BIAL_ RFQ-Vr.1 Page 1 of 24
REQUEST FOR QUOTATION (RFQ)
Reference Number: BIAL/E&M/2019-20/00470 dated.13-Mar-2020
For providing “AHU Coil Replacement Chilled Water Pipe connection works”
Name and address of the entity seeking RFQ:
Bangalore International Airport Limited.
Administration Block,
Kempegowda International Airport, Bengaluru
Bangalore 560 300
Web: www.bengaluruairport.com
Person responsible for any additional information and receipt of quotes:
Head – Procurement and Contracts,
Bangalore International Airport Limited
E-Mail: [email protected]
Mobile : 9538882614
BIAL_ RFQ-Vr.1 Page 2 of 24
INDEX
Clause Contents page
DISCLAIMER 3-4
1 INTRODUCTION 5
2 OBJECTIVE 5
3 MINIMUM ELIGIBILITY CRITERIA 5
4 DESCRIPTION AND TENTATIVE DATES OF THE TENDER 6
5 QUERIES FROM BIDDERS 7
6 ADDENDUM/CORRIGENDUM 7-8
7 PAYMENT AND DEPOSITS 8-9
8 INSTRUCTIONS TO SUCCESSFUL BIDDER 9
9 LOCATION, TIMELINE AND DURATION FOR SERVICES 9
10 GENERAL 10-11
11 BUSINESS ETHICS AND STANDARD PRACTICES 11-12
ANNEXURE I BILL OF QUANTITIES
ANNEXURE II TECH SPECIFICATIONS/SCOPE
ANNEXURE IV FIRM / COMPANY BACKGROUND DETAILS
ANNEXURE V HR AND LABOUR COMPLIANCES
BIAL_ RFQ-Vr.1 Page 3 of 24
DISCLAIMER
1. The information contained in this RFQ document or subsequently provided to the
Bidders, whether verbally or in documentary or any other form by or on behalf of
Bangalore International Airport Limited (‘BIAL’) or any of its employees or advisers, is
provided to the proposers on the terms and conditions set-out in this RFQ, and such
other terms and conditions subject to which, such information is provided.
2. This RFQ is neither an agreement, nor, an offer by BIAL to the prospective Bidders or
any to other person. The purpose of this RFQ is to provide the Bidders with the
information, which may be useful to them, in the formulation of their Quotes. This RFQ
includes statements, which reflect various assumptions and assessments arrived at by
BIAL in relation to the work. Such assumptions, assessments and statements do not
purport to contain all the information that each Bidder may require. This RFQ may not
be appropriate for all the persons, and it is not possible for BIAL, its employees or
advisers to consider the objectives, technical expertise and particular needs of each
party, who reads or uses this RFQ. The assumptions, assessments, statements and
information contained in this RFQ, may not be complete, accurate, adequate or correct.
Each Bidder should, therefore, conduct its own investigations and analysis, and should
check the accuracy, adequacy, correctness, reliability and completeness of the
assumptions, assessments and information contained in this RFQ, and obtain
independent advice from appropriate sources.
3. Information provided in this RFQ to the proposers is on a wide range of matters, some
of which depends upon interpretation of law. The information given, is not an exhaustive
account of statutory requirements, and should not be regarded as a complete or
authoritative statement of law. BIAL accepts no responsibility for the accuracy,
inaccuracy, or otherwise for any interpretation or opinion on the law expressed herein.
4. BIAL, its employees advisers and agents make no representation or warranty, and shall
have no liability to any person including any proposer under any law, statute, rules or
regulations or tort, principles of restitution or unjust enrichment or otherwise for any
loss, damages, cost or expense which may arise from or be incurred or suffered on
account of anything contained in this RFQ or otherwise, including the accuracy,
adequacy, correctness, reliability or completeness of the RFQ and any assessment,
assumption, statement or information contained therein or deemed to form part of this
RFQ or arising in any way in this award process.
