1.review the design status and performance of all dedicated insertions 2.review the overall lattice integration and space allocation/optimization 3.review the performance of the integrated lattice in terms of dynamic aperture, error tolerances etc. 4.identify any areas with optimization potential and propose high-priority actions towards the next milestone, FCC week Rome in April review goals 02/12/2015F. Burkart3TRANSCRIPT
![Page 1: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/1.jpg)
review of FCC-hh optics & beam
dynamicsIPNO, Orsay, Paris
19-20 November 2015
Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann (CERN, chair)
Work supported by the European Commission under the HORIZON 2020 project EuroCirCol, grant agreement 65430502/12/2015 F. Burkart 1
![Page 2: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/2.jpg)
review agendaTime (19.11) length title speaker14:00 Welcome and review goals Michael Benedikt14:00-14:20 20 min. Arc lattice, lattice integration Antoine Chance14:20-14:40 20 min. IR lattice Andrei Seryi14:40-14:50 10 min. Minimum separation of detectors Rob Appleby14:50-15:05 15 min. Collimation system requirements Stefano Redaelli15:05-15:20 15 min. Betatron& momentum coll. lattices Antoine Lachaize15:20-15:40 20 min. Collimation tracking & evaluation James Molson15:40-16:10 30 min. Discussion16:10-16:30 20 min. Coffee break16:30-16:45 15 min. Injection lattice section Florian Burkart16:45-16:55 10 min. Integration of RF Bernhard Holzer 16:55-17:10 15 min. Extraction/dump lattice section Florian Burkart17:10-17:30 20 min. Errors,tolerances,corrections DA Barbara Dalena17:30-18:00 30 min. Overall layout & optimization Daniel Schulte18:00-18:30 30 min. Discussion
Time (20.11) length title Speaker09:00-11:00 120 min. Executive session (closed) reviewers
Additional invitees: WP2 and WP3 participants, R. Aleksan (ECB chair)02/12/2015 F. Burkart 2
![Page 3: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/3.jpg)
1. review the design status and performance of all dedicated insertions
2. review the overall lattice integration and space allocation/optimization
3. review the performance of the integrated lattice in terms of dynamic aperture, error tolerances etc.
4. identify any areas with optimization potential and propose high-priority actions towards the next milestone, FCC week Rome in April 2016.
review goals
02/12/2015 F. Burkart 3
![Page 4: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/4.jpg)
Review of FCC-hh optics & beam dynamics
Extraction lattice section
19. / 20. November 2015
Input fromM. Barnes, W.Bartmann, M.Benedikt, F.Burkart, B.Goddard,
W.Herr, T. Kramer, A. Lechner, D. Schulte, L.Stoel
02/12/2015 F. Burkart 4
![Page 5: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/5.jpg)
• Beam extraction concept and optics.• Dilution kicker requirements.• Beam dump line geometry.• Conclusions
Outline
02/12/2015 F. Burkart 5
![Page 6: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/6.jpg)
Extraction straight options
Too tight.R2E.
MKB parameters.
Too tight.R2E.
MKB parameters.
02/12/2015 F. Burkart 6
![Page 7: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/7.jpg)
• “Conventional” beam extraction system, 1 per beam.
• Segmented kicker system • Try to minimize frequency of asynch. dump by accepting a single switch erratic
– Reduce beta function (in bending plane) at the kicker to limit the oscillation from an erratic
– Increase beta function at septum to have better kick efficiency (trade off with septum width) and to have beam dilution for protection absorbers up- and downstream of the septum
• Asymmetric in optics functions. 638 m central drift
Concept
02/12/2015 F. Burkart 7
Enlarged quadrupole
Triple chamber quadrupole?
MKBH MKBVKicker0.13mrad
Septum1.7 mrad, 1.42 T
![Page 8: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/8.jpg)
HW parameters
LHC scaled Kicker Septum
B.dl T.m 2 - 22 19 - 284
Available system length m 100 200
Rise time us 3 -
Flat top length us >340
GFR h/v mm 18/18 18/18
Aim for 1 us due to absorber limits
02/12/2015 F. Burkart 8
![Page 9: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/9.jpg)
• To be studied for FCC week in Rome:– Impact of ~ 1 sig oscillation for one turn on machine?
