Research Projects Continuous Monitoring of the Dowling Hall Footbridge Research Team: Babak Moaveni (PI), Peter Moser (grad student), Iman Behmanesh (grad student), Alyssa Kody (undergrad student) Funding: NSF-BRIGE (1125624), Tufts FRAC Duration: 5/2009 – present Relevant publications to date: Moser, P., and Moaveni, B. (2012). "Design and deployment of a continuous monitoring system for the Dowling Hall Footbridge." Experimental Techniques, in press. This page contains the following topics: Instrumentation (Phase I) Instrumentation (Phase II) Automated System Identification 17-Weeks of Ambient Vibration and Temperature Data The Dowling Hall Footbridge on the Tufts campus provides a live laboratory for vibration-based structural health monitoring research and teaching. Figure 1. Dowling Hall Footbridge (photo on the right from www.maps.bing.com)

Upload: others

Post on 18-Sep-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Research Projects - engineering.tufts.edu · Sf2 r s h Sf3 1 0 A9 rs rs Sf A Sf1 Sf4. Automated System Identification Once the data have been filtered and down-sampled, an automated

Research Projects Continuous Monitoring of the Dowling Hall Footbridge

Research Team: Babak Moaveni (PI), Peter Moser (grad student), Iman Behmanesh (grad student), Alyssa Kody (undergrad student)

Funding: NSF-BRIGE (1125624), Tufts FRAC Duration: 5/2009 – present Relevant publications to date: – Moser, P., and Moaveni, B. (2012). "Design and deployment of a continuous monitoring system for the

Dowling Hall Footbridge." Experimental Techniques, in press. This page contains the following topics: Instrumentation (Phase I) Instrumentation (Phase II) Automated System Identification 17-Weeks of Ambient Vibration and Temperature Data The Dowling Hall Footbridge on the Tufts campus provides a live laboratory for vibration-based structural health monitoring research and teaching.

Figure 1. Dowling Hall Footbridge (photo on the right from www.maps.bing.com)

Page 2: Research Projects - engineering.tufts.edu · Sf2 r s h Sf3 1 0 A9 rs rs Sf A Sf1 Sf4. Automated System Identification Once the data have been filtered and down-sampled, an automated

Instrumentation (Phase I) The first phase of installing a monitoring system on the Dowling Hall Footbridge was performed in the fall of 2009. Partial funding ($4,645) for this instrumentation was provided by the Tufts University Faculty Research Award Committee (FRAC). This system included an array of eight accelerometers and ten thermocouples, a rugged and remotely operable data acquisition system, and a reliable communication system. A set of data is recorded once an hour or when triggered by large vibrations. The system generates thousands of data records and development of programs automating the transfer, processing, and analysis of data was crucial to the success of the project. The monitoring system has been running continuously since January of 2010 and is still providing data. Figure 2 shows the location of accelerometers and thermocouples on the footbridge.

(a) (b)

Figure 2. Location of accelerometers (a) and thermocouples (b) on the footbridge Eight Piezoelectronics model 393B04 uniaxial accelerometers were permanently mounted to the underside of the bridge as shown in Figure 3. The current sensor network was found adequate for estimating the six lower vibration modes considered in this project. The monitoring system was designed to measure the air temperature, the steel frame temperature, the temperature of the heated concrete deck, and the temperature of the piers, all at several locations.

1

2

3

45

6

7

8

Dowling

Hall

Upper

Campus

North

Dowling

Hall

Upper

Campus

Steel

Concrete

Air

S1

S3

S4

S2A1

A2C3

C4

C2

C1

North

Page 3: Research Projects - engineering.tufts.edu · Sf2 r s h Sf3 1 0 A9 rs rs Sf A Sf1 Sf4. Automated System Identification Once the data have been filtered and down-sampled, an automated

Figure 3. Installed accelerometer under the bridge A National Instruments cRIO-9074 integrated chassis/controller is the core component of the data acquisition system. The ability to sample different sensors at different rates (acceleration vs. temperature) and direct on-chip scaling of raw data to account for channel sensitivities are two attractive features of the FPGA. Figure 4 shows the cRIO and three NI modules located inside a weatherproof enclosure next to the footbridge.