5. This RFQ, along with its Annexures and attachments is not transferable. The RFQ and
the information contained therein, are to be used only by the prospective Bidder to
whom, it is issued. It may not be copied or distributed by the recipient to third
BIAL_ RFQ-Vr.1 Page 4 of 24
parties (other than in confidence to the recipient’s professional advisors). In the event
that, the recipient does not continue with its involvement in the work in accordance
with this RFQ, this RFQ document must be kept confidential.
6. BIAL also accepts no liability of any nature, whether resulting from negligence or
otherwise, however caused, arising from reliance of any Bidder upon the statements
contained in this RFQ. It is the responsibility of the Bidders to make their own
assessments in preparing their Quotes.
7. BIAL may, in its absolute discretion, but, without being under any obligation to do so,
update, amend or supplement the information, assessment or assumption contained in
this RFQ.
8. The proposer shall bear all its costs associated with or relating to the preparation and
submission of its Quotes including, but not limited to preparation, copying, postage,
delivery fees, expenses associated with any demonstration or presentation, which may
be required by BIAL or any other cost incurred in connection with or relating to its
Quotes. All such costs and expenses will remain with the Bidder, and BIAL shall not be
liable in any manner whatsoever, for the same, or, for any other costs or, other expense,
incurred by any Bidder, in preparation or submission of the Quotes, regardless of the
conduct or outcome of the selection process.
9. BIAL reserves the right to accept or reject any or all Quotes; qualify or disqualify any or
all proposers without giving any reason, and is not obliged to correspond with any
proposer in this regard. Further, BIAL reserves the right to relax, change, review, revise
or/and cancel the eligibility criteria and the RFQ process, at any time, without prior
notice or without assigning any reason whatsoever. This invitation for RFQ does not give
rise to any right in rem, and is not an offer or invitation to offer.
10. BIAL will not entertain any claim for expenses in relation to the preparation of any
Quotes pursuant hereto.
11. BIAL at its absolute discretion, reserves the right, until the closure of the Quotes
submission, to modify any proposed terms and conditions set-out in the RFQ as
necessary, including but not limited to cancelling/withdrawing the RFQ, to meet its
objectives and principles.
BIAL_ RFQ-Vr.1 Page 5 of 24
1. INTRODUCTION
Concession Agreement between Government of India and BIAL
Bangalore International Airport Limited (‘BIAL’), a Company within the meaning of the
Companies Act, 2013, has obtained exclusive right and privilege from the Government
of India to carry-out the development, design, financing, construction, operation,
upgrade and management of the ‘Kempegowda International Airport, Bengaluru, at
Devanahalli, in the State of Karnataka’ (the ‘Airport’).
For more information, log on to www.bengaluruairport.com
2. OBJECTIVE
RFQ intent is to seek technical and commercial (“Quotes”) from leading Original
Equipment Manufacturers (‘OEMs’) or/and System Integrators (‘SIs’) or suitably qualified
and experienced suppliers/firm/company, authorized dealers, service providers as
applicable (hereafter referred as ‘Bidders’) for “Replacement Chilled Water Pipe
connection works ” at Airport.
The Quotes are intended for providing Services which shall be executed in accordance
with the specifications provided in
• Annexure I (Bill of quantities)
• Annexure II (plan, drawing & specifications) and
• Annexure III (list of approved makes)
The quote shall be issued on the basis of the requirement specified herein and comply
with all the standards listed in the technical specification, drawings, timeline and
schedule of quantities mentioned in the RFQ.
BIAL shall evaluate the Quote of only those Bidders, who have satisfied the criteria and
complied with the other requirements of this RFQ.
3. MINIMUM ELIGIBILITY CRITERIA
3.1 Each of the participant Bidders should fulfill the following eligibility criteria:
a) Minimum work experience and proven track record of three (3) years or more in
the field of “AHU Coil Replacement Chilled Water Pipe connection works” .
b) Should possess and have prior experience of performing and completing the
works of similar nature as per this RFQ scope in the preceding last two (2) years
BIAL_ RFQ-Vr.1 Page 6 of 24
for the annual basic value exceeding or more. (Balance sheet/ Annual Report
or any other supporting documents should be produced as proof)
c) Bidders shall submit certified copies of all the documents mentioned in
Annexure IV along with the Quotes.
d) If applicable Bidder should be compliance of all the applicable laws
/rules/other guidelines including all labour and safety enactments and
guidelines as mentioned in Annexure V.
