REQUEST FOR PROPOSALS FOR INTERIOR DESIGN AND CONSTRUCTION PHASE SERVICES OF EXPLORE & MORE CHILDRENS MUSEUM AT CANALSIDE, BUFFALO, NEW YORK Released: November 2, 2015 Proposals Due: November 23, 2015 Explore & More Children’s Museum 300 Gleed Avenue East Aurora, NY 14052 www.exploreandmore.org

Upload: phamthu

Post on 03-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

REQUEST FOR PROPOSALS FOR INTERIOR DESIGN AND

CONSTRUCTION PHASE SERVICES OF EXPLORE & MORE CHILDREN’S MUSEUM AT CANALSIDE, BUFFALO, NEW YORK

Released: November 2, 2015 Proposals Due: November 23, 2015

Explore & More Children’s Museum 300 Gleed Avenue

East Aurora, NY 14052 www.exploreandmore.org

PROJECT DESCRIPTION Explore & More Children’s Museum (E&M) is requesting proposals for architectural, engineering, and construction phase services for the interior of a new children’s museum at Canalside, Buffalo, NY as outlined in Attachment A. The core and shell of the new 42,900 SF building (including sub-basement) is being designed and constructed by Erie Canal Harbor Development Corporation (ECHDC) and their team of architects, engineers, and construction managers. Exhibits (within the new museum are being designed by Gyroscope, Inc. a national museum planning firm based in Oakland CA. The firm selected by E&M will be required to closely coordinate its design with E&M, ECHDC, and Gyroscope.

Qualified firms must demonstrate expertise in program development level functions through project design, procurement, construction administration, and commissioning. The project work requires full architectural and engineering services for the museum interior, utility design (water supply, power, sanitary, communications, internet), and mechanical design (heating, ventilation, and air conditioning, fire protection) as highlighted in Attachment B. SCOPE OF WORK A detailed description of work and schedule are included in Attachment A. The following services are required: Interior Design, including:

Coordination with ECHDC and Gyroscope Local and State Code compliance. Design of Interior and Exterior Signage Mechanical Design coordination with ECHDC design team and Gyroscope Security Design Telephone System Design Specialty Lighting Non-Exhibit Signage Interior/Exterior Et cetera

Core and Shell Coordination, including work with ECHDC Construction Manager on building core and shell costs, value engineering, changes and change orders that impact interior design and function. Work with ECHDC team to coordinate design and seek ways to reduce construction costs. Core and Shell definition can be found in Attachment B The selected team will be expected to participate in weekly design meetings with the following schedule:

Go-To-Meeting led by Gyroscope focusing on exhibit design on Tuesdays at 1 p.m. (see Attachment C) Go-To-Meeting led by Fontanese Folts Aubrecht, and Ernst (FFAE) focusing on core and shell design on Tuesdays at 3 p.m.

SELECTION CRITERIA The proposals will be rated based on the following criteria using the scorecard in Attachment D: Development of the proposed Scope of Work and Timeline Experience of the Team & Team Leader/Organizational & Management Approach Project Communication Plan Experience of sub-consultants Demonstration of working relationships with clients Cost / best value SELECTION PROCESS The ideal proposal will include the following, in the following order:

1. Team Description and Experience, include resumes and references of all key staff 2. Anticipated process and schedule of work to coincide with current ECHDC and E&M schedules

(Attachment E – schedule as of October 30, 2015) 3. Letters of recommendation from past clients 4. List and contact information for the last three completed projects of comparable size; List of

current projects 5. Detailed Fee Schedule in a separate SEALED envelope

E&M’s construction committee - comprised of staff, board members and members of the community – will review the proposals. Interviews will be held with the top candidates. The committee will make a recommendation to the E&M Board, which will make the final decision in December. The interviewed firms will be notified. Through November 20, E&M will make every effort to respond to questions via email, and will share the questions and answers with all interested parties. Questions or requests to receive the Q&A’s can be sent to [email protected]. SCHEDULE Release of RFP /Start of Q&A Period November 2, 2015 End of Q&A Period (through 5 p.m.) November 20, 2015 Proposals due November 23, 2015 Interviews week of December 4, 2015 Final Approval of Explore & More Board December 2015 Hire Date January 2016

