resume&cover letter for aneesh jose
TRANSCRIPT
Planning & Project Control / Scheduling Engineer
Cover Letter of Planning & Project Controls /Scheduling Engineer Page 1
Dear Sir/Madam,
I am Aneesh Jose having around 07years of work experience in the construction industry.
As a dynamic professional I have worked on various projects in the field like Petrochemical, Oil &Gas, Water Desalination, and Power Plant of international standards with Client as well as Contractor and have in depth knowledge of project development, right from construction stage till commissioning stage.
I am well versed with construction procedures & methodologies of these sectors and worked on industry recognized project management software’s as a tool to implement the construction process.
Presently I am working with M/s Nasser S Al Hajri Corporation as a Planning & Project control /Scheduling Engineer, looking after multi-million dollar SADARA Chemical Company Plant Project.
My job profile includes Planning, Scheduling, Coordination and controlling the project development right from inception till completion.
On an academic front I am a Mechanical Engineer from Anna University Chennai, one of the leading universities in India.
I am well versed with project management software Primavera (P6), and MS Project.
I would appreciate an opportunity to discuss my qualifications for the suitable Planning/Scheduling post in greater detail.
Further attached herewith is my latest CV which outlines my qualifications & skills.
Regards
ANEESH JOSE
CoverLetter
Resume
ANEESHPoonoly HoCheranalloErnakulam Kerala, Ind
Educatio Pro
(M Ba
(M Dip
(Ap
AreaofE Pla Pro
Professio A
/ScPla
CreMS
DeIns
We To
resVa
Incetc
Pre De Mo
ad Pre Ov
Plannin
HJOSEouse, or P O Dist
dia
onoject Planningay 2012) chelor of Engar 2009) ploma in Mecpril 2006)
Expertiseanning and Proposal and Bu
onalSnapsdynamic procheduling Engant. eate a projecS office. eveloped Worstrumentationell versed with
o review & sources & conlue Analysis (corporated adc. epared discipeveloped consonthly Invoiceditional worksepared & monversee constru
ng & Pro
g & Control M
gineering (BE)
hanical Engin
roject Controludget Prepara
hotofessional havgineer in vari
ct monitoring
rk Break Strun, Structural, h Fabrication monitor the nstruction me(EVA) & S-Cudditional work
line wise Progstruction & pre preparations. nitored weekluction project
oject Con
Management,
) in Mechanica
neering from A
/ Schedulingation, Perform
ving around ious fields lik
system for
ucture (WBS) Piping and Prand Erectionoverall reso
ethodology torve on primavks with live s
gress Measureocurement prs based on B
y / fortnightlyts through to
ntrol /S
Primavera (
al Engineering
Al- Ameen Ins
g, Earned valumance Analysi
07 years ofke Petrochemi
project inform
for all discipre Commissio for the Pipinource deployo avoid futurevera(P6) schedule and
ement Systemrogress measBOQ (Unit Ra
y / monthly pclose out.
chedulin
Cur KSA E-m Skyp
(P6) from CA
g from Anna
stitute of Tec
ue Analysis. is, Cost and P
f experience ical, Oil & Ga
mation/docum
pline like Mecon Activities. g & Structura
yment, matere claims. Ana
generated C
m (PMS), and surement stepte/ Man hour
progress & oth
ng Engi
rrent LocationA Mob: +966 5mail:-aneeshjope: - aneeshp
ADD Center Ke
university Ch
chnology, Erod
Progress Cont
as Planning as, Water De
ment sharing
chanical, Civi
al. rial procuremalysis techniqu
Critical path &
commodity cps. rs) and raise
her technical
neer
n: Saudi Arabi577 517 150
ose141@gmaipoonoly
erala, India
hennai, India
de, India
trol.
and Projectsalination, an
using Primav
il, Building, E
ment, producues used are
&Look ahead
curves.
the change o
reports
Page 1
ia (KSA)
l.com
t Control nd Power
vera and
Electrical,
ctivity of e Earned
schedule
order for
Resume
Experien1. Pla
Na
2. PlaKa
3. PlaS M
4. JuDo
KeyfuncPre‐c To
prewitpla
Tocosch
ToTecoun
PostC To
me To
& a To
& 3
Planninnceanning & Proasser S Al Haj
PerformCompan
anning & Pronoor General Took a
Refinery Worked
CorporaDoosan
anning EnginM Elemech &E Worked
Project
nior Mechanorman Engine
WorkedProject
ctionalitiesonstructio
o develop & ueliminary, detth tendering anning, Techno prepare tenntractors & shedule etc.