4. DESCRIPTION AND TENTATIVE DATES
4.1 BIAL has adopted the following schedule for submission of the Quotes under this
RFQ:
Sl.No Schedule Date
1 Date of Issue 13-Mar-20
2 “Due Date” for submission of Quotes 17-Mar-20
4.2 Bidders shall mention the RFQ reference number and submit their Quotes either by
email or signed and sealed hard copy of the Quotes by courier, registered post or by
hand delivery, during 0900 to 1700 hours Indian Standard Time, on or before the Due
Date and the Quotes shall be submitted as per the format stipulated in Annexure I,
II & III herein. All the Quotes shall be submitted to BIAL at the following address:
a) Attention: Head - Procurement & Contracts,
Bangalore International Airport Limited
Alpha 2, Administration Block,
Kempegowda International Airport, Bengaluru
Bengaluru 560 300
b) Through Email at : [email protected]
Any Quote received after the Due Date and time, will be summarily rejected at the
discretion of BIAL.
4.3 Selection Process: BIAL as per its procedures shall select the Bidder whose technical
and financial quotation against bidding meets BIAL’s expectation and such qualified
Bidder be called for further discussion and finalization of the Services.
BIAL_ RFQ-Vr.1 Page 7 of 24
4.4 The Quotes shall be unconditional, firm and valid for a period of ninety (90) days
from the Due Date of submission of the quote (the “Validity Period”). Any Quote,
which have validity lower than that Validity Period shall be rejected by BIAL as
being non-responsive at BIAL’s discretion. However, in exceptional circumstances,
if the process of the award of contract is not completed within the Validity Period,
BIAL may request the Bidders to extend the validity of Quotes beyond the Validity
Period by an additional period of sixty (60) days, and BIAL shall, at least fifteen
(15) days prior to the expiry of the initial Validity Period, notify the Bidders
accordingly.
5. QUERIES FROM BIDDERS
5.1 For all the queries and clarifications under this RFQ the interested Bidders has to
submit their concerns to [email protected] on or before dates specified in
clause 4.1 above.
5.2 All the query or clarification should bear the RFQ reference number and
clarification should be detailed without any ambiguity.
5.3 All incorrect, irrelevant and repetitive queries shall not be entertained.
5.4 BIAL at its discretion may call for meeting for the clarifications of queries and
Bidder shall attend such meetings and seek the required inputs from BIAL.
5.5 All response to the queries from BIAL shall be through email only.
5.6 No liability whatsoever, will be admitted by BIAL, nor will a claim to BIAL be
considered, with respect to the errors or ambiguities contained if any in the RFQ,
which shall be rectified at the request of the Bidder.
6. ADDENDUM/CORRIGENDUM
6.1 At any time prior to the closure of the Due Date, BIAL may, for any reason, whether
on its own, or in response to a clarification requested by a Bidder, modify the RFQ
by issuing Addendum/Corrigendum.
6.2 Any addendum/Corrigendum issued, shall be a part of the RFQ pursuant to this
clause, and shall be uploaded in the BIAL website or communicated in writing by
email to all the Bidders.
6.3 In order to afford the Bidder’s reasonable time to take an amendment into
account, or for any other reason, BIAL may, at its sole discretion, extend the due
BIAL_ RFQ-Vr.1 Page 8 of 24
date for submission of the Quotes, in which case, all rights and obligations of BIAL,
and the Bidders previously subject to the original deadline will thereafter be
subject to the extended deadline. In case of issuance of Addendum/Corrigendum,
BIAL shall have the right to modify the other dates in relation to this RFQ.
6.4 In case, after issuance of Addendum/Corrigendum, the Bidder, who have already
submitted their Quotes, do not resubmit their bids, but can submit the
modification, in accordance with the terms and conditions of this RFQ, to the
extent of Addendum/Corrigendum, and the same shall be treated as part of
previously submitted quote.
