Flowchart of overall Strategy
- Facilitating Business & related Infrastructure
- Strengthening & Installing support systems
A. Facilitating Business & related Infrastructure
1. Potential industry identified
2. Sub Sector /Industry wise info
3. Summary of parks & RBHs
B. Strengthening & Installing support systems
- Core Infrastructure Development
- Financial inflows
- Research & Capacity Building
- Policy Initiatives suggested
- Project Implementation mechanism
Summary
Strategic SolutionIII
Business ModelsIV
Current SituationII
Map I
IndexIndex
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Sectoral Composition of GSDP
48.78 40.85 42.00
9.9212.08 9.02
41.29 47.06 48.98
0%
20%
40%
60%
80%
100%
1993-94 1999-2000 2004-05
TertiarySecondaryPrimary
Over the decade, the share of secondary sector has remained at a level of 9%
Construction activities now form a larger share of secondary activities
Negative growth rate in manufacturing
The increase in tertiary sector share shows a process of tertiarization much before a process of industrialization
Background & rationale of studyBackground & rationale of study
A comprehensive development strategy for the development of Bihar was called for,with a ‘multidimensional approach across sectors’
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Objectives of the studyObjectives of the study
The major challenges to be addressed through this study are to:
Provide Linkage for Farm & Non-farm produce with industry / business
Add Value to the primary produce within the state
So that rural masses & artisans are economically empowered
So that the secondary sector grows and the
economy of the state develops
Identify major resources & bring
in anchor industries as prime
movers
Create a higher no. of smaller oases (RBH) to facilitate linkages into the
rural hinterland (RBH - PPPP model)
Create a few oases of competence / Parks as Hubs (PPP
model)
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Flow of Overall StrategyFlow of Overall Strategy Facilitating Set up of business & related infrastructure
Creation of core
Infrastructure
Enable & facilitate
Research
Strengthen Institutions & Resources (Public sector & PPP model)
Credit flow into identified sectors
Capacity building
Project implementation
mechanism
Pragmatic Policy
Install
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Flow of Overall StrategyFlow of Overall Strategy Strengthening & Installing Support Systems
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Facilitating Business & Related
Infrastructure
Potential Industry Identified
Sub Sector / Industry Wise Information
Summary of Parks & RBHs
Fruits & VegetablesCereals & PulsesSpicesPotatoMakhana
Herbal & medicinal Plants
Jute
Sugarcane
RESOURCE GROUPRESOURCE GROUP ACTIVITY & SPECIFIC ACTIVITY & SPECIFIC RESOURCESRESOURCES
INDUSTRY SEGMENT FOR INDUSTRY SEGMENT FOR RESOURCE UTILIZATION/ RESOURCE UTILIZATION/ REVITALISATION REVITALISATION
Milch Cattle & Dairy Farming activity
Bees & Orchards, Apiary activity
Gherzi Gherzi -- GenesisGenesis
Water bodies / rivers & fishery skills
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Agriculture & Horticulture
Agro & Food Processing Industry
Herbal Medicine & Aromatic Industry
Jute Industry
Sugar Industry
Animal Husbandry & Allied Sector
Milk Processing
Honey
Fisheries
Poultry Farming & Animals Rearing
Animal Hides
Poultry & Meat Processing
Leather
Potential IndustryPotential Industry IdentifiedIdentified
RESOURCE GROUPRESOURCE GROUP ACTIVITY & SPECIFIC ACTIVITY & SPECIFIC RESOURCESRESOURCES
INDUSTRY SEGMENT FOR INDUSTRY SEGMENT FOR RESOURCE UTILIZATION/ RESOURCE UTILIZATION/ REVITALISATION REVITALISATION
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesiscGenesisc
Handicraft Skills
Handloom Weavers & Looms
Limestone
Steel scrap, Sponge Iron, Ingots & Millets
Handicrafts
Handlooms
Handicrafts
Handlooms
Minerals Cement Industry
Steel Mini Steel, Secondary Steel & Castings
Potential IndustryPotential Industry IdentifiedIdentified
Quartzite & Granite Glass & Ceramic Industry
Ethanol & CoalChemical Chemical & Allied Industry
RESOURCE GROUPRESOURCE GROUP ACTIVITY & SPECIFIC ACTIVITY & SPECIFIC RESOURCESRESOURCES
INDUSTRY SEGMENT FOR INDUSTRY SEGMENT FOR RESOURCE UTILIZATION/ RESOURCE UTILIZATION/ REVITALISATION REVITALISATION
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesiscGenesisc
Places of Heritage, Culture, & Religious interests
Tourism Hospitality & Tourism Industry
Potential IndustryPotential Industry IdentifiedIdentified
Local WorkforceEducation & Training ITI, IT, ITES, Hotel Management, Nursingm
Training Centre
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesAgriculture Agriculture & Horticulture& Horticulture
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesAgriculture Agriculture
& Horticulture& Horticulture
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesAgriculture Agriculture & Horticulture& Horticulture
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesAgriculture Agriculture & Horticulture& Horticulture
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing Proposed Food ParksAgriculture Agriculture & Horticulture& Horticulture
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Food Parks under PPP Model are suggested at Hajipur (Vaishali), Purnea, Bihta (Patna) and Begusarai
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info.