• Beam-beam kick• Collimation system• Showers• …?
– Impact on absorbers during a sweep (max. bunch separation required short kicker rise time).
– Also interesting for segmentation of kicker system.
To be studied
02/12/2015 F. Burkart 9
![Page 10: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/10.jpg)
Beam dump line geometry
1.4 km dump insertion 2.8 km collimation insertion
2.5 km dump line
Kicker Septum 10 mrad bend Dilution Absorber
• 2 – 2.5 km dump line (for dilution system / drift)
• 10 m diameter dump cavern
• Need some physical separation between FCC tunnel and dump cavern – say 5 m.
• Separation between FCC beam and dumped beam of about 15-20 m after 2 km:
– 10 mrad fixed deflection in dump line
– Needs ~100 m of 16 T dipole at 167’000 Tm
– Without 10 mrad, dumped beam is only about 0.7 m separate in H from FCC circulating beam, after 2 km (collimation).
02/12/2015 F. Burkart 10
![Page 11: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/11.jpg)
1.4 km dump insertion
2.6 km passive protection
• Septum bends in the vertical plane.• Long dump line would help dilution kicker.• Reduced radiation impact to electronics as only passive protection for failure cases.• Separation for dump block cavern needed.• Asymmetric optics for both sides of the LSS.• Might be better to have RF with injection.
Beam dump line geometry
RF
RF1.4 km dump insertion2.6 km passive protection
19/11/2015 F. Burkart 11
“Baseline 2”
![Page 12: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/12.jpg)
Hydrodynamic tunneling simulation benchmark with HiRadMat experiment and simulations with FCC beam parameters
12
Beam dump considerations
02/12/2015 F. Burkart
![Page 13: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/13.jpg)
90.400 K
120.000 K
Beam dump considerationsCopper after the impact of 10 and 50 FCC bunches
Simulation results for FCC beam parameters show that the beam will penetrate ~ 300 m in Copper, assuming no dilution. Dilution required!
02/12/2015 F. Burkart 13
![Page 14: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/14.jpg)
Fixed dilution frequency:• f = 50.9 kHz• Maximum amplitude at the dump block: 80 cm• Bunch separation > 1.8 mm• Branch separation: 4 cm• Max deflection: 0.32 mrad• B.dl = 53 T.m
Alternative with frequency change:• f = 20.4 kHz – 42.9 kHz• Bunch separation = 1.9 mm constant• Branch separation = 4 cm• Max deflection = 0.24 mrad• Max amplitude = 0.59 m• Bdl = 39 Tm (2.5 km dump line)
Energy deposition studies by FLUKA (A.Lechner & P. Garcia)Max. temperature below ~ 1500 °C.
Dilution pattern was evaluated as a function of dilution kicker magnet MKB parameters and energy deposition on the TDE.
02/12/2015 F. Burkart 14
![Page 15: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/15.jpg)
Dilution kicker system
02/12/2015 F. Burkart 15
• Horizontal and vertical kicker system as in the LHC • ~45 horizontal kickers ~110 vertical kickers within ~ 300 m to be
optimized • Challenging part of the extraction system as “full” beam rigidity to be
handled.• Magnet aperture increases with system length due to beam deflection,
reduced efficiency of the magnets. • Electronics close to the magnets no collimation close or upstream of
the system.• Optimization started, increased lever arm (length of the dump line) would
help the dilution kickers, additional help with quads in the dump line.
Detailed studies discussed in the FCC dump meetings
![Page 16: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/16.jpg)
• “Conventional” beam extraction system, 1 per beam.• Optics for extraction asymmetric. Optics for combined extractions to be studied.• Dilution kicker magnet requirements studied - system is challenging.
FCC beam will penetrate ~ 300 m in Copper without dilution.
Failure modes to be studied.
long lever arm / dump line would help the dilution kickers.• Study the impact on machine for sweep and 1 sigma oscillation.
– Collimation– Showers in the arc– Impact on kickers, triggering lines…– Energy deposition on septum protection / absorbers.– Need for (and design of) sacrificial absorbers.
