    Introduction

    Resourcelevelingisatechniqueinprojectmanagementthatoverlooksresourceallocationandresolvespossibleconflictarisingfromoverallocation.Whenprojectmanagersundertakeaproject,theyneedtoplantheirresourcesaccordingly.

    Thiswillbenefittheorganizationwithouthavingtofaceconflictsandnotbeingabletodeliverontime.Resourcelevelingisconsideredoneofthekeyelementstoresourcemanagementintheorganization.

    Anorganizationstartstofaceproblemsifresourcesarenotallocatedproperlyi.e.,someresourcemaybeoverallocatedwhilstotherswillbeunderallocated.Bothwillbringaboutafinancialrisktotheorganization.

    TheTwoKeyElementsofResourceleveling

    Asthemainaimofresourcelevelingistoallocateresourceefficiently,sothattheprojectcanbecompletedinthegiventimeperiod.Hence,resourcelevelingcanbebrokendownintotwomainareasprojectsthatcanbecompletedbyusingupallresources,whichareavailableandprojectsthatcanbecompletedwithlimitedresources.

    Projects,whichuselimitedresourcescanbeextendedforoveraperiodoftimeuntiltheresourcesrequiredareavailable.Ifthenagain,thenumberofprojectsthatanorganizationundertakesexceedstheresourcesavailable,thenit'swisertopostponetheprojectforalaterdate.

    StructureofResourceleveling

    Manyorganizationshaveastructuredhierarchyofresourceleveling.Aworkbasedstructureisasfollows:

    Stage

    Phase

    Task/Deliverable

    Alloftheabovementionedlayerswilldeterminethescopeoftheprojectandfindwaystoorganizetasksacrosstheteam.Thiswillmakeiteasierfortheprojectteamtocompletethetasks.

    Inaddition,dependingonthethreeparametersabove,theleveloftheresourcesrequired maybedifferent.Therefore,theresourcerequirementforaprojectisalwaysavariable,whichiscorrespondingtotheabovestructure.

    EstablishingDependencies

    Themainreasonforaprojectmanagertoestablishdependenciesistoensurethattasksgetexecutedproperly.Byidentifyingcorrectdependenciesfromthatofincorrectdependenciesallowstheprojecttobecompletedwithinthesettimeframe.

    Herearesomeoftheconstraintsthataprojectmanagerwillcomeacrossduringtheprojectexecutioncycle.Theconstraintsaprojectmanagerwillfacecanbecategorizedintothreecategories.

    MandatoryTheseconstraintsariseduetophysicallimitationssuchasexperiments.

    DiscretionaryTheseareconstraintsbasedonpreferencesordecisionstakenbyteams.

    ExternalOftenbasedonneedsordesiresinvolvingathirdparty.

    TheProcessofAssigningResources

    Forresourcelevelingtotakeplace,resourcesaredelegatedwithtasks ,whichneedsexecution.Duringthestartingphaseofaproject,idealisticallytherolesareassignedtoresources atwhichpointtheresourcesarenotidentified.

    Later,theserolesareassignedtospecifictasks,whichrequirespecialization.

    LevelingofResources

    Resourcelevelinghelpsanorganizationtomakeuseoftheavailableresourcestothemaximum.Theideabehindresourcelevelingistoreducewastageofresourcesi.e.,tostopoverallocationofresources.

    Projectmanagerwillidentifytimethatisunusedbyaresourceandwilltakemeasurestopreventitormakinganadvantageoutofit.

    Byresourceconflicts,therearenumerousdisadvantagessufferedbytheorganization,suchas:

    Delayincertaintasksbeingcompleted

    Difficultyinassigningadifferentresource

    Unabletochangetaskdependencies

    Toremovecertaintasks

    Toaddmoretasks

    Overalldelaysandbudgetoverrunsofprojects

    ResourcelevelingTechniques

    Criticalpathisacommontypeoftechniqueusedbyprojectmanagerswhenitcomestoresourceleveling.Thecriticalpathrepresentsforboththelongestandshortesttimedurationpathsinthenetworkdiagramtocompletetheproject.

    /!*%+.%05!4,!.%!*!/'%((/!0

    !(%2!.(!/

    $1)*.!/+1.!/

  • 5/23/2015 ResourceLeveling

    http://www.tutorialspoint.com/cgibin/printpage.cgi 2/2

    However,apartfromthewidelyusedcriticalpathconcept,projectmanagersusefasttrackingandcrashingifthingsgetoutofhand.

    FasttrackingThisperformscriticalpathtasks.Thisbuystime.Theprominentfeatureofthistechniqueisthatalthoughtheworkiscompletedforthemoment,possibilityofreworkishigher.

    CrashingThisreferstoassigningresourcesinadditiontoexistingresourcestogetworkdonefaster,associatedwithadditionalcostsuchaslabor,equipment,etc.

    Conclusion

    Resourcelevelingisaimedatincreasingefficiencywhenundertakingprojectsbyutilizingtheresourcesavailableathand.Properresourcelevelingwillnotresultinheavyexpenditure.

    Theprojectmanagerneedstotakeintoaccountseveralfactorsandidentifycriticaltononcriticaldependenciestoavoidanylastminutedelaysoftheprojectdeliverables.