resume 2015 .doc 2

21
RESUME Name: Siow Chon Wah Nric: 590502-04-5077 Date of Birth: 02 nd May 1959 Address: No.83A, PT 1573, Jalan Flora 3, Taman Flora, 71000 Port Dickson, Negeri Sembilan. E-Mail Address [email protected] Telephone No: 017-8757322 (Handphone) EDUCATION BACKGROUND: Secondary School CAREER SUMMARY Mr. Siow Chon Wah is a Piping and Mechanical Supervisor with over 20+ years' experience in a variety of roles across various construction industries including extensive experience in the Oil & Gas offshore and onshore sector, Petroleum Refinery, Chemical Plant, Mining, Power Plant, Module / Topside Platform, Storage Tank and Pipeline. Mr Siow Chon Wah has been exposed to various field activities in Vendor Shop Fabrication, New Construction, plant shutdown and revamp with performed a key role of technical executive for field engineering, construction supervision includes test pack line checking / punch listing, pressure testing, pre- commissioning, reinstatement and mechanical completion for system handover. Also familiar in QA/QC work and HSE Management and well verse with International Codes and Standards like ASME, AWS, ASTM, ANSI, API, BS, JIS and PTS. QUALIFICATIONS AND OTHER CERTIFICATIONS/TRAININGS: Professional Qualifications: Highly Technical Experience In Oil & Gas and Petro Chemical Industries. Piping Supervisor / Inspector 1

Upload: siow-chon-wah

Post on 14-Aug-2015

374 views

Category:

Documents


17 download

TRANSCRIPT

Page 1: Resume 2015 .doc 2

RESUME

Name: Siow Chon WahNric: 590502-04-5077 Date of Birth: 02nd May 1959Address: No.83A, PT 1573, Jalan Flora 3,

Taman Flora, 71000 Port Dickson, Negeri Sembilan.E-Mail Address [email protected] No: 017-8757322 (Handphone)

EDUCATION BACKGROUND: Secondary School

CAREER SUMMARY

Mr. Siow Chon Wah is a Piping and Mechanical Supervisor with over 20+ years' experience in a variety of roles across various construction industries including extensive experience in the Oil & Gas offshore and onshore sector, Petroleum Refinery, Chemical Plant, Mining, Power Plant, Module / Topside Platform, Storage Tank and Pipeline.

Mr Siow Chon Wah has been exposed to various field activities in Vendor Shop Fabrication, New Construction, plant shutdown and revamp with performed a key role of technical executive for field engineering, construction supervision includes test pack line checking / punch listing, pressure testing, pre-commissioning, reinstatement and mechanical completion for system handover. Also familiar in QA/QC work and HSE Management and well verse with International Codes and Standards like ASME, AWS, ASTM, ANSI, API, BS, JIS and PTS.

QUALIFICATIONS AND OTHER CERTIFICATIONS/TRAININGS:

Professional Qualifications: Highly Technical Experience In Oil & Gas and Petro Chemical Industries. Piping Supervisor / Inspector

SUMMARY OF YEARS OF WORKING EXPERIENCE:

Total Years of Working Experience: 26 years 8 months

Total Years of Related Working Experience Sector: 26 years 8 months

1

Page 2: Resume 2015 .doc 2

WORKING EXPERIENCE:

Company JGC

Period 2015-04-02 To PRESENT

Division /Project MLNG Train 9 Project in Bintulu

Position QC Piping

EMPLOYMENT HISTORY

Company Foster Wheeler

Period 2014-06-01 To 2014-12-31

Division /Project Position Mechanical and Piping Supervisor

Duties/Responsibilities

Name of Client: SYNTHOMER Sdn. Bhd. Pasir gudang, Johor (September to December)

Project: SYNTHOMER PROJECT JOB 4.1 MONOMER RECOVERIES AT PASIR GUDANG, JOHORE.

Position: Mechanical and Piping Supervisor

Name of Client: ARKEMA Thiochemical dn.Bhd (June to August) Project: EPCC for LYCHEE Project at ARKEMA Plant Kerteh Malaysia. Position: Piping Supervisor / Line Checker

Job Responsibilities:

Performed Piping Test pack line checking and punch listing with category A, B and C. Witness Pressure Testing such as Hydro, Pneumatic, Visual and Service Test.

Carried out final Test pack re-instatement prior for Mechanical Completion or system walk down.

Attend daily pre-start work performed by sub-contractor, to ensure the tool box brief to workers is related to safety. Responsible to monitor and check the contractor manpower loading and workforce allocation on daily basis respective assignment.

