resume&cover letter for aneesh jose

4
Planning & Project Control / Scheduling Engineer Cover Letter of Planning & Project Controls /Scheduling Engineer Page 1 Dear Sir/Madam, I am Aneesh Jose having around 07years of work experience in the construction industry. As a dynamic professional I have worked on various projects in the field like Petrochemical, Oil &Gas, Water Desalination, and Power Plant of international standards with Client as well as Contractor and have in depth knowledge of project development, right from construction stage till commissioning stage. I am well versed with construction procedures & methodologies of these sectors and worked on industry recognized project management software’s as a tool to implement the construction process. Presently I am working with M/s Nasser S Al Hajri Corporation as a Planning & Project control /Scheduling Engineer, looking after multi-million dollar SADARA Chemical Company Plant Project. My job profile includes Planning, Scheduling, Coordination and controlling the project development right from inception till completion. On an academic front I am a Mechanical Engineer from Anna University Chennai, one of the leading universities in India. I am well versed with project management software Primavera (P6), and MS Project. I would appreciate an opportunity to discuss my qualifications for the suitable Planning/Scheduling post in greater detail. Further attached herewith is my latest CV which outlines my qualifications & skills. Regards ANEESH JOSE Cover Letter

Upload: aneesh-jose

Post on 24-Jan-2017

160 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Resume&Cover Letter For Aneesh Jose

Planning & Project Control / Scheduling Engineer  

Cover Letter of Planning & Project Controls /Scheduling Engineer Page 1  

 

Dear Sir/Madam,

I am Aneesh Jose having around 07years of work experience in the construction industry.

As a dynamic professional I have worked on various projects in the field like Petrochemical, Oil &Gas, Water Desalination, and Power Plant of international standards with Client as well as Contractor and have in depth knowledge of project development, right from construction stage till commissioning stage.

I am well versed with construction procedures & methodologies of these sectors and worked on industry recognized project management software’s as a tool to implement the construction process.

Presently I am working with M/s Nasser S Al Hajri Corporation as a Planning & Project control /Scheduling Engineer, looking after multi-million dollar SADARA Chemical Company Plant Project.

My job profile includes Planning, Scheduling, Coordination and controlling the project development right from inception till completion.

On an academic front I am a Mechanical Engineer from Anna University Chennai, one of the leading universities in India.

I am well versed with project management software Primavera (P6), and MS Project.

I would appreciate an opportunity to discuss my qualifications for the suitable Planning/Scheduling post in greater detail.

Further attached herewith is my latest CV which outlines my qualifications & skills.

Regards

ANEESH JOSE

 

CoverLetter   

  

Page 2: Resume&Cover Letter For Aneesh Jose

Resume  

ANEESHPoonoly HoCheranalloErnakulam Kerala, Ind

Educatio Pro

(M Ba

(M Dip

(Ap

AreaofE Pla Pro

Professio A

/ScPla

CreMS

DeIns

We To

resVa

Incetc

Pre De Mo

ad Pre Ov

Plannin 

HJOSEouse, or P O Dist

dia

onoject Planningay 2012) chelor of Engar 2009) ploma in Mecpril 2006)

Expertiseanning and Proposal and Bu

onalSnapsdynamic procheduling Engant. eate a projecS office. eveloped Worstrumentationell versed with

o review & sources & conlue Analysis (corporated adc. epared discipeveloped consonthly Invoiceditional worksepared & monversee constru

ng & Pro

g & Control M

gineering (BE)

hanical Engin

roject Controludget Prepara

hotofessional havgineer in vari

ct monitoring

rk Break Strun, Structural, h Fabrication monitor the nstruction me(EVA) & S-Cudditional work

line wise Progstruction & pre preparations. nitored weekluction project

oject Con

Management,

) in Mechanica

neering from A

/ Schedulingation, Perform

ving around ious fields lik

system for

ucture (WBS) Piping and Prand Erectionoverall reso

ethodology torve on primavks with live s

gress Measureocurement prs based on B

y / fortnightlyts through to

ntrol /S

Primavera (

al Engineering

Al- Ameen Ins

g, Earned valumance Analysi

07 years ofke Petrochemi

project inform

for all discipre Commissio for the Pipinource deployo avoid futurevera(P6) schedule and

ement Systemrogress measBOQ (Unit Ra

y / monthly pclose out.

chedulin

Cur KSA E-m Skyp

(P6) from CA

g from Anna

stitute of Tec

ue Analysis. is, Cost and P

f experience ical, Oil & Ga

mation/docum

pline like Mecon Activities. g & Structura

yment, matere claims. Ana

generated C

m (PMS), and surement stepte/ Man hour

progress & oth

ng Engi

rrent LocationA Mob: +966 5mail:-aneeshjope: - aneeshp

ADD Center Ke

university Ch

chnology, Erod

Progress Cont

as Planning as, Water De

ment sharing

chanical, Civi

al. rial procuremalysis techniqu

Critical path &

commodity cps. rs) and raise

her technical

neer

n: Saudi Arabi577 517 150

ose141@gmaipoonoly

erala, India

hennai, India

de, India

trol.

and Projectsalination, an

using Primav

il, Building, E

ment, producues used are

&Look ahead

curves.

