research team - dima
TRANSCRIPT
Massimo TronciFull [email protected]+39 06 44585746
Francesco CostantinoAssistant [email protected]+39 06 44585260
Giulio Di GravioAssistant [email protected]+39 06 44585260
Lorenzo FedeleAssistant [email protected]+39 06 44585252
RESEARCHTEAM
Mario FargnoliAdjunct Professor
Marco GentiliniAdjunct Professor
Riccardo PatriarcaPhD Student
Andrea FalegnamiPhD Student
ING-IND/17
RESEARCHACTIVITIES
SSD09-B2(INGN-IND/17) IndustrialSystemsEngineering
ING-IND/17
-Designofindustrialsystems RiskManagementOperationsmanagement:
design,control,monitoring,optimization
Logistics andSupplyChainManagement
Safety andMaintenance LifeCycleAssessment andManagement
Environmental andQualityManagement
RESEARCHACTIVITIES
Current researches- Rating model for Health and Safety (Confindustria, INAIL, Dip. DICMA)- Spare parts management for complex systems (Dip. MEMOTEF)- Quality monitoring for airport ground handlers (ADR handlers)- Industry 4.0 (Cicero HuB, Microsoft Italia, Cassa Depositi e Prestiti,
Confindustria)- Resilience Engineering for complex systems: Safety-II and Functional
Resonance Analysis Method in Industrial Plants, Environmental Risks, AirTraffic Management, Aviation, Maritime operations, Space missions,Railway, Healthcare (ANACNA, Lund University, Danish Maritime AccidentInvestigation Board, Umberto I, Duke NUS Singapore)
- Supply Chain rating model (University of Parma, University of Bologna,University of Florence, University of Bergamo, Marche PolytechnicUniversity)
ING-IND/17
LABSANDINFRASTRUCTURE
- System simulation software• Witness• Simul8• Palisade DTS
- Life Cycle Analysis• SimaPro
- Organization survey system• Quaesitum
- Statistics and data analytics• SPSS• R• Microsoft Power BI
- Maintenance and Reliability• Relex
- Multicriteria Analysis• Super Decision Software
- Neural Networks• NeuroSolution
Proprietary software- Safety Cube toolset: risk simulator and visualizer- myFRAM: FRAM model builder and analyser- MP quality manager: multidimensional analysis tool for quality assessment
Licenced software
ING-IND/17
UNIVERSITYSPIN-OFFDevelopmentanddistributionofGovernance,RiskandCompliance(GRC)PlatformYouComply®andCRisk®DevelopmentanddistributionofwhistleblowingITplatformWBConfidential®Developmentofthe opendata webplatformOpenSafety®ConsultingprojectsforGRCmanagementConsultingprojectsforprocessesimprovement
PRODUCT
SAN
DSER
VICES
INDUSTRYUNIVERSITYCOLLABORATIONS
FUNDINGANDPARTNERS
- Research projectsCommissione Europea, Lazio Innova, Ministero del Lavoro e dellePolitiche Sociali, Ministero dello Sviluppo Economico, Ministerodell’Istruzione, dell’Università e della Ricerca, CNR, ISPESL, INAIL
- Research contractsPublic entities: ASL di Siena, ASL di Lecce, Banca d’Italia, Cameradi Commercio di Arezzo, CNIM, Comune di Apiro, Comune diColleferro, Provincia di RomaPrivate companies: Aeroporti di Roma, AGIC Consulting srl, ARC,Anas Spa, ATAC spa, Autodromo di Vallelunga, Consulta Spa,ENAV, ISED, ITALFERR, SEI-ENEL Real Estate, NOVA Consulting srl,Simav Spa
ING-IND/17
FUNDINGANDPARTNERS
ING-IND/17
- Project and research collaborations
APQI
RESEARCHTARGETANDSTRATEGIES
BecameExcellenceCenterforRE- OrganizationofFRAMily Event2017inRome- Strengthenandextendtheinternationalpartnerships- PatentnewtoolsforRE- ApplyforH2020calls
BerecognizedasReferenceCenterforcentralItalyfortheIndustry4.0- JoinClusters,Hubsanddedicatednetworks- Updatetheliteraturestateoftheart- specificontologyandimplementingframework
BerecognizedasReferenceCenterforsupplychainassessmentandrating
BerecognizedasReferenceCenterformethodologiesandtechniquesforadvancedmaintenanceandpredictivesafety
ResilienceEngineering&RiskManagement
Industry4.0
ING-IND/17
SupplyChainManagement