Figure 4. cRIO monitoring system installed on the footbridge The monitoring program continuously samples the acceleration channels at a 2048 Hz sampling rate. Temperatures are recorded at a rate of one sample per second. A 5-minute data sample is recorded to the storage drive of the cRIO-9074 once each hour beginning at the top of the hour. The program also performs automatic triggering by continuously monitoring the one-second RMS value of each acceleration channel and will record a 5-minute sample if the values exceed 0.03 g. Sample recording can also be triggered manually.

Page 4: Research Projects - engineering.tufts.edu · Sf2 r s h Sf3 1 0 A9 rs rs Sf A Sf1 Sf4. Automated System Identification Once the data have been filtered and down-sampled, an automated

Instrumentation (Phase II) In the second phase of instrumentation of the DH Footbridge, four additional accelerometers and four strain gages were added on the bridge. The second phase of instrumentation was fully funded by the National Science Foundation (award no. 1125624) and was completed in April of 2012. The extra accelerometers were added on the piers (A11 and A12) and at the east side of the bridge (A9 and A10) as shown in Figure 5. Location of the four piezo-electric PCB 740B02 strain gages are also shown in Figure 5. The strain gages were attached to the prepared surface of the steel bottom cords under the bridge using epoxy (Figure 6a). After the installation of the strain gages, the locations where the paint was stripped were covered with black paint to prevent future rusting (Figure 6b).

Figure 5. Layout of the added sensors during Phase II of instrumentation in April 2012

(a) (b) Figure 6. (a) Installed strain gage on prepared surface of the beam, and (b) finished installation after painting the stripped paint spot

A12

Sf2

Upper

Campus

North

Sf3

A11

A10

A9

Old Sensors

New Sensors

Strain Gauges Sf

Accelerometers A

Sf1

Sf4

Page 5: Research Projects - engineering.tufts.edu · Sf2 r s h Sf3 1 0 A9 rs rs Sf A Sf1 Sf4. Automated System Identification Once the data have been filtered and down-sampled, an automated

Automated System Identification Once the data have been filtered and down-sampled, an automated stochastic subspace identification method is used for continuous modal analysis of the footbridge. Automatic modal analysis was completed for each of hourly measured records. A stabilization diagram is used to automatically select the physical modes of interest. Figure 7 shows the first six excited modes of the footbridge. Figure 8 shows a sample stabilization diagram.

Figure 7. Natural frequencies and mode shapes identified from a preliminary test on April 4, 2009

Figure 8. Sample stabilization diagram for data-driven SSI

Page 6: Research Projects - engineering.tufts.edu · Sf2 r s h Sf3 1 0 A9 rs rs Sf A Sf1 Sf4. Automated System Identification Once the data have been filtered and down-sampled, an automated

The identified natural frequencies for a sixteen-week period beginning on January 5, 2010 and ending April 25, 2010 are shown in Figure 9. A clear pattern of daily variation in the natural frequencies can be observed. During this period, natural frequencies of the six identified modes varied by 4 to 8 percent while temperatures ranged from -14 to 39 °C. Because of this inherent variability in the natural frequencies, a model of the relationship between temperature and natural frequency must be developed before the dynamic characteristics of the bridge can be used for condition assessment.

Figure 9. Variation of the natural frequencies of the first six modes during a 16-week period 17-Weeks of Ambient Vibration and Temperature Data

Week 1: January 4–10, 2010

Week 2: January 11–17, 2010

Week 3: January 18–24, 2010

Week 4: January 25–31, 2010

Week 5: February 1–7, 2010

Week 6: February 8–14, 2010

Week 7: February 15–21, 2010

Week 8: February 22–28, 2010

Week 9: March 1–7, 2010

Week 10: March 8–14, 2010

Week 11: March 15–21, 2010

Week 12: March 22–28, 2010

Week 13: March 29–April 4, 2010

Week 14: April 5–11, 2010

Week 15: April 12–18, 2010

Week 16: April 19–25, 2010

Week 17: April 26–May 2, 2010