Resume Jeremiah Peter Hogan 229 Lakeview Inlet Home Ph # (403) 719-7873 Chestermere, AB T1X 1P4 Cell Ph # (403) 466-1431 Email [email protected] Career Objective : Move into Management position in the oil and gas sector. Employment History : Shell Albian - Fort McMurray AB (Contract) Feb 2013 – Jan 2015 – PreComm-CSU Lead Mechanical Coordinator Work with clients and vendors to complete related equipment / process issues Review and update internal process to work in conjunction with the owner group Provide support in completing and finalizing operations and process manuals Hands on operations support during pre-commissioning, commissioning and start up Support in documentation process as per client requirements Update or create internal processes to mold our processes to our clients for the startup and commissioning phase Deficiency list review and elimination Initiate or update communication system for hazardous and harmful chemicals within process Finalize documentation processes and procedures related to the current operation Update, create and/or review HAZOPS Ongoing consultation in trouble shooting and optimization Site Supervision – oversee construction of facilities and pipelines as necessary PreComm and startup of 3500 HP VFD motors, pumps and lube oil systems Complete walk downs on civil, structural and piping Engineering Work Packages 1 J.P. (Peter) Hogan

Upload: peter-hogan

Post on 14-Aug-2015

66 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Resume April15

ResumeJeremiah Peter Hogan

                                                                                   229 Lakeview Inlet Home Ph # (403) 719-7873 Chestermere, AB T1X 1P4 Cell Ph # (403) 466-1431

Email [email protected] Career Objective : Move into Management position in the oil and gas sector.

Employment History :

Shell Albian - Fort McMurray AB (Contract)Feb 2013 – Jan 2015 – PreComm-CSU Lead – Mechanical Coordinator

Work with clients and vendors to complete related equipment / process issues Review and update internal process to work in conjunction with the owner group Provide support in completing and finalizing operations and process manuals Hands on operations support during pre-commissioning, commissioning and start up Support in documentation process as per client requirements Update or create internal processes to mold our processes to our clients for the startup and

commissioning phase Deficiency list review and elimination Initiate or update communication system for hazardous and harmful chemicals within process Finalize documentation processes and procedures related to the current operation Update, create and/or review HAZOPS Ongoing consultation in trouble shooting and optimization Site Supervision – oversee construction of facilities and pipelines as necessary PreComm and startup of 3500 HP VFD motors, pumps and lube oil systems Complete walk downs on civil, structural and piping Engineering Work Packages Actively demonstrate support for the corporate position on health, safety, sustainable

development, diversity, respectful workplace and the General Business Principles and Code of Ethics 

Cameco Corp (Underground Mine), Cigar Lake SK (Contract)Sept 2012 – Jan 2013 – Sub Surface Rotating and Static Equipment InspectorResponsible for:

Performance of all aspects of inspection activities Monitor welders performance and conduct visual inspections or welds and repairs in

accordance with company procedures Read and interpret the various drawings used for executing the work Interact with team members and work to resolve quality related issues with workers,

subcontractors and the client Organize and implement Quality Control Systems and processes Check, inspect and test incoming welding and materials to ensure they meet project

specification requirements Maintain project Quality Control documentation

1J.P. (Peter) Hogan

Page 2: Resume April15

Responsible for performing quality evaluations on standard and routine processes and products according to engineering drawings, specifications, prescribed methods and instructions

Identify and report non-conformance to known standards using various measuring and testing methods

Fully participate in continuous process improvement and cost control, following quality policies and procedures and standards to maintain within company guidelines

Perform other duties as required, including accurate and timely completion of paperworkSpectra Energy, Nelson BC (Contract)June 2012 – Sept 2012 – Rotating and Static Equipment InspectorResponsible for:

Quality Assurance of Rotating /Reciprocating Equipment in various stages of installation and commissioning using appropriate designated standards as the guideline

Responsible to ensure Quality Assurance requirements are defined and met for mechanical work performed

Administer applicable Quality Assurance guidelines as they apply to Rotating Equipment Identify high risk equipment, provide onsite support and offer proactive maintenance

suggestions Ensure appropriate hold and witness points are identified for rotating equipment Provide troubleshooting expertise with hands on approach in assisting field personnel to

insure equipment installation and repair/maintain mechanical best practices Provide Surveillance and Audit inspection activities within the team for quality compliance

and to ensure compliance to API 686 requirements Ensure inspection activities are complete with reporting expectations clearly defined and

adhered to Aid in development of appropriate pre and post equipment check sheets, develop quality

assurance criteria and supply reporting, training and expectations to field personnel and 3rd party inspectors as required

Support evaluation of rotating equipment and provide guidance to stakeholders to identify key areas for potential improvement

Accountable for following Operations Readiness Deliverables for Rotating Equipment Assure all Critical information is ‘AS BUILT’

Suncor Energy, Fort McMurray AB (Contract)June 2011 – Jan 2012 – Construction CoordinatorResponsible for:

Meeting with the Project Leader/Manager to understand all vital aspects of the project Ensuring all team members understand scope of the project as well as their individual

responsibility Coordinating activities with vendors & suppliers, and maintain relationships Assisting the Project Leader/Manager in various activities (i.e. budget monitoring) Creating completion schedules Conducting team meetings Compiling and maintaining interim project reports Communicating relevant information to all team members, such as change in schedule

dates, changes in the project’s requirements, unexpected complications, etc. Ensuring that Canadian Construction Industry Standards were followed

2J.P. (Peter) Hogan

Page 3: Resume April15

Ledcor Construction - Shell Albian, Fort McMurray AB (Contract)Aug 09 – May 2011 - Start-up – CommissioningAs part of the Commissioning Team responsibilities included:

