1 CONFIDENTIAL REQUEST FOR QUOTATION WATERPROOFING & STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO YEARS Prepared By: Administration, Corporate Services This document is the intellectual property of Bursa Malaysia. No part of the document is to be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording or any information storage and retrieval system, without permission in writing from Bursa Malaysia.

Upload: vunhan

Post on 27-Mar-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

1

CONFIDENTIAL

RREEQQUUEESSTT FFOORR QQUUOOTTAATTIIOONN

WWAATTEERRPPRROOOOFFIINNGG && SSTTRRUUCCTTUURRAALL RREEPPAAIIRR WWOORRKKSS

FFOORR AA CCOONNTTRRAACCTT TTEERRMM OOFF TTWWOO YYEEAARRSS

Prepared By: Administration, Corporate Services

This document is the intellectual property of Bursa Malaysia. No part of the document is to be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording or any information storage and retrieval system, without permission in writing from Bursa Malaysia.

Table of Contents

1.0 INTRODUCTION ............................................................................................................................................2

1.1 BACKGROUND ................................................................................................................................ 2

2.0 STANDARDS AND INSTRUCTIONS ...........................................................................................................3

2.1 INSTRUCTIONS TO PROSPECTIVE VENDORS .......................................................................................... 3 2.2 CONTACT PERSONS ......................................................................................................................... 4 2.3 TIME FRAME .................................................................................................................................. 4

3.0 TENDERER RESPONSE REQUIREMENTS ..............................................................................................4

3.1 COMPANY PROFILE .......................................................................................................................... 4 3.2 SITE BRIEFING .............................................................................................................................. 5

4.0 SCHEDULE OF UNIT PRICES .....................................................................................................................5

5.0 FORM OF QUOTATION ................................................................................................................................5

6.0 CONFIRMATION ON THE PROPOSED MATERIALS ...........................................................................5

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

2

1.0 INTRODUCTION

This document sets out the requirements of Bursa Malaysia Berhad (“Bursa”) to look for a

waterproofing specialist contractor to resolve and rectify all related water leaking problems in the

building structure at Exchange Square and Annexe Building, Bukit Kewangan, 50200 Kuala Lumpur.

The main objective of the contractor is to prevent the intrusion of leaking water from damaging the

building’s reinforced concrete (RC) structure in order to ensure the building is safe and intact. The

tenderer is required to address all the requirements stated in this Request For Quotation (“RFQ”)

document and its appendices.

The RFQ belongs to Bursa and the tenderer is required to hold such proprietary and confidential

information in the strictest form. It is not to be duplicated, distributed or disclosed to any third parties

without written consent from Bursa.

1.1 Background

Bursa would like to engage a permanent waterproofing contractor for a tenure of two (2) years to

attend to the following ad-hoc request works:

• Pressure grouting – to use polyurethane resin to inject cracks and joints to stop water leaking

from the walls or soffit of concrete slabs.

• Structural repair – to repair the spalled concrete surface of retaining walls.

• Replacement of the non-functional polysulphide sealants at GRC panels of external building.

1.2 Costing

The quoted rates of the abovementioned works should take into consideration the following:

• Materials, tools, labour and transportation costs.

• Mobilisation cost for attending to any of the above requests.

• Overtime labour charges if Bursa requests the repair work to be done during night time or

holiday.

1.3 Responsibility

Under Bursa’s Service Level Agreement, the successful tenderer shall fulfill the following requirements:

• The contractor must ensure that all repair works will not disturb the office operations of Bursa

as well as the tenants.

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

3

• The contractor must attend to Bursa’s request within four (4) hours for any water leaking and

structural problems when there is an urgent requirement.

• The contractor must ensure that all methodologies in relation to the application of

waterproofing materials must follow in accordance to the manufacturer’s instructions.

• The contractor must ensure that all waterproofing and structural repair work shall provide

three (3) years warranty.

2.0 STANDARDS AND INSTRUCTIONS

This section covers the standards and instructions that should be followed by the tenderers in

response to this RFQ. Please read this RFQ specification carefully. Tenderers are advised to read the

whole of this document.

