  • 8/17/2019 review of reservoir management

    1/17

    CHAPTER TWO

    LITERATURE REVIEW

    2.1 Background of Study

    Petroleum reservoir management is a dynamic process that recognizes the uncertainties in

    reservoir performance resulting from our inability to fully characterize reservoirs and

    flow processes. It seeks to mitigate the effects of these uncertainties by optimizing

    reservoir performance through a systematic application of integrated, multidisciplinary

    technologies. It approaches reservoir operation and control as a system, rather than as a

    set of disconnected functions. As such, it is a strategy for applying multiple technologies

    in an optimal way to achieve synergy (Karimi, !"#$.

  • 8/17/2019 review of reservoir management

    2/17

    !g 2.1" %he &eservoir 'anagement hallenge

    %he reservoir management process must be tailored to individual fields depending on

    (Karimi, !"#$)

    • *ize

    • omple+ity

    • &eservoir and fluid properties

    • epletion state

    • &egulatory controls

    • -conomics

    2.2 T#$ conc$%t of R$&$r'o!r (anag$)$nt

    2.2.1 *$f!n!t!on

    &eservoir 'anagement has been defined by Al/ussainy and /umphreys as 0the

    marshalling of all appropriate business, technical and operating resources to e+ploit a

    reservoir optimally from discovery to abandonment. &eservoir 'anagement is about a

    careful orchestration of technology, people 1 resources (*apulli et al., !!2$.

  • 8/17/2019 review of reservoir management

    3/17

    !g 2.2) &eservoir 'anagement as the key to success in the life of a reservoir 

    2.2.2 R$&$r'o!r (anag$)$nt Pr!nc!%+$&

    2.2., Stag$& of r$&$r'o!r (anag$)$nt

    3asically, there are five main contributors to an integrated reservoir management

    (Kalaydjian and Bourbiaux, 2002))

     4 well design and management5 4 reservoir characterization and description5

     4 reservoir modeling5

     4 surface facilities design5

     4 economics.

  • 8/17/2019 review of reservoir management

    4/17

    It impacts the various facets of a field6s life, economic and uneconomic (see figure

     below$.

    !g 2.,) &eservoir 'angement Process (7ringarten, "889$

    *ome of the stages of reservoir management are discussed as follows.

    2.2.,.1 R$&$r'o!r *$&cr!%t!on

    :ne of the most important stages of reservoir management is reservoir description,

    this stage is to identify and present a model for describing the reservoir which it6s

     behavior and answer be similar to the actual behavior of the reservoir as much as

  • 8/17/2019 review of reservoir management

    5/17

     possible. &eservoir description is a dynamic process which is repeated as soon as

    receiving the new information.

    &eservoir model is yield from integrating the interpret models of different types of 

    information and by engineering software (*a;;adiyan,

  • 8/17/2019 review of reservoir management

    6/17

    of inflows and outflows and by the effects which are applied on the input flow and output

    flow the flow rate reach the optimal and economical status (Asadzadeh =arkhan, 3.,

    !"!$.

    2.2.,. W$++ *$&!gn and (anag$)$nt

    In order to optimize the production and increase the reserves, the e+ploitation of the

    reservoirs through comple+ wells (&enard et al., "889$ (horizontal wells, -& (-+tended

    &each rilling$ wells, multibranched wells$ has become the common practice. %he ma;or 

    drilling progress performed during the last ten years has led to multiple options for well

    design) stacked multibranch well, dual opposing laterals, reentry laterals from a vertical

    well, cluster well, multidrain or multilateral well, even > wells for reservoirs with a

    comple+ structure or sparselydistributed reservoir bodies. *uch wells have many

    advantages over conventional vertical wells)

     4 their in;ectivity?productivity is increased and their investigated area is larger, which

    allows to drill fewer wells5

     4 they enable to add reserves to difficult fields, characterized by thin reservoirs for 

    instance5

     4 and they increase the benefit of -:& methods since they provide higher sweep

    efficiencies.