Market led business Model tackling the challenges of: - Weak supply chain- Exploitative intermediaries- Low price to farmers - Delay in price recovery- Capacity building of producers/ farmers
Food Park (under PPP model) as common platform linking primary sector with secondary sector in identified zones
RBH – the collection point, to play the role of nodal points in backward linkages
95 mandis under the erstwhile Bazar Samities are proposed to be converted into RBH (under PPPP Model)
Create information display through IT & competition amongst buyers to ensure that exploitation does not occur
Deviation from previous model
Extension activity not left to
Government Agencies alone
Dominated by Rice, Dal & Oil
Commercial processing of fruit & vegetables is less than 1.0% volume terms
Small bakeries & confectionary units in the un-organised sector scattered in the state
Degree of Makhana processing is very limited
Low value addition
Old technology – not efficient in terms of recovery/ extraction and energy conservation
Lack of: Infrastructure, credit flow & marketing efficiency of Small enterprises
Current situation Strategic solution
Agriculture Agriculture & Horticulture& Horticulture
Current Situation/ Strategic Solution
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Farmers under various blocks / villages acting
as SHGs or Co-operatives
FOOD PARK & TERMINAL MARKET(PPP model)PROCESS INDUSTRY 1PROCESS INDUSTRY 2PROCESS INDUSTRY 3
Need based Infrastructure
Procurement areaPre cooling
Grading & sortingStorage
RBH 1
RBH 2
RBH 3
Under PPPP model at Intermediate Panchayat
level
MARKETS
RETAIL CHAINS
MARKETS
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Agriculture Agriculture & Horticulture& Horticulture
Proposed Supply Chain
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Agriculture Agriculture & Horticulture& Horticulture
Business Models
100%45043Institution & Cap. Building, Project Implementation
242701022.55Identified ClustersAgri-based units & Infrastructure Components
25%
5280279Identified ClustersF&V based units & Infrastructure Components
35600
5000
200
400
Employment Potential
500As per designated location
Rural Business Hubs with customized Common Facility Centres
2044.55Total
80Bihta (Patna), Begusarai
Food Park (Agri based)50%
120Hajipur (Vaishali), Purnea(Purnea),
Food Park & Terminal Market (F&V based)
Grants/ Subsidy Proposed
Investment Potential (Rs. Crs)
Locations recommended for prospective units
Business Model
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesJuteJute
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
RBHs earmarked for agri products suggested for procurement of Jute also1 Integrated Jute Park suggested at Purnea with backward linkage
Current situation
Availability of raw jute: 2 lac MT/annum; Bihar 2nd largest producer
Jute cultivators sell to Agents/ JCI for minimumPrice who in turn supply to jute mills of Bengal
Strategic solution
Set up an Integrated Jute Park at Katihar
Mills Procure raw jute through RBHs (using existing agricultural mandis in nearby districts) Enabling Farmers get remunerative prices & choices
Yet Bihar acts only as raw material supplier;No value addition in the state
5350165Jute Park at Purnea
Jute Mills & Processing units& Jute diversified products
954.25Capacity building & Project Implementation
10020KatiharIntegrated Jute Park
5545
Employment potential
189.25Total
Investment potential (Rs Cr)
Location Business Models
Encourage Jute Mills & processing units for manufacture & value addition
Sub Sectors / Industry Wise Info.Sub Sectors / Industry Wise Info. Current Situation/ Strategic Solution/ Business Model JuteJute
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesSugarcaneSugarcane
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
Locations for new factories already identified
Strategic Solution
Priority to unlocking the assets of closed mills
Suggestions of committee to be implemented
30000
Employment potential
Investment potential (Rs Cr)
Location Business Models
6750Sugarcane processing (Sugar, Ethanol, Bagassebased paper, co-generation of power)
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsSugarcaneSugarcane
Special cell to monitor laying of transmission lines from factory to Grid
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing concentration zones & proposed plantsDairyDairy
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Current situation
50 lac MT of raw milk produced in Bihar annually, of which only 5% is processed
Strategic solution – PULL mechanism required
Invite SME for milk processing independently, or as JV/ Franchisee of COMPFED/ Branded Players
452.25Barauni, Biharsharif, Bhagalpur Cattle Feed
903Muzaffarpur, Barauni, Gaya Ice Cream Plant (3 Nos)
301.5KhagariaMilk Powder Plant (1 No.)