the change o

reports

Page 1

ia (KSA)

l.com

t Control nd Power

vera and

Electrical,

ctivity of e Earned

schedule

order for

Page 3: Resume&Cover Letter For Aneesh Jose

Resume  

Experien1. Pla

Na

2. PlaKa

3. PlaS M

4. JuDo

KeyfuncPre‐c To

prewitpla

Tocosch

ToTecoun

PostC To

me To

& a To

& 3

Planninnceanning & Proasser S Al Haj

PerformCompan

anning & Pronoor General Took a

Refinery Worked

CorporaDoosan

anning EnginM Elemech &E Worked

Project

nior Mechanorman Engine

WorkedProject

ctionalitiesonstructio

o develop & ueliminary, detth tendering anning, Techno prepare tenntractors & shedule etc.

o review & anechnically whnstruction wotil final testin

Constructio

o visit the siteeeting with coo prepare & uadvice a nece

o review & mo3 month look

ng & Prooject Controri Corporation

ming as a Plany’s Chlorine

oject Contro Contract Est

action as a Py Plant Projecd as a Plannination (SWCC)n Heavy Indus

neer | Dec 2Engineering Pd as a Planniwith client ES

nical Engineeering Pvt. Ltd

d as a Juniowith client Th

:‐nRoles&r

update the Stail design de& biddings p

nical, Commender stage wiset key param

nalyze contraich includes orks, logic, ag & commiss

onRoles&

on weekly baonsultant, conpdate the proessary action onitor the week ahead Sched

oject Conl /Schedulingn | Saudi Arabnning & Proj& Brine Plant

l /Scheduling. | Saudi ArabPlanning & Pct with Client ng & Project C) 2400MW Rastries & Const

2010–April 20Pvt. Ltd. | Oding Engineer SSAR Project

er | Jun2009d. | Odisha, Inr Mechanicalhermax India

responsibil

chedule as pevelopment, process until rcial & Projecise Schedulemeters & guid

actors tenderthe disciplin

uthority apprioning & hand

responsib

asis for undentractor & suboject master S

ekly & monthdule against t

ntrol /Sg Engineer |bia ect Control /t Project with

g Engineer |bia Project ContrS K Engineer

Control /Schedas Al-Khair Potruction Co. a

012 isha, India (Piping) at M(I) Ltd. And C

9 – Nov 2010ndia Engineer atPvt. Ltd.

lities

per project destage wise aconstruction

ct execution tefor contracto

delines viz. c

r & executionne wise Worrovals, Nominding over.

ilities

r constructionbcontractorsSchedule on

hly reports & phe baseline S

chedulin| Mar-2014 –

/Scheduling EClient JACOB

| Jun-2012 –

rol /Scheduliring & Construduling Engineower and Desand Consultan

M/s Indian OConsultant Fo

0

t M/s Bhusha

evelopment gpprovals by commencem

eam ors viz. enabconstruction c

n stage schedrk Breakdownation schedu

n projects & t

weekly basis

periodic repoSchedule.

ng Engi– to Present

Engineer at MBS ZATE

–December -

ng Engineer uction Co. Ltdeer at M/s Sasalination Plant is M/s Poyry

il Corporationoster Wheeler

an Power &

guidelines whno. of autho

ment in coord

bling, main &completion m

dule submissn Structure ules, utilities

to lead the w

s to analyze th

rts submissio

neerM/s SADARA

-2013

at Saudi Ad. line Water Co

ant Project wiy Energy AG

n Ltd (IOCL) r AG

Steel’s WHR

hich includes rities approva

dination with

& specialist nomilestones, no

sions contrac(WBS), sequ& services a

weekly progres

he project bo

ns, 2week loo

Page 2

Chemical

RAMCO’s

onversion ith Client

Refinery

RB Boiler

concept, als along Business

ominated omination

ctually & uence of approvals

ss review

ttlenecks

ok ahead

Page 4: Resume&Cover Letter For Aneesh Jose

Resume  

Tone

Toco

Evrec

An To Mo

cas

Skills Pro

Po

Languag En Hin Ta Ma

Personal Na Da Pa Va Mo

 

 

Plannino review & moar critical pat

o track the nstruction mealuate extecommendationalysis techniqo develop diffeonthly Invoicesh flow

oject Planningwer Point etc

eProficienglish ndi mil

alayalam

lDetailsationality ate of Birth ssport No lid Driving Lic

ob No (India)

ng & Proonitor the proth; Analysis teoverall resouethodology tonsion of tns to the proj

ques used areerent reportine preparation

g, Execution ac.), and AutoC

ncy: Advanced : Advanced : Advanced : Native

: Ind : 04 : H 5

cense : Ind : +9

oject Conoject overall pechniques useurce deploymo avoid future ime claims,ject director

e Earned Valung formats to n, raise Chan

and ManagemCAD

dian May 1985 5700193 dia 91 9496 826 2

ntrol /Sproject progreed are manpoment, materia

claims. including

ue Analysis (Eanalyze & coge Order for

ment, Primave

253

cheduliness especially ower histogramal procureme

concurrent

EVA) & S-Curvontrol the projr additional w

era (P6), Micr

ng Engifor activities

ms & S-Curveent, product

delay and

ve on primavject work proworks and as

rosoft Office (

neeron the critica

e ivity of reso

make ap

era(P6) gress.

ssist in prepa

(Excel, Word,

Page 3

al path &

ources &

propriate

ration of

Outlook,