6.5 if the Bidder, who have already submitted its quote, do not modify their bids,
pursuant to the Addendum/Corrigendum, it shall be deemed that, such Bidder do
not intend to modify its Quotes already submitted on the basis of the
Addendum/Corrigendum and the Quotes submitted by such Bidder shall be treated
as final quote submitted by them.
7. PAYMENT
7.1 Retention Money: (0%) of the contract value shall be withheld by BIAL as “Retention Money” and the same will be released after the successful completion of Defect Liability Period.
A. 7.1.1 Retention Money shall be retained from the running bills due to the
successful Bidder, or alternatively Retention Money can be submitted
through a bank guarantee, in a format preapproved by BIAL and in Indian
nationalised bank.
B. 7.1.2 At BIAL’s discretion, the successful Bidder shall have the option to have
the Retention Money issued through bank guarantee issued in favour of BIAL
and in such event the Bidder would require to furnish the bank guarantee
before the “Commencement Date” of the Services. The bank guarantee
shall be in the prescribed format of BIAL and from the list of approved banks
as informed by BIAL.
C. 7.1.3 Retention money shall be returned by BIAL without any interest and
subject to any deductions thereof, on completion of the Defect Liability
Period (if any) within thirty (30) days subject to BIAL issuing a
completion/clearance certificate as applicable.
D. 7.1.4 ‘Defect Liability Period’ will be for a period of twelve (12) months
from the successful hand over of the Services subject to BIAL issuing a
completion/clearance certificate as applicable.
E.
BIAL_ RFQ-Vr.1 Page 9 of 24
F. 12.2 Performance Bank Guarantee (PBG): The selected Bidder/Vendor
shall provide the PBG equivalent to percent (0%) of the Contract Value in
order to ensure the due performance of its obligations herein, within thirty
(30) days from the date of entering into definitive agreement. The PBG
shall be procured from any leading nationalized bank having branches at
Bengaluru in the format pre-approved by BIAL as per the timelines
mentioned above. All costs and expenses towards procuring the PBG shall
be borne by the selected Bidder/Vendor.
G.
H. 12.2.1 In the event the selected Bidder/Vendor fails to furnish the PBG as
per clause 10.2 above then, BIAL shall have the right to deduct the amount
equivalent to Ten percent (10%) of the gross amount of first bill payable to
the selected Bidder/Vendor or running bill of the Bidder/Vendor at BIAL’s
discretion until the entire PBG amount is recovered and the same will be
converted to as a performance security (“Performance Security”) under this
RFQ/definitive agreement. The recovery made hereunder shall be
independent to the requirement arising under this Clause 12.2.1 and not
subject to any other recovery made under this RFQ in whatsoever name.
I.
J. 12.2.2 BIAL shall have the right to deduct from the PBG or the Performance
Security such amount for any non-performance of the Services by the
selected Bidder/Vendor. PBG or the Performance Security shall be
deducted in full or part based on the level of non-performance on a case
to case basis at the sole discretion of BIAL.
K.
L. 12.2.3 Subject to the due performance and completion of the Services to
the satisfaction of BIAL, the PBG or the Performance Security will be
released, thirty (30) days after the expiry of the term or BIAL issuing a
completion/clearance certificate whichever is later subject to any
deductions thereof by BIAL. The PBG or the Performance Security shall not
carry any interest.
7.2 Liquidated Damages:
In addition to and without limiting any remedies in law or in equity that may be available to BIAL including, but not limited to, injunctive and other equitable relief, the Bidder shall pay an amount of 1% per week of the contract value which shall be deducted as liquidated damages for delay in completion beyond the agreed time line up to a maximum of 5% of the contract value. Parties agree that the Liquidated Damages herein are a fair estimation of the damages likely to
BIAL_ RFQ-Vr.1 Page 10 of 24
result from such delay and shall not be construed as the final costs, penalty and expenses of any kind.
