.7 The following phases (7 to 9) set out the 0257 excavation process within each 3.2m x 2m area. These phases will be facilitated by 0503:
Phase 7
4.4.8 0503 facilitate the 0257 excavation and recording of Roman archaeological deposits.
Phase 8
4.4.9 0503 facilitate the 0257 excavation and recording of the northern half of the Roman archaeological deposits, to produce a composite East—West section.
Phase 9
4.4.100503 facilitate the 0257 excavation and recording of the northern half of the alluvial deposits, continuing the composite East—West section. Where the section is more than c. 1.2m deep or is unstable, it will be carried out in 2+ stages (and/or hand augered).
4.4.11 If Roman structures/features are identified in the alluvial deposits which continue into the unexcavated half, these will be locally excavated by 0257.
Phase 10
Page 10 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
Crossrail Limited
8
1 1
12
9
10
6
7
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
4.4.1 0503 remove remaining alluvial deposits under 0257 general watching brief and then, once the 0257 hand excavation completion certificate is signed off, continue with bulk excavation with no further archaeological requirements.
Figure 2 C257 planned sequence for archaeological excavation of the utilities corridor (phases 7- 9)
Excavated in Stage 1; can be used for Spoil Skips in Stage 2 as required
Used for Spoil Skip etc in Stage 1; Excavated in stage 2
East 32m x 2m areas
2
3
4
5
64/est
MHS1 excavation (Appendix A— Drawing 4)
4.4.2 The procedure for 0503 regarding archaeological excavation of the MHS1 area differs from the above due to the likely presence of in situ and disarticulated human remains relating to the Bethlem burial ground.
4.4.3 Where works involve the exposure and exhumation of human remains by 0257, 0503 will provide covering for the exposed area to prevent public observation of the works, these should be:
large enough to allow safe working;
Page 11 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
• waterproof;
• translucent (to provide sufficient light); and
• be of a type that can be quickly erected and removed to facilitate access for plant when required.
4.4.4 Ground level (112.76m to 112.28m ATD) to surface of burial ground (111.52m to 110.70m ATD)
4.4.5 Remove, under supervision of the 0257 Archaeology Contractor the road surface and modern overburden, to the predicted level of cemetery deposits. The surface of cemetery deposits is present at an average depth of 1.34m below ground level (highest level identified in trial trench evaluation: 111.52mATD).
4.4.6 If disarticulated human remains are identified in the made ground they will be removed by the C257 Archaeology Contractor and C503 will store them securely on site and provide them to the Exhumation Contractor in accordance with the burial license.
4.4.7 The burial ground (from c.111.52m to 109.45m ATD)
4.4.8 C503 will facilitate the excavation of the burial ground (present from approximately 111.52m to 109.45m ATD) by the C257 Archaeology Contractor.
4.4.9 Deeper archaeological deposits (c.110.64m ATD to 105.00m ATD)
4.4.10Following the removal of cemetery deposits by the C257 Archaeology Contractor, C503 will facilitate the further excavation of archaeological deposits by the C257 Archaeology Contractor until the full sequence of deposits has been excavated. Due to the location of these works on the conjectured route of the River Wa!brook the base of archaeological deposits may be as deep as 106-105mATD.
4.4.11Upon completion of the archaeological excavation, and when the completion certificate has been signed off, bulk excavation by C503 may commence.
4.5 C503 Procedure for archaeological general watching brief and targeted watching brief
4.5.1 The removal of made ground by C503 will be carried out under archaeological observation (general watching brief) by the C257 Archaeology Contractor.
4.5.2 The C257 Archaeology Contractor will advise C503 if and when archaeological deposits are encountered. C503 will allow for archaeological deposits to be hand excavated/machined (as appropriate) in stages (targeted watching brief) by the C257 Archaeology Contractor to the maximum depth of impact (It is estimated that the trigger point will be at approximately 1.3-1.5m below ground level). NB. Human remains are likely to be encountered.
4.5.3 Where the construction methodology involves timber-headed tunnelling, C503 will allow access for the C257 Archaeology Contractor to record archaeological deposits in section where possible.
4.5.4 Material excavated by C503, which contains disarticulated human remains will be stored securely on site by C503 and provided to the Exhumation Contractor in accordance with the Ministry of Justice Burial License.
Page 12 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail J 5 Instructions to C257 Archaeological Contractor and
Specification
5.1 Detailed excavation and general watching brief
5.1 .1 A programme of archaeological investigation comprising detailed archaeological excavation and targeted and general watching brief will be carried out on 0503 construction activities comprising the construction of the utilities corridor, the sewer shafts: MHS1 (west) and MHS2 (east), 100 Liverpool Street diversion and Phase 3 utilities diversions.
5.1.2 Further details on the required standards for excavation and recording for the Archaeological Contractor are to be found in the Written Scheme of Investigation for Liverpool Street Station (C138-MMD-T1-RST-C101-00001).
5.1.3 The 0257 Archaeology Contractor will ensure that the burial license for archaeological works is current and update the license as required.
5.1.4 The C257 Archaeology Contractor will, in liaison with C503, produce a programme for the archaeological works to be included in the C257 Method Statement.
5.1.5 Prior to commencing works on site the C257 Archaeology Contractor will provide a Method Statement inclusive of risk assessment and safe method of working, prepared in liaison with and countersigned by C503 and approved by Crossrail.
