resume work sample_di meng
DESCRIPTION
ÂTRANSCRIPT
DI MENG
University of Pennsylvania | School of Design | Master of Architecture Candidate 20163600 Chestnut Street, RM303 MB720, Philadelphia, PA 19104 | 206.618.8656 | [email protected]
EDUCATION
University of Pennsylvania, Philadelphia, PAM.Arch 8/2013-presentExpected Graduation Date: 05/2016University of Washington, Seattle, WA B.A. with Honors in Architectural Studies 8/2009-6/2013AwardsL.Arnie Chinn Memorial Endowed Scholarship 2013Dean’s List: Annual Dean’s List 2010-2013
SKILLS
LanguageChinese – native languageEnglish – speak fluently and read/write with high proficiency Graphic RepresentationAdobe Creative Suite (Photoshop, Illustrator, InDesign, Premiere) | AutoCAD | Maxwell Render | Vray | Podium 3D ModelingRhino 5 | Maya | Revit | SketchUp | AutoCAD Data ProcessingMicrosoft OfficeOther MediumFreehand Sketch | Water Color Painting | Hand Drafting | Color Pencil Rendering/Sketching | Hand Crafting
EXPERIENCE
Studio 19 Architects, Seattle, WAStudent Intern 6/2012-9/2012 - Designed schematic layouts for loft units in Jinan High Rise project. - Did researches and analysis of the site; developed drawings, physical models, digital models and digital renderings for the project of Everett Farmer’s Market. - Prepared presentation files and firm’s portfolio. - Participated in producing construction documents for two mixed-use projects.
China-US Professional Workshop and CharretteProject Coordinator 9/2012-10/2012 - Lead a team of six members to prepare and participate in a 2-day case based interactive problem-solving charrette with professionals from Seattle and cities of Chengdu, Chongqing, Beijing and Lanzhou. - Attended the Annual Conference of the American Planning Association WA chapter in Olympia-special track on trans-pacific practice.
University of WashingtonResearch Assistant 5/2012 - Help Prof. Elizabeth Golden translated and researched on articles that related to the construction technology and details on Ningbo Museum designed by Wang Shu.
Trace Architecture Office, Beijing, ChinaStudent Intern 7/2011-9/2011 - Developed drawings, renderings and physical model for one residential project and one tea-factory project.
ACTIVITIES
Chinese Students and Scholars Association, UW, Seattle, WAGraphic Designer 9/2010-6/2013 - In charge of designing and making posters, membership cards, tickets, banners and flyers for every major event and activities. - Help hold activities and events.The Foundation for International Understanding Through StudentsFacilitator 9/2010-12/2010 - Helped new coming international students adjust life in Seattle and assisted in carrying out events and activities
PUBLICATIONS/OTHER WORKS
Discovery Park Field Lab - Published on The Future +Design Website, December, 2011Adaptive Reuse - Bringing Art into Neighborhoods - Published on SKIN, volume 10, 2013Visual Identification Suite design & Interior Design for Beijing Kcalin New Energy Technology Co.,Ltd - 2012Logo Design, Business card Design for Tianjin Wei Neng New Materials Co., Ltd - 6/2012
INVASION - a dancing performing art space
As a dancing performing art space, this project starts with a series studies of human body movement and eventually come up with a pavilion that houses performing spaces.
fall_2013_prof. Ezio Blasetti
PLAN
Public Entrance
Reception
Audience Seats
Audience Seats
Dressing Room
Stage
Upper Floor Private Studio Open Stage
Open Stage Audience Seats
Open Stage
Dancing Studio
Private Lobby
Public Lobby
Stage
N
SECTION
PLAN
N
SECTION
PennDesign Arch 501 Design Studio Fall 2013, instructor: Ezio Blasetti design team: Di Meng
an interactive performingart center
invasion
PennDesign Arch 501 Design Studio Fall 2013, instructor: Ezio Blasetti design team: Di Meng
an interactive performingart center
invasion
PennDesign Arch 501 Design Studio Fall 2013, instructor: Ezio Blasetti design team: Di Meng
an interactive performingart center
invasion
THRESHOLD - a subdivision matrix as public pavilion
As a public pavilion, this project is a full scale design build practice. Working as a group with Yingfei Wang.
fall_2013_prof. Ezio Blasetti
TENDENCY - a fire station (modeled and designed in REVIT)
This is a Revit group project. My partner was Troy Lacombe. The intention was to play with three massing blocks to divide different programs and utilize the intersection of three blocks to create inter-active spaces for firemen.
