* 6 TENN iSSEgy VALLJEY AUTHORITY C.HATTANOOGA, TENNESSEE 37401 400 w Street Tower II U.3. Nuclear Regulatory Comssion Fbur 2016 Amgoco II Attn: Mr. James P. OtReilly, Regional Administrator 101 Marietta Streets, N99 Suite 2900 Atlanta, Georgia 30303 Dear Mr. O'14ei11y: WATTS BRA NIMELE PLANT 91ITS 1 AND 2 - nc-oLE rE~r0 nI ImSPECTIOII WORl 50-390/84-oit 50-391,h8"i - EFoin m~ VIoLATIO The subjeot tnpo tion report cited TWA with a Severity Level V Violation (391/84-O1-01) in acocrdance with 10 CPR 2.201. Encloased in our response to the subject violation. If you have any questions, please get In touch with R. R. Shell at MT 858-268. To the beet at my Iciovedges, I declare the statements contained herein are complete and true. Very truly yours, TENNESWE VALLEY LUTE)RITY L. N. Hills,.Nmp Nuclear Licensing Racloasre, 0c (femulomare): Mr. Richard C. DeToung, Director Office of TOp~io and Enforcement U.S. Nuclear Regulatory Commssioni Vashingtons, ID.C. 2D555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 r3 2 wJ210 940 An 94"a OPeu~ty Efflooy

Upload: others

Post on 23-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Responds to NRC 840123 ltr re violations noted in IE Insp Repts … · (391/84-O1-01) in acocrdance with 10 CPR 2.201. Encloased in our response to the subject violation. If you have

* 6

TENN iSSEgy VALLJEY AUTHORITY C.HATTANOOGA, TENNESSEE 37401

400 w Street Tower II

U.3. Nuclear Regulatory Comssion Fbur 2016 Amgoco II Attn: Mr. James P. OtReilly, Regional Administrator 101 Marietta Streets, N99 Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'14ei11y:

WATTS BRA NIMELE PLANT 91ITS 1 AND 2 - nc-oLE rE~r0 nI ImSPECTIOII WORl 50-390/84-oit 50-391,h8"i - EFoin m~ VIoLATIO

The subjeot tnpo tion report cited TWA with a Severity Level V Violation (391/84-O1-01) in acocrdance with 10 CPR 2.201. Encloased in our response to the subject violation.

If you have any questions, please get In touch with R. R. Shell at MT 858-268.

To the beet at my Iciovedges, I declare the statements contained herein are complete and true.

Very truly yours,

TENNESWE VALLEY LUTE)RITY

L. N. Hills,.Nmp Nuclear Licensing

Racloasre, 0c (femulomare):

Mr. Richard C. DeToung, Director Office of TOp~io and Enforcement U.S. Nuclear Regulatory Commssioni Vashingtons, ID.C. 2D555

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

r32wJ210 940

An 94"a OPeu~ty Efflooy

Page 2: Responds to NRC 840123 ltr re violations noted in IE Insp Repts … · (391/84-O1-01) in acocrdance with 10 CPR 2.201. Encloased in our response to the subject violation. If you have

VUTTS BAR EUCLUR PLANTr MON I ANDW2 Rc-oIZ RIT' fl USM~UNr Worr

50-390/P-01 AD 50-391/8"1Q iNsiouu-1 TO VIDLATIG

Severity Level V Violation-391/SA-0I-01

10 CVI 50, Appendix B, Criterion!V, as J)impleme by Watts Bar MSR Section IT, paragraph I7.IA.5 requires that activities affecting quality be prescribed by domminted procedures and drawings and be accomplished in mcordame with them procedures and drawings.

Watts Bar QCP 4.23-4, QCP 4.23-5 amd QCP 4.23-8 provide the procedures and acceptance criteria tinr Inspetion of the saftty-related pipe supports and restraints.

Contrary to the above,, between Jazwusa 3-6, 196k!, activities affecting quality were not being accomplished in accordnc with documen ted procedures and drawings in that a reinspection of six hangers revealed two hangers with deviations fro, the doct..,,ted requiriements.

Adaisin or Denial of the Alleged Violation

TVA admts the violation occurred as stated.

Reason for the Violation

The inspe.tors tailed to properly verit snubber cold setting on hanger 2072-72-2CS-R9, and snubber transition tube and weld configuration on hanger 2072-T2-2CS-R369 apparently fte to a lack ot attention to drawring requirements.

Corrective Stes Taken and Results Achieved

The inspection activities cited in this violation were performed on Mlarcht 30 and May 5, 1963. These deficiencies have been doctemmted in SCR 5307, whaich required rework in accordance with design drawings and/or vendor catalogs, and redoommetation In accordance with procedures UUP-QC-A.23ý-5, 0Support Shock Sppressors,' and UP-WC4.234, 'Support Visual Rzamintion of Vold Joints.0 Thaw hanges. have been rewsorked and this ICR was closed.