ADDITIONAL INFORMATION Explore & More will require all firms to meet the following requirements: Insurance Requirements:

· Commercial General Liability insurance - $1 million per occurrence / $2 million aggregate · Auto Liability insurance - $1 million per occurrence / $1 million aggregate · Excess Umbrella Liability insurance - $5 million per occurrence / $ 5 million aggregate · Must show evidence of Worker’s Compensation & Employer’s Liability insurance at State

statutory limits · Must show evidence of Disability insurance coverage at State statutory limits · Explore & More Children’s Museum, the Erie Canal Harbor Development Corporation and the

NYS Urban Development Corporation d/b/a Empire State Development must be named as additional insureds on a primary and non-contributory basis on all of the following policies: Commercial General Liability, Auto Liability, and Excess Liability policies

· All policies listed above should include a waiver of subrogation in favor of Explore & More Children's Museum. ECHDC & NYS UDC d/b/a ESD

· Professional Liability Insurance of $1 million An individual certificate (including hold harmless) must be provided to each of the following organizations: Explore & More Children’s Museum, New York State Urban Development Corporation d/b/a as Empire State Development Corporation, Erie Canal Harbor Development Corporation. MWBE Requirements It is the policy of the State of New York, ESD, and ECHDC to comply with all federal, State and local laws, policy, orders, rules and regulations which prohibit unlawful discrimination because of race, creed, color, national origin, sex, sexual orientation, age, disability or marital status, and to take affirmative action in working with contracting parties to ensure that New York State Business Enterprises, Minority and Women-owned Business Enterprises (M/WBEs), Minority Group Members and women share in the economic opportunities generated by ECHDC’s participation in projects or initiatives, and/or the use of ESDC and ECHDC’s funds. ECHDC’s non-discrimination and affirmative action policy will apply to this initiative. Should there be any expenditure of State funds made pursuant to this RFP, the selected organization shall be required to use good faith efforts to achieve M/WBE participation of not less than 25% (20%-MBE, 5%-WBE) of the total dollar value of the any contract executed pursuant to this RFP. Submit proposals (one hard copy and one electronic copy) no later than 5 p.m. on Monday, November 23, 2015 to: Barbara Leggett Explore & More Children’s Museum

300 Gleed Avenue East Aurora, NY 14052 [email protected]

Attachment A Programming Phase

1. Complete the Program of Spaces for building interior, including: basic information such as sizes, space requirements, workflows, activities and special uses, based on Gyroscope’s Schematic Design (Attachment C)

2. Facilitate regular meetings with E&M and ECHDC staff during basic components to include, but not limited to: development, building systems, equipment and materials. Document each meeting.

3. Attend coordination meetings with E&M and ECHDC staff and any pertinent external agencies (County, State) as required to determine and gain approvals from all pertinent entities.

4. Identify building systems connection points, and required ECHDC coordination. 5. Prepare renderings and present design to Explore & More staff and Board 6. Prepare Design Rationale Report (DRR) to document all findings.

Schematic Design Phase (50% design)

1. Facilitate meetings with E&M and ECHDC staff to review building square footage, required utilities, and infrastructure needed to develop Schematic Design Documents. Document each meeting.

2. Prepare Schematic Design Documents, Preliminary Specifications, Schematic cost estimate and schedule to E&M for review and approval. Components to include:

a. Floor plans, building circulation b. Interior design c. Interior elevations, rendering and color palette d. Critical building sections and details e. Relevant right of way information such as easements, limits of construction, site work,

etc. f. Location of utilities and sizes g. Mechanical, electrical, plumbing design h. Signage (interior, exterior) non-exhibit, security design, telephone systems, general

lighting, specialty lighting, etc. necessary for a complete operating children’s museum. i. Utility tie-in point location table/schedule j. Electrical one-line diagrams. k. Building control control schematics, (fire annunciation, HVAC, etc.) l. HVAC Schematic Diagrams with equipment, flow rates, controls, valves, and dampers. m. Potable water and sanitary diagrams n. Fire protection schematic diagrams with sprinkler density, coverage, controls and

annunciation. 3. Respond in writing to all E&M comments and update the project DRR. 4. Coordinate with private utilities and service providers.