45045Gaya, Gopalganj, Motihari, Muzaffarpur, Saharsa, Bhagalpur, Aurangabad, Purnia, Darbhanga
Milk Processing Units (9 Nos.)
601.05Muzaffarpur, Saharsa, Bhagalpur Cattle Breeding Farm
1201.2AI services
2254.5Comm. Dairy Farms
1310
170
120
Employment potential
0.80Capacity Building
Investment potential (Rs Cr)
Location Business Models
63.8Total
4.530 designated milk-shed Districts Bulk Coolers
Limited storage, transportation & processing infrastructure
Involve farmers/ SHGs/ local entrepreneurs at Village/ Block level for bulk cooling & transportation facilities
Set up Commercial Dairy Farms; Mobile Vet/ AIServices at farm gate to improve animal health; More Cattle Breeding Farms to increase productivity
Low productivity due to indigenous cattle, though population 1.62 crores
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current Situation/ Strategic Solution/ Business ModelsDairyDairy
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesHoneyHoney
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info.
RBHs earmarked for agri products to be used for Honey as wellProcessing Units for Honey are suggested at Hajipur & Begusarai Food Parks
Current situation
80% of honey processed outside the state – only 3 process plants exist in state
Only state producing litchi honey on commercial scale
Strategic solution
Potential of about 40,000 MT (RAU estimate)
There are four to five honey flows in Bihar
3608.32Food Park at Hajipur & BegusaraiProcessing Units
26643.31Fruit producing districtsCommercial farming & Extension Activity
1002.20Capacity Building & project Implementation
3124
Employment potential
13.83TOTAL
Investment Potential (Rs Crs)
Location Business Models
Rural Business Hubs of Agro-Sector to be used for market linkages for Honey Processing Units
Processing Units in Food Parks to create market pull
Current Situation/ Strategic Solution/ Business ModelsHoneyHoney
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesFisheriesFisheries
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info.
Current situation
Untapped resources:-1.38 lac hectares of water bodies- 2700 kms of seven major rivers
Strategic solution
2 Aqua Parks suggested at Muzaffarpur & Bhagalpur.
38 RBHs suggested so that fishermen get better selling options & better price
Culture fisheries to be developed
Fish seed production only 347 million against demand of 600 M (Only 26 hatcheries exist)
Only 20% of the area is under scientific culture.
Separate Directorate of Fisheries needs to be created.
18012Integrated Fish Processing Units
3659.8 Cold Storage, Ice Factories, Units for Boats & Gears
25029.5Capacity Building & Project Impl.
70760543Fish Seed, Nurseries, Hatcheries, Commercial & Aquaculture Fish Farming
160038E&W Champaharan, Muzaffarpur, Darbhanga, Saran, Vaishali, Sitamarhi, Gopalganj, Buxar, Bhojpur, Nalanda, Purnea, Madhubani,Saharsa, Nalanda, Munger, Bhagalpur, Banka, Katihar & Khagaria RBHs
Rural Business Hub
73355
200
Employment potential
Investment potential (Rs. Crs)
Location Business Models
642.3Total
10Muzaffarpur & BhagalpurAqua Park
Current Situation/ Strategic Solution/ Business ModelsFisheriesFisheries
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing concentration zonesPoultry & Poultry &
Meat ProcessingMeat Processing
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info.