• R2E to be studied.• Studies for Baseline 1 (extraction and beta-collimation) and Baseline 2 (separate collimation and
extraction) to be followed up. • Baseline 2 preferred.
Summary
02/12/2015 F. Burkart 16
![Page 17: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/17.jpg)
general remarks
• enormous progress after only half a year of EuroCirCol project
• ultimate optics parameters appear within reach
• tools and algorithms ready (IR debris, collimation efficiency, magnet errors,…)
• now it is time to focus on the design details
02/12/2015 F. Burkart 17
![Page 18: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/18.jpg)
Summary
02/12/2015 F. Burkart 18
• Arc - choice of magnet aperture is a good starting point, but looks tight
• study implications of aperture on minimum injection energy• further optimization of the filling factor (cell length
[aperture!], phase advance per cell [60o instead of 90o?], length of insertions, …)
• make a second iteration on interconnection length• Collimation simulation tools are on good track • assess length of the secondary collimator jaws• confirm and possibly revise gap size with help of shower
simulations• attempt to introduce dispersion between primary and
secondary collimators• RF looks good - the dogleg may need substantial space
![Page 19: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/19.jpg)
injection lattice
comments:• several 100 beam transfers to fill the FCC
recommendations:• insertions like these should be kept flexible
enough to be used as phase trombone station
02/12/2015 F. Burkart 19
![Page 20: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/20.jpg)
extraction lattice
comments:• this is a challenging system
recommendations and questions:• does the present optics solution fulfil the basic
constraints for an extraction insertion? E.g.• p/2 phase advance between MKD and TCDQ See optics plot later.• large b function (>5 km) at the dump Influence of high beta at the dump is low (see FLUKA studies).
02/12/2015 F. Burkart 20
![Page 21: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/21.jpg)
02/12/2015 F. Burkart 21
A.Lechner – FCC dump meetinghttps://indico.cern.ch/event/446212/
![Page 22: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/22.jpg)
overall layout & optimization
comments:• on good track for the arcs and the two main
experimental IRs• more work and details needed for other IRs
recommendations:• continue the excellent work
02/12/2015 F. Burkart 22
![Page 23: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/23.jpg)
02/12/2015 F. Burkart 23
Preferred layout
![Page 24: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/24.jpg)
• Extraction:– Small beta at MKD, big beta at Septum Asymmetric in optics.– Feasible MKB parameters.– 2.8 km space for passive protection for extraction failures, TCDQ, TCDS,TPSGs Size / Positions to be defined.– 90 degree phase advance (MKD and TCDQ)– another 180 degrees to the next absorber stage.
• Dump:– Protection devices.– b of a few km.– Bunch separation: ~ 2 mm– Branch separation: ~ 4 cm
• Dump cavern:– > 5 m separation to circulating beam.
• Low radiation to kicker electronics.• ??
02/12/2015 F. Burkart 24
What influences FCC extraction settings?
![Page 25: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/25.jpg)
• Dump block considerations:• R=1 m• Shielding: ~ 3 m (doubled from LHC)• Air / crane / catwalk / etc.: ~ 3 m • > 5 m wall between cavern and arcDistance between middle of dump block / circulating beam: >13 m
Asymmetric dump block cavern? To be studied by CE.
02/12/2015 F. Burkart 25
Dump considerations
![Page 26: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/26.jpg)
02/12/2015 F. Burkart 26
2.5 km
MKDvMSEhMKB
4.2 km
2.3 km
Not to scale
Extraction failure absorbers / TCDQ
Extraction with bend
Bend into extra tunnel solution:+ fast separation+ no radiation to MKB electronics- ~ 2.5 km extra tunnel per beam- 100m 16T bends in the dump line.- Bend protection needed.- Challenging MKB parameters.
90degree
Separation with MSE and bend.14m separation after 1.5 km but MKB would need 95 Tm.
![Page 27: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/27.jpg)
02/12/2015 F. Burkart 27
w.o. bend:+ only 0.8 km extra tunnel per beam+ relaxed MKB settings- “slow” separation- Radiation to MKB electronics? Shielding needed?
