INTER-OFFICE COMMUNICATION October 2 , 2019 DATE: Department of Engineering and Public Works P.O. Box 21229 West Palm Beach . FL 33416- 1229 (561) 684- 4000 FAX: (561) 684-4050 www. pbcgov .com Mack Bernard, Mayor Members , Board of County Commissioners Tanya N. McConnell, P.E. , Deputy County Engineer ' TO: THRU: Holly B. Knight, P.E. , Contracts Section Manager Roadway Production Division // , FROM: October 1, 2019, Selection Committee Results Lyons Road / Sansburys Way Buffered Bike Lanes From Forest Hill Boulevard to Okeechobee Boulevard Project No.: 2019604 RE: Palm Beach County Board of County Commissioners This Inter-Office Communication serves to advise you of the results of the above referenced Selection Committee meeting, evaluation of the presenting firms ( see Attachment 2) resulted in the following ranking for the identified project : Mack Bernard , Mayor The Committees Dave Kerner, Vice Mayor Hal R . Valeche Gregg K. Weiss Robert S. Weinroth HSQ Group, Inc. RADISE International, LC 1 . Mary Lou Berger Melissa McKinlay American Consulting Engineers of Florida, LLC Brown & Phillips , Inc. GCME, Inc . Propel Engineering, Inc. 2. County Administrator Stanley Consultants, Inc. HSQ Group, Inc. RADISE International, LC 3. Verdenia C. Baker An Equal Opportunity Affirmative Action EmployerF:\ ROADWAY\ CCNA\2019\2019604 Lyons Sansburys Buffered Bike Lanes\Selections\Selection Meeting\Selection Results_BCC. docx printed on sustainable and recycled paper

Upload: others

Post on 17-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

INTER-OFFICE COMMUNICATION

October 2, 2019DATE:

Department of Engineeringand Public Works

P.O. Box 21229

West Palm Beach. FL 33416-1229

(561) 684-4000

FAX: (561) 684-4050

www.pbcgov.com

Mack Bernard, MayorMembers, Board of County Commissioners

Tanya N. McConnell, P.E., Deputy County Engineer '

TO:

THRU:

Holly B. Knight, P.E., Contracts Section ManagerRoadway Production Division // ,

FROM:

October 1, 2019, Selection Committee ResultsLyons Road / Sansbury’s Way Buffered Bike LanesFrom Forest Hill Boulevard to Okeechobee BoulevardProject No.: 2019604

RE:

Palm Beach CountyBoard of CountyCommissioners

This Inter-Office Communication serves to advise you of the results of theabove referenced Selection Committee meeting,

evaluation of the presenting firms (see Attachment 2) resulted in thefollowing ranking for the identified project:

Mack Bernard, MayorThe Committee’s

Dave Kerner, Vice Mayor

Hal R . Valeche

Gregg K. Weiss

Robert S. Weinroth HSQ Group, Inc.RADISE International, LC

1.

Mary Lou Berger

Melissa McKinlay American Consulting Engineers of Florida, LLCBrown & Phillips, Inc.GCME, Inc.Propel Engineering, Inc.

2.

County Administrator

Stanley Consultants, Inc.HSQ Group, Inc.RADISE International, LC

3.Verdenia C. Baker

“An Equal OpportunityAffirmative Action Employer”

F:\ROADWAY\CCNA\2019\2019604 Lyons Sansburys Buffered BikeLanes\Selections\Selection Meeting\Selection Results_BCC.docx

printed on sustainableand recycled paper

Page 2: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

October 2, 2019

October 1, 2019, Selection Committee ResultsLyons Road / Sansbury’s Way Buffered Bike LanesFrom Forest Hill Boulevard to Okeechobee BoulevardProject No.: 2019604

Re:

In accordance with PPM# CW-O-048, the results of the referencedSelection Committee meeting are being sent to you for your information.Also, as prescribed in PPM # CW-O-048, negotiations will commencewith the top ranked firm unless a request to review the results is receivedwithin ten (10) business days of the date of this communication.