5.1.6 The C257 Archaeology Contractor will provide a team of suitably qualified archaeologists, experienced in archaeological site investigation and the nature of archaeological deposits which are expected on this site.
5.1.7 The C257 Archaeology Contractor will shall provide a suitably qualified buildings archaeologist as required.
5.1.8 During the excavation of in situ burials by C257 (MH-S1), the Archaeology Contractor shall give consideration to the osteo-archaeologist being present for the duration of the works to provide on-site assessment, thereby enabling the sampling and excavation strategy to be modified on-the-ground as required.
5.1.9 During detailed excavation, following the initial overall strip and clean, individual features are to be hand cleaned and defined by the C257 Archaeology Contractor, sufficient to determine type, plan form and relationships (e.g. for structures and rebuilds); and recorded. Sufficient archaeological features/structures are to be sample excavated either using a smaller machine with graded digging bucket (by C503 under archaeological supervision) or hand dug if appropriate.
5.1.10During the excavation of the utilities corridor staffing levels will be based on one archaeologist per 3.2m x2m areas shown in figure 2. Staffing for targeted watching brief at MHS1 and MHS2 to be determined when the scope of works is available from C503.
5.1.11The C257 Archaeology Contractor will develop a strategy for archaeological science in liaison with EH Regional Science advisor as appropriate. The strategy will be presented in the Method Statement and approved by the Employers Archaeologist.
Page 13 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
1Crossrail
5.1.12The 0257 Archaeology Contractor will carry out metal detector survey of archaeological features and spoil excavated by C503 from archaeological deposits.
5.1.13The C257 Archaeology Contractor will give consideration to an appropriate methodology to retrieve worked bone waste (e.g. sample and sieve).
5.1.14The C257 Archaeology Contractor will ensure that all site staff attend the C503 site induction a suitable period of time prior to the start of site works.
5.1.15The C257 Archaeology Contractor will attend weekly progress meetings each week at 1-14 Liverpool Street to discuss safety during the works; progress against programme; and to discuss any other matters arising.
5.1.16The requirement for extended hours working will be assessed throughout the duration of the archaeological works and instructed to C257 via a Project Managers Communication.
5.2 Deliverables
5.2.1 The fieldwork activities relating to the utilities corridor will be reported in an interim report. The fieldwork report will be produced at a later date and will comprise a combined report with further archaeological works being undertaken in relation to the Broadgate Ticket Hall.
5.3 Site Archives
5.3.1 Refer to the Site Specific Written Scheme of Investigation.
5.4 Post-excavation
5.4.1 Refer to the detail set out within the C257 Works Information and the Written Scheme of Investigation for Liverpool Street Station.
Page 14 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail J 6 Provisional Timetable
Table 2 Provisional programme — utilities corridor
Phase Organisation Description Start Date Duration C257 Staffing
1
C503
(0257 general watching brief)
Excavate down to construction level for 1st props. 4th March 1 week
[1]
1 Senior Archaeologist
2 0503 Insert 1st level of props -
3
C503
(C257 supervision)
Excavate modern material in southern c.1400mm
11th March
2 weeks
[3]
1 Senior Archaeologist + 1 to 2 Archaeologists
4 C257 Record and excavate area of higher archaeology in rolling programme with above
5
0503
(0257 supervision)
Excavate remaining modern material to surface of archaeology in rolling programme with above
6 0503 Insert 2nd level of props -
7-9 0257 excavation
Excavate and record Roman features (Phase 7), northern half of Roman dumps (Phase 8), & northern half of alluvium (Phase 9)
Approx. 25th March (TBC)
3 to 4 weeks
[7]
1 Senior Archaeologist + 6 Archaeologists
10
0503
(0257 watching brief)
Removal of rest of alluvium and natura l geology
Approx. 22nd April
[1 to 2]
1 Senior Archaeologist + 1 Archaeologist as required
NB. The above provisional programme is based on discussions between Crossrail, C503 and C257.
Table 3 Provisional programme- other C503 activities
Activity Archaeology required Start End C257 attendance
Construction of MHS1 and MHS2 and 100 Liverpool Street sewer diversion
General watching brief and targeted watching brief
2012 May 2013 Intermittent attendance during diversion works
Demolition of QVT and Broad St Station ticket hall
Level 2 English Heritage Survey
Sept 2013
Sept 2013 1-2 days
Phase 3 utilities diversion (Diversion of utilities in footprint of Broadgate ticket hall)
General watching brief and targeted watching brief
Aug 2013
Aug 2014 Intermittent attendance during diversion works
Page 15 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail J Appendix A — Drawings
Drawing List
1. Location of archaeological investigations. From C257 Fieldwork Report: C257-MLA-X-XCS-CRG02-50015
2. C257 sketch phase diagram for utilities corridor archaeological works
3. C138-MMD-C-DDA-C101_Z-89001 Broadgate Ticket Hall - Enabling Works Utilities Corridor Site Plan
4. MCN12-007-1011 Liverpool Street Station Enabling Works Phase 2 Temporary Works Design For Utility Corridor Section B-B and Section C-C
5. C138-MMD-U-DDA-C101-50052 100 Liverpool Street Sewer Proposed Diversion Plan
Page 16 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Drawing 1: Location of archaeological investigations. From C257 Fieldwork Report: C257-MLA-X-XCS-CRG02-5001
Page 17 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Drawing 2: C257 sketch phase diagram for utilities corridor archaeological work
Page 18 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Drawing 3: C138-MMD-C-DDA-C101_Z-89001 Broadgate Ticket Hall - Enabling Works Utilities Corridor Site Plan
Page 19 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Drawing 4: MCN12-007-1011 Liverpool Street Station Enabling Works Phase 2 Temporary Works Design For Utility Corridor Section B-B and Section C-C
Page 20 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
@ Crossrail Limited RESTRICTED
Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0
Crossrail
Drawing 5: C138-MMD-U-DDA-C101-50052 100 Liverpool Street Sewer Proposed Diversion Plan
Page 21 of 21
Document uncontrolled once printed. All controlled documents are saved on the CRL Document System
Crossrail Limited RESTRICTED
www.crossrail.co.uk
Rev :
E14 5LQ
London
Canary Wharf
25 Canada Square
Crossrail Limited
Notes
Originator :
Location :
Scale : Drawing and CAD file No :
Title :
Suitability :
DateRev. Description By Chkd App
' Crossrail
Co
py
Ap
pr
ove
d f
or
Desi
gn -
Create
d:
20-
SE
P-
20
11
By :
Auth :
Contract :
@ A1
Chk :
App :
Auth
15
13
14
11
LB
LBPHSB
100
TCB
15
35
5
31 to 33
Place
6
BLO
MFIE
LD S
T
12.8m
1
LIVERPOOL STREET
Liverpool St Station
Hope Square4 to 10
Ward B
dy
Ward Bdy
I.
