Øresund link technical visits october 2, 2009 · 2015. 10. 7. · j.meijer 01-06-04 rev 2003-04-06...

14
Øresund Link technical visit October 2, 2009

Upload: others

Post on 09-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Øresund Link technical visit October 2, 2009

Page 2: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Programme : Øresund Link Technical visitLecture m

aterial will be available at http://uk.oresundsbron.com

/page/378 /Railw

ay

Times Company/ Speaker

Subject

09.30-10.00 DSBFirst

A review of safety features and facts about the trains at Svågertorp Station.

10.00 11.30 Øresund Bridge Rolf Sundqvist/ Alan Rees

Study visit DSBFirst and Øresund Bridge. Guided tour with an Øresund train on the Øresund link

12.00-13.00

Lunch Luftkastellet (Air Castle)

13.00-13.25 Øresund Bridge Johnny Restrup-Sørensen

Ensuring Crossborder operation without compromising safety

13.25-13.50

Rambøll Søren Randrup-Thomsen

Establishing and Operation of a Safety Management System

13.50-14.10

DSBFirst Bjørn Nettervik

DSBFirst (Operational aspects of the link)

14.10-14.30 Coffee

14.30-14.55

Banverket Peter Carlsson

Radio Tele (GSM-R) Telecommunications Systems - GSM-R in general and its implementation on the Øresund Link

14.55-15.20

Ansaldo Signal Lucas Orve

ATC Signal, ATP System and interfaces between Danish and Swedish Systems

15.20-15.50 Øresund Bridge Ulla V. Eilersen

Contingency and contingency plan in operation

15.50-16.00

Øresund Bridge Johnny Restrup-Sørensen

Closing Øresund Link IRSC Technical visit

1

Page 3: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Øresund Link Technical visits October 2, 2009

Introduction

The DSBFirst railway company, the Øresund Bridge Consortium and the infrastructure managers bid you welcome to this technical visit to the fixed link between Denmark and Sweden. We look forward to a few pleasant hours with you. This little booklet is intended to give you a little background.

So, just take a seat and enjoy the view.

Please keep the aisles free from baggage

Overview.

Our journey starts in Svågertorp with an inspection of the combined system for detecting hot boxes, dragging brakes and derailments. We then visit the Lernacken toll station. At Lernacken the changeover is made from the Swedish 15 kv 16 ¾ hz system to the Danish 25 kV 50 Hz system.

•We will stop at the highest point of the Öresund bridge to enjoy the view and mingle a little. •A brief stop at the Swedish/Danish border point to take photographs•A brief stop at Pepperholm where the technical systems, Danish/Swedish electricity and traffic control change over•Tunnel •The Kastrup peninsula.

2

Page 4: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

The Øresund link from coast to coast

The illustration below gives an overview of the entire Øresund link, including the facilities on both Danish and Swedish territory. A definition of the boundary between the Øresund line (defined as the railway system on the coast-to-coast section of administered by the Øresundsbro Consortium) and the relationship between the Danish and Swedish facilities is given in section 3.

•The coast-to-coast section of the Øresund link, which comprises a four-lane motorway and a double-tracked electrified railway over the Øresund, can be divided into the following parts:

•A 430 metre long artificial peninsula at Kastrup

•A 3750 metre long submerged tunnel under Drogden between the artificial peninsula at Kastrup and Pepperholm

•A 4055 m long artificial island, Pepperholm, south of Saltholm

•A bridge and two approach bridges with a total length of 7845 metres. The bridges join Pepperholm and Sweden

•A toll facility at Lernacken.

Ø R E S U N D

Københavns Lufthavn

Kastrup

Hovedbanegård

København

MALMÖ

Malmö Centralstation

Lernacken LOC

Sænke-tunnel

Peberholm Bro

Saltholm

KunstigHalvø Driftscenter

Lernacken

Figure 2. Overview of the Øresund link.

3

Page 5: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Hot box, dragging brakes, hot wheel, derailment and profile control of trains

To minimise the risk of accidents on the Øresund railway, there are detection systems on both the Danish and Swedish sides. The installations detect hot boxes, dragging brakes hot wheels and derailments, but there ios only one profile control system, which is on the Danish side.

This system checks that no wheel on a train has left the rails. If any cable in the loop on each side of the rails is damaged, the stop signal is activated.

Illustration: combined hot box and dragging brake detector

CableCableIllustration: derailment control

4

Page 6: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

The traction power supply

The traction power supply system in Denmark is normally AC 25 kV 50 Hz, while the traction power supply system in Sweden is normally 15 kV 16 3/4 Hz. Normally the power changeover would have taken place on the artificial island of Pepperholm, where the traffic management systems and technical systems are separated. However, it would have been an expensive solution and it is not very practical to switch both safety and traffic management systems at the same time

The actual power shift takes place on the Swedish side at Lernacken station. Below is a diagram of the solution adopted. The principle is that the pantograph going to a lower amperage to the other without power agreed branch is taken down. The train automatically detects the change of amperage and adjusts accordingly