7.3 All or any payment to be made to the selected Bidder shall be made only upon satisfactory completion of Services or achieving the desired stage of progress, within a period of 30 days from the date of receipt of certified invoice by BIAL.
7.4 Under this RFQ ‘Commencement Date’ shall mean the date mentioned in
purchase order issued pursuant to this RFQ or any other date explicitly
confirmed by BIAL wherein the selected Bidder commences Services.
7.5 All Quotes under this RFQ should include the applicable taxes, duties,
levies etc and shall be defined distinctly in Annexure I.
8. INSTRUCTIONS TO SUCCESSFUL BIDDER
The successful Bidder shall:
8.1 Provide the Services in a professional manner and in accordance with the
specifications and guidelines provided by BIAL;
8.2 Be responsible for the timely completion of the Services and execution of order as
per the time lines and specifications provided of BIAL from time to time;
8.3 At its own cost and expense, undertake, comply with and perform all its obligations
and shall comply with all the applicable laws and regulations including the BIAL
safety and security guidelines from time to time;
9. LOCATION, TIMELINE AND DURATION FOR SERVICES
9.1 The proposed Services is to be delivered at the Airport. BIAL at its discretion shall
have the right to change the location any time based on its requirement.
9.2 The Services shall be completed in all respect within [1 Year] calendar days from
the Commencement Date. In the event the selected Bidder breaches any of the
provisions mentioned herein and/or fails to comply with the Services provision
within the agreed timelines in this clause 9.2. BIAL shall have a right to cancel and
terminate the Services of the selected Bidder without any further notice at its
discretion and BIAL shall not be responsible for any payment obligation for any
BIAL_ RFQ-Vr.1 Page 11 of 24
of the expenses incurred by the selected Bidder and no payments shall be made
by BIAL to such selected Bidder.
10. GENERAL
10.1 The Bidder by submission of its Quotes, hereby agrees to transmit the most up to
date information and complete records. BIAL’s determination as to whether a
Bidder is qualified and selected, will be based upon the information provided by
the Bidder in its Quotes, economic disclosure, Statements and affidavits (if
requested by BIAL), interviews (if applicable) and other sources deemed to be valid
by BIAL.
10.2 The successful Bidder shall execute and complete the Services in accordance with
the scope and the Services provided shall be free from all defects, damage and
free of faults of workmanship, be of the highest grade, consistent with the
established and generally accepted standards. In the event Services are found
defective or are found not in accordance with the scope of work, quality or the
specifications prescribed by BIAL, the successful bidder shall replace/rectify the
same at free of cost.
10.3 Confidentiality: Each Bidder should ensure the confidentiality of all documents
furnished or given by BIAL, including this RFQ. Any documents provided or made
available by BIAL shall be used only for the selection process and treated
confidential by Bidders.
10.4 Assignment: Any assignment of this RFQ or of any rights hereunder, in any manner,
by operation of law or otherwise, without the prior written consent of BIAL, shall
be void.
10.5 Government regulations: The Bidder shall be responsible for obtaining and
maintaining all permits, sanctions, permissions, approval and also shall comply
with all the laws, orders, regulations or other instructions issued by all statutory
authorities in India or otherwise.
10.6 BIAL reserves the right to accept or reject any or all quotations without assigning
any reasons and is not obliged to correspond with the Bidders in this regard.
Further, BIAL reserves the right to change/modify and / or cancel this process or
withdraw the RFQ at any time without prior notice or without assigning any reasons
whatsoever, and this shall be without prejudice to all its right to re-tender at any
time in the future and in such case, Bidders shall not have any claim arising out of
such action against BIAL.
BIAL_ RFQ-Vr.1 Page 12 of 24
10.7 BIAL reserves the right to verify any, or all statements made by the Bidders in
response to this RFQ, and to inspect the Bidders’ outlets, places of business, etc.,
if necessary to establish to its satisfaction about the Bidders ability and expertise
to provide the Services and Bidder shall cooperate for such inspection.
10.8 Pursuant to the response to this RFQ by Bidder, it is considered as unconditional
acceptance by the Bidder of all the terms and conditions mentioned herein.