Design Development and Bid Phase (95% and 100% design) 1. Facilitate meetings with E&M to develop design documents. Document each meeting.. 2. Prepare and submit coordination drawings and specifications in preparation of design

development meetings. Documents include specifications, cost estimate and schedule. Components to include complete:

a. Floor plans, Structural, Architectural, MEP, Fire Protection, phone and data lines, security, signage, etc.

b. Interior elevations, rendering materials boards, and color palette c. Building sections and details d. Interior elevations, casework and millwork elevations e. Interior design f. Report addressing Building Code requirements g. Specifications

3. Respond in writing to all E&M comments, update the DRR 4. Coordinate final utility plans. 5. Assist E&M with Bid Phase and Award.

Construction Services Phase (construction must be complete by May 2018)

1. Project Administration: Provide consultation, recommendations, explanation of design intent, and guidance during construction phases of the project as requested. Consultant shall schedule, chair, and document bi-weekly construction meetings.

2. RFI and ASI Review: Review and respond to the Contractor's RFIs (request for information) and prepare ASI's (Architectural Supplemental Instructions).

3. Shop Drawing Review: Review process notations shall read "Reviewed and Approved", or "Reviewed and Disapproved", or "Revise and Resubmit", or "Approved - Make Corrections Noted".

4. Schedule Review: Review and comment on the Contractor's schedule, including milestone dates and cash flow submittals, for compliance with the specification requirements.

5. Testing and Inspection: Assist E&M as directed in obtaining independent specialized testing and inspections, the final inspection, commissioning, and testing of the Contractor's work for final acceptance of the contract for construction.

6. Change Orders: Provide change order assistance and preparation as directed by E&M. Prepare revisions to original project documents to reflect the proposed change order (PCO)/change order (CO) and/or differing field conditions.

7. As-Built Information: Modify original electronic drawing files of the final contract documents to reflect record/as-built conditions as identified by the contractor through its marked-up field drawings and furnish all documents in the same format and conventions approved for the final contract documents

8. Special Inspection(s): Assist E&M in procuring independent special inspection services. 9. Routine Inspection and Reviews: Perform routine inspections to confirm as proper, correct and

in compliance with the applicable Contract Documents, all work performed by the Contractor and all equipment and materials furnished and installed on the project.

10. Material Testing: Assist E&M in obtaining independent material testing and inspection services, which includes arranging for, conducting or witnessing field, laboratory and shop tests of materials required by the Contract Documents.

11. Contract Document Interpretation: In conjunction with the design support consultant, interpret the Contract Documents as requested by E&M and check the construction activities performed by the prescribed construction Contractor to assure compliance with the intent of the design.

12. Inspection of Work In-Place: Verify, and confirm quantities with the Contractor on a regular basis, and confirm the sufficiency of the work performed.

13. Progress Schedule Review: Review, analyze and approve, the Contractor's initial progress schedule, including milestone dates, and cash flow projections, as well as periodic update submittals for compliance with the specification requirements.

14. Technical Submittal Review: Review and process RFIs (requests for information); all shop drawings, mix design and all other technical submittals as submitted by the Contractor.

15. Maintenance of Records: Maintain all construction records, information, provide directions, etc. in accordance with AIA

16. Progress Payment Review: Review, confirm, and approve, for contract compliance, all payment requests from the Contractor prior to submittal Explore & More for payment.

17. Additional Professional Services: Perform all work required by the Contract Documents for the project which requires performance by a Registered Architect or Professional Engineer, to the extent such work is necessary, specified, or becomes necessary.

18. Subcontractor/Supplier Review: Review background, experience and capability of formally proposed material suppliers, sub-consultants and subcontractors for the project. Coordinate its reviews with the appropriate E&M personnel for approval.