L. 106.372
I.
L. 106.732
I.
L.106.702
I.
L. 106.637
I.
L. 106.668
(5) 225
V.
C. I.
L.106.479
I.
L. 106.513
I.
L. 106.137
S.
L. 107.354
I.
L. 106.429
I.
L. 106.427
(9) 300
V.
C. I.
L. 106.342
(10) 450
C.I. I.
L. 106.327
I.
L. 106.302
(12) 300
V.
C.
+ I.
L. 105.807
I.
L. 106.254
(14) 150
V.
C.
I.
L. 106.090
(1) 225
C.I.
(2) 225
V.
C.
(3) 225
V.
C.
(4) 150
V.
C.
(6) 225
V.
C.
(7) 225
V.
C.
(8) 225
V.
C.
(11) 225
V.
C.
I.
L. 106.333
(13) 225
V.
C.
I.
L. 106.105
(15) 150
V.
C.
BRICK EGG CLASS A ENG BRICK (1230 X 750)
(
16) 225 C
.
I. I.L.
10
6.003
I.L. SE
WER 105.653
(17) 225 C.I. I.L. 106.095
BR
OA
D STREET B
UIL
DI
NGS
SE
WER I.L. 105.320 S.L. 106.531
(18) 225
C.I. I.
L. 105.720
(19)_225
C.I. I.
L. 105.715
(22)_150
V.
C. I.
L. 105.462
225
V.C. I.L. 105.867
150
V.C. I.L. 105.726
I.L. 105.436
S.L. 106.648
AB
AN
DO
NE
D 1939
ABANDONED 1948
Ramp
Steps
Steps
Fire Es
cape
Ventilat
or Roo
m
Plinth
Plinth
Casing
Stair
Metal
110.93
113.03
113.06
UIC
113.15
UIC
113.18
UIC
113.25
113.30
113.41
113.43
113.41
113.43
113.49
113.52
113.53113.54
113.55
Bols
UIC
UIC
UIC
113.570
113.599
113.62
Bols
113.65
113.73
113.76
113.79
114.36
114.370
Greater London Authority
Pillar
Pillar
Pillar
Pillar
Pillar
Pillar
Pillar
Pillar
Stanch
ion
Pillar
2/407
Switch R
oom
No Acc
ess
Retaining Wall
Retaining Wall
Platform Edge
Steps
Pillar
Pillar
Pillar
Escalat
ors to Ce
ntral Lin
e Platf
orms
2/239
2/242
Pillar
Pillar
Pillar
Pillar
Pillar
Locker
s
Operatio
ns
Room
Pillar
Ramp
Steps
Steps
2/151
2/778
2/455
2/454
2/453
2/452
2/451
2/731
2/236
2/317
Fire Po
int
Cable Shaft
Steps
Steps
Switch
Room
Step
Plinth
Plinth
Signal B
ox3/9
93
2/239
Pillar Pilla
r Pillar
Pillar Pilla
r
Pillar
Pillar
Pillar
Pillar
Ramp
Steps
Steps
Steps
Office
Toilet
Pillar
Open To Flo
or Belo
w
LT Elect
icity Su
b Stati
on
Fire Es
cape
Stanch
ion
Stanch
ion
Plinth
Ventilat
or Roo
m
Plinth
Step
Shutters
Shutters
Cladding
Cla
ddin
g
Cladding
Platform 2 (Westbound)
Platform1 (Eastbound)
Circle, Metropolitan, Hammersmith and City Lines
2/664
Metal
Steps
Plinth
Contin
ues
Under
Not
e: T
unnel W
all b
ulges
out from gr
ound line
Arch r
oof co
ntinues
over
2/781
Plinths
appr
ox. 0.13
m high
Plinths
appr
ox. 0.13
m high
Old Quee
n Victo
ria Tun
nel
Gas Me
ter
(disuse
d)
Lo
w
wall
mesh fce
Boarde
d
up
windows
Cable
Shafts
PGM 15
108.20
7m
PGM 13
108.30
3m
PGM 16
108.76
3
Pillar
Open meta
l stairs
Lower Ce
llar to
Pub
Signal B
ox
WC
Disused
Signal B
ox
Access
No
Plinth
Casing
Stair
Metal
110.93
Pillar
Pillar
Pillar
Conc BaseConc Base
Conc Base
Slopin
g Retainin
g Wall
Pillar
Step
Ste
p
Ste
p
Store
Room2/2
81
Steps
Steps
2/663
Elec
2/240
Escape Route
2/662
Elec
Room
Switch
Switch
Roo
m
StepSte
p
Step
Plinth
Plinth
Plinth
Plinth
Inaccessible
Are
a
2/672
2/666
2/667
Escalat
or tray
Plinth
Ste
ps
Shutte