    7uaranteeing the in;ectivity?productivity of those wells is a ma;or issue as well. It is thus

    re@uired to prevent as much as possible or remediate to any impairment (due to the

  • 8/17/2019 review of reservoir management

    7/17

    invasion of drilling and completion fluids, particle deposition and retention$. =or this

    reason, well productivity and in;ectivity restoration has to be part of the pro;ect

    implementation plan, especially for openhole comple+ wells (ongeron et al., !!!$. %he

    design of improved remediation methodologies can be optimized using a laboratory

    approach that contributes to improve the physical understanding and modeling of well

     productivity and in;ectivity. &egarding implementation plan, actions include)

     4 the use of breakers to overcome cake barrier5

     4 stimulation procedures involving acid fracturing and matri+ acidizing5

     4 well treatment by gels to prevent massive water or gas production, a drastic

    re@uirement for optimizing surface treatment facilities5

     4 and also an overall management of well rates at reservoir scale.

    omple+ wells combined with conventional and -:& processes such as gas in;ection,

    viscous flooding or thermal flooding represent new opportunities for mature fields. et us

    consider the polymer flooding method. %he very long tra;ectories of comple+ wells

    minimize the risks of polymer degradation because of lower flow rates around the

    in;ector, whereas their in;ection rate remains higher than that of a vertical well. %hus,

    fewer in;ectors are re@uired and moreover, the method can be applied to reservoirs having

    lower permeability than the limit imposed by vertical wells.

    %o end with, a detailed modeling of the well neighborhood using unstructured grids and

    improved PI6s (Productivity Inde+ =ormulations$ (Beannin et al, !!!$ is useful for 

  • 8/17/2019 review of reservoir management

    8/17

    assessing well impairment and predicting well productivity?in;ectivity remediation

    efficiency. *uch a modeling has to take into account the comple+ flow geometry around

    the well (perforation effects, etc.$ as well as possible multiphase flow effects, with a

     proper calibration from laboratory e+periments (ing et al, !!$.

    2.2., (ot!'at!on for r$&$r'o!r (anag$)$nt

    It is generally known that sound reservoir management policies is a panacea for sustained

    success. ompanies like -++onmobil, 3P, %otal, *hell etc have been successful because

    of their huge reserves discovery but have remained successful because of the reservoir 

    management policy they operate by. *ome of the motivation for reservoir management

    are summarized in the table below.

    Ta/+$ 2.1) 'otivation for &eservoir management (*aputelli et al, "88C$

  • 8/17/2019 review of reservoir management

    9/17

    2., R$&$r'o!r )anag$)$nt Proc$&&

    =or many years, the dream of the oil company operators has been to integrate the data,

    interpretations, models, simulations, and effects of development and production decisions

    in such a way as to optimally deplete the reservoir according to a business model and

    economic constraints (Kha;avi, A., !!85 %ayyebi et al, !!2$.

    %he basic steps are shown below.

    !g 2."  Key Inputs and basic steps of the overall reservoir 'anagement Process

    (7ringarten, "889$

    A central step in reservoir management is the development of a reservoir model that can

     be used in mapping the distribution of fluids, identifying unswept reservoir volumes and

  • 8/17/2019 review of reservoir management

    10/17

    developing production strategies, including placement of infill wells, design of in;ection

    and production programs (such as e+tended well testing$, and targeting of horizontal and

    multilateral (multiple wells from the same primary wellbore, possibly with further 

     branches and subbranches$ wells.

    %he model must capture reservoir geometry, internal architecture, rock properties and

    their variability, content and distribution, fluid properties and producibility.

    Key elements of the flow simulation include the fluid mechanics of multiphase fluids in

    comple+ porous and fractured media, the thermophysical properties of hydrocarbon

    fluid?a@ueous salt solution mi+tures and their variation with temperature?pressure and

    their thermodynamic phase behaviour under reservoir and production conditions. %he

    overall ob;ective of building the model is reduced reservoir uncertainty in a broad sense,

    from prospect appraisal to production e+tension. %his is a key to e+ploration risk 

    reduction and to optimum reservoir management.

     Dot shown in the figure, but underlying all elements of the process, is the ata

    'anagement system responsible for all data involved in reservoir management. -fficient

    data management and software integration are of prime importance throughout

    (7halehban, !"!$. %hey often limit the practicality of iterative, detailed reservoir model

    development and 0what if6 scenario planning.

    2. R$&$r'o!r (anag$)$nt *$c!&!on&

    2..1 W$++ +ocat!on for d!ff$r$nt ty%$& of r$&$r'o!r&

  • 8/17/2019 review of reservoir management

    11/17

    %he reservoirs and the well cost used in all previous the case studies represent the situation of a

    development plan for mediumsize onshore reservoirs. If the well cost was much smaller (as in

    onshore reservoirs$ or the size of the reservoirs was much bigger, the optimal number of wells

    would be much larger and the modeling of the geological uncertainty could be less relevant for 

    the decision of the best number of wells and their spatial configuration.

    'odeling the geological uncertainty between the conditional data is only relevant for the

    decision of the best scenario if that decision varies depending on the realization.