19. Progress Reporting: Submit detailed bi-weekly or such frequency as determined by conditions of the work, progress reports of construction activity to the E&M

20. Change Order: The preparation and approval of change orders. 21. Equipment/System Startup: Review all equipment/system and associated accessories prior to

energizing/startup. 22. Commissioning: After startup, observe Contractor commissioning of all equipment and systems. 23. Project Closeout: Prepare all project documents for archiving. 24. Project Completion: Construction Phase Services shall generally conclude approximately one (1)

month following contract document final completion and acceptance of the project work.

Building Project Design Deliverable     October 29, 2015   Page 1 of 5   

  

  

Building Project Design Deliverable Parcel A2.1/2.4  The  purpose  of  this  document  is  to  outline  the  Building  Project  Design  Deliverable,  which identifies the Landlord’s design of anticipated building components included in the 42,900 GSF of core and  shell  space on Canalside Parcels A2.1/2.4  to be  leased by Explore & More Children’s Museum.    The Building Project Design Deliverable  is currently based on mid‐Schematic Phase  information and  is being provided at the request of the Explore and More Children’s Museum so they may define a scope of work for their upcoming Interior Design RFP.  It is anticipated that the Building Project Design Deliverable shall be part of the basis for the Core and  Shell  definition,  as  described  in  the  October  2013  Non‐Binding  Memorandum  of Understanding and August 31, 2015 Canalside – Children’s Museum Term Sheet.   Landlord  is  defined  as  the  Erie  Canal  Harbor  Development  Corporation  (‘ECHDC’).    Tenant  is defined as the Explore & More Children’s Museum (‘EMCM’).  General Requirements:  The Building Project Design Deliverable shall be in complete compliance with the following:  � All  local,  state  and  federal  fire  and  building  codes  and  regulations  and  other  legal 

requirements. � American with Disabilities Act and handicap regulations. � Sustainable Design: 

o The Project would achieve at a minimum LEED® for Building Design and Construction for Core and Shell (“LEED® BD&CCS”) version 2009 Certified Levels (40 to 49 points), with a goal of attaining Silver Level (50 to 59 points). 

o Project will need to comply with New York State ‐ Executive Order 88  

 Building Components: 

1. Sub‐Structure and Structure: Landlord to design all necessary foundational and structural components required to meet all of tenants Live/ Dead load requirements, coordinate & support  all  tenant  uses  and  equipment.  Provide  all  necessary  floor/roof  openings including roof, green roof, and all levels. 

Building Project Design Deliverable     October 29, 2015   Page 2 of 5   

2. Exterior Closure:  Insulation throughout the building shall meet the New York State Energy Conservation Codes.   Landlord will design all exterior  finishes, doors, windows,  lighting, etc., per landlord/tenant joint specifications pending Design Review Committee approval.  Balconies and Canopies (See 2.d. below) will be designed by Landlord as an ADD Alternate to the Core/Shell Contract Documents.  

a. Finishes:    Finishes  shall  be  provided  in  accordance  with  legal  requirements  per Landlord/Tenant joint specifications pending Design Review Committee approval. 

b. Doors  and Windows:    Building  entry/egress  doors  and  windows  shall  be  provided  in accordance  with  legal  requirements  per  Landlord/Tenant  joint  specifications  pending Design  Review  Committee  approval.    All  door  hardware  shall  be  ADA  compliant  in accordance with all applicable  legal requirements.   The Tenant’s main entrance on Lloyd Street will not be shared by other tenants. 

c. Exterior  lighting:    Building mounted  luminaires  shall  be  provided  for  illumination  of pedestrian walkways, streets and waterways adjacent to the building as well as building accent  lighting.    Fixture  selection(s)  shall  be  coordinated  with  Landlord/Tenant  joint specifications pending Design Review Committee approval. 

d. Balconies and Canopies:  Balconies, canopies and associated any railings shall be designed per Landlord/Tenant joint specification pending Design Review Committee approval. 