rs
Room
#119
Room
#120
Step
Step
Room
#16
Ra
mp
Plinth
0.6
6m
H
Recess
# 118
Gas
Meter R
oo
m Room
#117
110.181
PGM 1009
AreaLef
t Lugga
ge
Room
WashEscape
Fire
Escape
Fire
Escape
Fire
Step
Room
#15
Ra
mp
Ra
mp
2/239
2/242
Fire
Risers
Cable Shaft
Steps
Step
Pillar
Pillar
Pillar
Pillar
UIC
UICUIC
UIC
UIC
UIC
Ramp
Steps
Steps
Steps
Office
Toilet
Open To Flo
or Belo
w
Fire Es
cape
UIC
Plinth
DP
UIC
UIC
Ventilat
or Roo
m
Plinth
UIC
UIC
Cable
Shafts
UIC
Plinth
Casing
Stair
Metal
110.93
ICe
ICe
ICe
Box
2/672
2/666
2/667
107.95
Room
#120
Step
Step
Room
#16
Ra
mp
Plinth
IC
SumpSump
AreaLef
t Lugga
ge
Room
WashEscape
Fire
Escape
Fire
Escape
Fire
IC
Room
#15
Ra
mp
Grill
(EDF)Elec
ticity S
ub Sta
tionREC
Plinth
Step
Step
Ra
mp
Cable Tro
ugh
Sump
Cable Tro
ugh
IC
Ducts
Cable
Ducts
Cable
(x10)
Cable Ducts
Ducts
Cable
Step
ELDON STREET
BL
OM
FIE
LD
ST
RE
ET
Pillar
Pillar
Pillar
Pillar
Pillar
Pillar Pillar
IR
PillarPillar
Drain
Drain
Pillar
17
Pillar
Pillar
6Broad
Street
17
1
11
100Liverpool Street
23
35
106
Railway
TavernPH
77-7
6
FENCE
SCAFFOLDING
Hatch
RWSteps
Steps
Pillar
PillarPillars
PillarsStep
Vents
Vents
Vents
VentVent
Vent
Vent
Vent
Ste
ps
Steps
RW
RW
Steps
UIC
G
G
Pillar
Pillar Pillar
Pillar
Steps
RW
Steps
BWBW
SC
Drain
Drain
Pillar
Pillar
VentVent
Drain
Step
Steps
Step
BL
BL
BL
BL
BL
BL
UIC
UIC
UIC
Plinth
Steps
Steps
No Acc
ess
Entra
nce to
Liverp
ool St
Und
ergro
und
Entran
ce To
Liverpo
ol St
Underg
round
Shopping Arcade
112.2
2
112.2
2
G
112.2
2
G
IC
112.23
G
G
112.25112.2
7
Steps up
Ramp
ICtel
ICtel
112.29
112.2
9
GV
ICtel
ICtel
112.3
1
STEP
S
DO
WN
ICtel
SC
SC
SC
112.32 UIC G
ICtel
ICe
ICe
ICe
SC
ICtel
ICtel
ICtel
ICtel
112.36
112.3
6
112.3
6
112.37
112.3
8
ICtel
112.38
ICtel
UIC
112.38
112.3
9
GV
112.39
RS
LP
LP
SP
SP
GP
GP
SP
RS
112.39
ICtel
112.4
1
ICtel
112.4
1
ICtel
112.4
2
UIC
UIC
UICUIC
UIC
FH
ICtel
112.42
112.43RS
ICtel
112.43
ICe
112.4
4
UIC
ICtel
MH
RS
SC
LB
ICtel
112.4
6
ICtel
112.47
ICtel
112.4
7
112.4
7
112.4
7
GV
G
112.4
8
112.4
8
GV
ICe
SC
112.4
8
RS
112.48
112.49
112.4
9
112.4
9
SC
SC SC
ICtel
112.4
9
ICtel
SC
112.50
FH
ICtel
112.5
0
SC
112.50
112.51
G
MH
Tarmac
G
UIC
ICtel
Bol
SC
G
ICtel
112.53
112.5
3
112.5
3TPav
112.53
112.5
4
112.54
UIC
G
ICtel
112.54
SVs
112.54
SC
112.55
G
112.55
112.5
5
112.55
SV
IR
G
112.56
112.5
6
112.56
IR
112.57
112.57
SV
112.57
SVs
SV
UICs
SC
IR
TPav
ICe
112.59
ICtel
112.5
9
ICtel
112.5
9
112.5
9
112.6
0ICtel
IR
112.6
0
LB
112.6
0
112.61
IR
G
112.6
1
ICtel
112.6
1
ICe
ICtel
G
TL112.62
IR
ICtel
112.6
2
112.62
112.63
MH
ICtel
ICtel
112.6
3
IR
112.61
112.6
3
IR
112.63
112.63
Bol
112.6
4
MH
TS
112.65
SV
Bol
Bol
Bol
Bol
Bol
Bol
112.6
5
112.6
5
112.66
SC
SC
MH
SCs
TPav
G
112.6
7
Bol
SC
112.6
8
SC
P
112.68
112.6
8
112.6
9
112.69
112.6
9
ICtel
112.6
9
ICtel
ICtel
Bol
ICtel
TPav
