Review of ConceptsReview of Proposed
Golf Course Renovation Concepts
Updated March 9, 2017
Kipp Schulties - Architect
Kipp Schulties: President/Architect25 Years of Golf Course Design Experience
• Civil Engineering: PURDUE UNIVERSITY
• MBA Finance: UNIVERSITY OF MIAMI, FL
• Professional Affiliations:
Gene Bates, Fred Couples,Jack Nicklaus, Ian Baker-Finch
Honda Classic Ambassador PBGCSA, EGCSA Chapter member
Kipp Schulties: President/Architect25 Years of Golf Course Design Experience
• Civil Engineering: PURDUE UNIVERSITY
• MBA Finance: UNIVERSITY OF MIAMI, FL
• Professional Affiliations:
Gene Bates, Fred Couples,Jack Nicklaus, Ian Baker-Finch
Honda Classic Ambassador PBGCSA, EGCSA Chapter member
KSGD: Associates
Lee Marshall: Senior Architect
Landscape Architecture: University Of Georgia
Graham Moecker: Design Associate
Landscape Architecture: Florida International University
Partial Southeast Florida Client List
o Adios Golf Club (Palmer)
Coconut Creek
o High Ridge CC (Lee)
Boynton Beach
o Hunters Run CC East (Litten)
Boynton Beach
o Lost Tree Club (w / Nicklaus)
North Palm Beach
o Addison Reserve CC (Hills)
Delray Beach
o The Boca Raton Resort (Flynn) (Resort Course)
Boca Raton
o Riviera CC (Ross)
Coral Gables
o Mayacoo Lakes CC (Nicklaus)
West Palm Beach
o Admirals Cove (Henderson)
Jupiter
o Lago Mar CC (Watt)
Plantation
o Gleneagles CC (Litten)
Delray Beach
o BallenIsles CC North Course (Lee)
Palm Beach Gardens
o Florida Keys Resort (Mahannah)
Marathon
o Stonebridge CC (Litten)
Boca Raton
o Vanderbilt CC (Lewis)
Naples (2015)
o Copperleaf GC (Lewis)
Bonita Springs (2015)
o Island Country Club (Palmer / Sarazen)
Marco Island (in 2017)
o Gulf Harbour Yacht & CC (Powell)
Fort Myers (in 2019)
o Fiddlesticks CC (Wee Friendly) – (Garl)
Fort Myers (in 2018)
o Imperial Golf Club (Hills)
Naples (2012 and 2015)
Partial Southwest Florida Client List
Renovations over 1 million between 2007 and 2012
Kipp Schulties Golf Design Sample Before and After Photos
o BallenIsles North Course – Hole # 13
o Adios Golf Club – Hole # 1
Hole # 13 Before Redesign (195 yard Par 3)
Hole # 13 After Redesign – 173 Yard Par 3
Adios Hole # 1 After Redesign
Focus Group Purpose(Why they Are conducted)
o Golf Course Renovation in South Florida is Normal and Typical
Focus Group Purpose(Why they Are conducted)
o Gather Feedback from the membership on the current course condition
o Gather Feedback by Skill Set (This is Key)
o Comments / Thoughts / Opinions and Results Defines the Renovation by Addressing Needs and Desires of the Membership (not the Golf Course architect)
Hole-by-Hole Analysis of
Proposed Golf Course Concepts
“Typical” Renovation Calendar for 2019 Project
l Master Planning: Winter / Spring 2017l Course Design: Winter – Summer 2018 l Permitting: Fall 2018l Contractor Bidding: Fall 2018l Grass Eradication: Spring 2019l Construction: April - Mid August 2019l Grow - In: August thru Novemberl Grand Re-opening: November 2019