o review & anechnically whnstruction wotil final testin
Constructio
o visit the siteeeting with coo prepare & uadvice a nece
o review & mo3 month look
ng & Prooject Controri Corporation
ming as a Plany’s Chlorine
oject Contro Contract Est
action as a Py Plant Projecd as a Plannination (SWCC)n Heavy Indus
neer | Dec 2Engineering Pd as a Planniwith client ES
nical Engineeering Pvt. Ltd
d as a Juniowith client Th
:‐nRoles&r
update the Stail design de& biddings p
nical, Commender stage wiset key param
nalyze contraich includes orks, logic, ag & commiss
onRoles&
on weekly baonsultant, conpdate the proessary action onitor the week ahead Sched
oject Conl /Schedulingn | Saudi Arabnning & Proj& Brine Plant
l /Scheduling. | Saudi ArabPlanning & Pct with Client ng & Project C) 2400MW Rastries & Const
2010–April 20Pvt. Ltd. | Oding Engineer SSAR Project
er | Jun2009d. | Odisha, Inr Mechanicalhermax India
responsibil
chedule as pevelopment, process until rcial & Projecise Schedulemeters & guid
actors tenderthe disciplin
uthority apprioning & hand
responsib
asis for undentractor & suboject master S
ekly & monthdule against t
ntrol /Sg Engineer |bia ect Control /t Project with
g Engineer |bia Project ContrS K Engineer
Control /Schedas Al-Khair Potruction Co. a
012 isha, India (Piping) at M(I) Ltd. And C
9 – Nov 2010ndia Engineer atPvt. Ltd.
lities
per project destage wise aconstruction
ct execution tefor contracto
delines viz. c
r & executionne wise Worrovals, Nominding over.
ilities
r constructionbcontractorsSchedule on
hly reports & phe baseline S
chedulin| Mar-2014 –
/Scheduling EClient JACOB
| Jun-2012 –
rol /Scheduliring & Construduling Engineower and Desand Consultan
M/s Indian OConsultant Fo
0
t M/s Bhusha
evelopment gpprovals by commencem
eam ors viz. enabconstruction c
n stage schedrk Breakdownation schedu
n projects & t
weekly basis
periodic repoSchedule.
ng Engi– to Present
Engineer at MBS ZATE
–December -
ng Engineer uction Co. Ltdeer at M/s Sasalination Plant is M/s Poyry
il Corporationoster Wheeler
an Power &
guidelines whno. of autho
ment in coord
bling, main &completion m
dule submissn Structure ules, utilities
to lead the w
s to analyze th
rts submissio
neerM/s SADARA
-2013
at Saudi Ad. line Water Co
ant Project wiy Energy AG
n Ltd (IOCL) r AG
Steel’s WHR
hich includes rities approva
dination with
& specialist nomilestones, no
sions contrac(WBS), sequ& services a
weekly progres
he project bo
ns, 2week loo
Page 2
Chemical
RAMCO’s
onversion ith Client
Refinery
RB Boiler
concept, als along Business
ominated omination
ctually & uence of approvals
ss review
ttlenecks
ok ahead
Resume
Tone
Toco
Evrec
An To Mo
cas
Skills Pro
Po
Languag En Hin Ta Ma
Personal Na Da Pa Va Mo
Plannino review & moar critical pat
o track the nstruction mealuate extecommendationalysis techniqo develop diffeonthly Invoicesh flow
oject Planningwer Point etc
eProficienglish ndi mil
alayalam
lDetailsationality ate of Birth ssport No lid Driving Lic
ob No (India)
ng & Proonitor the proth; Analysis teoverall resouethodology tonsion of tns to the proj
ques used areerent reportine preparation
g, Execution ac.), and AutoC
ncy: Advanced : Advanced : Advanced : Native
: Ind : 04 : H 5
cense : Ind : +9
oject Conoject overall pechniques useurce deploymo avoid future ime claims,ject director
e Earned Valung formats to n, raise Chan
and ManagemCAD
dian May 1985 5700193 dia 91 9496 826 2
ntrol /Sproject progreed are manpoment, materia
claims. including
ue Analysis (Eanalyze & coge Order for
ment, Primave
253
cheduliness especially ower histogramal procureme
concurrent
EVA) & S-Curvontrol the projr additional w
era (P6), Micr
ng Engifor activities
ms & S-Curveent, product
delay and
ve on primavject work proworks and as
rosoft Office (
neeron the critica
e ivity of reso
make ap
era(P6) gress.
ssist in prepa
(Excel, Word,
Page 3
al path &
ources &
propriate
ration of
Outlook,