Bol
G:0.40S:8.00
H:8
112.71ICtel
TPav
BolICtel
ICtel
112.72
112.7
2
G
ICe
112.7
3
Bol
112.7
4
MH
Bol
112.7
5
112.7
5 TB
TB
112.75
MHws
112.7
5
112.7
6
G
G
TL
ICtel
SV
112.7
7
GV
LP
SCICe
P
P
P
DK
ICe
TL
ICtel
Bol
Bol
TB
112.7
8
G:0.40
S:8.00
H:8
112.78
112.79
ICtel
ICtel
ICtel
UIC
112.7
9
UIC
ICtel
P
FH
Bol
P
ICtel
ICtel
P
P
P
SC
ICtel
ICtel
ICtel
TPav
CAMICtel
TPav
MH
Box
112.83
ICtel
BL
112.83
FH
112.83
G
ICtel
ICtel
Bol
MH
Bol
G
112.8
6
112.86
112.86
112.87
IC
112.87
FH
G
112.88
Line of Marker Studs
SCFH
TL
UIC
SC
112.9
1
112.91
112.91
SC
RS
SCUIC
112.99
G
113.01
113.02
113.02
UIC
113.03113.03
ICtel
113.03
113.04
113.0
5
113.06
GV
113.08
IC
113.10
UIC
G
113.1
1
113.12
Bols
113.13
UIC
113.15
SC
MH
MH
113.16
UIC
ICtel
Bol
113.18
113.18
G
113.20
SC
UIC
113.2
1
Bols
113.22
113.23
113.2
3
FH
FH
UICUIC
UIC
UIC
113.25
MH
RSRS
RS
113.2
7 FH
DK
113.27
ICtel
113.28
113.2
9
113.3
0
113.30
113.30
113.3
1
ICe
113.31
UIC
G
113.3
4
SC’s
113.35
Bols
113.36
113.36
SC
G
MH
MH
UIC
113.3
8
SC’s
SC’s
113.3
9
ICtelSC
113.41
RS
113.4
1
113.4
1
113.4
1
SC
113.4
2
113.4
2
113.42
SC
SC
113.4
3
113.43
113.41
ICtel
113.43
ICtel
RS
ICe
RS
G
113.47
113.47
113.4
7
113.4
8
UIC
UIC
113.4
9
113.4
9
113.49
113.5
0
113.5
0
113.5
0
113.5
0
ICtel
FH
113.5
1
113.5
1
113.5
1
TPav113.51
SC
113.52
GSC
SC
SC
113.53
113.53
SC
113.5
4
113.5
4
FH
113.54
G
113.55
GV
SCLB
SC
LP RS
G
SC
CATV
CATV
113.5
7
Bols
UIC
UIC
ICe
GG
MHMH
ICtel
Bols
ICtel
UIC
113.570
113.599
113.6
0
113.61
113.61
113.61
113.6
2
113.62
113.62
SC
113.63
113.63
Bols
113.64
113.64
Boxs
113.6
5
113.65113.65
G113.65
SC
G
SC
113.6
6113.6
6
113.66
SC
113.67
ICtel
113.68
P
Col
113.68
113.68
113.68
RS
113.69
113.69
113.69
113.7
0
113.70
SCUIC
113.70
113.71
113.7
1
113.72
113.72
113.72
113.72
113.72
Bols
113.73
113.73UIC
113.73
113.73
113.73P
RS
113.75
113.75113.76
LIVERPOOL STREET
113.76
113.76
Bols
P
113.7
8
113.7
8
IR
IR IR IR IR IR
P113.79
113.79
113.7
9
113.79
113.80
113.80
113.80
113.80
Bols
113.82
BolsBols
113.83
113.83 113.83 113.83
BolsCol
113.8
4
113.84
113.84113.85 113.
85
113.85
113.86113.87
113.9
5
UIC
UIC
114.0
3
114.05
114.05
114.08
114.1
4114.16 114.1
7
114.20
MH
114.2
7
114.28
114.2
8
114.33
114.3
6 114.36
114.370
114.37
114.37
114.38
114.3
8114.3
8
114.3
8
114.3
8
114.3
8
114.3
8
114.3
9
114.4
0
114.4
1
114.42
114.43
114.68
Direction of flow
RE
ST
RIC
TE
D
1:200
Plan
Mott MacDonald Limited
Liverpool Street Stn
C138-MMD-U-DDA-C101-50052
S4
Liverpool Street Station Design
---
Key Plan Legend Legend Cont’d
BD Existing Thames Water manhole
Back Drop
100 Liverpool Street Sewer
Existing sewer to be retained
Utilities corridor
Proposed Diversion
Liverpool St. sewer diversion
Proposed sewer diversion as part of
Ex BD
Manhole
Existing British land
Existing sewer connection from 100 Liverpool St.