10.9 All documents and/or any other information submitted pursuant to the RFQ shall
remain the property of BIAL.
10.10 Each of the Bidder shall be responsible and bear all costs associated with the
preparation and submission of its respective Quotes.
10.11 BIAL shall not be liable or held liable for any loss, damage, expenses, costs or
liability arising either directly or indirectly, arising out of this RFQ. Further, BIAL
shall not be held liable for any damage or loss caused to the Bidder due to injury
or death caused to any of its personnel.
10.12 Jurisdiction: The courts at Bengaluru shall have the exclusive jurisdiction in this
regard and the laws of India shall be applicable.
10.13 Notice Address: Any notice to be made, must be in writing and may be given by
post or hand to either party to address communicated from time to time.
11. BUSINESS ETHICS AND STANDARD PRACTICES
11.1 Standards
It is essential to BIAL’s business that BIAL acts under the highest ethical and legal
standards. Not only does BIAL follow a competitive approach in selecting and
engaging suppliers/vendors/bidders based on merit and values, but BIAL also lays
great importance in conducting business in accordance with the highest ethical
standards and BIAL expects all of its vendors to comply on it. Below are some of
the key provisions to be follow.
11.1.1 Ethical Dealings
• Conducting business with high ethical standards is fundamental to BIAL and BIAL
holds its service providers/ selected Bidders/ suppliers / vendors to the same
standards.
BIAL_ RFQ-Vr.1 Page 13 of 24
• All BIAL employees are governed by a strict code of business conduct. The Vendor
must never offer to a BIAL employee any incentive or any gratification, including
by way of gifts or personal favors, whether in cash or kind, to gain preferential
treatment or obtain or retain any business or contract, or for discharging or
forbearing to discharge, or for showing or forbearing to show favor or disfavor to
any person in the discharge of, any function on behalf of BIAL.
• BIAL expects its service providers/ selected Bidders/ suppliers / vendors to avoid
conflicts of interest when doing business with BIAL including not offering to or
accepting from BIAL’s employees any business courtesies or entertainment that
are or could be perceived as an improper attempt to influence a business
decision, or discharge of any function on behalf of BIAL.
• BIAL shall have a zero tolerance policy on this service providers/ selected
Bidders/ suppliers / vendors who are not in compliance with this provision herein
shall face the risk of termination of any or all contracts or engagements with
BIAL.
11.1.2 Whistle Blower Policy
• If the supplier/vendor suspects or observes any un-ethical practice or behavior
by BIAL employee, BIAL encourages you to immediately report the same using
the following channel.
• E-mail: [email protected]
• BIAL assures you that all complaints will be taken seriously and investigated
thoroughly. This will be treated as strictly confidential between the service
providers/ selected Bidders/ suppliers / vendors and BIAL.
11.1.3 No Purchase Order - No Payment Policy
• The service providers/ selected Bidders/ suppliers / vendors should ensure that
a valid purchase order is in place before delivering any goods or services. If the
service providers/ selected Bidders/ suppliers / vendors acts on requests that do
not have a reference purchase order or has not been properly authorized by BIAL
or BIAL’s authorized representative, the service providers/ selected Bidders/
suppliers / vendors may lose the right to claim such amount and BIAL will not be
obligated to make such payments.
Please communicate these expectations throughout your organization as
appropriate. We look forward to your continued support and co-operation.
BIAL_ RFQ-Vr.1 Page 14 of 24
ANNEXURE – 1 (BILL OF QUANTITIES)
Sl.No Description of work Qty Unit Rate Amount
1
AHU chilled water pipe disconnection and reconnection works to facilitate AHU coil replacement by carrying out pipe fabrication works along with necessary material like MS pipe, elbows, reducers, flanges etc as per site condition. The vendor must also complete the insulation and aluminium cladding after reconnecting the chilled water pipe.