Gherzi Gherzi -- GenesisGenesis
Current situation
Bihar ranks fourth in terms of meat production
Strategic solution
8008.00Muzaffarpur, Saran, West Champaran, East Champaran, Nalanda, Patna, Rohtas, Kaimur, Arwal, Jehanabad, Bhagalpur, Banka, Katihar, Kishanganj, Supaul, Purnea,
RBH
50025.00Patna, Muzaffarpur, Bhagalpur, Kishanganj, Fatuah
Processing
201.50Muzaffarpur & BhagalpurInfrastructure components
5944 21.36Commercial Poultry Farms, Broiler Units, Hatcheries, Poultry Feed Plant , Fodder Units & Extension activity
7514
250
Employment potential
10.30 Capacity Building & Project Impl.
Investment potential (Rs. Cr)
Location Business Models
66.16Total
Annually 0.7 to 1 million small and large animals& birds are slaughtered in Municipal Slaughter houses
Promote Commercial Poultry & Livestock Farming
Facilitate the market linkages through RBH
No modern abattoirs and processing facilities Ensure Up gradation of Municipal Slaughter Houses
Rural Business Hubs suggested so that poultry farmers / animal rearers get better selling options & price
Current situation/ Strategic solution/ Business Models
Poultry & Poultry & Meat ProcessingMeat Processing
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesLeatherLeather
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Leather Parks under PPP Model are suggested at Muzaffarpur & Katihar
Current situation
Availability of raw hides: 36 lakh pieces
Only few private units for Primary processing at Muzaffarpur: raw to wet blue stage
No secondary processing. Wet blue leather is sent to Kolkata, Kanpur & Chennai for final processing
Strategic solution
Set up leather park at Muzaffarpur and Katihar
Local units will get finished leather from thetanneries
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsLeatherLeather
5004.5Capacity building & Project Implementation
8005Bihta (Patna), Betiah, Muzaffarpur, Baruini, Siwan
Revival of Processing plant and Tanning units
7600329.5Total
5800120Tanneries & processing units
500200MuzaffarpurKatihar
Small Integrated Leather Parks
Employment Potential
Investment Potential
LocationBusiness Models
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesHandicraftsHandicrafts
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info.
Create marketing outfit for ‘bihar‘ brand of handicrafts
Current situation
Total revenue of Rs. 150 crore per annum.
Huge Export Potential for:- Madhubani painting- Sikki Grass- Khatwa- Sujni Kantha
Strategic solution
Set up 21 RBHs for linkages with marketing outfitsMore than 2 lakhs artisans employed
20020Major cities & towns of Bihar and IndiaRetail marketing outfit (2 Nos.)
6008.25Capacity building & Project implementation
2105.25Muzaffarpur, East Champaran, Darbhanga,, Madhubani, Samastipur, Sitamarhi, Saran, Patna, Bhojpur, Vaishali, Aurangabad, Gaya, Nawada, Nalanda, Katihar, Kishanganj, Munger
Rural Business Hubs (21Nos.)
1010
Employment potential
33.50TOTAL
Investment Potential (Rs Crs)
Location Business Models
Set up marketing organization to promote Brand ‘BIHAR’on JV basis with Private party / NGO (PPP model)
Facilitate use of ‘CRAFTSMARK’
GI Registrations of handicrafts which are unique (Madhubani Painting , Sikki Grass, Khatwa)
No brand nor organised marketing
Current situation/ Strategic solution/ Business modelHandicraftsHandicrafts
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesHandloomsHandlooms
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
40000 handlooms and 90000 skilled weavers (approx); weavers shifting to other Profession; the weavers are unable to keep pace with changes in the market
No Design, Dyeing, Printing & Quality testing facilities in the clusters / located far beyond the reach of the weavers
Strategic solution
Cluster based CFC to be developed by involving NGOs, for easy accessibility
Thus proper market linkage, financial assistanceand access to all facilities under one roof will lead to increased production
200025Biharsarief, Darbhanga, Bhagalpur, Pandaul, Siwan
Revive Central Processing Plant, Finishing Plant, Dyeing & Cooperative Spinning Mills
2600
200
400
Employment potential
3.60Capacity Building & project Implementation
Investment potential (Rs Cr)
Location Business Models
40.60Total
12Bhagalpur, Gaya, Banka, Madhubani, Nalanda
Common Facility Centre with market Hub
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info.