The traction system is built to handle speeds up to 250 km / h

The contact wire height is 5330 mm for most of the line

Illustration: Traction power supply system border

281-9

281-8

281-7

281-6

281-5

281-4

281-3

281-2

281-1

Msi 912

281-10

281-11

Lernacken. Luft / Luftlösning enligt BRSBE

Aros Rail CoJ.Meijer 01-06-04Rev 2003-04-06

Körtråd

Lyft tråd med stavisolator

Msi 914

Tunnelmynning

Slopasellerflyttas

+835

+742

+788

+695

+652

Trådby tes-lägen:

Ny brygga

Bef. brygga

X31 nr 1

X31 nr 2

X31 nr 3

78,9 m

78,9 m

Körriktn180 km/h

281-9

281-8

281-7

281-6

281-5

281-4

281-3

281-2

281-1

Msi 912

281-10

281-11

Lernacken. Luft / Luftlösning enligt BRSBE

Aros Rail CoJ.Meijer 01-06-04Rev 2003-04-06

Körtråd

Lyft tråd med stavisolator

Msi 914

Tunnelmynning

Slopasellerflyttas

+835

+742

+788

+695

+652

Trådby tes-lägen:

Ny brygga

Bef. brygga

X31 nr 1

X31 nr 2

X31 nr 3

78,9 m

78,9 m

Körriktn180 km/h

281-9

281-8

281-7

281-6

281-5

281-4

281-3

281-2

281-1

Msi 912

281-10

281-11

Lernacken. Luft / Luftlösning enligt BRSBE

Aros Rail CoJ.Meijer 01-06-04Rev 2003-04-06

Körtråd

Lyft tråd med stavisolator

Msi 914

Tunnelmynning

Slopasellerflyttas

+835

+742

+788

+695

+652

Trådby tes-lägen:

Ny brygga

Bef. brygga

X31 nr 1

X31 nr 2

X31 nr 3

78,9 m

78,9 m

Körriktn180 km/h

281-9

281-8

281-7

281-6

281-5

281-4

281-3

281-2

281-1

Msi 912

281-10

281-11

Lernacken. Luft / Luftlösning enligt BRSBE

Aros Rail CoJ.Meijer 01-06-04Rev 2003-04-06

Körtråd

Lyft tråd med stavisolator

Msi 914

Tunnelmynning

Slopasellerflyttas

+835

+742

+788

+695

+652

Trådby tes-lägen:

Ny brygga

Bef. brygga

X31 nr 1

X31 nr 2

X31 nr 3

78,9 m

78,9 m

Körriktn180 km/h

281-9

281-8

281-7

281-6

281-5

281-4

281-3

281-2

281-1

Msi 912

281-10

281-11

Lernacken. Luft / Luftlösning enligt BRSBE

Aros Rail CoJ.Meijer 01-06-04Rev 2003-04-06

Körtråd

Lyft tråd med stavisolator

Msi 914

Tunnelmynning

Slopasellerflyttas

+835

+742

+788

+695

+652

Trådby tes-lägen:

Ny brygga

Bef. brygga

X31 nr 1

X31 nr 2

X31 nr 3

78,9 m

78,9 m

Körriktn180 km/h

Prepared by: Rolf SundqvistDat: 15.01.2009

Traction power supply system border

15 kV

25 kV

Cantanary

Lifting wire with a rod insulator

Wire replacement mode

Se from the TopSe from the side

5

RC-filter

Page 7: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Expansion joints

Track expansion jointsExpansion: +/- 600 mm

Expansion joints covered by safety grids

6

Page 8: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Expansion joints above the catenary system

7

Page 9: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

View Lillgrund wind farm

The Lillgrund wind farm

The Lillgrund wind farm was officially opened in June 2008.

It is located around 10 km off the coast of southern Sweden, just south of the Öresund Bridge.

With its 48 wind turbines, Lillgrund is Sweden’s biggest offshore wind farm and one of the largest in the world.

The wind farm will generate 0.33 TWh annually.

This is equal to the domestic electricity demand of more than 60,000 homes.

8

Page 10: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Stop on the highest section of the bridge

There will be a stop on the highest section of the bridge and a chance to walk around and then go down under the bridge via one of the bridge-pillars. We will also be able to see the escape routes and emergency access stairs.

There will be a stop near the pylons, which are 204 metres high. The Öresund bridge is currently the largest of its kind in the world.

At this point we are about 80 metres above the sea and the shipping lane into Malmö Harbour. The Öresundsbro Consortium also owns lighthouses in the shipping lanes.

If you are not scared of heights, enter the pylons and enjoy the view!

At the official border there will be the opportunity to take photographs

9

Page 11: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Interlocking Systems on the Fixed Link

Peberholm Swedish CoastDanish Coast

Relay interfaceDSB 1990 STLV85

Concentrators

10System border

Page 12: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Øresunds tunnel

11

Page 13: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas

Axle counting system

Az S 350 UAxle counting system Siemens 350 Universal

4 0Counter-depth axles Counts outgoing axles

12

Page 14: Øresund Link Technical visits October 2, 2009 · 2015. 10. 7. · J.Meijer 01-06-04 Rev 2003-04-06 Körtråd Lyft tråd med stavisolator. Msi 914. Tunnelmynning Slopas eller flyttas