13 Nos
All Quotes should include applicable taxes, duties levies (if any) and GST. SAC : GST : Work Completion period :
BIAL_ RFQ-Vr.1 Page 15 of 24
BIAL_ RFQ-Vr.1 Page 16 of 24
ANNEXURE II
PAYMENT TERMS
Payment shall be made only on achieving the desired stage of progress to
the satisfaction of BIAL.
SL No Description Percentage of Fees
1 Invoices 30 days from the date of receipt of Invoice
BIAL_ RFQ-Vr.1 Page 17 of 24
Annexure IV
Firm / Company Background Details
I. Commercial Documents
1. Firm/Company History 2. List of similar projects handled in the last 3 Years (Attach separate Sheet). 3. List of similar projects for which work in progress (Attach separate Sheet & Enclose
Work Orders as proof). 4. Certified true copy of Experience Certificates or Customer satisfaction certificates or
Completion certificate for at least last 3 years and summarize as in table format (Attach separate Sheet).
BIAL reserves its right to demand any other additional information that might be
relevant for the evaluation of the Quotes, at a later stage.
II. Legal Documents
1. For Companies
• Certificate of Incorporation
• Memorandum of Association
• Articles of Association
• Latest List of Directors
• Permanent Account Number Card
• Board Resolution or/and Power of Attorney/Authorization Letter resolving/ empowering/authorizing the representative of the party to sign and bind the Company
2. For Partnership Firms
• Registration Certificate, if registered
• Partnership Deed
• Permanent Account Number Card
• Goods and Services Tax Registration Certificate
• Professional Tax Registration Certificate
• Certificate of Registration of Establishment issued by the Labour Department, Government of Karnataka under the Shops & Establishments Act, 1961
3. For Proprietorship Firms
• Registration Certificate, if registered
• Bank Statement
• Permanent Account Number Card
• Goods and Services Tax Registration Certificate
• Professional Tax Registration Certificate
• Certificate of Registration of Establishment issued by the Labour Department, Government of Karnataka under the Shops & Establishments Act, 1961
BIAL_ RFQ-Vr.1 Page 18 of 24
BIAL_ RFQ-Vr.1 Page 19 of 24
1. Labor License
ANNEXURE V
BANGALORE INTERNATIONAL AIRPORT LIMITED
Guidelines for Statutory Compliances
If the successful Bidder (hereafter referred as ‘Contractor’ under this Annexure-V) is
deploying 20 & more workers on any day for the execution of contract at Airport, such
Contractor has to apply for Labor License for the required number of manpower to the
Assistant Labor Commissioner (Central), Bangalore and submit acknowledgement copy to
BIAL before start of the awarded contract work.
2. Compliance under Building & Construction Workers Welfare Act
If the Contractor is deploying 10 & more workers on any day for the execution of any
construction related / civil contract work at Airport,
The Contractor has to register under the BOCWW Act with the Central Labour Dept.
The Contractor has to enroll the workers as beneficiaries with State Labour Dept., and get
them beneficiary cards.
The Contractor has to pay 1% of cess on the entire construction to the BOCCWW Board.
3. ESIC/WCIP – The Contractor’s labor should be covered either under (a) ESIC, OR (b)
Employees Compensation Insurance Policy. (BIAL area is currently not covered under the
ESIC notifications).
4. EPFO – The Contractor’s labor should be covered under the EPFO scheme from day one.
5. Minimum Wages
The Contractor should comply with the minimum wages as notified by the Central Labor
Department from time to time (to be revised in every April & October).
6. Payment of Wages
Payment of wages to labours should be made on or before 7th of every month in the
presence of BIAL’s representative who shall witness and certify the same.
7. Statutory Bonus/ Gratuity – The Contractor shall pay bonus as well gratuity to eligible
employees as per the Act.
8. Equal Remuneration for male and female workers doing the same/similar work.
9. Prohibition of child labour - The Contractor should not employ any workers below the age
of 18 years.
BIAL_ RFQ-Vr.1 Page 20 of 24
10. The Contractor should issue employment card/appointment letter to all workmen.
11. Registers / Records
The Contractor should maintain attendance register, wages register, register of workmen,
advance register, fines register, over time register, leave register, Form-D, etc., in the
formats as prescribed by Central Labor Department.