2.1 Instructions to Prospective Vendors

2.1.1 The RFQ must be enclosed in a SEALED envelope and must be addressed to:-

Vice President, Administration, Corporate Services

Bursa Malaysia Berhad

1st Floor Business Centre, Exchange Square

Bukit Kewangan

50200 Kuala Lumpur

2.1.2 The proposal must reach Bursa not later than 5.00 pm, Wednesday, December 11, 2013.

Late responses will not be entertained.

2.1.3 The top left-hand corner of the envelope must be marked “RFQ For Waterproofing and

Structural Repair Works For A Contract of Two Years ”. This is also required for any

subsequent written correspondence.

2.1.4 English and/or Bahasa Malaysia is to be employed in any correspondence and technical

literature. The tenderer must explain how the proposed solution meets every technical

requirement specified and how the proposed components fit into the entire solution.

2.1.5 The tenderer assumes the risk of the method of dispatch chosen. Bursa assumes no

responsibility for delays caused by any delivery services. Postmarking by the due date will not

substitute for actual proposal receipt. Do not deliver proposals by facsimile transmission or

other telecommunication or electronic means.

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

4

2.1.6 Proposals must be signed by an official who is authorised to act on behalf of the organisation

submitting this proposal.

2.1.7 Any suggestions for additional features or alternatives, within the general framework of this

specification, are welcome.

2.1.8 Prices must be quoted in Ringgit Malaysia (RM) on a per item basis as per Specifications /

Schedule of Prices (Appendix 1).

2.1.9 Bursa reserves the right to accept or reject any proposal submitted.

2.2 Contact Persons

All questions regarding this RFQ must be submitted in writing or via e-mail to the parties listed below:-

Contact Person Leong Shee Sim

Address 13th Floor, Exchange Square, Bukit Kewangan 50200

Kuala Lumpur

E-Mail Address [email protected]

Contact Number 019-354 7066

Contact Person Hairil Azmi Zaidi

Address 13th Floor, Exchange Square, Bukit Kewangan 50200

Kuala Lumpur

E-Mail Address [email protected]

Contact Number 014-715 7491

2.3 Time Frame

Date Action

4-12-2013 Tender Invitation 6-12-2013 Briefing to participating tenderers : Q&A session at Lower

Ground Floor, Exchange Square before 2.30 pm. 11-12-2013 Submission of proposal by tenderer

3.0 TENDERER RESPONSE REQUIREMENTS

Tenderer must address the following requirements:

3.1 Company Profile

The tenderer must provide the following information:

3.1.1 Tenderer’s profile (by completing the form in Appendix II).

3.1.2 Previous experience in dealing with similar requirements.

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

5

3.1.3 Reference sites.

3.2 Site Briefing

A site briefing will be conducted on December 6, 2013 at 3.00 pm. Tenderers are requested to

assemble at Lower Ground Floor, Exchange Square before 2.30 pm. If you require further information

please contact our Mr Leong Shee Sim at telephone no. 019-354 7066.

4.0 SCHEDULE OF UNIT PRICES

4.1 The tenderer is to submit their Schedule of Unit Prices in the attached format provided in

Appendix II.

5.0 FORM OF QUOTATION

4.1 The tenderer is to submit their Form of Quotation in the attached format provided in

Appendix III.

6.0 CONFIRMATION ON THE PROPOSED MATERIALS

4.1 The tenderer is to submit their Confirmation on the Proposed Materials in the attached format

provided in Appendix IV.

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

6

Appendix I

SCHEDULE OF UNIT PRICES

No Description Unit Unit Price (RM) 1. PRESSURE GROUTING

1.1

1.2

PU Resin To supply labour, materials, tools and scaffolding to inject polyurethane resin into cracks and joints to stop water leaking from walls or soffit concrete slabs, complete with disposal of construction debris, touch up and repainting the attached area. Specifications :

• Brand of PU Resin : Pentens • Product Code : Golden Foam • Made In : Malaysia • Warranty Period : Two (2) years

Epoxy Resin To supply labour, materials, tools and scaffolding to inject epoxy resin into cracked concrete to strengthen concrete structures, complete with disposal of construction debris, touch up and repainting the attached area. Specifications :

• Brand of Epoxy Resin : Sika • Product Code : Sikadur 52 • Made In : Malaysia • Warranty Period : Two (2) years

Per Point

Per Foot Run

2. CEMENTATION WATERPROOFING 2.1 To supply labour, materials and tools to apply two layers of

cementation waterproofing compound on the affected floors to stop water leaking to soffit concrete slabs, complete with hacking, cleaning the surface, touch up and repainting the attached area and disposal of construction debris. Specifications :