Crossrail Limited or Crossrail Central.
other parties without consent from either Mott MacDonald Limited or from the party which commissioned it,
This document contains confidential information and proprietary intellectual property. It should not be shown to
being used for any other purpose;
We accept no responsibility for the consequences of this document being relied upon by any other party, or
or used for any other purpose;
It should not be relied upon by any other party, unless the contrary intention is expressly stated in the contract,
Crossrail project only;
This document is issued for the party which commissioned it and for specific purposes connected with the
Subject to the terms of the contract between Crossrail and Mott MacDonald Limited:
Notes
BL
OM
FIE
LD S
TR
EE
T
Eldon Stre
et
1
OL
D B
RO
AD S
TR
EE
T
521
N
Scale 1:100
N = 36300.659
E = 83361.638
Proposed 1400mm Ø sewer
50019
C138-MMD-U-DDB-C101-50012 -
C138-MMD-U-DDA-C101-50010,
diversion works(refer to drg No.s
as part of Liverpool St. sewer
Proposed MH S1 to be constructed
retained.
1230 x 750mm sewer to be
Existing brick egg shaped
to 1230 x 750 mm
sewer. Sewer changes
Stepped section within
units I.D = 1.5m
Pre-cast chamber
=106.980mI.L
=113.210mC.L
Proposed MH S2-100
British Land boundary
I.D= 1.5m
with two backdrops
Pre-cast chamber units
=107.305mI.L
=113.580mC.L
450mm Ø combined sewer
to be located above existing
Proposed MH S1-100
IL = 107.650
CL =112.630
TW MH 0604
(QVT)
Queen Victoria Tunnel
egg shaped sewer.
Existing Brick 1219 x 762mm
be confirmed by further survey.
brickwork invert (refer to note 20). Pipe construction
with concrete lining and cast iron segments with
Existing 1219 x 876mm brick egg shaped sewer
is shown for information only
The proposed Utilties Corridor
Note:
Ex. G
BD
class
A pipe be
dding
450m
m Ø concrete pipe @ 1:70
ductile iron
150mmØ
1
class A pipe bedding
450mm Ø concrete pipe @ 1:70
Basement boundary line
refer to note 19)
(based on existing levels
water drain.Gradient 1:415
combined foul and surface
Existing connections 450Ø
I.L=
BD
I.L=
BD
Ex. BD
refer to note 19)
(based on existing levels
water drain. Gradient 1:415
combined foul and surface
Existing connections 450Ø
I.L. 112.230m**(assumed gradient 1:32)
live and then abandoned after sewer diversion.
to be maintained until new proposed route made
connection from United Bank of Switzerland(UBS)
Approximate location of existing 300mm Ø
MH-EX2
MH S1-100
Gradient 1:100
concrete pipe
Proposed 300Ø
C138-MMD-D-DDA-C101 1-41002)
drainage ( refer to drawing
CRL main works surface water
Backdrop provision for future
BD
BD
A
50057
Broadgate Ticket Hall
Ex. BD
Hall works
to be removed as part of the Broadgate Ticket
Existing brick egg shaped 1230 x 762mm sewer
C138-MMD-U-DDB-C101-50012 to 50019)
drg. No. C138-MMD-U-DDA-C101-50010 &
Liverpool St. sewer diversion works(refer to
Proposed MH S2 to be constructed as part of
using an approved safe method of working.
and competent contractors carrying out the work
These notes are based on the use of experienced
Diii.
Dii.
LIV-004 - Damage to Thames Water Assets Di.
Dismantling/Demolition (Future)
Miii.
Mii.
Mi.
Maintenance
Oiii.
Oii.
LIV-002 - Confined space working Oi.
Operations
LIV-010 Contaminated Land Ciii.
LIV-003 - Working with or near a live sewer Cii.
LIV-001 - Striking or damage to identified/ unidentified utilities Ci.
Construction
normally associated with this type of work:
Notes below are additional to hazards/risks
Safety, Health and Environmental Information
Existing Back Drop
ExG Existing Gully Surface water connection
1
I.L = 106.270
04m 4m 8m 12m 16m 20m
IL = Unknown
CL = Unknown
asset record
TW MH 0605 - based on TW
brick egg shaped sewer
Existing 1480 x 1050mm
MH S2-100
MH S1-100
be retained.
1219 x 762mm sewer to
Existing brick egg shaped
Hall works
and removed as part of Ticket
Existing sewer to be abandoned
=1.5m ID
=107.340m*I.L
=113.600m*C.L
(To be retained)
Existing British land MH - EX 2
diversion. Crown level = 112.230m**(assumed gradient 1:32)
proposed route made live and then abandoned after sewer
United Bank of Swizerland(UBS) to be maintained until new
Approximate location of existing 300mm Ø connection from
I.D= 2.1m
=107.370m*I.L
=114.370m*C.L
(To be retained)
Existing British land MH - EX 3
Plan A
02m 2m 4m 6m 8m 10m
(based on existing levels - refer to note 19)
connected to MH S1-100 Gradient 1:75
foul and surface water drain to be
Existing connection 450mm Ø combined
MH-EX1
Refer to Plan A
Refer to Plan A
Hall works
part of the Broadgate Ticket
MH EX 1 to be removed as
manhole EX 1 is abandoned.