Weavers have been reduced to job workers due to lack of finance & direct market linkage
Current situation/ Strategic solution/ Business ModelsHandloomsHandlooms
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
Limestone deposit: 211 million MT
Currently mining is not possible due to environmental regulations
Strategic Solution
Grant Mining Leases, prospecting licenses and mineral concession
Set up Industrial units near the mine areas or in areas easily connected by roadways
1000
Employment potential
Investment potential (Rs Cr)
Location Business Models
1500Kaimur (Rohtas)Integrated Cement plant
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsCement Cement
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
Quartzite deposit: 203.30 million tonnes
Primarily small and medium scale sector glass Industries
Strategic Solution
Clearances need to be obtained
Integrated cement plant of 4 Million Ton capacity feasible
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsRealty, Glass Realty, Glass & Ceramic & Ceramic
Granite deposit: 32.04 Mn.CU.M
Lack of knowledge about the modern glass and ceramic technology
287550Total
75015Glass Unit
112515Munger Jamui, Gaya
Ceramic Unit
1000
Employment potential
Investment potential (Rs Cr)
Location Business Models
20Banka, Jamui, Gaya
Granite cutting, polishing and slab / tile making units
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
Bihar is a net steel importer
Currently construction steel units are operating mainly around Patna
Raw material (coal & iron ore) for DRI/Sponge iron plants accessible from Jharkhand/ Orissa/ Chattisgarh/ WB
Strategic Solution
Target regional demands in Infrastructure projects
Competitive advantage of skilled pool of human resource
Thrust on mild steel ingots through induction furnace route
Prioritize production of long products with continuous casting facilities
Linkage with the miners on long term basis
260250Mini Integrated Steel Plant (1 No.)
4900748.5Total
1200140Mini Steel Plant (4 No.)
12012Ferro Alloy Unit (2 Nos.)
20020Patna areaSponge Iron (DRI) (2 Nos.)
1420126.5Patna, Vaishali, Muzaffarpur area
Castings (6), Foundry (25) & Forging unit (2)
1550
150
Employment potential
180Others (Wire Drawing, Rolling Mill, Wagon Making, Refractories)
Investment potential (Rs Cr)
Location Business Models
20DalkholaPig Iron with Mini Blast Furnace route (1 No.)
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsSteelSteel
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
Direct Access to rich deposit of non-coking coal
Concentration of polymer & elastomer based chemical industry in Begusarai
Strategic Solution
Preference to be given to Agro-based and coal based chemicals
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsChemical & Chemical & AlliedAllied
30 big and medium scale industry are present
25030Project with Ethanol as feedstock
118076
Chemical Hub at Barauni
Pigments, Zinc Oxide and Emulsion & PaintsLubricant manufacturing UnitHeavy & Hazardous Chemicals
3000323.90Total
65042.60Health Care & PharmaceuticalsOrganic Chemicals
20020Sodium Hydroxide Processing Project with technology options (Mercury Cell Process, Membrane Process)
720
Employment potential
Investment potential (Rs Cr)
Location Business Models
155On NH-98 near Jharkhand Bihar border
Coal Based Chemical (Syngas, Methane Gas, Coal Based Tar)
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Current situation
Population 828 Lacs
591 Degree Colleges 5 Engineering Colleges 8 medical Colleges 3 Krishi Vidyalaya
Strategic Solution
Linking Institutions with Industry
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solution/ Business ModelsEducation & Education & TrainingTraining
Literacy Rate 47.53%
Patna, Darbhanga, Saran, Madhubani, Samastipur, West Champaran, Gaya, Katihar, Muzaffarpur,
505.5Training centres for para-medics, nursing & midwifery
604
Patna
Training Centre for Hotel management & Applied Nutrition
62760.15Total
6010IT & ITES Training Centre
457
Employment potential
Investment potential (Rs Cr)
Location Business Models
40.65Patna, GayaKatihar/Kishangunj, Vaishali, West & East Champaran, Muzaffarpur, Siwan, Chhapra, Saran, Madhubani,
ITI in PPP ModelTraining centre for Agro-product manufacturing & Entrepreneurship development for SMEsVocational Training Centre for Textile under PPP Model
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTTSubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Map showing major concentration zonesTourismTourism
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Prepare Master Action Plan for Brand building and promotionLocation specific Projects and Related infrastructure and amenities
Form a State Tourism Promotion Board witha Task Force to monitor implementation of programs & projects
Create a Tourism Development Fund
No holistic Plan for developing this sector
Invitation to Private sector to set up Hotels, Restaurants, Tours, Parks & other projects in the State
For operations of Government run hotels, restaurants etc, tie-up with private players where feasible under PPP Model
Little incentive for private participation in this sector.