• Brand of Cementation : Pentens • Product Code : T305 • Made In : Taiwan • Warranty Period : Two (2) years

Per Square Feet

3. STRUCTURAL REPAIR 3.1 Concrete Spalling

To supply labour, materials and tools to repair the spalled concrete area (on the wall or slab), complete with the following necessary works :

Per Square

Feet

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

7

• Removal of spalled concrete area to expose the

steel bars. • Cleaning and descaling of the exposed rusted steel

bars. • Application of anti-rust coating (rust inhibitor) on

the affected rebars. • Replacement of existing rebars with new ones, if

the rebars cannot be used anymore due to being badly deteriorated.

• Re-plastering of the affected surface with waterproofing cement.

• Repainting of the affected surface with 2 coats of emulsion paint.

Specifications :

• Brand of Cement Mortar: Fosroc • Product Code : Renderoc TG • Made In : Malaysia • Warranty Period : Two (2) years

Kindly refer to the attached photo with regards to the spalled concrete at retaining wall of basement car park :

4. POLYSULPHIDE SEALANT

4.1 Replacement of Existing Damaged/Non-functional Sealant Joints of GRC Panels at the Exterior Building To supply labour, materials and tools to replace existing non-functional sealant which is located at the joints (joint width : 1.5 inches) of the Glassfiber Reinforced Cement (GRC) panels with the approved type weather proof Polysulphide sealant to prevent water leaking into GRC’s metal support brackets . Kindly refer to the attached photos with regards to the current condition of the GRC joints and gaps on the roof of Exchange Square :

Per Foot Run

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

8

Scope of Work :

• Removal of existing spoilt polysulphine sealant to expose the backing rods.

• Cleaning the dirt and loose materials of the joint surfaces of GRC gaps.

• Application of a layer of primer coating (type of primer must be recommended by the Manufacturer) on surface before caulking of the new polysulphine sealant.

1.5 inches

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

9

• Application of polysulphine sealant must follow the instruction and methodology of the manufacturer.

Specifications :

• Brand of Sealant : V-TECH. • Product Code : VT 260 • Colour : Brown Colour (Must follow the existing

colour of the GRC panels) • Made In : …………………………. • Warranty Period : Two (2) years

5.

5.1

OTHER WORKS : Any other works which bidder reckons need to be included in this quote. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………………………………………

Signature : …………………………..…………………………… Authorised Person Name: ………………………………. Company Chop : Date : …………………… Email Address : ……………………………………………………… Your Reference No. ………………………( The bidder must fill in the quote reference no.)

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

10

Appendix II

PARTICULAR OF PROSPECTIVE BIDDER

1. Particular of the Company

Name : ………………………………………………………………………………….. Address : ………………………………………………………………………………..

……………………………………………………………………………….. …………………………………………………..…………………………..

2. Date First Registered : …………………………………………………………… 3. Paid-up Capital : …………………………………………………………………….

4. Authorised Capital : ………………………………………………………………..

5. Ownership :

Major Shareholder % Specify (B) – Bumiputra

(NB) – Non-Bumiputra

6. We declare that the abovementioned company is :

a related Public Listing Company (PLC) with Bursa Malaysia. a related subsidiary and associate company of PLC. a non-related company to PLC.

7. Financial Performance

Last Three years’ Turnover

Year Turnover ( RM’000) 2012 2011 2010

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

11

Note: You are also required to submit your last three years’ audit profit and lost account statement.

8. Staffing

Last Three Years’ Staff Strength Year Number of Staff at December 31 2012 2011 2010

9 Job Reference

Client Name Scope of Work Project Sum (RM)

Year

I believe that the information given above, to the best of my knowledge, is correct. …………………………………………………. Signature Name : …………………………………………………. Designation : …………………………………………. Date : ……………………………………………………

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

12

Appendix III

FORM OF QUOTATION

BURSA MALAYSIA BERHAD CORPORATE SERVICES 13th Floor, Exchange Square Bukit Kewangan 50200 Kuala Lumpur REQUEST FOR QUOTATION FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS CLOSING DATE : DECEMBER 11, 2013 TIME : 5.00 PM Herewith, we transmit our bid which is based on the Quotation Documents we received from you:- (a) Schedule of Prices Template (b) Photos We confirm that our bid fully complies with your specifications and with your scope of work as contained in the Quotation Documents. We offer to carry out the work in Ringgit Malaysia as per the attached Schedule of Prices (Appendix I) , being valid up to two (2) years effective date of the award of this contract. We undertake to complete the work within ………………………….. days upon confirmation of order. We understand that you are not bound to accept the lowest or any offer you may receive and that you reserve the right to award contract separately for itemised quotes. Yours faithfully …………………………………… Signature Name : …………………………………………………….. Bidder’s Stamp : Date : ………………………………..