    =or a very large number of wells, the scenarios are defined by different grids (or patterns$ of 

    wells with regular spacing between the wells and the particular behavior of a few wells would

    not change the overall response of a scenario. %he overall response of a scenario is determined

     by the spacing between the wells in the regular grid defined in the scenario and by the average

     properties of the reservoir, instead of by any local characteristic.

    If the average properties of a reservoir do not change from one realization to another, because

    they are correctly depicted by the conditional data which are honored by all realizations, the

    decision of the best scenario (grid of wells$ would be the same with any realization.

    2..2 V$rt!ca+ or #or!0onta+ $++

    %he decision to drill a well vertically or horizontally is governed by the differences in cost and in

     production (or in;ection$ of the two types of well. *ince a horizontal well is more e+pensive, it

    must produce (or in;ect$ more and?or longer than a vertical well.

    %he final oil recovery with a horizontal well may be higher than with a vertical well because of 

    two characteristics of a horizontal well)

  • 8/17/2019 review of reservoir management

    12/17

    ("$ higher productivity (or in;ectivity$ due to a greater length of the interval completed in the

    well, and ($ better location of the completed intervals.

    In general, the reservoirs in which a horizontal well is e+pected to work better than a vertical

    well have a small oil column and good vertical permeability. *ome common situations where a

    horizontal well may be preferred are)

     *mall oil column with gas cap and?or bottom a@uifer.

     %hin oil layer with good permeability embedded in other layers with much smaller permeability.

     Daturally fractured reservoirs, with the direction of the horizontal well normal to the fractures.

    %he geological characterization necessary to determine if a reservoir is appropriate for horizontal

    wells is typically performed at the macroscale and this kind of characterization does not change

    from one realization to another. =or e+ample) if there is a gas cap in one realization it would be

     present in all the realizations5 if the average oil column is five meters in one realization, it is not

    likely to be #! meters in any other5 if the average ratio of vertical permeability over horizontal

     permeability is !.# in one realization, it is not likely to be !." in any other, etc.

    %herefore, in general, the consideration of multiple realizations to decide between vertical and

    horizontal wells is not likely to be relevant.

    2.., Int$r'a+& to co)%+$t$ a $++

    %he decision as to which intervals to complete in a well is made after the drilling of the well and

    is based on)

    ("$ the overall recovery strategy for the field and

    ($ the specific electric logs of that well.

  • 8/17/2019 review of reservoir management

    13/17

    %he overall recovery strategy for the field is determined using geological characterization at a

    macroscale, which is the same for all the realizations. =or e+ample, if the oil column is thick with

    homogeneous permeability, if there is an active bottom a@uifer and if no gas cap is e+pected to

     be formed during production, the strategy may be to complete only the upper intervals for 

     production. In another e+ample, if the reservoir is multilayered with small hydraulic

    communication between the layers and if there is a lateral a@uifer or waterEood, the strategy may

     be to complete all the good layers to start producing and to return to the well in the future to

    close some intervals with very high water cut.

    %he definition of the specific intervals to complete in a well is made based on the electric logs,

    which show the good and bad intervals for that well. %ypically, the data from the well are

    considered deterministically, the well information is assumed laterally continuous around the

    well and no uncertainty is considered in the definition of the specific intervals to complete in the

    well.

    %herefore, in general, the consideration of multiple realizations to decide the intervals to

    complete a well for production is not likely to be relevant.

    2.. 3u)/$r of %+atfor)&

    %he definition of the number of platforms is not really a problem different from the definition of 

    the optimal number of wells and their spatial configuration5 the number and location of the

     platforms must be part of the scenario definition. %he prot function used to compare the

    scenarios must incorporate the costs of different numbers of platforms and the costs of the Eow

    lines to connect the wells to the platforms.

  • 8/17/2019 review of reservoir management

    14/17

    -ven for the case where ;ust one platform is considered in all the scenarios, the location of the

     platform must be known to allow the incorporation of the costs of the Eow lines into the prots

    resulting from the production of different numbers and locations of wells. =or e+ample, it may

    happen that an additional well gives sufficient additional production to pay the additional drilling

    cost, but that well may be very far from the platform and the inclusion of its Eow line costs may

    lead to a lesser prot. onsidering geological uncertainty may be relevant to decide between one,

    two or three platforms when the number of wells is moderate (less than #!$. %he necessity to

    consider scenarios with different number of platforms depends on)

     %he ma+imum number of wells within the range of possible numbers of wells defined by the

    scenarios.

     %he e+pected total length of the production lines with different number of platforms.

