\ Tata Power Company Limited ( m/s Bharat Oman Refineries Ltd) Control Room Engineer Bina, MP From – Feb. 2015 To Present Job Responsibilities Safe and Efficient operation of 3X275 TPH CFBC Boilers make BHEL and 3x33 MW TG (CPP) make BHEL & BOP equipments from DCS with co-ordination of AHP,CHP and DM water plant. Commissioning and operation of Turbo Driven BFP and ACW . Annual maintenance of boilers and its auxiliaries, Preventive maintenance of STG & BOP Equipments, maintaining defect list, coordinates with and Operation of Turbo maintenance department for proper execution. Safe Start-up, Shut Down, Emergency handling, Tripping and Blackout handling, Normal Operation & Also Maintenance of running equipments, Change- over Etc. Follow appropriate Safety standard during jobs to achieved zero accidents in any hazard identification area. Bajaj Energy (P) Limited Sr. Engineer ( Operation Department ) Pilibhit , UP From - Dec. 2010 To Feb. 2015 Job Responsibilities Commissioning & Operation Smooth operation of 2x190 TPH CFBC boilers and 2X45 MW TG (IPP) from DCS (Invensys make) with co-ordination of AHP,CHP and DM water plant. C/O Raju Sahu Behind Badkul Ji, Pathak Ward Kachchi Sadak, Bina MP-470113 Tel : 9644595999, 9536126364 Email : [email protected] [email protected] Vipin Kumar Mechanical Engineer in Operation WORK EXPERIENCE ( Total 7 Years in Thermal Power Plant ) Key skills: - DCS Operation of Boiler ,Turbine and BOP.(BOE 1 ST Class from Kanpur, UP).Knowledge of UI, Forecasting & Rescheduling of Load in IPP. - Project, Erection & Commissioning of CFBC Boilers , Pumps, Piping etc. - Maintenance of BTG & BOP equipments with

Upload: vipin-singh

Post on 16-Apr-2017

20 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: resume_modern_06

\

Tata Power Company Limited ( m/s Bharat Oman Refineries Ltd)

Control Room Engineer

Bina, MP From – Feb. 2015 To Present

Job Responsibilities

Safe and Efficient operation of 3X275 TPH CFBC Boilers make BHEL and 3x33 MW TG (CPP) make BHEL & BOP equipments from DCS with co-ordination of AHP,CHP and DM water plant.

Commissioning and operation of Turbo Driven BFP and ACW . Annual maintenance of boilers and its auxiliaries, Preventive maintenance of STG & BOP Equipments,

maintaining defect list, coordinates with and Operation of Turbo maintenance department for proper execution.

Safe Start-up, Shut Down, Emergency handling, Tripping and Blackout handling, Normal Operation & Also Maintenance of running equipments, Change-over Etc.

Follow appropriate Safety standard during jobs to achieved zero accidents in any hazard identification area.

Bajaj Energy (P) Limited

Sr. Engineer ( Operation Department )

Pilibhit , UP From - Dec. 2010 To Feb. 2015

Job Responsibilities

Commissioning & Operation

Smooth operation of 2x190 TPH CFBC boilers and 2X45 MW TG (IPP) from DCS (Invensys make) with co-ordination of AHP,CHP and DM water plant.

Involve in smoothly completion of Hydro Test ,slow firing, refractory dry out, alkali boil out and steam blowing of 2x190 TPH CFBC Boiler make Thyssenkrupp. Air Load Test and circuit test of ESP make VT Corp.

Safe Start-up, Shut Down, Normal Operation & Also Maintenance of running equipments, Change-over Etc.

Involve in Commissioning of 2x45 MW extractions & condensing Turbine make Siemens.

Strong contribution for maintaining single digit Auxiliary Power Consumption.

C/O Raju SahuBehind Badkul Ji, Pathak WardKachchi Sadak, BinaMP-470113Tel : 9644595999, 9536126364Email : [email protected] [email protected]

Vipin Kumar Singh Mechanical Engineer in Operation Department

WORK EXPERIENCE ( Total 7 Years in Thermal Power Plant )

Key skills: - DCS Operation of Boiler ,Turbine and BOP.(BOE 1ST Class from

Kanpur, UP).Knowledge of UI, Forecasting & Rescheduling of Load in IPP.

- Project, Erection & Commissioning of CFBC Boilers , Pumps, Piping etc.

- Maintenance of BTG & BOP equipments with appropriate safety procedure.

Page 2: resume_modern_06

Monthly Progress Report, Generation Target Preparation , Scheduling, daily maintenance such as lubrication scheduling & emergency breakdown etc.

Data base monitoring of plant efficiency, production gain or loss and data analysis followed by necessary corrective actions.

Project Management

Erection supervision of 2x 190 TPH CFBC Boilers (ThyssenKrupp Make), ESP (VT Corp. make) and External high pressure piping.

Supervision of Ducting, Structural fabrications, quality checking and maintaining record, safety monitoring etc.

Planning & Scheduling, resource management, Billing & Contracts Management. Material chasing and follow-up, Site-HO co-ordination etc.

Bhushan Steel Ltd

Engineer (Project)

Angul ,Orissa From Sept 2009 to Dec. 2010

Job Responsibilities

Erection & commissioning of All types of Pumps, Compressors, Piping and supports, Cooling Towers and Water Treatment Plant..

Preventive maintenance, Man and resources management ,Planning and implementation of shut-down activities etc.

Operational activities of all Jobs related, 2x150 MW Bleed cum Condensing Turbine make Siemens, 4x250 TPH CFBC Boiler make IJT.

Mechanical Project Work Monitoring, Study and rectifying the Mech & Civil Drawing if any. Proper planning to get the work done in time, Coordination with Civil Construction team from any other improvement.

Installing and commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipments.

EDUCATION

2014 : BOE 1st class from Kanpur Board ,UP 2005 -2009 : B. Tech – Mech. Engg. from IET Purvanchal University ,Jaunpur ,UP with 72%. 2003 -2005 : XII from UP Board with 70% . 2003 : X from UP Board with 64%. 2015 : Pursuing MBA (Operation Management) from IGNOU

Page 3: resume_modern_06

TRAINING

Performed one month training at NTPC TANDA UP in Boiler Maintenance Division. Completed one month vocational training course AUTO-CAD & Pro-E from IDTR Jamshedpur.

Completed training on work in Heights, Confined Space ,Scaffolding inspection.

Completed training on First Aid and basic need .

Date of Birth : 20 July 1988 Father's Name : Late Shri Jitendra Pr. Singh Sex : Male Permanent Address : C/O Urmila Singh ,Vill.-Harhi PO.- Sonikpur

Dist. Jaunpur-222003 UP Marital Status : Married

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars

Place: Bina (M.P) (VIPIN KR. SINGH)

PESONAL DETAILS

DECLARATION