be abandoned once existing
Existing gully connections to
=1.8mI.D
=107.270m*I.L
=113.570m*C.L
(To be abandoned)
Existing British land MH - EX 1
C5
***
M2
C6
C1*
**
*
*
C2
C3
C4
M1
C* - Coordinates of incoming/outgoing pipes inside of manhole
M* - Coordinates at intersection of channels within Manhole
Key:-
Eastings Northings
C1
83401.977 36305.391
83402.431 36305.606
83402.232 36304.861
83401.360 36305.065
83402.068 36305.924
C2
C3
C4
M1
Eastings Northings
83379.474 36309.334
83378.939 36309.062 C6
M2
83380.062 36309.217
MHS1-100 Manhole Internal connection co-ordinates MHS2-100 Manhole Internal connection co-ordinates
C5
Manhole Coordinates
(450mm Ø sewer)
= 106.700IL
shaped sewer)
= 106.320 (existing eggI.L
= 112.480C.L
sewer by Saddle/side connection
existing Thames Water
Proposed connection to
22/08/2011 DKACJBP02
- refer to note 19
water drain (source unknownTBC)
Existing 300mm Ø foul and surface
and removed
Existing sewer to be abandoned
STREET
LIVERPOOL
required into manhole
11.5” connection pipe
at all times
Streets building to be maintained
(flows) from 100 Liverpool
All existing sewer connections
MH S2-100
connected to diverted sewer
Existing gully connection to be
excavation for future main works pilling
to install sheet pile protection barrier within
and is shown for information only. Contractor
main works following the sewer diversion
Will be constructed as part of
Extent of proposed Broadgate Ticket Hall.
clearance for segmental pipe sections
future main works pilling and allow
barrier within excavtion for
Contractor to install protection
existing survey levels - refer to note 19 & 24)
Ticket Hall works, Gradient 1:15(based on
is to be removed as part of the Broadgate
made live and then the existing connection
at all times until the new proposed route is
Existing 450mm Ø sewer flow to be maintained
refer to note 19
drains (source unknown)
300mm Ø (surface water)
Existing 150mm Ø (foul) &
by Thames Water (refer to note 24)
connection is based on the dye testing
Approximate route of existing UBS
Proposed 100 Liverpool Street sewer diverson (ØID)
SADKSC10/05/2011P01 Initial Design Submission
Final Detailed Design Submission (EAI071)
See note 30
assumed 500mm
Extent of basement wall
Contractor.) See note 30
(Extent to be confirmed by the
to accommodate sewer diversion.
cut down/broken out if necessary
Existing sheet pile wall to be
TWDP Final Design Review Comments Resubmission
the existing structure of 100 Liverpool Steet
30. Conctractor to confirm route can be constructed without impacting
protected during trench excvation for sewer installation
29. Existing cables and ducts need to be accommodated and
C138-MMD-U-DDA-C101-50062.
28. For proposed highway arrangements refer to drg. No.
CRL1-XRL-U-DDA-C101-00147.
27. For combined utilities plan refer to drg. No.
by Crossrail.
26. Other utility diversions from 100 Liverpool St. to be coordinated
survey drg. No. A041-XX-00525-DES-A.
25. Levels shown suffix 1, are based on Thames Water line & level
LSS/CS/01.
Water dye testing survey, and City of London survey drg. No.
24. Existing connection location and alignment is based on Thames
23. MH S2-100 to be located within the British Land boundary.
Central
Drg. No. CRL1-XRL-U-DDB-C101-00008 received from Crossrail
22. All levels shown suffixed with double astrix, thus** are based on
to 50019.
C138-MMD-U-DDA-C101-50010, C138-MMD-U-DDB-C101-50012
Sewer diversion drawing refer to drg. No.
advance of Liverpool Street sewer abandonment. For Liverpool St.
21. 100 Liverpool Street sewer diversion works to be completed in
No. LE30-21/07
20. Pipe construction information is based on archive record drg.
site survey, report No. C138-MMD-U-RGN-C101-50008.
19. All levels shown suffixed with an asterisk, thus *, are based on a
are based on the Thames Water drg. No. A041-XX-00525-DES-A
18. Existing Liverpool, Eldon & Blomfield Street sewer alignments
17. Internal diameter of existing & proposed pipe shown on drawing.
times
16. All exisitng sewer connections to be maintained in operation at all
15. Detailed design to be agreed with Thames Water.
commencement of works.
14. All necessary approval/agreement to be obtained prior to
13. All incoming and outgoing pipes to be laid with level soffits.
of the Contractor.
12. All temporary works required for construction are the responsibility
the Engineer.
by the Contractor. Any changes on site to be checked with
connections from 100 Liverpool Street and to be confirmed on site
11. Chamber/Manhole locations subject to position of existing sewer
drawings, reports and specifications.
Liverpool Street utilities corridor works and other consultants
10. This drawing shall be read in conjunction with all structural
C138-MMD-U-DDB-C101-50053.
9. For sewer longitudinal section refer to Drg. No.
C138-MMD-U-DDD-C101-50053 & 50054.
8. For construction details refer to Drg. No.
Drg No. C138-MMD-U-DDB-C101-50057.
and proposed Broadgate Ticket Hall piling refer to
7. For section between 100 Liverpol Street basement
C138-MMD-U-DDA-C101-50063.