Not treated as a potential revenue earning industry.
Strategic SolutionCurrent Situation
SubSub Sectors / Industry Wise Info.Sectors / Industry Wise Info. Current situation/ Strategic solutionTourismTourism
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Chemical Park
Instead of the one proposed at Fobesganj / Katihar
Jute ParkPurnea
Jute Park
Leather Parks
Aqua Culture Parks
Food Park
Aqua Culture ParkBhagalpur
Aqua Culture ParkMazaffarpur
Agri basedFood Park (Cereals, Pulses based) Bihta
Instead of MadhepuraFood Park & Terminal market (F&V based)Purnea
Leather ParkMazaffarpur
Food Park (Cereals, Pulses based) Begusarai
Already proposedFood Park & Terminal market (F&V based)Hajipur
Chemical Hub at Barauni in BegusaraiBegusarai
Leather ParkKatihar
RemarksType of Park/Mega growth centre Location
Restructure BIADA and Restructure the existing Industrial Areas
Summary of Parks & Rural Business Hubs ParksParks
Parks to be developed on BOT basis through SPV
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
This business hub with CFC will help weavers in accessing common facilities and in creating marketing linkages
Designated districts
8Business Hub with CFC
Handloom
Conduit points for providing market linkages and technical inputs to artisans
Designated districts
21Rural Business Hub for Handicraft
Handicraft
Animal Husbandry / Agriculture Allied Sector
Nodal point of all market linkages, extension and capacity building activities.
Designated districts
100Rural Business Hub for Agri & Horti Produce
Agriculture & Horticulture
Linkage between the poultry / livestock farmers & processors as well as markets
Designated districts
32Rural Business Hub for Poultry & Meat
Conduit for market linkages, extension activities and capacity building of fish farmers. Will also prove to be catalytic for fishery activity
Designated districts
38Rural Business Hub for Fishery activity
Function Location Proposed Number
Cluster based rural infrastructure
Summary of Parks & Rural Business Hubs RBHsRBHs
RBHs to be developed under PPPP mechanism through SPV
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
Strengthening & Installing support systems
Enable & Facilitate
- Core Infrastructure Development
- Financial Inflows
Strengthen – Research & Capacity Building
Install
- Policy Initiatives Suggested
- Project Implementation Mechanism
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Conduct feasibility for rejuvenating 25 old Air strips & Feasibility for new Airports at Raxaul and Birpur.Improve passenger amenities at Patna
Build an Air Cargo Complex at Patna.
Initiate - Fast inter-city express trains & upgraded, fast & reliable freight movement. Take up the matter with the concerned Ministry
Poor Air connectivity, except for Patna city
Inadequate facilities for promoting Exports
Passenger / Freight movement within State unreliable / uneconomical
Air & Rail
Connect all proposed Parks & Hubs with hinterland & major towns by 2/4 lane roads on priority
Road connectivity still poor in most areas of State.
