Restoration Design
Incorporating Design and Project Management into Restoration
Practice
![Page 2: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/2.jpg)
• Kern Ewing and Jim Fridley
• Restoration Ecology and Environmental Horticulture Program
• University of Washington, Seattle
http://www.cfr.washington.edu/classes.cfr.302/
![Page 3: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/3.jpg)
• Why design and project management?– To efficiently use time and resources– To make sure you make deadlines and hit
windows– To make sure everything is done– To communicate with clients, regulators– To budget– To document your work– To come up with better solutions
![Page 4: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/4.jpg)
Design
![Page 5: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/5.jpg)
• Design stages:– Identification of need– Problem framing– Setting design requirements and constraints– Synthesis of design parameters– Approval and acceptance– Implementation– Assessment and adjustment
![Page 6: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/6.jpg)
• Stakeholders– Problem owner (client)– Those responsible for proposing or initiating
action (design team)– Those who implement solutions (workers)– Those who may benefit from, or be injured by,
proposed actions (affected persons)– Potential blockers (activists, regulators,
bureaucrats, manager).
![Page 7: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/7.jpg)
Time
Steps
Progress alongdesign sequence
Implementation
![Page 8: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/8.jpg)
• Design stages:– Identification of need– Problem framing– Setting design requirements and constraints– Synthesis of design parameters– Approval and acceptance– Implementation– Assessment and adjustment
![Page 9: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/9.jpg)
• Design stages (1): identification of need– Assigned problems– Self-identified problems
![Page 10: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/10.jpg)
• Get a concise description of project in words of stakeholders.
• Communicate a concise restatement of project in words of design team (Active Listening)
![Page 11: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/11.jpg)
• Design stages (2): problem framing– Dominating Perspective or Viewpoint – Establish Policy & System Level Functional
Requirements and Constraints– Set Tolerance and Acceptance Criteria– Identify Top Level Constraint Owners
(Stakeholders) – Identify Collaborators for Concurrent Design
![Page 12: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/12.jpg)
• Design stages (3): setting design requirements and constraints
![Page 13: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/13.jpg)
Functional Requirements (FR’s)– Functional Objectives Stated in Solution-
Neutral Terms
Constraints (C’s)– Limitations on Designer Freedom– All C’s Must Be Owned by a Stakeholder
![Page 14: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/14.jpg)
• Constraints
• Constraint Owner
• No more than…• At least…• Without…• Limits, bounds
• Functional Requirements
• Problem Owner
• Provide …• Increase …• Decrease ...• Don’t have but want
or need
![Page 15: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/15.jpg)
• Design stages (4): Synthesis of design parameters– Iterative: you go back and forth between
stages 3 and 4.
![Page 16: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/16.jpg)
• Design is done when:– Persons of ordinary skill can implement the
solution so that it performs the desired functions.
– The solution does not violate constraints.
![Page 17: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/17.jpg)
Project management
![Page 18: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/18.jpg)
• Goal of project management:– Achieve better outcomes
• Meet FR’s• Not violate C’s
– Stay within budget– Complete project within a pre-determined time
![Page 19: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/19.jpg)
• Planning and sequencing– Identify tasks– Identify precedence relationships (A must
precede B)– Estimate task durations– Sequence the tasks to meet precedence
requirement
![Page 20: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/20.jpg)
Task list
• Tasks might be: Plan for vegetation Plant site Condition site Remove invasive plants Purchase seed Select and propagate Replace dead plants Monitor installation Develop succession management plan Install large woody debris Control for human activity
![Page 21: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/21.jpg)
Determine Precedence
• Generate a table that shows, for each task, what tasks must precede and what tasks must follow.
• BPA project example at right.
Task Follows Precedes
A. Wait for BPA to finish - C,D,E,K
B. Plan for vegetation - C,F,G
C. Plant site A,D,F,G,K
D. Condition site E
E. Remove invasive plants A
F. Purchase seed B
G. Select and propagate B
H. Replace dead plants C
I. Monitor installation J,L
J. Develop succession management plan
- B,I
K. Install large woody debris A,D,E C
L. Control for human activity J,C -
![Page 22: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/22.jpg)
Network Diagram
![Page 23: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/23.jpg)
Look at the project sequencing as a diagram with circles and arrows:
Start Finish
Condition Site
Start Finish
Plant Site
Start Finish/Start
Condition Site
Finish
Plant Site
![Page 24: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/24.jpg)
Example network diagram (BPA right of way)
![Page 25: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/25.jpg)
Determine Precedence
• Generate a table that shows, for each task, what tasks must precede and what tasks must follow.
• BPA project example at right.
Task Follows Precedes
A. Wait for BPA to finish - C,D,E,K
B. Plan for vegetation - C,F,G
C. Plant site A,D,F,G,K
D. Condition site E
E. Remove invasive plants A
F. Purchase seed B
G. Select and propagate B
H. Replace dead plants C
I. Monitor installation J,L
J. Develop succession management plan
- B,I
K. Install large woody debris A,D,E C
L. Control for human activity J,C -
![Page 26: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/26.jpg)
7 3 5 4 3 2 ?
10 ?
10
10
5 0
0 0
Task durations are shown in black
![Page 27: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/27.jpg)
7 3 5 4 3 2 ?
10 ?
10
10
5 0
0 0
0 2015107 25
10
23
2010
25
Task durations are shown in blackEarly start times are shown in green
![Page 28: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/28.jpg)
7 3 5 4 3 2 ?
10 ?
10
10
5 0
0 0
0 2015107 25
10
23
2010
2523
Task durations are shown in blackEarly start times are shown in greenLate start times are shown in red
Determine Late Starts/Discuss/Submit
![Page 29: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/29.jpg)
7 3 5 4 3 2 ?
10 ?
10
10
5 0
0 0
0 2015107
25
10
23
20
10
25
23
2320
20
16
15
13
11
10
8
01
Task durations are shown in blackEarly start times are shown in greenLate start times are shown in red
![Page 30: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/30.jpg)
A-7 E-3 D-5 K-4 C-3 L-2 I-?
J-10 H-?
B-10
G-10
F-5 0
0 0
0 2015107
25
10
23
20
10
25
23
2320
20
16
15
13
11
10
8
01
Tasks and their durations are shown in blackEarly start times are shown in greenLate start times are shown in red
![Page 31: Restoration Design Incorporating Design and Project Management into Restoration Practice](https://reader035.vdocuments.us/reader035/viewer/2022062714/56649d635503460f94a46935/html5/thumbnails/31.jpg)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
A 7
B 10
C 3
D 5
E 3
F 5
G 10
H -
I -
J 10
K 4
L 2
Gantt Chart
Complete/Discuss/Submit