Lawrence Jacobs 9396 Forest Knoll Dr. Jonesboro, GA 30238 Cell: 678-510-9496 Home: 770-681-0617 E-mail: [email protected] Objective To obtain a Journeyman Instrument Fitter or Foreman position. Achievements Various Safety Awards/ NCCER FOREMAN/ NCCER PLUS INSTRUMENT FITTER Work Experience MMR Offshore ,Broussard, LA– Offshore 5/2004-10/2006 Instrument Fitter

Upload: lawrence-jacobs

Post on 11-Apr-2017

82 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESUMEFOREMAN2016

Lawrence Jacobs

9396 Forest Knoll Dr.

Jonesboro, GA 30238

Cell: 678-510-9496

Home: 770-681-0617

E-mail: [email protected]

Objective

To obtain a Journeyman Instrument Fitter or Foreman position.

Achievements

Various Safety Awards/ NCCER FOREMAN/ NCCER PLUS INSTRUMENT FITTER

Work Experience

MMR Offshore ,Broussard, LA– Offshore

5/2004-10/2006 Instrument Fitter

Reading blueprints, installing instruments, bending and installing tubing. Pulling and termination of cable.

MMR Constructors ,Corpus Christi, TX (New Construction)

11/2006-12/2009 Instrument Fitter

Reading blueprints, installing instruments, attend safety meetings, fabricate and install tray and tubing.

Rabalais I & E Construction, Corpus Christi, TX-(TURNAROUND)

Page 2: RESUMEFOREMAN2016

2/2010-5/2010 Journeyman Instrument Fitter

Reading blueprints, installing instruments, fabricate and install tray and tubing. Permit writing.

BE&K, Tuscaloosa, AL

5/2010-9/2010 Journeyman Instrument Fitter

Reading blueprints, installing instruments, fabricate and install tray and tubing.

Merit Electrical, Inc., Pascagoula, MS (New Construction)

9/2010-2/2011 Journeyman Instrument Fitter

Installing instruments, fabricate and install tray. Reading prints. Bend and install tubing.

MMR Constructors, Corpus Christi, TX -Offshore

2/2011– 12/2011 Journeyman Instrument Fitter

Fabricate and install tray and tubing. Install instruments. Attend safety meetings. Pressure test tubing. Read prints. Troubleshoot.

Bay Area I & E, Benecia, CA-(TURNAROUND)

01/2012– 03/2012 Journeyman Instrument Fitter

Read blueprints, install instruments, install hydraulic lines, pressure test tubing, loop check. Removal and installation of displacers. Demo and installation of tray, tubing and supports. Rodding out taps Permit writing. Bend and install tubing.

SW&B, Hodge, LA-(TURNAROUND)

03/2012- 05/2012 Journeyman Instrument Fitter

Page 3: RESUMEFOREMAN2016

Read blueprints, install stands and instruments .Fab and install socket- weld pipe.Fabricate and install supports and rack tubing.

Merit Electrical, Inc. Ashdown, AR(Two week shut down)

05/2012- 06/2012 Journeyman Instrument Fitter *24 TUBE RACKS*

Read prints. Demo tubing and supports. Fab and install rack tubing and supports. Identify and tag lines. Pressure test tubing. Troubleshoot.

Zachry Industrial, Barnesville, GA (New Construction)

06/2012-07/2012 Journeyman Instrument Fitter

Install stands and instruments. Install brackets and tray. Bend and install tubing. Pressure test tubing, Prepare and install decron. Read prints. Attend safety meeting.

Tradesman International, Augusta, GA (Turnaround)

07/2012-08/2012 Journeyman Instrument Fitter Leadman

Demo tubing and supports. Fabricate and install bracket, tray and tubing. Mount instruments. Read blueprints. Troubleshoot.

*24 Tube Rack*

KBR, Juliette, GA (New Construction)

08/2012- 12/2012 Journeyman Instrument Fitter Leadman

Mount instruments. Fabricate and install brackets, tubing tray and stands. Bend and install tubing. Read blueprints. Verify lines. Direct other fitters.

GA West Juliette, GA (New Construction)

Page 4: RESUMEFOREMAN2016

02/2013- 09/2013 Journeyman Instrument Fitter Foreman

Read prints. Order material. Bend and install conduit. Install instruments. Pressure test tubing. Bend and install rack tubing. Fabricate socket weld pipe. Install flanges w/TE’s. Install regulators. Install ¾” tubing. Completed auxiliary air system and limestone slurry system with no help from anyone.

KBR, Juliette, GA (New Construction)

09/2013-11/2013 Journeyman Instrument Fitter

Bend and install tubing. Ran ½’’ tubing to taps in duct work. Supplied control valves with air with ½’’ tubing. Bolt up expansion on duct. Read prints. Maintained flawless safety record. Finished outage one week ahead of schedule.

ISC, Kemper County, Miss. (New Construction)

11/2013-03/2014 Journeyman Instrument Fitter Leadman Read prints. Completed six towers on time directing four man crew. Fabricated and installed tray. Bent and installed rack tubing. Loop checks. Fit and installed socket weld pipe. Installed stands and instruments. Installed decron for process.

Turner Industries, Laporte, TX. (Turnaround)

03/2014-07/2014 Journeyman Instrument Fitter Leadman

Demo tray, tubing and instruments. Install LT’s with diaphram flanges. Bend and install tubing and tray. Read prints. Pressure test tubing. Permit writing. Attend safety meetings.

Big G Electric & Engineering, Northslope, Alaska (Turnaround)

07/2014-09/2014 Journeyman Instrument Fitter Lead

Demo old instruments, tray and tubing. Install new instruments.

Page 5: RESUMEFOREMAN2016

Fabricate and install supports, tray and tubing. Read prints. Permit writing. Safety awards. Loop check

Fluor Inc. Hardeeville, SC (turnaround)

10/2014-12/2014 Journeyman Instrument Fitter

Changed out PDITS and enclosures. Demo old deco trace and installed upgraded deco trace. Pressure test tubing

01/2015-4/2015 Journeyman Instrument Fitter Lead

Fluor Inc. Freeport, TX (new construction)

Assisted foreman read prints, delegated work, held safety meetings and ordered material. Submit time and progress to Supt

4/2015-9/2015 Journeyman Instrument Fitter

PCL Charleston, TN (new construction)

Responsible for installing instruments per detail. Duties included but were not limited to; Fabricating and installing supports, tubing tray and tubing. Read prints. Maintained paperwork. Followed all safety rules.

Meitec West Winfield)), NY (new construction-expansion)

9/2015-1/2016 Instrument Fitter Foreman

Duties included but were not limited to; Walking down systems. Ordering material. Reading prints. Calibrating instruments. Made sure instrumentation was installed per detail. Met with vendors and field engineer. Lined out crew. Maintained paperwork. Ensured safety rules were being followed. Maintained clean and organized fab area.

Page 6: RESUMEFOREMAN2016

Lawrence Jacobs