REQUEST FOR QUOTATIONS (RFQ) NO.: 1220-040-2017-069
TITLE: JANITORIAL AND CUSTODIAL MAINTENANCE SERVICES GUILDFORD RECREATION CENTRE OVERNIGHT CLEANING
ADDENDUM ISSUE DATE: JULY 21, 2017
**NEW DATE: PREFER TO RECEIVE QUOTATIONS ON OR BEFORE AUGUST 14, 2017
INFORMATION FOR PRE-QUALIFIED CONTRACTORS This Addendum is issued to provide answers to questions raised by potential Contractor for the above named project, to the extent referenced and shall become a part thereof. No consideration will be allowed for extras due to the Contractor not being familiar with this addendum. This Addendum No. 1 contains eight (8) pages in total.
1. REFER TO ITEM 3. D ATE
DELETE in its entirety and SUBSTITUTE with the following:
The City would prefer to receive Quotations on or before, August 14, 2017. The City'soffice hours are 8:30 a.m. to 4:00 p.m., Monday to Friday, except statutory holidays.
2. REFER TO SCHEDULE A, SECTION 6.1 CONTRACT SERVICES
DELETE in its entirety and SUBSTITUTE with the following:
The Guildford Recreation Centre’s hours of operations are as follows:Monday to Friday 6:00am to 10:00pm Saturday and Sunday 8:00am to 8:00pm Statutory Holidays 8:00am to 8:00pm
The City prefers consistent cleaning personnel who shall perform cleaning tasks services.
The Services shall be performed seven (7) days a week after hours of operations, including statutory holidays. The Department Representative will coordinate the service hours with the Contractor.
3. QUESTIONS & ANSWERS
Q1. If possible can you provide the usable square footage of only the areas to be cleaned?
A1. This information is not available. The Contractor may refer to the maps as attached to this Addendum #1 for estimated square footage.
Q2. Can you please confirm Page 41 - 6. Contract Services 6.1 Day Porter Services is not required is accurate.
A2. Confirm, Day Porter Services in not required.
Q3. Page 100 Section B-2 Table A – Contract Services – 2. Materials. Please confirm this section is not to include any consumable supplies as per 5.3 Materials (Cleaning Supplies and Consumables) b) Consumables.
A3. Refer to Section 5.3 item (b) Consumables. The City will furnish and pay for an adequate inventory of following consumable items:
• Paper products – toilet tissue, paper towels (folded or rolled to fit dispenser installedin each Site) toilet seat sanitary protective covers;
• Hand Cleaners;• Hand Soap, Liquid(Pink Liquid, Lanolin)/Foam and Powdered hand soaps including
dispensers (not anti-bacterial);• Organic Liners, and• Trash can liners (trash bags).• Pre-diluted glass cleaner, disinfectant, general cleaner, bathroom cleaner
Q4. Can you please also confirm that comparable experience to the Building Service Worker is acceptable to the City?
A4. Refer to RFQ Attachment 1 – Draft Quotation Agreement, Section 16.1.
The Contractor will provide only personnel who have the qualifications, experience and capabilities to perform the Services.
All personnel assigned by the Contractor under this Contract should have a Building Services Worker (BSW) certificate of proficiency from an accredited program or an equivalent program or an equivalent combination of education, experience.
Q5. Please provide number of washrooms and shower stalls in the facility.
A5. Information as follows: • 1 Small accessible washroom – 1 toilet• 2 Male washrooms – combined number of 4 toilets & 5 urinals• 2 Female washrooms - Combined 12 toilets• 1 Male Change room – 2 urinals, 2 toilets, 5 shower stalls• 1 Female Change room – 3 toilets, 5 shower stalls
Q6. In Clause 6, the City is asking only one cleaner in the night. Is the current contractor providing one cleaner in the night and is it acceptable to the City?
A6. Refer to response to item #2 above.
2
Q7. Confirming that there is no Day Services required by the City in this tender.
A7. See response to Q2.
Q8. There is no project work such as carpet cleaning or floor waxing is involved and is done by the City BSWs.
A8. That is correct:
Q9. Library and Pool is not part of this Tender.
A9. That is correct:
Q10. Can the City please clarify the hours and number of personnel for each shift as stated on page 41 Section 6 Contract Services of the RFQ?
A10. Refer to response to item #2 above.
4. REFER TO SCHEDULE A, SPECIFICATIONS OF GOODS AND SCOPE OF SERVICES
DELETE in its entirety SECTION 28. STATUTORY HOLIDAYS.
5. REFER TO SCHEDULE B, FORM OF QUOTATION
DELETE in its entirety Section B-2, TABLE A and replace with Section B-2 attached to thisAddendum #1.