Roads
Restore Barauni, Muzaffarpur & Kosi Hydel Power StationsEnsure un-interrupted supply to Industrial Parks, Estates & RBHsInvite Private sector participation for generation.Transmit & distribute Electricity under PPP modelProvide incentives to industries with captive power generation
Huge Demand- Supply Gap
AT&C losses 70% against national average of 40%
State’s low generation leading to high cost of purchasing power
Power
Strategic SolutionCurrent SituationSector
Enable & Facilitate Core Infrastructure DevelopmentCore Infrastructure Development
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Connect identified RBHs / Clusters through IT backbone on priority under ‘Common Service Centers’ scheme
Establish therein e- kiosks or Gyan Chaupalsunder PPP model
Set up State Wide Area Network for state level connectivity under PPP model
Substantial vacant land in Estates lying un- utilized
Exploitation by middlemen due to lack of knowledge & information amongst rural farmers
Inadequate Information flow within State Administration
IT Connectivity
Prepare overall Action Plan for BIADA & restructure its operations
Hand over O&M of Estates to private players under PPP model
Conduct viability study of sick / closed units and Unlock / Recycle land held by unviable Industrial Units
Develop contiguous portions of vacant land in PPP model as specialized Parks through private developers
Most Industrial Estates resemble industrial graveyards
Infrastructure/ facilities non –existent
Large portions of land locked in Units closed down
Substantial vacant land in Estates lying un- utilized
Industrial Infrastructure
Strategic SolutionCurrent SituationSector
Enable & Facilitate Core Infrastructure DevelopmentCore Infrastructure Development
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Create initial corpus through state intervention or public issue / private placements, Tie-up with Commercial Banks for consortium lending and refinancing
Paucity of Funds to participate in Industrial Revival
Prepare Restructuring Plan for InstitutionsAll State Financial Institutions are defunct
State Financial Institutions
Fund SHGs through micro-finance.Involve NGOs for capacity building
Rural segment not being reached effectively
Requirements of private sector in Bihar not being understood by Banks/ Institutions
Cohesiveness required between Institutions & State
Set up Special Cell to co-ordinate & monitor implementation of resolutions
Cell to ensure time bound Action from Banks for: increasing credit flow through innovative models of lendingSpecial packages for specific sectorsSpecial focus for MSMEsLiberal margin/ security norms
Poor Recovery & CD ratio track record
Central Financial Institutions/ Banks
Strategic SolutionCurrent SituationInstitutions
Enable & Facilitate Financial InflowsFinancial Inflows
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Simply allocating funds to ineffective delivery institutions is not likely to bear any result
The thrust should be to leverage public resources through:
Participation of local communitiesIngenuity of private sector
Only then, PPP can prove to be effective
Strengthen Research & Capacity BuildingResearch & Capacity Building
Type of suggested partnership
BOT
JV
Franchise
Outsource
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
NGOs / graduates to be involved on franchise basis
Extension services / Capacity building & Training
Outsource to NGOsOrganising SHGs / setting up co-operatives
Operations on franchise basis through graduates
Rejuvenate & set up Testing labs & Quality control
Animal HusbandryOperations on Franchise basis (under PPP)
Operate Vet hospital, clinics; AI centers
Entire primary sector NGOs – Banks linkages to be established Special cells to liaison with NABARD / Banks to enable increase in outlay
Enabling credit inflow
Agriculture & AlliedSet up new ones & bring existing set ups under Joint Venture (PPP)
Rejuvenate & set up Seeds farms / nurseries / hatcheries
• Agriculture & Allied• Handloom• Handicraft
Set up under Public SectorSet up Research & Development Institution
Relevant Sub Sector / Industry
ModelAction Points
Strengthen Research & Capacity BuildingResearch & Capacity Building
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Capital subsidy support is very much needed for inducing any appreciable local investment in Bihar
Capital subsidy on Plant & Machinery @ 25% subject to a maximum of 100 lacs
Interest subsidy @3% on working capital
Study for revival of ailing industries
Initiatives at farm level
Encouragement of SHGsAllowing contract farming with safeguardsInvolvement of panchayats
Thrust on PPP based delivery institutions
Set up Directorate of Food Processing
Project Management Agencies for various sub sectors / Industries
• In turn PMA to utilize NGOs at ground level for organizing / federating farmers & artisans
Install Policy Initiatives Suggested & Project Implementation MechanismPolicy Initiatives Suggested & Project Implementation Mechanism
Policy Initiatives SuggestedPolicy Initiatives Suggested
Project Implementation MechanismProject Implementation Mechanism
Set up Directorate of Fisheries
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT
Gherzi Gherzi -- GenesisGenesis
summary
6382883350024256821TOTAL
1040Project Implementation
102952705Institution & Capacity Building
3205974243631Business Model for Processing
638288
13271510485Infrastructure
INDIRECT EMPLOYMENT
POTENTIAL
ESTIMATED PROJECT
COST (In Rs. Lakh)
DIRECT EMPLOYMENT
POTENTIAL
Thank You
Gherzi Gherzi -- GenesisGenesis
RESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENRESOURCE MAPPING OF BIHAR & STRATEGIC ACTION PLAN FOR DEVELOPMENTT