e. Perimeter Walls:    Interior  side  of  exterior walls  shall  be  furred with metal  studs,  batt insulation  in  compliance  with  legal  requirements,  and  ready  for  drywall  by  Tenant.  Depending on  location a 3’‐6” high parapet wall and/or  fascia/gravel  stop  (no Parapet) shall be provided around the perimeter of the Terrace Roof. 

f. Vertical  circulation  and  transportation:    All  necessary  vertical  circulation  and transportation  as  required  by  code  to  the  Landlord/Tenant  joint  specification  shall  be provided.   All other vertical circulation shall be provided by the Tenant and shall comply with all governing codes. 

g. Core Walls and Common Area Walls:   All walls constituting stair towers, elevator shafts, mechanical  rooms  and  ventilation  shafts,  refuse  and  recycling  room,  which  shall  be minimally metal stud  framed,  insulated, and drywalled  full height.   These walls shall be designed  in accordance with all  legal requirements,  including proper UL designation and fire‐rating criteria, and shall  include all necessary blocking, equipment sleeves, dampers and fire stopping. 

3. Interior Walls,  Floors,  Ceilings  and  Exhibits:    All  Tenant  interior  walls,  floors,  ceilings (located  below  Floor/Roof Metal  Deck  System),  exhibits,  or  other  spaces,  and  related finishes shall be designed by the Tenant and shall comply with all governing codes. 

4. Roof:  Landlord  to  design  an  insulated  weathertight  roof  per  Landlord’s  specification.   Terrace  Roof  area  will  be  insulated  and  weathertight  per  landlord/tenant  joint specification. 

5. Sanitary Sewer:   Landlord to design sanitary sewer and grease waste  line and rough‐ins, 

Building Project Design Deliverable     October 29, 2015   Page 3 of 5   

and grease trap at a designated location per landlord/tenant joint specifications. Landlord shall provide an external grease interceptor sized to comply with local codes if necessary. Landlord  to  provide  a  conventional  gravity  type  sanitary  sewer  and  vent  system  to convey sanitary waste  from all plumbing  fixtures and equipment  located on all  floors, including one (1) sanitary sewer main located on the Marine Drive side of the building, and multiple vertical and horizontal, sanitary waste and vent risers capped at each floor for  future  connections,  and  a  sanitary  vent  system  extending  through  the  roof  in various, non‐objectionable locations and terminating a minimum of 1’‐6” above finished roof. 

6. Storm  Sewer:    Landlord  to  design  a  conventional  gravity  type  storm water  drainage system  with  interior  rainwater  leaders  to  convey  storm  water  from  all  roof  drains. Separate from the Primary System above, a Secondary (emergency) will be incorporated with a secondary roof drain system and  interior rainwater  leaders which will discharge above grade in a visible location.  Multiple storm water sewer mains are expected to be provided and exit the building below grade on the canal side of the building. Accessible cleanouts will be provided at the base of each storm water  leader and every  fifty  (50) feet within the building. 

7. Natural Gas  Service:    Landlord  to  design  a  separately metered  gas  service with meter manifold and meter per landlord/tenant joint specification. 

8. Domestic Water Service:  Landlord to design a single domestic water service. The service is expected to originate from the existing municipal water main  located within Marine Drive and would  include a water meter,  strainer and  reduced pressure  zone backflow prevention device, as well as a duplex, variable speed, domestic water pressure booster pump  system.   These devices will be  located within  the mechanical equipment  room located  in  the  sub‐basement.   This  system will  insure  adequate water pressure  to  all fixtures and equipment located throughout the building and roof.  Landlord will provide all Vertical Risers with  tees/stubs  for Tenant  future  connection  for  required domestic cold, hot and hot water rough‐ins to Tenant Restroom locations.  Landlord will provide a domestic cold water riser from the towpath level up to the roof terrace level. Each level will have a branch connection valved and capped for future connection.   

9. Tenant Restrooms:   Landlord will provide sewer and water stubs necessary at each floor location for Tenant Restrooms per landlord/tenant joint specification.  Tenant shall fitout all toilet rooms within their leased space, regardless of their location. 