3
SECTION B-2
Fees and Payments
8. The Contractor offers to supply to the City of Surrey the Goods and Services for the pricesplus applicable taxes as follows:
TABLE A – CONTRACT SERVICES - FIXED FEE SCHEDULE
Category
Enter Estimated # of Cleaning Personnel Provided
Enter Estimated
Total Monthly Cleaning Service Hours
Enter ¹Hourly Rate (Per
Billable Hour)
Enter Price Per Month
(C x D)
Enter Estimated Amount Year 1
(Per Month x 12)
A B C D E F 1. LABOUR (CLEANING PERSONNEL)a) Guildford Recreation
Centre – Night Shift $ $ $
Total: $ $
Contractor Supplied Cleaning Supplies and Consumables (Refer to Section 5.3 (a) of Schedule A)
Enter Price Per Month
Enter Estimated Amount Year 1
(Per Month x 12) 2. MATERIALS (CLEANING SUPPLIES)
Total: $ $
Sub Total (sum of items 1 & 2 above): $
GST (5%): $
TOTAL QUOTATION PRICE: $
6. ADD SCHEDULE A-6 MAPS AS ATTACHED TO THIS ADDENDUM #1
4
N
Dec
embe
r 201
4
POO
LEN
TRY
POO
LEN
TRY
ENTR
AN
CE
TO L
OA
DIN
GEL
EVAT
OR
FR
OM
PAR
KIN
G T
OEN
TRY
LEVE
L
PAR
KIN
G L
EVEL
P2
PAR
KIN
G L
EVEL
P2
STA
IRS
FRO
MPA
RK
ING
P1
TOEN
TRY
LEVE
L
STA
IRS
FRO
MPA
RK
ING
P2
TOEN
TRY
LEVE
L
STA
IRS
FRO
MPA
RK
ING
P1
RA
MP
DN
TO
PAR
KIN
G P
1
STA
IRS
FRO
MPA
RK
ING
P1
REC
REA
TIO
NC
ENTR
E - G
YMEN
TRY
105
AVEN
UE
152 STREET
LINCOLN DRIVE
LIN
COLN
DRI
VE
LINCOLN DRIVE
POO
L
GYM
GU
ILD
FOR
D R
ECR
EATI
ON
C
ENTR
E15
105
- 105
Ave
nue,
S
urre
y, B
C
Fire
Saf
ety
Plan
LIB
RA
RY
DN
UP
OPE
N T
OPA
RKIN
GBE
LOW
UP
UP
UP
Site
Pla
n
5
NG
UIL
DFO
RD
REC
REA
TIO
N C
ENTR
E 15
105
- 105
Ave
nue,
Sur
rey,
BC
Fire
Saf
ety
Plan
Dec
embe
r 201
4
UP
UP
UP
SE
CU
RIT
YG
ATE
SE
CU
RIT
YG
ATE
GYM
1
DIV
IDIN
G C
UR
TAIN
DIVIDING CURTAIN
GYM
2
OC
CU
PAN
T LO
AD
735
PER
SON
S
OC
CU
PAN
T LO
AD
100
PER
SON
S
OC
CU
PAN
T LO
AD
735
PER
SON
S
OC
CU
PAN
T LO
AD
590
PER
SON
S
OC
CU
PAN
T LO
AD
295
PER
SON
S
LOB
BY LO
BB
Y
STO
RA
GE
STO
RA
GE
STR
.
W.R
.
W.R
.W
.R.
AE
RO
BIC
S
RE
CE
PTI
ON
RE
CE
PTI
ON
WE
IGH
T R
OO
M
SP
IN R
OO
M
FITN
ES
S R
OO
M
CH
ILD
MIN
DIN
G
GE
N.
OFF
ICE
S
.OFF
ICE
.OFF
ICE
.OFF
ICE
MA
CH
.R
OO
M
STO
RA
GE
STO
RA
GE
STO
RA
GE
SP
OR
TS B
OX
MA
SS
AG
E
MA
SS
AG
E
YO
UTH
ME
CH
.
FEM
ALE
W.R
.
FEM
ALE
CH
AN
GE
RO
OM
MA
LEC
HA
NG
E R
OO
M
MA
LEW
.R.
GYM
3
UP
UP
OH
DOH
D
W
POO
L -
LOBB
Y LE
VEL
(SEE
SEP
ARA
TE D
RAW
ING
)
EM ST
AIR
4
STA
IR 8
STA
IR 9
STA
IR 5
STA
IR 1
1
ELEV
. 3
ELEV
. 2
POO
L
LIBR
ARY
GYM
Lobb
y Fl
oor -
Rec
Sid
e
6
NG
UIL
DFO
RD
REC
REA
TIO
N C
ENTR
E 15
105
- 105
Ave
nue,
Sur
rey,
BC
Fire
Saf
ety
Plan
Dec
embe
r 201
4
DN
UP
LAD
DER
TO
FAN
RO
OM
UP
TO R
OO
F
DN
DN
DN
UPP
ER P
AR
TO
F G
YM 1
OP
EN
TO
BE
LOW
OP
EN
TO
BE
LOW
OP
EN
TO
BE
LOW
LIBRARY-MAIN FLOOR
DE
CK
DE
CK
ME
ETI
NG
PR
ES
CH
OO
L
W.R
.S
TR.
STR
.
STR
.
STR
.
EN
TRY
LOB
BY
LIBRARY BUILDINGMAIN ENTRY
OP
EN
TO
BE
LOW
OP
EN
TO
BE
LOW
CA
RD
IO
UPP
ER P
AR
TO
F G
YM 2
UPP
ER P
AR
TO
F G
YM 3
TRA
CK
TRA
CK
TRA
CK TR
AC
K
DIV
IDIN
G C
UR
TAIN
DIVIDING CURTAIN
FEM
ALE
W.R
.
CR
AFT
SR
OO
MC
RA
FTS
RO
OM
SE
NIO
R
KIT
CH
EN
MU
LTI-P
UR
PO
SE
MA
LEW
.R.
JAN
.
STA
IR 4
STA
IR 8
STA
IR 7
STA
IR 1
1
STA
IR 9
STA
IR 1
0
STA
IR 5
ELEV
. 2
ELEV
. 3
POO
L
LIBR
ARY
GYM
POO
L - R
OO
F LE
VEL
(SEE
SEP
ARA
TE D
RAW
ING
)
DN
DN
LOW
ER R
OO
F
Upp
er F
loor
- R
ec S
ide
7