Check and verify the drawings and ensure that the drawing is in a latest revision/edition and approved for construction. Check and verify the spools and support are correct route, location and dimension according to the drawing

Ensure and confirm the types of material used are correct as per piping class and specification. Follow up the outstanding field material in order to complete the piping system

2

Page 3: Resume 2015 .doc 2

Conduct piping test pack line checking and punch listing based on priority system. Witness piping test package hydro testing, flushing, air blowing and reinstatement. Attend daily turnover coordination meeting with client and contractor.

Prepare daily and weekly piping progress report and submit to superior in charge

EMPLOYMENT HISTORY

Company Welfield Services Sdn. Bhd.

Period 2014-01-01 To 2014-04-01

Division /Project

Position Safe Start Program Supervisor

Duties/Responsibilities

Name of Client: ABF (Bintulu)

Project: Pre-shutdown and shutdown work Job Responsibilities:

Work filing due to test pack box-up during turnaround.

Closely coordinate with engineering department for drawing revision update. Prepare daily and weekly test package progress report to construction manager.

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

EMPLOYMENT HISTORY

Company Hitachi Plant Technologies, Ltd. Office of Indonesia (EPCC)

Period 2013-02-01 To 2013-12-31

Division /Project

Position Q.C. on Jacket Pipes

Duties/Responsibilities

Name of Client: KAO Indonesia Chemicals CO.

3

Page 4: Resume 2015 .doc 2

LTD. Project: KAO Indonesia Chemicals CO. LTD.

Job Responsibilities:

Review jacketed pipe WPS, ITP PQP and QMS based on project specification and technical standard Physical Material inspection at warehouse as per mill cert. prior for fabrication and site erection.

Conduct daily quality inspection due to fit-up and welding perform by construction team. Witnessing hydro testing on jacket pipe.

Closely monitoring and auditing pipe jacket and steam jump over installation at site. Prepare and submit daily quality report to head of QA or head department.

Closely coordinate to construction team to ensure that the construction activities compliance to quality procedure, ITP and specification requirement.

Closely coordinate to engineering for new revision and as-built drawing in order for weld mapping update.

EMPLOYMENT HISTORY

Company Alliance (Lynas / UGL Resources) EPCC

Period 2011-10-01 To 2012-11-30

Division /Project

Position Piping Supervisor & Permit Coordinator

Duties/Responsibilities

Name of Client: Lynas Malaysia Sdn Bhd.

Project: LAMPSON"- Lynas Advance Material Project. Job Responsibilities:

Engineering works, mechanical completion, procedure, scope of standard, specification and execution. Update permit to work (PTW) based on daily work activities requested by contractors.

Join site visit with contractor to check the condition at the working area as permit request. Carry out gas test with assistance of competent AGT before entering the confined space.

Managing, planning and controlling construction activities in all aspects of works to be aligned with project standard, specification and requirement.

4

Page 5: Resume 2015 .doc 2

Drawing preparation, interpretation and reviewing such as Plot plan, PEFS, G.A., Isometric, piping standard support & steel structure detail drawing

Daily monitoring and auditing the daily manpower loading, time keeping, progress & material delivery as per project planned & schedule.

Closely coordinate to QA/QC to ensure that the construction activities compliance to project ITP, procedure and specification requirement.

Closely coordinate to engineering pertaining on the site technical query, drawing revision and drawing as-built. Closely coordinate to planner / scheduler engineer regardless to construction work progress ahead or delay as per project plan / schedule.

Prepared and submit daily / weekly report to head of department / management prior to track down the progress status of construction works.

Attend daily safety tool box / pre start briefing to all workers, to control the risk and hazards on site and to ensure the works area is safe condition to work.

EMPLOYMENT HISTORY

Company Foster Wheeler E&C (M) Sdn. Bhd. EPCM

Period 2008-04-01 To 2010-02-28

Division /Project

Position Piping Tie-in Supervisor

Duties/Responsibilities

Name of Client: PPMSB (Petronas Penapisan Melaka Sdn. Bhd. Project: PSR-2 Revamp.

Job Responsibilities:

Responsible to study and understand the revamp technical standard and procedure, based on project specification in order to harmonize the work flow and work sequence.

Reviewed revamp drawing to identify piping tie-in point and tie-in quantity against P&ID, GAD & Isometric. Manage, supervise and closely monitor the piping construction revamp works such new revamp spools fabrication, installation and tie-in, included existing pipeline refurbishment.

Conduct piping tie-in tagging to existing pipe line, with assistance of plant operation team, to ensure the tie-in number and tagging point against drawing spec.

5

Page 6: Resume 2015 .doc 2

Prepare workforce team to carry out the piping tie-in works and activities such as welded / bolted / cold tap / hot tap, based on approved tie-in work pack.

Established a working relation and line of communication with TA manager, area engineer, mechanical / project planner, QA/QC & defect engineer, test inspection engineer, DOSH officer and operation to decipher turnaround discrepancies.