Attachments:1- Selection Committee Meeting Minutes2- Compilation of Selection Committee Voting Ballots

ec: with Attachments:Verdenia Baker, County AdministratorPatrick Rutter, Assistant County AdministratorDavid Ricks, P.E., County EngineerTanya N. McConnell, P.E., Deputy County EngineerSteve Carrier, P.E., Assistant County EngineerJames Stiles, Director, Water UtilitiesIrwin Jacobowitz, Director, Contract Development and ControlTonya Johnson, Director, Office of Equal Business OpportunityOmelio A. Fernandez, P.E., Director, Roadway ProductionMorton Rose, P.E., Assistant Director, Roadway ProductionDavid Young, P.E., Special Projects Manager, Roadway ProductionHolly Knight, P.E., Contracts Section Mgr, Roadway ProductionMostaque Khan, P.E., Project Engineer, Roadway ProductionJaeAnn Dean, Technical Assistant II, Roadway ProductionAnthony Montero, Office of the Inspector GeneralYelizaveta B. Herman, Assistant County AttorneyFay Reynolds, Legal Secretary, County AttorneyCommittee Members

F:\ROADWAY\CCNA\2019\2019604 Lyons Sansburys Buffered BikeLanes\Selections\Selection Meeting\Selection Results__BCC.docx

Page 3: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

F:\ROADWAY\CCNA\2019\2019604 Lyons Sansburys Buffered Bike Lanes\Selections\Selection Meeting\Selection Minutes.doc.docx

MINUTES OF SELECTION COMMITTEE MEETING October 1, 2019, Commencing: 9:02 A.M., Ending: 10:58 A.M.

Engineering & Public Works Department, 3rd Floor Conference Room #3W-12

MEMBERS PRESENT:

David Ricks, P.E. - County Engineer Hassan Hadjimiry, P.E.* - Deputy Director, Water Utilities Tanoy Williams** - Contracts Analyst, Contract Development & Control Morton Rose, P.E.*** - Assistant Director, Roadway Production Division Allen Gray**** - Sm. Business Dev. Mgr., Office of Equal Business Opportunity David Young, P.E. - Special Projects Manager, Roadway Production Division

* denote any delegated votes here:

*James Stiles - Director, Water Utilities **Irwin Jacobowitz - Director, Contract Development & Control ***Omelio Fernandez, P.E. - Director, Roadway Production Division ****Tonya Johnson - Director, Office of Equal Business Opportunity DISCUSSION: Quorum is present representing a minimum of four members at least two of which are engineers. The Selection Committee was called to order by David Ricks, P.E., County Engineer. It was stated that the committee would be selecting a firm for Professional Engineering Consulting Services for:

Lyons Road / Sansbury’s Way Buffered Bike Lanes From Forest Hill Boulevard to Okeechobee Boulevard

Project No. 2019604

The meeting was opened up the meeting for Public Comments, public was present but none had questions or comments. Opening discussion identifying and outlining the project requirements was given by David Young, P.E., Special Projects Manager. The outline stated what the work entailed, and what the committee should be looking for in the presentations by the firms. The order of business was to select one consultant. Each was invited to make a presentation of their qualifications before the Selection Committee. RESULTS: The Selection Committee voting resulted in the following ranking order of the consulting firms:

1. HSQ Group, Inc. 2. American Consulting Engineers of Florida, LLC 3. Stanley Consultants, Inc.

At the end of the Presentations David Ricks, P.E., County Engineer, stated that the Public is welcome to make comments or sit and observe the discussions. Jagannatha Katkuri of American Consulting Engineers, had asked to sit and observe, however, he left. Nour Shehadeh and Hank Deibel of HSQ Group, later returned and observed the discussions.

Page 4: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

COMPILATION OF SELECTION COMMITTEE VOTING BALLOTS

ONE (1) FIRM TO PROVIDE: Professional Engineering Consulting Services for

Lyons Road / Sansbury's Way Buffered Bike Lanes from Forest Hill Blvd. to Okeechobee Blvd.

PROJECT NO: 2019604

MEETING DATE: Tuesday, October 1, 2019

MEETING TIME: 9:00 A.M.

TOTALS/ RANKINGS

Total points from each voting member and associated rank offirm.

American Stanley Consultants,

Selection Committee Consulting Engineers of FL, LLC

Inc.

