resume

3
J O H N P R E S T O N W E S T F A L L A R C H I T E C T 3323 NE 70 th Avenue Portland, Oregon 97213 503 (274-9450) Page 1 RESUME OF PROFESSIONAL QUALIFICATUIONS: REGISTRATION Architect; Sate of Arizona 1986, Registration No. 20165 EDUCATION Arizona State University - College of Architecture, Tempe, Arizona Bachelor of Architecture University of Arizona - College of Liberal Arts and Sciences, Tucson, Arizona Bachelor of Arts in Anthropology EXPERIENCE Dull Olson Weekes Architects Portland Oregon (11/97 11/2010) Responsibilities included cost estimating, Schematic design through Contract Administration, consultant coordination, Owner/Architect meeting preparation and presentation, project closeout and the use of AutoCAD. Project Manager for additions and alterations for the Tigard/Tualatin School District, West Linn School District, Salem Keiser School District and Beaverton School District. Project Manager for the Redmond Police Station in Redmond, Oregon. Cost: $1.4 million Project Manager for the Center for Design and Technology Building for the Bend School District. Cost: $5 million Project Manager for the Doc Harris Stadium for the Camas School District Cost: $6.8 million Project Manager for the Portland Golf Club The Orcutt / Winslow Partnership Phoenix , Arizona (6/93 4/97) Project Manager for additions and alterations to buildings for the Baltz and Washington School Districts. Responsibilities included cost estimating, schematic design through contract administration, consultant coordination, Owner/Architect meeting preparation and coordination, project closeout and the use of Archicad.

Upload: john-westfall

Post on 08-Mar-2016

212 views

Category:

Documents


0 download

DESCRIPTION

My resume of Architectural and Feature Film work

TRANSCRIPT

Page 1: Resume

J O H N P R E S T O N W E S T F A L L

A R C H I T E C T

3323 NE 70

th Avenue Portland, Oregon 97213 503 (274-9450)

Page 1

RESUME OF PROFESSIONAL QUALIFICATUIONS:

REGISTRATION

Architect; Sate of Arizona – 1986, Registration No. 20165

EDUCATION

Arizona State University - College of Architecture, Tempe, Arizona

Bachelor of Architecture

University of Arizona - College of Liberal Arts and Sciences, Tucson, Arizona

Bachelor of Arts in Anthropology

EXPERIENCE

Dull Olson Weekes Architects – Portland Oregon (11/97 – 11/2010)

Responsibilities included cost estimating, Schematic design through Contract

Administration, consultant coordination, Owner/Architect meeting preparation

and presentation, project closeout and the use of AutoCAD.

Project Manager for additions and alterations for the Tigard/Tualatin School

District, West Linn School District, Salem Keiser School District and Beaverton

School District.

Project Manager for the Redmond Police Station in Redmond, Oregon.

Cost: $1.4 million

Project Manager for the Center for Design and Technology Building for the Bend

School District. Cost: $5 million

Project Manager for the Doc Harris Stadium for the Camas School District

Cost: $6.8 million

Project Manager for the Portland Golf Club

The Orcutt / Winslow Partnership – Phoenix , Arizona (6/93 – 4/97)

Project Manager for additions and alterations to buildings for the Baltz and

Washington School Districts. Responsibilities included cost estimating,

schematic design through contract administration, consultant coordination,

Owner/Architect meeting preparation and coordination, project closeout and the

use of Archicad.

Page 2: Resume

J O H N P R E S T O N W E S T F A L L

A R C H I T E C T

3323 NE 70

th Avenue Portland, Oregon 97213 503 (274-9450)

Page 2

South Pole Pictures, Inc. and Brooksfilm, Inc. – Phoenix, Arizona (2/91 - 6/93)

Assistant set designer for major motion picture starring Charlie Sheen: Fixing the

Shadow. Producers: Mark Taylor, John Fielder, Designer: Jim Shoppe Director

Larry Furguson.

Assistant set designer for major motion picture starring Bill Paxton, Marshall Bell

and Michael Ironside: The Vagrant. Executive Producer: Mel Brooks; Designer:

Michael Bolton; Director: Chris Walas.

Thomas E. Gale, Architect – Scottsdale, Arizona (8/90 – 2/91)

Project Architect/General Contractor for custom homes: new, remodeling and

additions

Salazar Associate Architects, Ltd. – Phoenix, Arizona (2/90 – 2/91)

Project Architect for Westside Food Bank Warehouse, A.D.O.T. Rest Stop

Rehabilitation and American Express Pedestrian Bridge. Responsibilities

included design development through working drawings and code review

Architect One – Phoenix, Arizona (6/86 – 9/89)

Project Architect for University Libraries, office projects, detention facilities and

tenant improvement. Responsibilities included development of working drawings,

code review, coordination of consultants, cost estimating, specifications, field

observation and contract administration. Use of AutoCAD software

The Orcutt / Winslow Partnership – Phoenix, Arizona (9/83 – 3/86)

Project Architect for school and office projects. Responsibilities included

development of working drawings, code review, coordination of consultants, cost

estimating, specifications, field observation and contract administration. One year

experience with AutoCAD software

Paul Hendrix Masse – Phoenix, Arizona (5/83 – 8/83)

Draftsman for mixed use design for retail center located in San Francisco

Page 3: Resume

J O H N P R E S T O N W E S T F A L L

A R C H I T E C T

3323 NE 70

th Avenue Portland, Oregon 97213 503 (274-9450)

Page 3

Koehnlein, Lightowler & Johnson, Inc. – Phoenix, Arizona (5/81 – 5/83)

Draftsman; preliminary planning and site design, graphic presentation and

production of commercial developments

LANGUAGES

Proficient with conversational Spanish. Applicable knowledge of French and Russian.

TRAVEL

Travels to many parts of the United States, including Alaska. Travels in north and

southern Europe, Southeast Asia, China, Nepal, India, Australia, New Zealand, Northern

and Southern Africa, the Middle East, South and Central America.

INTERESTS

Member: American Institute of Architects, Arizona Songwriters Association. Former

member of the Arizona Central Village Planning Committee, Garfield Neighborhood

Association Board Member, Board Member for the Weed and Seed Federal Grant, Law

Enforcement Chair and Rebuilding Together Captain for 3 years

REFERENCES

Available upon request