SISTEMA DE RED Y CONEXIONES AGUADESCRIPCION RED (ML) CONEXION (ML)LONGITUDINALES 5171.8 3828JR. ASUNCION 192.47 120JR. SALAMANCA 1020.73 876JR. LIBERTAD 783.83 804JR. AYACUCHO 578.3 492JR. AMAZONAS 685.91 552JR. TRIUNFO 719.61 540JR. JUNIN 341.78 126JR. PIURA 286.26 204DANIEL ALCIDES CARRION 562.91 114TRANSVERSALES 3542.94 2406JR. PUNO 188.4 156JR. SANTO DOMINGO 192.75 102JR. CHINCHA ALTA 678.36 426JR. ORTIZ ARRIETA 264.05 288JR. GRAU 356.53 216JR. DOS DE MAYO 481.9 354JR. LA MERCED 478.72 258JR. UNION 379.86 192JR. RECREO 189.98 168JR. SANTA LUCIA 332.39 246
REPOSICION TOTAL EN RED 8714.74REPOSICION TOTAL CONEXI 6234
DESCRIPCION LONTIGUTO TOTAL ( ML) ANCHO (M)REPOSICION TOTAL EN RED 8714.74 0.6REPOSICION TOTAL CONEXI 6234 0.6
TOTAL (M2)
SISTEMA DE RED Y CONEXIONES ALCANTARILLADODESCRIPCION RED (ML) CONEXION (ML)LONGITUDINALES 3328 3144JR. SALAMANCA 940 780JR. LIBERTAD 492 876JR. AYACUCHO 203 192JR. AMAZONAS 589 486JR. TRIUNFO 634 420JR. JUNIN 186 150JR. PIURA 284 240TRANSVERSALES 3113 2232JR. PUNO 193 168JR. SANTO DOMINGO 188 114
METRADO PARA REPOSICION DE PAVIMENTO EN DIFERENTES CUADRAS DEL CASCO URBANO DE LA CIUDAD DE CHACHAPOYAS
![Page 2: RESPOSICION DE PAVIMENTO.xlsx](https://reader031.vdocuments.us/reader031/viewer/2022020506/56d6bed91a28ab301693d32c/html5/thumbnails/2.jpg)
JR. CHINCHA ALTA 670 498JR. ORTIZ ARRIETA 286 354JR. GRAU 142 42JR. DOS DE MAYO 480 384JR. LA MERCED 288 162JR. UNION 379 126JR. RECREO 187 168JR. SANTA LUCIA 300 216
REPOSICION TOTAL EN RED 6441REPOSICION TOTAL CONEXI 5376
DESCRIPCION LONTIGUTO TOTAL ( ML) ANCHO (M)REPOSICION TOTAL EN RED 6441 0.8REPOSICION TOTAL CONEXI 5376 0.8
TOTAL (M2)
PRESUPUESTOMETRADO TOTAL (M2) 18422.844COSTO POR M2 81.00
1,492,250.36COSTO TOTAL PARA REPOSICION (S/)
![Page 3: RESPOSICION DE PAVIMENTO.xlsx](https://reader031.vdocuments.us/reader031/viewer/2022020506/56d6bed91a28ab301693d32c/html5/thumbnails/3.jpg)
TOTAL M25228.844
3740.48969.244
![Page 4: RESPOSICION DE PAVIMENTO.xlsx](https://reader031.vdocuments.us/reader031/viewer/2022020506/56d6bed91a28ab301693d32c/html5/thumbnails/4.jpg)
TOTAL M25152.84300.8
9453.6