David Ricks 75 2 74 3

Hassan Hadjimiry 73 3 77 2 -

Tanoy Williams 72 2 71 3

Morton Rose 79 1 73 3 -- - --Allen Grey 78 2 77 3

David Young 78 3 81 1

TOTAL 13 15

RANK 2 3

JaeAnn Dean

Secretary Name Printed

HSQ Group, Inc.

79 1 --

79 1 -

73 1

77 2

79 1

79 2

8

1

Page 5: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

MAX SCORE

Selection Committee

American 

Consulting 

Engineers of FL, LLC

Stanley 

Consultants, Inc.HSQ Group, Inc.

David Ricks 32 32 35

Hassan Hadjimiry 30 32 35

Tanoy Williams 30 30 32

Morton Rose 33 30 34

Allen Grey 33 32 35

David Young 35 35 35

MAX SCORE

Selection Committee

American 

Consulting 

Engineers of FL, LLC

Stanley 

Consultants, Inc.HSQ Group, Inc.

David Ricks 30 31 35

Hassan Hadjimiry 30 34 35

Tanoy Williams 29 30 32

Morton Rose 33 32 34

Allen Grey 32 34 35

David Young 30 35 35

MAX SCORE

Selection Committee

American 

Consulting 

Engineers of FL, LLC

Stanley 

Consultants, Inc.HSQ Group, Inc.

David Ricks 3 3 3

Hassan Hadjimiry 3 3 3

Tanoy Williams 3 3 3

Morton Rose 3 3 3

Allen Grey 3 3 3

David Young 3 3 3

CRITERIA:

Location of the firm's offices where work will be accomplished.

3

CRITERIA:

Approach to the project, understanding of the project and quality of written response, including 

meeting schedule requirements.

35

CRITERIA:

Ability, knowledge of design criteria and past performance of firm and the designated project team 

to satisfy the requirements of the project.

35

Page 6: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

MAX SCORE

Selection Committee

American 

Consulting 

Engineers of FL, LLC

Stanley 

Consultants, Inc.HSQ Group, Inc.

David Ricks 2 2 2

Hassan Hadjimiry 2 2 2

Tanoy Williams 2 2 2

Morton Rose 2 2 2

Allen Grey 2 2 2

David Young 2 2 2

MAX SCORE

Selection Committee

American 

Consulting 

Engineers of FL, LLC

Stanley 

Consultants, Inc.HSQ Group, Inc.

David Ricks 0 0 0

Hassan Hadjimiry 0 0 0

Tanoy Williams 0 0 0

Morton Rose 0 0 0

Allen Grey 0 0 0

David Young 0 0 0

MAX SCORE

Selection Committee

American 

Consulting 

Engineers of FL, LLC

Stanley 

Consultants, Inc.HSQ Group, Inc.

David Ricks 8 6 4

Hassan Hadjimiry 8 6 4

Tanoy Williams 8 6 4

Morton Rose 8 6 4

Allen Grey 8 6 4

David Young 8 6 4

10

CRITERIA:

EBO Program Evaluation preference as applied by the GSC.  The API for this contract is a minimum 

mandatory 20% SBE participation.

0

CRITERIA:

Volume of previous work awarded by the County over the past 4 years.  (The firm with the most 

work receives the lowest score.)

2

CRITERIA:

State Certified MBE (2 points for state certified MBE primes and/or subconsultants)

Page 7: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION COMMITTEE TALLY SHEET -- - -- - -- - -

ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:

Lyons Road / Sansbury's Way Buffered Bike Lanes from Forest Hill

Blvd. to Okeechobee Blvd.

PROJECT NO: 2019604

MEETING DATE: Tuesday, October 1, 2019

MEETING TIME: 9:00 A.M.

American Stanley

Consulting HSQGroup, Selection Committee Consultants,

Engineers of Inc. Inc.

FL, LLC

County Engineer David Ricks 2 I 3 1

County Administrator Absent Director of Water Utilities ~ Hassan Hadjimi~ 3

j 2 1

- -Director of Contracts Development & Control Taney Williams 2

I 3 1

- --I

--Director of Division to which project belongs Morton Rose 1 3 2

I --

Director of OSBA * Allen Grey 2 3 1 -

[ David Young - -, -r -- -

Project Manager for project 3 1 2 -

Total 13 15 8

Rank 2 3 1

* - Denotes a delegate for a committee member

- -- -- -- -- -

JaeAnn Dean ( _ \. ""'1._

~ ~ "r,.. "" ~ Secretary's Printed Name

.