SafetyandMaintenance
Environmentalrisksinasinterplant
Recent project:RESILIENCEENGINEERING
RunwayIncursionfortheAirTrafficManagementsystem
Recent project:RESILIENCEENGINEERING
incollaboration with:
MARITIMEMooringofaship
Recent project:RESILIENCEENGINEERING
incollaboration with:
SPEEDSETTINGinaDC9
Recent project:RESILIENCEENGINEERING
incollaboration with:
Administeringdrugsinneuro-anesthesiology
Recent project:RESILIENCEENGINEERING
incollaboration with:
Accidentanalysisintherailwaydomain
Recent project:RESILIENCEENGINEERING
Gallerie(>1000metri)
PLPonti(>500metri)eViadotti
Attraversamentostazioni
Vicinanzaacentriabitati
Vicinanzaimpianti
chimici/elettrici/etc
TR1 Torino-MilanoAV 0 0 1 0 0 0TR2 Torino-MilanoTr 0 1 1 1 1 1TR3 Milano-BolognaAV 0 0 1 0 0 1TR4 Milano-BolognaTr 0 1 1 1 1 1TR5 Bologna-FirenzeAV 1 0 0 0 0 0TR6 Bologna-FirenzeTr 1 1 1 1 1 0TR7 Firenze-RomaDir 1 1 1 0 1 0TR8 Firenze-RomaLenta 1 1 1 1 1 0TR9 Roma-NapoliAV 1 0 1 0 0 1TR10 Roma-NapoliFormia 1 1 0 1 1 0TR11 Roma-NapoliCassino 1 1 0 1 1 0TR12 Napoli-SalernoAV 1 0 1 0 1 0TR13 Napoli-SalernoTr 1 1 1 1 1 1TR14 Bologna-Venezia 0 1 1 1 1 1TR15 Napoli-Nola 0 1 0 1 1 0
TRATTA
Topografici
Recent project:RISKMANAGEMENT
RiskAnalysisinrailwaysconsideringtopographicandtravelingcharacteristics
RiskassessmentmodeltointegrateFTAanalysiswithascenariosimulationoftheoperationalconditions
Insignificante Marginale Critico Catastrofico
Feritolieve PiùferitilieviDaunferito
graveaunmorto(oequivalente)
Piùdiunmorto(oequivalente)
FrequenteProbabilecheaccadafrequentemente.Lasituazionepericolosasipresenteràcontinuamente
0,020000 X X X X
ProbabileAccadràparecchievolte.Cisipuòaspettarechelasituazionepericolosasipresentispesso.
0,010000 X X X X
OccasionaleProbabilecheaccadaparecchievolte.Cisipuòaspettarechelasituazionepericolosasipresentiparecchievolte
0,002000 X X X X
RemotoProbabilecheaccadaqualchevoltanellavitadelsistema.Cisipuòragionevolmenteaspettarechelasituazionepericolosasipresenti
0,000100 Tollerabile X X X
ImprobabileImprobabilecheaccadamapossibile.Sipuòassumerechelasituazionepericolosapossapresentarsieccezionalmente.
0,000010 Trascurabile Tollerabile Tollerabile X
InverosimileEstremamenteimprobabilecheaccada.Sipuòassumerechelasituazionepericolosapossanonpresentarsi.
0,000001 Trascurabile Trascurabile Trascurabile Tollerabile
Prob
abilità
Gravità
MeasurementsystemsbasedonAHP/ANPtoevaluateSafetyperformancesofATMandaddressriskassessmentonorganizationalandtechnicalchanges
Riskassessmentforairtrafficmanagement
Recent project:RISKMANAGEMENT
3)RiskTreatment:
1) RiskIdentification(multi-levelanalysis):
•Maintenancepolicies(before)•Maintenanceoperation(during)•Maintenanceerrors(after)
Negligible Rare LikelyPossible Very likely
Pr
Mem
bers
hip
Very low Low HighMedium Very high
Fr
Mem
bers
hip
Easily avoidable Avoidable Inevitable
AvM
embe
rshi
p
CR
ITIC
ALI
TY IN
DE
X (C
I)
INFE
RE
NC
E R
ULE
S
2)RiskAnalysis:R=Sex(Pr +Fr +Av)RiskScoringMethod
Trainingabout safety risksofmaintenance tasks
Accidentprevention:before,duringandaftermaintenance
Recent project:RISKMANAGEMENT
Prototypeofa“Smart”remote-controlledgeographicalsystemformaintenancemanagementandintegratedpredictive safety
Recent project:MAINTENANCE
Theresearchintegrates:• aPlantResultManagementModel• aTele-maintenanceIntelligentSystemtoforecastperformancelevelsandscheduleoperations• apredictiveSafetyapproachintegratedintheproductivesystems
Tele-MaintenanceandpredictiveSafetyIntelligentSystem
Recent project:MAINTENANCE
Tele-MaintenanceandpredictiveSafetyIntelligentSystem Allthedatadetectedontheplantsare
regularlytransmittedtotheremotecontrolcenterandrecordedontheindividualplantidentificationfileinordertoupdatethegeneralplantdatabaseandforsubsequentprocessing.