Interface with Project Engineering, Planning, Construction and Start-up groups Ensuring all modification work was completed in compliance with corporate standards,

company policies & procedures and industry regulations Pre-commissioning and Commissioning works were prioritized in line with the Asset's safety,

production, environmental and OPEX objectives Identifying opportunities to improve contractor/supplier performance, reduce costs and

improve the quality of services supplied Providing specialist Commissioning and Start-up technical support to Facilities Engineering

and Operations teams and other functions as required Management Change Control procedures (MOC) and working practices were maintained in

line with company procedures Performing walkdown visits in support of ongoing Commissioning activities Developing and maintaining positive and constructive relationships with engineering &

construction stakeholders and held regular feedback meetings with these stakeholders Providing coaching and mentoring support to less experienced trades personnel 

Jacobs Canada, Inc. – Shell Waterton Complex, Pincher Creek, ABMar 08 – Dec 08 - Q/A Mechanical InspectorResponsible for inspection and installation of rotating equipment, which included:

Installation of steam turbines, pumps, motors, gearboxes Preservation, leveling, alignment, grouting, final alignment and pre- commissioning Welding and structural steel audits Civil and structural steel inspections Audit and surveillance of piping processes, inspection of boiler and static equipment, with

pre-commissioning turnover to clients, inspectors and ABSA Work was completed to API 686 and applicable codes and standards Monitoring that OH & S standards were complied with by contractor Supervision of millwright staff

Kinetic Projects Inc – Encana SAGD Project – Expansion Phase, Christina Lake, ABAug 07 - Mar 08 - QA/QC Inspector/ForemanResponsible for:

Supervision of fabricating / welding / hydro test crews Building of hydro test packages for construction and shut downs Liaison with clients and engineers to rectify issues Supervising fabrication of pipe spools Cost estimating up to $1M for piping packages

3J.P. (Peter) Hogan

Page 4: Resume April15

  Quinn Contracting – Nova Petro Chemical Site, Joffre, ABMay 07 - Aug 07 – Piping Forman during shutdown at Ethylene Production Complex Responsible for:

Insuring all tasks were completed in a timely and safe manner Projects were completed within budget Managing local subcontractor work force and maintained standards and implemented

permits to work systems   

TIW Western - Shop Fabrication, Calgary, ABOct 06 - May 07 - QA/QC InspectorResponsible for:

Performing visual inspection for Once Through Steam Generators and Heat Recovery Steam Generator packages

Visual Inspection on structural components Radiographic inspection on process and boiler piping Work completed using ASME B31.1 and B31.3 Codes

Triton Projects Ltd. - Petro Canada SAGD Project, Fort McMurray, ABMay 05 – Sept 06 – QA/QC Mechanical and Piping Inspector (Contract)

Participated in the construction / pre-commissioning of SAGD Project Responsible for providing QA/QC for process buildings and piping Prepared hydro test packages and weld maps

Employed for the following companies in between Construction Projects and full – time school during the years of 1990 – 2005:

Bradon Construction Ltd – Calgary, AB (Millwright and Pipefitter) Ledcor Construction Ltd – Calgary, AB (Millwright and Pipefitter) Stanley Industrial Ltd – Calgary, AB (Mechanical Engineering Technologist) Cobra Maintenance Ltd – Cochrane, AB (Millwright and Pipefitter) Quinn Contracting – Red Deer, AB (Millwright and Pipefitter) Parkland Projects – Olds, AB (Millwright and Pipefitter)

4J.P. (Peter) Hogan

Page 5: Resume April15

EDUCATION 2015 – First Level Supervisor Training - CLAC

2014 – In the process of completing APEGA Membership Application

2011 – CASTI – ASME Section IX Welding Codes and Metallurgy

2011 – CASTI – ASME B31.3 Process Piping Code Design Requirements

2011 – Leadership for Safety Excellence – Alberta Construction Safety Association

2011 – Principles of Health and Safety Management – Alberta Construction Safety Association 2009 - Fundamentals of Project Management University of Calgary – Calgary, AB. 2009 - API-570 Pipe Inspector CASTI – Edmonton, AB. 2006 - Journeyman Steamfitter / Pipefitter (Red Seal) Southern Alberta Institute of Technology – Calgary, AB. 2002 - 2nd yr. Millwright (completed 9000 + hrs. towards trade ticket) Southern Alberta Institute of Technology – Calgary, AB. 1997 - Pipeline Design and Construction University of Calgary – Calgary, AB. 1996 - Mechanical Engineering Diploma Southern Alberta Institute of Technology – Calgary, AB. Other Relevant Experience:

Proficient with Microsoft Projects, Word, Excel, Outlook Membership: ASME Safety Tickets: WHMIS, CSTS, H2S Alive

5J.P. (Peter) Hogan

Page 6: Resume April15

Addendum for Jeremiah Peter Hogan Resume

Centrifugal Compressor Experience

1996 - Ledcor Construction Ltd – Revamp at ANG, Cochrane, AB (Millwright)

Installation of gas turbine package RB211 DR 6 stage centrifugal gas compressor package Associated coolers and seal and lube oil systems Assisted in pre-commissioning

1991 – Parkland Projects - North Compressor Site Shell Caroline, AB (Pipefitter)

Installation of centrifugal gas compressors and motors Fabricating and installation of piping to static equipment and compressors Assisted in pre-commissioning

1980 – 1982 – Brown and Root Saudi Arabia Ltd (Pipeline and Mechanical Superintendent)

Installation of reciprocating gas compressors Seal and lube oil packages and associated static equipment Installation of centrifugal refrigeration packages for gas cooling Assist in start-up of pipelines and processing facilities Installation of towers and coolers

6J.P. (Peter) Hogan