Carried out equipment blinding, tagging & LOTO, with assistance of plant operation team to prove the blinding & tagging works are as per operation blinding list.

Direct monitoring and supervision to the workers, to develop and implement a plan for system & area turnover that coordinate the activities of all craft discipline and responsible to ensure all works comply with turnaround quality and procedure.

Mobilized tools, materials, spools and equipment to work site area for turnaround preparation, before the declaration of mechanical day.

Supervision on the plant start-up such as removing and refitting of process drain and blanks at the battery limits as well as at the whole plant.

EMPLOYMENT HISTORY

Company Various Companies

Period 1986-02-01 To 2008-02-01

Division /Project

Position Various Roles

Duties/Responsibilities

Employment Period: March 2007 To February 2008 Employer :Kejuruteraan Dan

6

Page 7: Resume 2015 .doc 2

Pembinaan Sikojaya Sdn. Bhd. Position:Q.C.

Project Involved:Tuanku Jaafar Power Station Port Dickson Rehabilitation Project - Phase 2

Job Involved: Q.C. works and reporting.

Employment Period: January 2007 To February 2007 Employer:Science Tech Solution Sdn. Bhd. (STS) Position:Supervisor

Project Involved:PSR-1 Phase V Turnaround at Petronas Penapisan (Melaka) Sdn. Bhd. Job Involved:Shut-down works.

Employment Period: August 2006 To October 2006. Employer:Shinryo (M) Steamline (M) Consortium. (SSC). Position:Piping Supervisor / Line Checker

Project Involved:Petronas Penapisan Melaka Cogeneration Plant Project. Job Involved:New Power Plant on piping works.

Employment Period: June 2006 To July 2006. Employer:Rahabco Engineering & Construction Sdn. Bhd. Position:Supervisor

Project Involved:Asean Bintulu Fertilizer Sdn. Bhd. Job Involved:Shut-down works.

7

Page 8: Resume 2015 .doc 2

Employment Period:November 2005 to May 2006. Employer:Chiyoda (M) Sdn. Bhd.

Position:Tank Supervisor

Project Involved: Independent Oil Terminal Project at Sarawak. Job Involved:Erection New Tank

Employment Period:August 2005 To October 2005. Employer:Kejuruteraan Sri Lambaian Sdn. Bhd. (KSL) Position:Piping QC

Project Involved: Cognis / Rita Chemical Plant at Telok Panglima Garang Banting, Klang.

Job Involved: Piping works on Pre-shutdown and shutdown works.

Employment Period:April 2005 To July 2005. Employer:Ranex (M) Sdn. Bhd.

Position:Supervisor.

Project Involved: Shell Refinery at Port Dickson. Job Involved: Pre-shutdown and shutdown works.

Employment Period:October 2004 To March 2005. Employer:Risen Engineering & Construction Sdn. Bhd.

Position:Supervisor Coordinator.

Project Involved:PDI Shell Refinery at Port Dickson. Job Involved:Up grading

8

Page 9: Resume 2015 .doc 2

facilities (Bottom Loading).

Employment Period:August 2004 To September 2004. Employer:Chiyoda (M) Sdn. Bhd.

Position:Material Controller.

Project Involved:Esso Malaysian Bhd. (Port Dickson Refinery) Job Involved:Esso PDR Turnaround 2004 Project.

Employment Period:June 2004 To July 2004. Employer:Risen Engineering & Construction Sdn. Bhd. Position:Supervisor Coordinator

Project Involved:L.P.G. Shell Refinery at Port Dickson.

Job Involved: Extension of existing L.P.G. Filling Plant and Recond Plant (civil and structures work).

Employment Period:April 2004 To May 2004. Employer:Dialog

Position:Supervisor

Project Involved:BASF PETRONAS CHEMICALS Sdn.Bhd. Gebeng, Kuantan, Pahang.

Job Involved:Pre-shutdown and shutdown works at Oxo/Syngas Complex.

Employment Period:December 2003 To April 2004. Employer:Transfield Servicers Asia Sdn. Bhd.

Position:Project / Safety Supervisor

9

Page 10: Resume 2015 .doc 2

Project Involved:R.A.A.F. Air Force Base at Butterworth. Shell Refinery at Port Dickson.

Job Involved:Maintenance and Shut-Down works

Employment Period:June 2003 To September 2003. Employer:Shell Malaysia Trading Sdn Bhd.

Position:Site Project Supervisor

Project Involved:New Bitumen Storage Facilities Tank 12 at Shell Tanjung Gelang Installation, Kuantan, Pahang.

Job Involved:Supervise, Safety, Quality.