I " \ Secretary's Signature "-._)

Page 8: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION EVALUATION FORM ,- - - ---- --

ONE (1) FIRM TO PROVIDE: I All Engineering Services Required for: -I Lyons Road/ Sansbury's Way Buffe,ed B;ke

-PROJECT NO:

Lanes from Forest Hill Blvd. to Okeechobe_e_

- 2019604 ~ J -

SELECTION MEETING DATE:f --

Tuesday, October 1, 2019 -SELECTION MEETING TIME: 9:00A.M.

- - -I -I

American Stanley

Criteria Max Consulting

Consultants, HSQGroup,

Score Engineers of Inc. FL, LLC

Inc.

Ability, knowledge of design criteria and past performance of

I firm and the designated project team to satisfy the 35 requirements of the project. ~ -i 3, " 35

I ~ I t---

Approach to the project, understanding of the project and

quality of written response, including meeting schedule 35 I I requirements. '3 5

3 0 3 I.

Subtotal 70 b "?- b 3 I ~ 0

Location of the firm's offices where work will be I

3 3 3 ~ accomplished. --+--

I State Certified MBE (2 points for state certified MBE primes 2 2 2 2

and/or subconsultants) -

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: 20% Minimum Mandatory SBE 0 0 0 0

Participation I

- - --Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the 10 8 6

I 4

lowest score.)

Subtotal 15 13 11 9

Total 85 -, S" 'v I L/ } { ~

Rank 'V 2 "\, 3 ~ I

- ~ Member's Name: D IC::I. \J 10 R. \. <:. \<:....

Member's Signature: I ~ ~~ - --I

Page 9: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION EVALUATION FORM

ONE (1) FIRM TO PROVIDE:

PROJECT NO] SELECTION MEETING DATE:

-------SELECTION MEETING TIME:

Criteria

Ability, knowledge of design criteria and past performance of I firm and the designated project team to satisfy the

requirements of the project.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule

requirements.

Subtotal

Location of the firm's offices where work will be

accomplished.

State Certified MBE (2 points for state certified MBE primes

and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: 20% Minimum Mandatory SBE

Participation

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the

lowest score.)

Subtotal

Total

All Engineering Services Required for:

I .Lyons Road/ Sansbury's Way Buffered Bike

tLanes from Forest Hill Blvd. to Okeechobee

12019604 .... ----

Tuesday, October 1, 2019 ----,--

9:00A.M.

r American

Max Consulting Stanley

Consultants,

Inc.

HSQGroup,

Inc. Score Engineers of

FL, LLC

35 3o 3~ 3

T

35 3e;:? .?4 3j

70

3 3 3 3

2 2 2 +-' 0 0 0 0

10 8 6 4

15 13 l1 9

85 1q Rank )

Page 10: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION EVALUATION FORM - - -

-ONE (1) FIRM TO PROVIDE: f All Engineering Services Required for: _

Lyons Road/ Sansbury's Way Buffered Bike

PROJECT NO: I Lanes from Forest Hill Blvd. to Okeechobee

2019604 I - -I

--lruesday, October 1, 2019 I -- --

SELECTION MEETING DATE: f- -

SELECTION MEETING TIME: 9:00A.M.

I - -

I

American Stanley

Criteria Max Consulting

Consultants, HSQGroup,

Score Engineers of Inc. FL, LLC

Inc.

I Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the 35

3Z requirements of the project.

I 1P :,o

- t-I

Approach to the project, understanding of the project and

quality of written response, including meeting schedule 35 JZ requirements. ,f:r r:; I

Subtotal 70 J9 I 1~ 0 I ~t./ Location of the firm's offices where work will be I

accomplished. 3 3 3 3

r ,- T -

State Certified MBE (2 points for state certified MBE primes 2 2 2

t 2

and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: 20% Minimum Mandatory SBE 0 0 0 0 Participation + I -

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the 10 8

I 6

I

4

lowest score.)

Subtotal I 15 13 11 9

Total 85 "' 72- I'- "11 '\, 7:!; Rank "' 2--

'\. 3 I"' I

f-

Member's Na~ ~ov ~JI~ ~ ~~"-~ ~ )

Member's Signatur · ~ / /. .:::::,.