6. For proposed water main diversion plan refer to Drg. No.
5. The drainage design is based on the Sewers for Adoption 6th edition.
File No. CRL1-XRL-G-DMA-CR088-00015
Topographical survey drawing received by Crossrail
4. All levels shown on this drawing are based on the existing
See Crossrail standard CR-STD-010.
height datum which is 100 metres below Ordnance Datum Newlyn.
3. Coordinates to the London Survey Grid, heights to the London
2. All dimensions are in metres unless specified otherwise.
1. Do not scale from this drawing.
J.BHAMBRA
JB20/09/2011P03
P03
A.CHAUDHRY
AC
D.KEOGH
DK
Fit for auth
orisation
www.crossrail.co.uk
Rev :
E14 5LQ
London
Canary Wharf
25 Canada Square
Crossrail Limited
Notes
Originator :
Location :
Scale : Drawing and CAD file No :
Title :
Suitability :
DateRev. Description By Chkd App
' Crossrail
Co
py
Ap
pr
ove
d f
or
Desi
gn -
Create
d:
17-
OC
T-
20
12
By :
Auth :
Contract :
@ A1
Chk :
App :
Auth
Cable
Shafts
ICe
Rev.
Date
b
converted fr
om orig
inal 3d
file to
2d des
ign file
23/11/9
3
15
12
13
14
20
11
23
19
2120SL
LB
17
LBPHSB
SL
18
100
TCB
22
70
74
15
35
TCB
PCPBank
Street
1
Broad
5
4
2
31 to 33
BLO
MFIE
LD S
TREET
Place
3
6
BLO
MFIE
LD S
T
12.8m
1
76 to 8
0
LIVERPOOL STREET
AVENUE
Liverpool St Station
Subway
BROAD STREET
Hope Square
TCBs
4 to 10
Ward B
dy
Ward Bdy
RE
ST
RIC
TE
D
1:200
Site Plan
Mott MacDonald Limited
Liverpool Street Stn
C138-MMD-C-DDA-C101_Z-89001
Liverpool Street Station Design
N
PH
Tavern
Railway
OL
D
BR
OA
D
ST
RE
ET
Western End Typical Section Eastern End
04m 4m 8m 12m 16m 20m
DKDBPC25/09/2012P04CC503
Utilities Corridor
Broadgate Ticket Hall - Enabling Works
4321 5 6 7 8 9 10 114350 4350 4350 4350 4350 4350 9663 9000 9000 9000
C
QVT Support Wall South
Existing Queen Victoria Tunnel (QVT).
Utilities Corridor
1 - 14 Liverpool Street
QVT Support Wall North
Foam Concrete
Sewer Diversion
Proposed Liverpool Street
Crossrail Limited or Crossrail Central.
other parties without consent from either Mott MacDonald Limited or from the party which commissioned it,
This document contains confidential information and proprietary intellectual property. It should not be shown to
being used for any other purpose;
We accept no responsibility for the consequences of this document being relied upon by any other party, or
or used for any other purpose;
It should not be relied upon by any other party, unless the contrary intention is expressly stated in the contract,
Crossrail project only;
This document is issued for the party which commissioned it and for specific purposes connected with the
Subject to the terms of the contract between Crossrail and Mott MacDonald Limited:
Sewer
Existing Liverpool Street
2. Denotes footprint of Utilities Corridor.
1. For General Notes, refer to drg no. C138-MMD-C-DDJ-C101_Z-89004.
Key Plan
N
Granular Backfill
street level escalator piles
Broadgate Ticket Hall
DKACJB25/07/2011C01
BL
OM
FIE
LD
ST
RE
ET
ELDON STREET
using an approved safe method of working.
and competent contractors carrying out the work
These notes are based on the use of experienced
Diii.
Dii.
Di.
Dismantling/Demolition (Future)
equipment due to traffic noise.
UC-018 - Operatives fail to hear gas monitoring Miii.)
UC-001 - Inadequate ventilation within Utilities Corridor. Mii.)
public from open manhole.
- Hazard presented to members of the
UC-004 - Access to chamber in public footpath Mi.)
Maintenance
Oiii.
Oii.
Oi.
Operations
Liverpool Street.
properties on south side of Utilities Corridor
UC-019 - Restricted access for emergency services to Cviii.)
Regus building.
UC-012 - Risk of collapse of basement to adjacent Cvii.)
services.
UC-007 - Operative injury due to striking existing Cvi.)
UC-010 - Exposure to asbestos fibres in existing QVT.Cv.)
excavation caused by Burial Ground BG208.
UC-006 - Risk to operatives from diseases during Civ.)
Sewer - Biohazard to site personnel.
UC-16a - Collapse/Damage to adjacent Thames WaterCiii.)
Corridor.
within the QVT and adjacent to the Utilities
UC-015 - Stability of adjacent inhabited structures Cii.)
UC-011 - Stability of the QVT in the temporary condition.Ci.)
Construction
normally associated with this type of work:
Notes below are additional to hazards/risks
Safety, Health and Environmental Information
DKACJB14/07/2011P03
SABHIW17/02/2011P02
C503 RIBA F Submission
P04
P.CRUTTENDEN
PC17/10/2012C02
C02
D.BARTLES
DB
D.KEOGH
DK
Fit for construction
SAPJ
First Issue
27/08/2010
P01.1
BH
SSIssued as Fit for construction
RIBA E SubmissionP01
-Update to incorporate City of London and UKPN requirements
C503 RIBA F Submission
A
L.EDGE