0.8 km
MKDv MSEh MKB
4.2 km
3.15 km
Extraction failure absorbers / TCDQ
arc
Separation with septum and arc bending (14 m).
Not to scale
“standard” extraction
![Page 28: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/28.jpg)
02/12/2015 F. Burkart 28
0.8 km
MKDv MSEh MKB
4.2 km
arcarc
4.8 m
MSEv
• Dump line under arc with MSEv.• Dump cavern under arc with MSEh.• Difficult tunnel geometry (?) at the end of the
ESS, to be checked with CE.
Not to scale
Extraction of both beams
MKDhMKB
![Page 29: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/29.jpg)
02/12/2015 F. Burkart 29
MKB MKB
MKDvMSEh
MSEhMKDv
+ only 0.8 km extra tunnel per beam+ no bend in the dump line+ relaxed MKB settings+ symmetric systems- slow separation- Radiation to MKB electronics?
• pipe assembly – X pipe• triple aperture quad
Not to scale
Extraction of both beams to the outside
![Page 30: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/30.jpg)
Fixed dilution frequency:• f = 50.9 kHz• Maximum amplitude at the dump block: 80 cm• Bunch separation > 1.8 mm• Branch separation: 4 cm• Max deflection: 0.32 mrad / 0.254 mrad• B.dl = 53 Tm (2.5 km DL) / 42 Tm
Alternative with frequency change:• f = 20.4 kHz – 42.9 kHz• Max amplitude = 0.59 m• Bunch separation = 1.9 mm constant• Branch separation = 4 cm• Max deflection = 0.24 mrad / 0.19mrad• Bdl = 39 Tm (2.5 km DL) / 31.7 Tm
Energy deposition studies by FLUKA (A.Lechner & P. Garcia)Max. temperature below ~ 1500 °C.
Dilution pattern was evaluated as a function of dilution kicker magnet MKB parameters and energy deposition on the TDE.
02/12/2015 F. Burkart 30
with 3.15 km lever arm
Influence on MKB parameters
![Page 31: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/31.jpg)
02/12/2015 F. Burkart 31
3.1m 4.8m4.8m
Beam pipes (1/2)
![Page 32: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/32.jpg)
02/12/2015 F. Burkart 32
14m
2.5m 4.8m4.8m
14m
Beam pipes (2/2)
0.6m
![Page 33: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/33.jpg)
02/12/2015 F. Burkart 33
Optics for the ESS
Courtesy: L. Stoel
![Page 34: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/34.jpg)
02/12/2015 F. Burkart 34
Optics for extraction
Courtesy: L. Stoel
93.6deg
MKDMSE
TCDQ
![Page 35: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/35.jpg)
02/12/2015 F. Burkart 35
MKBh~ 45 modules
MKBv~ 110 modules
Not to scale
Quad in the dump line• Help the dilution kickers.• Reduce aperture in the MKBv.
Quad parameters:• 70 mm diameter aperture• g = 280 T/m• L = 6.2m
Reduce aperture by a factor 2.
Schematic apertures
95m
2.5cm 80cm
w.o. Quad
w. Quad
![Page 36: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/36.jpg)
– 1 sigma oscillation sweep.– Beam pipe at dump with > 80 cm radius.– X – chamber and beam separation of a few sigma – vacuum issues?– New septum concept. See Dani’s talk.– Optics, beamsizes and positions for absorbers for extraction failures. See
Linda’s talk next meeting.– Dump cavern size.– Beam dump window.– Stable field time of MSE in case of a failure.– Absorber requirements:
• Prepare table with beam parameters, bunch separation and probability for failure cases for TCDS, TCDQ, etc. for FLUKA team.
– Impact of Quad on MKB parameters.
02/12/2015 F. Burkart 36
Comments / to be studied:
![Page 37: Review of FCC-hh optics beam dynamics IPNO, Orsay, Paris 19-20 November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann](https://reader035.vdocuments.us/reader035/viewer/2022070611/5a4d1bb47f8b9ab0599cdeca/html5/thumbnails/37.jpg)
Thank you for your attention!