Employment Period:March 2003 To April 2003. Employer:Risen Engineering & Construction Sdn. Bhd. Position: Supervisor Coordinator

Project Involved:BP (AsPac) Lubricants Plant (M) Sdn. Bhd. Port Klang. BP Northport Terminal. Port Klang.

Job Involved:BP (AsPac) Lubricants Plant (M) Sdn. Bhd.

Fabricate, Install and Tie-in New pipeline at New and Old Blending plant. BP Northport Terminal.

Tank No: 01. Replacement Leaking Bottom Plates.

Employment Period:May 2002 To January 2003. Employer:IJM Prebore Piling & Engineering Sdn. Bhd. Position:Supervisor

10

Page 11: Resume 2015 .doc 2

Project Involved:T. N. B. Tuanku Jaafar Power Station, Port Dickson Job Involved:Demolish and Civil Works.

Employment Period:November 2001 To January 2002. Employer:Chiyoda (M) Sdn. Bhd.

Position:Material Controller.

Project Involved:Esso Malaysian Bhd. (Port Dickson Refinery) Job Involved:Additional Crude H2O Draw Off Facilities

Employment Period:March 2001 To May 2001. Employer:P. D. Tai Meng Eng. Construction Sdn. Bhd. Position:Safety Officer

Project Involved:Amoco Chemical Plant, Gebeng, Pahang. Job Involved:Per-shutdown and shutdown work

Employment Period: July 2000 To December 2000. Employer: Noroza Sbn. Bhd.

Position: Project Coordinator

Project Involved: T. N. B. Tuanku Jaafar Power Station, Port Dickson Job Involved: Demolish two concreted chimney by manual hacking from top to bottom (95 meter high)

Employment period: October 1999 To June 2000. Employer: Toyo Engineering

11

Page 12: Resume 2015 .doc 2

Corporation Position: Tank Supervisor

Project Involved:BASF PETRONAS CHEMICALS (MBOX Project ), Gebeng, Pahang. Job Involved:Erection New Tanks and QC report

Employment Period: May 1997 To May 1999. Employer:J. G. C. Sdn. Bhn. (Japan Gas Corporation) Position: Document Controller

Project Involved:LRCC (Long Residue Catalytic Cracker) at Shell Refinery, Port Dickson.

Job Involved: To set-up, Filling, Keep and hanged only one revision the latest, make copy of drawing / document and send to head department and appointed sub-Contractor through / via transmittal, make easy / exit filling document, key-In / up-date document revision on computer (current status report) and audit on sub-contractor document, coordinate with owner employee and sub-con

Employment Period:May 1996 To May 1997. Employer: KNM Steel Construction

Position: Piping Supervisor

Project Involved: M. P. P. / L.S.W.R. (Multi-Purpose Pipeline at Shell Refinery) Job Involved:To supervise and QC report on Grit Blasting,

Painting, Welding, Insulation, Piping, Pipe Laying and Tie-in

Employment Period: November 1992 To February

12

Page 13: Resume 2015 .doc 2

1996. Employer: KEJ. Q.K.S. Sdn. Bhd.

Position: Site-Supervisor

Project Involved:ESSO, SHELL, PETRONAS REFINERY.

Job Involved:Esso Refinery at Port Dickson

Oxygen and P. H. Analyzer for PF-2 regent facilities Replacement Tank 2 and Tank 35 roof, drain hoses and piping Water Injection C-7001

Cooling tower 2 gear box and motor support

C-206 suction and discharge pots on hydro test Shutdown work on Heat Exchanges, Drums, Reactors, Furnaces and Control Valves

A.P.S. Project by J. G. C. Sdn. Bhd. (Japan Gas Corporation) Shell Refinery at Port Dickson

To build new cone roof Tank 1583

To build new Furnace F-456 Shutdown work on Heat Exchanges,

Drums, Reactors, Furnaces, Control

13

Page 14: Resume 2015 .doc 2

Valves X-401 Load Test

PETRONAS at Malacca Shutdown work on Heat Exchange

Employment Period: 1990 To October 1992. Employer: Thian San Company

Position: Supervisor

Project Involved:Esso and Shell Refinery at Port Dickson. Job Involved:

Esso Refinery:

Additional regeneration facility for PF-2 Platform modification

Drums Cleaning

Shutdown work on Furnaces and Reactors Shell Refinery:

Drums Clearing

Shutdown work on Drums, Exchanges, Furnaces and Reactors.

Employment Period:1986 To 1990.

14

Page 15: Resume 2015 .doc 2

Employer:LOKE MUN HOI Engineering (M) Sdn. Bhd. Position:Fitter

Project Involved:Esso and Shell Refinery at Port Dickson. Job Involved:Miscellaneous on Rotary Equipment

15