resume
TRANSCRIPT
CURRICULUMVITAE
Father Name : Ghulam said
Date of Birth : 04, January 1982
Marital Status : Married
Nationality : Pakistani
Religion : Islam
Iqama No : 2303110338
Iqama Status : Valid & transferable
Languages : English, Arabic, Urdu, Pashto
Qualification:
GHSS (Science group) swat board 1998 (Govt Higher secondary school Khanpur)
F A (Arts group) swat board 2001(Govt Higher secondary school khanpur)
Career Objectives I want to be a part of dynamic goals and oriented organization where I would be able to play a vital role is acting as a dominant participant in professional team for the achievement of organization goals and objectives by implementing my creative abilities skills and knowledge.
Working Experience
1. ALSAFWAH AL-NAQIAH RAILWAY CO & ANSALDO STS PROJECT RIYADH KSA.
POSITION: PSDS & AFC TECHNICIAN
DURATION: 01, FEB 2013 TO TILL NOW
PROJECT : PRINCESS NORAH BINT ABDUL RAHMAN UNIVERSITY RIYADH, KSA Responsibilities:
Corrective and preventive maintenance of platform screen doors (PSDS) system.
Installation and replacing the platform screen doors (PSDS) and emergency exit
Doors (EED).
MUHAMMAD AKBAR Cell No: 00966-59-5771058 Email: [email protected] [email protected]
Responsible to order the material and equipment to use in installations.
Following the SAP to complete the tasks.
Supporting the technical team of telecom (TLC) for maintenance and troubleshooting.
Supporting the technical team of wayside (ATC) for maintenance.
Corrective and preventive maintenance of Automatic fair collection (AFC) system.
Maintenance of system includes hardware and software.
2. International Metro service(IMS) PNU Project Riyadh KSA POSITION: FIELD STAFF
DURATION: 15 August 2011 to 12 September 2012
Key points:
Conducting the Sweep run in main line with the train.
Changing the switch point machine manually from normal to reverse and from
reverse to normal.
Train movements in depot area.
Support depot tech for maintenance of depot equipment.
Maintenance of switch point machine.
3. Alsafwah al–naqiah Railway co and Ansaldo STS PNU Project
POSITION: FIELD STAFF
DURATION: 13, September 2012 to 31, January 2013
Key points:
Conducting the Sweep run in main line with the train.
Changing the switch point machine manually from normal to reverse and from
reverse to normal.
Train movements in depot area.
Support depot tech for maintenance of depot equipment.
Maintenance of switch point machine.
4. Fauji Cement company limited (FCCL) Taxila Pakistan
DURATION: January 2005 to January 2008
Apprenticeship (3year) in mechanical.
2 year as a mechanical technician 2008 to 2010
5. Al-joraid company sub-contractor of faiveley DURATION: 15 February to 14 august 2011
Cable pulling and cable termination.
Training sessions: Attend 01‐day training of short circuit device.
Attend 01‐day training of first aid.
Attend the training of fire.
Personal Skills
Excellent written and verbal communication skills.
Highly organized and efficient.
Ability to work independently or as part of a team. Your Truly: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Muhammad Akbar Ghulam Said