10. Fire  Life  Safety.    Landlord  to  design  sprinkler main,  grid  and  firm  alarm  per  landlord’s specification and to comply with all governing codes, including fire pull stations, exit signs, fire extinguishers and cabinets, life safety speakers/strobe light and smoke detectors, and fire  sprinklers.    Any  necessary modifications  per  Tenant’s  layout  shall  be  designed  by Tenant and shall comply with all governing codes.   Landlord will also design non‐freeze exterior wall hydrants within recessed vandal proof boxes around the perimeter of the building. 

Building Project Design Deliverable     October 29, 2015   Page 4 of 5   

11. Vertical HVAC, Mechanical and Electrical chases through building and up to roof: Landlord to design shafts per landlord/tenant joint specifications and all governing codes.  Refer to Item 2.g above. 

12. Heating, Ventilation and Air Conditioning (HVAC):   Landlord to design the core and shell HVAC system consisting of: 

A. Mechanical Plant:  Landlord will allow Tenant use of existing Ice Rink Chillers (Typical of two 128 Ton Chillers) and Cooling Towers.   Chilled Water Building Secondary  loop pump shall be variable volume/variable pressure.   Chilled water piping distribution to each Air Handling Unit cooling coil with 4” piping routed from the Plant to the Direct Outside Air System located on each level of the Museum.  

B. Boiler  Plant:    Landlord  to  design  a  Boiler  Plant  which  will  include  High  Efficient Condensing  Boilers,  Building  Hot Water  Loop  Pumping,  Boiler  Venting,  Hot Water piping mains for distribution to each dedicated outdoor air handler coil, Heating piping for perimeter radiation, Heating water piping distribution to each AHU coil, reheat coil and building perimeter radiation, and heating water piping distribution to each DOAS heating coil and building perimeter radiation. 

C. Dedicated  Outdoor  Ventilation  Air  Handling  to  handle  building  ventilation  loads:  Landlord to design Route Ventilation supply and return ductwork from ventilation air handling to 5’‐0” beyond unit, providing load centers and pathways for piping to VAV System. 

D. Building  Controls:    Landlord  to  design  building Head  End with  localized  controllers from the central system, including a localized controller to be tied into building Head End, and Area metering. 

E. System Control Strategy:   CO2 based Demand Control Ventilation, Occupancy based terminal equipment set back, AHU heating and cooling discharge temperature reset, Variable  flow  and  pressure  strategies  for  air  delivery,  and  independent  pressure control value approach. 

13. Electrical Service:  Landlord to design a grounded, electrical service supply terminated at a  free‐standing,  800amp,  480Y277‐volt  electrical  service  distribution  switchboard located  in the sub‐basement.   Service  is expected to  include one (1) electrical panel to supply HVAC loads, one (1) electrical panel to supply building exterior lighting, and one (1) transformer and one (1) electrical panel to supply building power and convenience outlet  loads.   Tenant  shall design all electrical distribution necessary  for  tenant build‐out. 

14. Emergency/Standby  Power  Service:    Landlord  will  allow  Tenant  use  of  existing emergency/standby  power  service  for  life  safety,  standby  and  critical  building equipment loads.  

15. Interior  Lighting:    Landlord  to  design  temporary  lighting  as  required by  code, per  the Landlord’s specification.  Tenant shall design all permanent interior lighting required for 

Building Project Design Deliverable     October 29, 2015   Page 5 of 5   

tenant build‐out and as required by code.  

16. Technology/Communications  and  Audio/Visual  (A/V)  Systems:    Landlord  to  design pathways.    Tenant  shall  design  all  associated  distribution/wiring  and  required equipment room. 

 17. Security,  Video  Surveillance,  Access  Control,  Intrusion Detection:    Landlord  to  design 

pathways.    Tenant  shall  design  all  associated  distribution/wiring  and  required equipment room. 

18. Loading  Dock/Refuse  and  Recycling  Room:    Landlord  to  design  a  trash/service  area, including suitable receptacles  for wet and dry garbage and recyclables.   Tenant shall be provided access to and use of the trash/service area.   Tenant shall adhere to the refuse and recycling schedule adopted by the Landlord for the building.  