12. The Contractor should display all applicable labor abstracts and notices as required Central
Labor compliance.
13. Over Time wages should be paid on gross wages for labours who have put in more than 9
hours in a day or 48 hours in a week at double the rate (not exceeding 50 hours in a quarter).
14. Weekly Holiday – 1 full day with wages for every six days worked.
15. Leave with wages – 27 days per annum.
16. National and Festival Holidays – 10 days per annum (submit list of holidays during the start
of the term).
17. Working hours should not exceed 9 hours in a shift (including spread hour/break).
18. Extend adequate welfare and safety measures for workers as required under the Contract
Labour Act. (BIAL has built a full-fledged Canteen facility for the benefit of Contract
Agencies to extend canteen provision to their Workers inside the premises of Airport.
Contract Agencies are requested to make use of it).
19. The Contractor should submit records & details to BIAL for any internal audits as and when
called for.
20. If the Contractor is having his corporate office / head office in other state and having an
employer PF Code other than Karnataka, then he has to apply and obtain a PF-Sub Code
from the Regional PF Commissioner-I, Bangalore for Karnataka operation.
21. The Contractor should employ adequate number of Supervisors at site to control and
supervise the workers deployed for execution of the contract work as per the contract scope
agreed with BIAL.
22. The Contractor should observe and comply with all the guidelines and provisions of state
and central labour departments with respect to the employment of women.
BIAL_ RFQ-Vr.1 Page 21 of 24
23. The Contractor should comply, remit all statutory deductions made from the works together
with his contribution to the respective authorities within the stipulated timelines and
furnish a copy of the same along with the Invoice to BIAL.
24. Apart from the compliance guidelines mentioned herein, the Contractor shall observe, and
comply with all labour laws applicable to the execution of contract work so awarded by
BIAL & indemnify BIAL against any notices, charges, penalties and liabilities.
25. Form-III – If the Contractor is deploying 20 and more workers, he has to obtain labour licence
from central labour Department. In such case, the Contractor shall submit a written request
to BIAL for issue of Form-III, to obtain labour licence, along with the following documents:
A.Purchase Order copy along with cost sheet. B.Contract Agreement copy C.R equest letter by the Agency for issue of Form-III, enclosing the following documents:
i) Registration certificate of establishment under appropriate authority (Shops Act / Factories Act/ Companies Act.) as the case may be.
ii) PF Registration certificate of the Agency.
iii) Registration certificate under ESIC scheme or copy of Workmen Compensation Policy insuring the proposed labours, by the Agency.
iv) Workmen/Employees Compensation Insurance Policy copy for having covered all the labours to be deployed for execution of contract at BIAL premises.
v) Profession Tax registration certificate of the Agency.
D.Declaration letter by Agency giving status of any cases with any Labour Department / Court, PF Department, ESIC Department and any Court of Law or with any Government Authorities in India.
E.Declaration letter by Agency stating prohibition of child labour deployment.
F. Declaration letter by Agency giving details of any workers Trade Union exist in the organization.
G. Name, Designation, email ID, Postal Address and Contact Number of MD/Proprietor and Site Incharge
BIAL_ RFQ-Vr.1 Page 22 of 24
H. Name, Designation, email ID, Postal Address and Contact Number of the official who handles labour/ HR statutory compliances.
I. If the Agency to whom the contract is awarded is engaging another Agency (sub-
contractor) for the supply of manpower, following documents are to be submitted: Approval letter from BIAL for engaging sub-contractor. Agreement / work order executed between the Contractor & sub-contractor. Documents mentioned in serial number 3 to 8 above, pertaining to sub-contractor.
J. Details of workers to be deployed for the execution of contract work at BIAL site (to be
emailed in the attached data format) within 15 days of commencement of work.
For any clarifications on the above, please contact:
Mr. Nagaraj.G, Asst. General Manager-HR, Mob.9538882076 ([email protected])
Mr. Sreenath D.R., Executive-HR, Mob.9538882075 ([email protected])