- u

Page 11: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION EVALUATION FORM

ONE (1) FIRM TO PROVIDE:

PROJECT NO: I SELECTION MEETING DATE: ! SELECTION MEETING TIME: .

Criteria

Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the

requirements of the project.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule

requirements.

Subtotal

Location of the firm's offices where work will be

accomplished.

State Certified MBE (2 points for state certified MBE primes

and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: 20% Minimum Mandatory SBE

Participation

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the

lowest score.)

Subtotal

Total

Member's Name:

All Engineering Services Required for: ---

Lyons Road/ Sansbury's Way Buffered Bike

Lanes from Forest Hill Blvd. to Okeechobee ---

2019604 I --t- t

~ \Tuesday,Octoberl,2019 __ ~_------

9:00A.M.

Max Score

35

35

70

3

2

0

10

15

85

Rank

American Consulting

Engineers of FL, LLC

??

Stanley Consultants,

Inc.

?YO

HSQGroup, Inc.

?f

~ ---

1;'1 ~2- I ;;'f I

~~ q 3 3 3

2 2 2

t 0 0 0

1 8 6 4

13 11 9

1 \, "' )--

Page 12: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION EVALUATION FORM ---- --

______ O_N_E_(~l) FIRM TO PROVI_D_E:-+----+-A_II_E_n_g_in_eering Services Required for:

PROJECT NO:

Lyons Road/ Sansbury's Way Buffered Bike

Lanes from Forest Hill Blvd. to Okeechobee

2019604 -r---==--SELECTION MEETING DATE:I !Tuesday, October 1, 2019 --1= SELECTION MEETING TIME: 9:00 A.M.

~----- --1------

Criteria Max

Score

Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the 35

requirements of the project.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule

requirements.

Subtotal

Location of the firm's offices where work will be

accomplished.

State Certified MBE (2 points for state certified MBE primes

and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: 20% Minimum Mandatory SBE

Participation

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the

lowest score.)

Subtotal

Total

Member's Name:

35

70

3

2

0

10

15

85

Rank

American Stanley

Consulting HSQGroup, Engineers of

Consultants, Inc.

FL, LLC Inc.

_ 3_3 -1. ~ J _< ---1

3 3

t-3

t--, 2 2

0 0 0

8 6 4

13 ll 9

1 '\J

Page 13: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION EVALUATION FORM -- -- --

ONE (1) FIRM TO PROVI~ IAII Engineering Services Required for: __ -Lyons Road / Sansbury's Way Buffered Bike

I

Lanes from Forest Hill Blvd. to Okeechobee - --

~ PROJECT NO: 2019604 1 . -

SELECTION MEETING DAL IT,esday, Octobe, 1, 2019

-

-- -SELECTION MEETING TIME: 9:00 A.M.

I I

American Stanley

Criteria Max Consulting

Consultants, HSQGroup,

Score Engineers of Inc. FL, LLC

Inc.

I Ability, knowledge of design criteria and past performance of

>> 3s firm and the designated project team to satisfy the 35 3.r requirements of the project.

I -- t I -i

Approach to the project, understanding of the project and 3s quality of written response, including meeting schedule 35 50 3..5 requirements.

Subtotal I 70

Location of the firm's offices where work will be 1

accomplished. 3 3 3 I 3

- -- ,- --State Certified MBE (2 points for state certified MBE primes

2 2 2 2 and/or subconsultants)

:

EBO Program Evaluation preference as applied by the GSC. I APls for this contract are: 20% Minimum Mandatory SBE 0 0 0 0

Participation I J_ -+ --

Volume of previous work awarded by the County over the past 4 years. (The firm with the most work receives the 10 8

I 6

I 4

lowest score.)