spring_2013_Prof. Jessica Miller
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
6/12
/201
3 4:
24:1
2 PM
A-000
COVER SHEET
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Checker
ARCHITECTURALA-000 COVER SHEETA-100 BUILDING SITE PLANA-101 LEVEL 1 FLOOR PLANA-102 LEVEL 2 FLOOR PLANA-103 LEVEL 3 FLOOR PLANA-201 BUILDING ELEVATIONSA-202 BUILDING ELEVATIONSA-211 BUILDING SECTIONSA-212 BUILDING SECTIONSA-300 PERSPECTIVEA-301 WALL SECTION_CREW AREAA-302 WALL SECTION_AP BAYA-311 GARAGE DOOR 1A-312 GARAGE DOOR 2A-313 SLATTINGA-314 SLATTING COMPONENTA-401 INTERIOR ELEVATIONS17
SHEET INDEX
South-West View South-East View
No. Description Date
UP
1A-212
1A-211
A
1
2 3 4
5
D
E
154 SF
Laundry 169 SF
mech
109 SF
Storage
103 SF
Electrical
158 SF
WC
140 SF
Communication
Atrium
C
B
1A-301
84 SF
Single RM
85 SF
Single RM
120 SF
Double RM
146 SF
Locker RM
130 SF
Toilet/Shower
73 SF
Janior
150 SF
Lounge
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1/8" = 1'-0"
6/12
/201
3 4:
24:2
1 PM
A-101
LEVEL 1 FLOORPLAN
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Miller
0' 4' 8' 16'
1/8" = 1'-0"1 LEVEL 1
No. Description Date
UP
UP
1A-212
1A-211
A
1
2 3 4
5
D
E
1802 SF
Apparatus Bay
290 SF
Day Room
264 SF
Clean RM
130 SF
Hose & Store
79 SF
Eq Storage
119 SF
Officer's Quarter136 SF
Officer Quarter
73 SF
Rest Room 38 SF
Janitor
99 SF
Officer QuarterLobby
Lobby133 SF
Report Desk
C
B
1A-302
1A-301
177 SF
Dining RM
116 SF
Kitchen
323 SF
GYM
A-3123
A-3134
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1/8" = 1'-0"
6/12
/201
3 4:
24:2
5 PM
A-102
LEVEL 2 FLOORPLAN
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Miller
1/8" = 1'-0"1 LEVEL 2
0' 4' 8' 16'
No. Description Date
UP
1A-212
1A-211
A
1
2 3 4
5
D
E
700 SF
Lounge
286 SF
Bunker Gear Room
134 SF
Work Area
134 SF
EMS Storage
111 SF
Supply Storage
81 SF
Janitor
90 SF
Restroom
189 SF
Station Office
6
C
B
1A-302
1A-301
1A-401
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1/8" = 1'-0"
6/12
/201
3 4:
24:2
8 PM
A-103
LEVEL 3 FLOORPLAN
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Miller
1/8" = 1'-0"1 LEVEL 3
0' 4' 8' 16'
No. Description Date
LEVEL 150' - 0"
LEVEL 262' - 0"
LEVEL 377' - 0"
ROOF90' - 0"
A-3135
15' -
5 1/2"
12' -
0"15
' - 0"
13' -
0"
LEVEL 150' - 0"
LEVEL 262' - 0"
LEVEL 377' - 0"
ROOF90' - 0"
12' -
0"15
' - 0"
13' -
0"
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1/8" = 1'-0"
6/12
/201
3 4:
24:4
4 PM
A-202
BUILDINGELEVATIONS
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Checker
1/8" = 1'-0"1 NORTH ELEVATION
1/8" = 1'-0"2 SOUTH ELEVATION
No. Description Date
LEVEL 150' - 0"
LEVEL 262' - 0"
LEVEL 377' - 0"
ROOF90' - 0"
A-4011
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1/8" = 1'-0"
6/12
/201
3 4:
24:5
0 PM
A-211
BUILDING SECTIONS
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Checker
1/8" = 1'-0"1 SECTION 1
No. Description Date
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
6/12
/201
3 4:
25:2
7 PM
A-300
PERSPECTIVE
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Checker
View from North-WestView from South West
No. Description Date
Apparatus Bay 2nd Floor View to Circulation AtriumCrew Area Lounge
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
6/12
/201
3 4:
25:2
7 PM
A-300
PERSPECTIVE
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Checker
View from North-WestView from South West
No. Description Date
Apparatus Bay 2nd Floor View to Circulation AtriumCrew Area Lounge
TEAM 06
Scale
Project number
Date
Drawn by
Checked by
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
6/12
/201
3 4:
25:2
7 PM
A-300
PERSPECTIVE
0800
007 Fire CentralMeng - Lacombe
07 May 2013Meng - Lacombe
Checker
View from North-WestView from South West
No. Description Date
Apparatus Bay 2nd Floor View to Circulation AtriumCrew Area Lounge
TASTE OF WINE - a winery, gallery and restaurant
This building is intended to be a prospective project on the Chateau Ste Michelle site. My intention was to apply the beauty of wine bottles into the building design.
REPEATING FRAME - a collaboration of experimental film artist
Spaces are excavated from volumes that are created from repeating frame. Frames are fixed, howev-er the spaces are changing throughout the day. Just like the process of film making, combining steady frames together will create moving scenes.
CONNECTION - discovery park field lab
This is a design invention on water-bluff edge conditions fund at Discovery Park. The task was to design a field lab for Seattle high school science students that will be used year round for environmental study.
ADAPTIVE REUSE - bringing art into neighborhoods
Grids and squares have always been structured or shaped in artists and architects’ life. For artists, sometimes grids are their limita-tions and sometimes they are artists’ windows for new ideas. As Art Spaces, the design plays between standardized units and order, trying to show different possibilities that grid can bring and articulates the tension between freedom and order. Eventually, this grid system will grow into the city spaces as art pieces that can pass the concept of freedom and order to publics.
other design studio works
Perspective PerspectivePerspective Perspective