     %he cost of the Eow lines by unit of length.

     %he cost of the platforms with different sizes (number of wells$.

    Fsing the ma+imum number of wells, if the cost of increasing the number of platforms increases

    more than the decrease in the cost of the Eow lines, then there is no necessity to consider 

    different numbers of platforms in the scenarios.

    /owever, if the cost of increasing the number of platforms is similar to or smaller than the

    decrease in the costs of the Eow lines, then different numbers of platforms need to be considered

    in the scenarios.

     Dote that the assessment of the necessity to consider different numbers of platforms in the

    scenarios is not inEuenced by the geological uncertainty, for a moderate number of wells.

  • 8/17/2019 review of reservoir management

    15/17

    =or a very large number of wells, the scenarios are defined by regular grids of wells and the

    number of platforms is defined based on the costs of platforms, costs of Eow lines and

    multiphase Eow constraints5 the eventual difference of production between the realizations does

    not a reflect the decision of the number of platforms.

    2..4 Ty%$ of $n#anc$d o!+ r$co'$ry

    ake ("889$ denes enhanced oil recovery as oil recovery by the in;ection of materials not

    normally present in the reservoir. %he common types of enhanced oil recovery and their recovery

    mechanisms are)

    • hemical

    • %hermal

    o *team (drive and stimulation$ reduction of oil viscosity and vaporization of light

    ends.

    o Insitu combustion same as steam plus cracking.

    • *olvent

    o Immiscible reduction of oil viscosity and oil swelling.

    o 'iscible same as immiscible plus development of miscible displacement.

    3ased on the physical mechanisms of the recovery, it is clear that the Euid properties are more

    important than the rock properties in the selection of the type of enhanced oil recovery to apply

    in a reservoir. Although geological uncertainty may have some inEuence in the selection of the

    type of enhanced oil recovery, the uncertainty that is really important is the uncertainty in the

    Euid properties.

    2..5 T!)$ to &tart at$r !n6$ct!on

    =or reservoirs with original gas cap, a good practice is to starting in;ecting water at the same time

    the production starts.

  • 8/17/2019 review of reservoir management

    16/17

    =or reservoirs with original pressure above the saturation pressure, a company may have a

    financial gain in delaying the water in;ection until the pressure drops to a value ;ust above the

    saturation pressure. %his G;ust above the saturation pressureH point in time is determined by

    material balance.

    'aterial balance uses the average properties of the reservoir and, therefore, the modeling of 

    geological uncertainty is not necessary to decide the time to start in;ecting water.

    2..7 *!r$ct!on of a #or!0onta+ $++

    If the reservoir is naturally fractured, the horizontal well should be drilled normal to the main

    direction of fracture to induce the Eow to be in the direction of higher permeability and to

    communicate a large area of the reservoir with the well. %ypically, the definition of the main

    direction of fractures is made based on seismic data without modeling of the geological

    uncertainty.

    If the reservoir is clearly elongated in one direction, the direction of the horizontal well may be

    determined without any consideration about the geological uncertainty.

    epending on the dimensions of the reservoir, a few horizontal wells aligned with the reservoir 

    length or several horizontal wells aligned with the reservoir width may be defined.

    =or other reservoirs, though, the definition of the direction of a horizontal well is basically the

    same problem of the definition of the number and spatial configuration of vertical wells and the

    consideration of the geological uncertainty is relevant.

  • 8/17/2019 review of reservoir management

    17/17

    %he most common action taken to improve the oil recovery of a reservoir is to in;ect water (or 

    gas$. Fnless the reservoir is known to have a very large a@uifer (and?or gas cap$, in;ection is

    always considered in the development plan.

    *imilarly to a producer well, the performance of an in;ector well depends on the specific

     properties of the reservoir around the well and the consideration of the geological uncertainty

    through multiple realizations may lead to different definitions of the best number and

    configuration of in;ector wells.

    Among the other types of reservoir management decisions, this problem of defining the best

    in;ection scenario was selected, because)

    (a$ consideration of in;ection is common and important in the definition of the development

     plans,

    (b$ the benefits of accounting for the geological uncertainty in the definition of the best in;ection

    scenario needed to be @uantified,

    (c$ this problem complements the e+ample used in the previous case studies for the definition of 

    the best scenario including producer and in;ector wells.

    %he best in;ection scenario determination must be integrated with the definition of the best

     production scenario. %he best number of in;ector wells depends on the number of producer wells

    and the best spatial configuration of in;ectors depends on the spatial configuration of producers.

    %herefore, any in;ection scenario is associated with a production scenario.