Subtotal I 15 13 ll 9

Total 85 I\. 7~ "v <JI I 7f L

Rank "v 3 ~ J ~ ~ J ;f}a//1d You j;J~ Member's Name: I ,. -- _/

- ~ (?(_ ~£/~,/ Member's Signature: -

I I I/

Page 14: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

N:\ROADWAY\CCNA\2019\2019604 Lyons Sansburys Buffered Bike Lanes\Selections\Selection Meeting\Summary Spreadsheet of Teams Page 1 of 2 10/4/2019 9:33 AM

One Firm to Provide:

Project No:EBO API's:

Meeting Date: Meeting Time:

PBC M/WBE

FL M/WBE

American Consulting Engineers of Florida, LLC 3.01 60% 60% $277,037 $166,222Brown & Phillips, Inc. 5.02 10% 10% 10.0 10.0 10.0 $627,252 $62,725GCME, Inc. 6.01 5% 5% 5.0 5.0 5.0 $106,074 $5,304Propel Engineering, Inc. 3.01 25% 25% 25.0 25.0 25.0 $148,091 $37,023

40.0% 40.0% 40.0%2

Stanley Consultants, Inc. 3.01 80% 80% $512,571 $410,057HSQ Group, Inc. 3.01, 5.02 15% 1 15% 15.0 15.0 $1,257,752 $188,663RADISE International, LC 6.01 5% 8 5% 5.0 5.0 5.0 $432,173 $21,609

20.0% 5.0% 20.0%2

HSQ Group, Inc. 3.01, 5.02 95% 1, 7 95% 95.0 95.0 $1,257,752 $1,194,864RADISE International, LC 6.01 5% 5% 5.0 5.0 5.0 $432,173 $21,609

100.0% 5.0% 100.0%2

TEAM EBO VOLUME OF PREVIOUS WORK ($)

SELECTION CONSULTANT SUMMARY

Professional Engineering Consulting Services forLyons Road / Sansbury's Way Buffered Bike Lanes from Forest Hill Blvd to Okeechobee Blvd

20% Minimum Mandatory SBE Participation2019604

Tuesday, October 1, 20199:00 a.m.

% Work on Project Notes % Work in

PBCPoints

(3 max)Team Members

LOCATION

SBE

2 8

100% 100% $271,274

3

Points (2 max)

Fee Considered

Pro-Rated Fee*

Points (10 max)Services Provided

3 2 4100% 100% $1,216,473

3 2 6100% 100% $620,328

Page 15: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

N:\ROADWAY\CCNA\2019\2019604 Lyons Sansburys Buffered Bike Lanes\Selections\Selection Meeting\Summary Spreadsheet of Teams Page 2 of 2 10/4/2019 9:33 AM

One Firm to Provide:

Project No:EBO API's:

Meeting Date: Meeting Time:

PBC M/WBE

FL M/WBE

TEAM EBO VOLUME OF PREVIOUS WORK ($)

SELECTION CONSULTANT SUMMARY

Professional Engineering Consulting Services forLyons Road / Sansbury's Way Buffered Bike Lanes from Forest Hill Blvd to Okeechobee Blvd

20% Minimum Mandatory SBE Participation2019604

Tuesday, October 1, 20199:00 a.m.

% Work on Project Notes % Work in

PBCPoints

(3 max)Team Members

LOCATION

SBE Points (2 max)

Fee Considered

Pro-Rated Fee*

Points (10 max)Services Provided

3.01 (General Hwy. Design, Access & Drainage)

6 - Prime does not have at least one prime category7 - Used incorrect questionnaire

5.02 (Engineering Surveying)6.01 (Gelogical & Geographic Studies)

Subcategories

3 - Incomplete Team4 - Did not meet mandatory EBO requirement5 - Prime is doing less than 50% of the work

2 - Unrequested Service

8 - See OEBO Review Letter for Tierra South Florida SBE status details.

Notes

* - Pro Rated Fee = Previous Work Amount multiplied by the % of work on the project1 - Prime and Sub on different teams

Prime Categories

Page 16: Results - Palm Beach County, Florida · 2020. 8. 13. · INTER-OFFICE COMMUNICATION DATE: October 2, 2019 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach

SELECTION COMMITTEE MEETING

Palm Beach County Engineering Department

One (1) Firm - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:

Tuesday, October 1, 2019

Name

ave

Lyons Road/ Sansbury's Way Buffered Bike Lanes From Forest Hill Boulevard to Okeechobee Boulevard

Project No. 2019604

Organization Phone

F:\ROADWAY\CCNA\2019\2019604 Lyons Sansburys Buffered Bike Lanes\Selections\Selection Meeting\SelectionMeetingSigninSheeet.docx

Email