TheKaandKsoutputvaluesofeachplant,resultingfromtheprocessingoftheneuralnetwork,togetherwiththedataoftheothermonitoredparameters,permittheimplementationofanintelligentandintegratedplantmaintenanceandsafetysystem.
Recent project:EVALBATT
Therealtimeevaluationofthelevelofbatterychargeandthereliabilityofbatteriesisofcapitalimportanceinmanyapplications:hybridandelectricalmeansoftransportation,hybridandelectricalsubmarines,bio-medicalsystems,militaryequipments,airplanes.Asamatteroffact,thelevelofchargeandthereliabilityoftheelectrochemicalaccumulatorsisafunctionofseveralvariablesnoteasilycontrollable.
Evalbatt isaninnovativesystemusedtoevaluatetheresidualchargecapacityinelectricalbatteriesandtheprobabilityoffailures,criticalforlithiumbatteries.Evalbatt solvessomebasicproblems:theopportunitytogettheresidual rangewithlowerror(less then 20%)andthetroubletomakesuccessfulevaluations“online”,duringtheoperationofthebattery.Majorbenefitswillbethereforethebetterutilizationofthebatteries,thereductionoftheloadsandthepredictabilityofstopsandaccidents.
Recent project:INNOVATIONINEDUCATION
FacultyfromPurdueUniversity(SchoolofIndustrialEngineering)andSapienzaUniversitàdiRoma collaboratedtodesignacoursefocusedonengineeringandpublichealthintheservicesector,inRome.Morespecifically,theintersectionoftopicsincludingsystems,reliability,processflow,maintenancemanagement,andpublichealthareexaminedthroughcasestudies,fieldexperiences,andassessments.EngineeringstudentsfrombothUniversitiesparticipateintheprogramwhilethePurduestudentsareinRome.
02468101214161820
Retailer Wholesaler Distributor Factory
Echelon'sBWEvalue
Supplychainpartner
Bullwipeffectvaluesfordifferentorderingconditions
TOC1
TOC2
TOC3
TOC4
-35-30-25-20-15-10-50510152025
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51
InventoryLevel
TimePeriods
InventorybehaviorundertheorderingconditionTOC1
RetailerInventoryWholesalerInventory
DistributorInventoryFactoryInventory
30.8
23.4 24.5
19.0
0
5
10
15
20
25
30
35
TOC1 TOC2 TOC3 TOC4
Overallbullwhipeffect
Orderingcondition
Overallbullwipeffectfordifferentorderingconditions
1( ) ( )i ix t x t-= Echelon
1i - Echelon
i
Echelon 1i +
1( )ix t-
1 ( )iy t-
( )iy t
( )1( )
( )0, ( ) ( 1) ( ) ( 1) , ( ) ( 1)i i
yi tt
if x t x ty x t x t if x t x ta-
ìïí +ïî
£ -=- - > -
Supplychaindisruption
Recent project:SUPPLYCHAINMANAGEMENT
Simulation of ordering policies based ondecentralized information sharing to increaseresilience and decrease bullwhip effect.
Europeanprojecttocloseatalocallevelthesupplychainofsecondaryrawmaterials(SRM):• Mappingoflocalproductionsandopportunities• Identificationoforigin/demandofSRM• Analysisofproductioncycleandtechnicalsolutions• InvestmentanalysisforSRM
Recent project:SUPPLYCHAINMANAGEMENT
Supplychainforsecondaryrawmaterials
EcologicalProfileofsupplychains
Recent project:SUPPLYCHAINMANAGEMENT
11.398
303 1.028
74.951
5
10.980
279 1.028
63.077
-1.052-10.000
0
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
Materialsreduction Production Distribution Use Endoflife
Edition2005
Edition2010
Innovativemethodologytoassessthecapabilityoftheenvironmentalimprovement,consideringregulatoryandvoluntaryrequirements.
LogisticsreengineeringthroughtheapplicationofLeanSixSigmamethodology
Recent project:LOGISTICS
Logisticsprocessesreengineeringforcostreduction
Simulationmodeloflogisticsperformancesincomplexmarkets:• multi-product,multi-brand,multi-sourcesoffers
• distributionsandreverselogistics• contemporaryMTSandMTOpolicies• nationalsourcingandglobaldelivery
Integratedlogisticsmodelfore-businessofMadeinItalySMEs
PerformanceBasedContractforcivilaviation
Recent project:SPAREPARTSMANAGEMENTFORCOMPLEXSYSTEMS
Definition of a Basilea 3 qualitative model of performance assessment to integrate bankDefault Risk models. The dynamic rating evaluates extended enterprise governance andsupply chain attitude of firms towards a “network contract”, combining EFQM and SCORprinciples.
Recent project:PERFORMANCE MANAGEMENT
Ratingofnetworkcontracts