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

13

Appendix IV

TECHNICAL CONFIRMATION ON THE PROPOSED MATERIALS

No Description Confirmation Remarks 1. PRESSURE GROUTING

1.1

1.2

PU Resin To supply labour, materials, tools and scaffolding to inject polyurethane resin into cracks and joints to stop water leaking from walls or soffit concrete slabs, complete with disposal of construction debris, touch up and repainting the attached area. Specifications :

• Brand of PU Resin : Pentens • Product Code : Golden Foam • Made In : Malaysia • Warranty Period : Two (2) years

Epoxy Resin To supply labour, materials, tools and scaffolding to inject epoxy resin into cracked concrete to strengthen concrete structures, complete with disposal of construction debris, touch up and repainting the attached area. Specifications :

• Brand of Epoxy Resin : Sika • Product Code : Sikadur 52 • Made In : Malaysia • Warranty Period : Two (2) years

Yes/No

Yes/No

2. CEMENTATION WATERPROOFING 2.1 To supply labour, materials and tools to apply two

layers of cementation waterproofing compound on the affected floors to stop water leaking to soffit concrete slabs, complete with hacking, cleaning the surface, touch up and repainting the attached area and disposal of construction debris. Specifications :

• Brand of Cementation : Pentens • Product Code : T305 • Made In : Taiwan • Warranty Period : Two (2) years

Yes/No

3. STRUCTURAL REPAIR 3.1 Concrete Spalling

To supply labour, materials and tools to repair the spalled concrete area (on the wall or slab), complete

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

14

with the following necessary works :

• Removal of spalled concrete area to expose the steel bars.

• Cleaning and descaling of the exposed rusted steel bars.

• Application of anti-rust coating (rust inhibitor) on the affected rebars.

• Replacement of existing rebars with new ones, if the rebars cannot be used anymore due to be badly deteriorated.

• Re-plastering of the affected surface with waterproofing cement.

• Repainting of the affected surface with 2 coats of emulsion paint.

Specifications :

• Brand of Cement Mortar: Fosroc • Product Code : Renderoc TG • Made In : Malaysia • Warranty Period : Two (2) years

Kindly refer to the attached photo with regards to the spalled concrete at retaining wall of basement car park :

Yes/No

4. POLYSULPHIDE SEALANT 4.1 Replacement of Existing Damaged/Non-functional

Sealant Joints of GRC Panels At The Exterior Building To supply labour, materials and tools to replace existing non-functional sealant which is located at the joints (joint width : 1.5 inches) of the Glassfiber Reinforced Cement (GRC) panels with the approved type weather proof Polysulphide sealant for the purpose to prevent water leaking into GRC’s metal support brackets. Kindly refer to the attached

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

15

photos with regards to the current condition of the GRC joints and gaps on the roof of Exchange Square :

Scope of Work :

• Removal of existing spoilt polysulphine sealant to expose the backing rods.

• Cleaning the dirt and loose materials of the joint surfaces of GRC gaps.

• Application of a layer of primer coating

1.5 inches

RFQ FOR WATERROOFING AND STRUCTURAL REPAIR WORKS FOR A CONTRACT TERM OF TWO (2) YEARS 27/11/2013

16

(type of primer must be recommended by the Manufacturer) on surface before caulking of the new polysulphine sealant.

• Application of polysulphine sealant must follow the instruction and methodology of the manufacturer.

Specifications :

• Brand of Sealant : V-TECH. • Product Code : VT 260 • Colour : Brown Colour (Must follow the

existing colour of the GRC panels) • Made In : …………………………. • Warranty Period : Two (2) years

Yes/No

5.

5.1

OTHER WORKS : Any other works which bidder reckons need to be included in this quote. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………………………………………