19. Temporary  Signage:    Landlord  shall  permit  temporary  signs  to  indicate  impending occupancy  of  the  space  pending  Design  Review  Committee  approval.    The  signs, hardware,  electrical  service,  and  other  related  requirements,  shall  be  designed  by  the Tenant. 

20. Permanent Signage:  Landlord shall permit permanent signs on the exterior of the building pending Design Review Committee approval.  The signs, hardware, electrical service, and other  related  requirements,  as  well  as  obtaining  their  approval,  will  be  designed  by Tenant as an ADD Alternate to the Core/Shell Contract Documents. 

21. Temporary  Power:  Landlord  shall  design  temporary  power  for  use  by  the  Tenant,  per Tenant’s specifications, until permanent power is energized. 

CriteriaRating*******0.0*-*5.0

Weight

ScoreNotes

Development*of*the*proposed*Scope*of*W

ork*&*tim

eline*

4*

Experience*of*Team*and*Team

*Leader/Organizational*and*

Managem

ent*approach*

4*

Project*communication*plan

*4*

Experience*of*SubEConsultants*

2*

Demonstration*of*w

orking*relationships*with*clients

*2*

Cost*/*best*value*

4*

Total*

IDTa

sk N

ame

Dur

atio

nS

tart

Fini

sh

1A

GR

EEM

ENTS

80da

ys?

Mon

8/3/

15Fr

i11

/20/

15

2Te

rm S

heet

Dev

elop

men

t20

days

?M

on8/

3/15

Fri

8/28

/15

3B

oard

Mat

eria

ls D

ue, 8

/31

1 da

yM

on8/

31/1

5M

on8/

31/1

5

4B

oard

Mee

ting,

Acc

ept T

erm

s an

d A

utho

rize

Sig

natu

re

(Sep

tem

ber 1

6, 2

015)

1 da

yW

ed9/

16/1

5W

ed9/

16/1

5

5B

indi

ng A

gree

men

t47 da

ysTh

u9/

17/1

5Fr

i11

/20/

15

6 7C

M P

RO

CU

REM

ENT

154

days

?Th

u9/

17/1

5Tu

e4/

19/1

6

8C

M R

FP D

evel

oped

by

EC

HD

C37 da

ysTh

u9/

17/1

5Fr

i11

/6/1

5

9C

M R

FP to

ES

D fo

r R

evie

w/A

ppro

val

10 days

Mon

11/9

/15

Fri

11/2

0/15

10PR

OC

UR

EMEN

T PE

RIO

D55

days

?Tu

e12

/1/1

5M

on2/

15/1

6

11A

dver

tise

RFP

in C

ontra

ct

Rep

orte

r (D

ecem

ber 1

, 20

15)

1 da

yTu

e12

/1/1

5Tu

e12

/1/1

5

12P

re-S

ubm

ittal

Tou

r, 12

/91

day

Wed

12/9

/15

Wed

12/9

/15

13Q

uest

ions

Due

, 12/

151

day

Tue

12/1

5/15

Tue

12/1

5/15

14Q

uest

ions

& A

nsw

ers

Issu

ed, 1

2/18

3 da

ysW

ed12

/16/

15Fr

i12

/18/

15

15P

ropo

sals

Due

(Ja

nuar

y 19

,20

16)

1da

y?Tu

e1/

19/1

6Tu

e1/

19/1

6

16P

ropo

sal R

evie

w to

S

hortl

ist,

1/27

6 da

ysW

ed1/

20/1

6W

ed1/

27/1

6

17N

otify

Sho

rtlis

t, 1/

270

days

Wed

1/27

/16

Wed

1/27

/16

18In

tevi

ews,

2/1

010 da

ysTh

u1/

28/1

6W

ed2/

10/1

6

19S

elec

tion,

2/1

53

days

Thu

2/11

/16

Mon

2/15

/16

20B

oard

Mat

eria

ls D

ue, 2

/??

10 days

Tue

2/16

/16

Mon

2/29

/16

21B

oard

Mee

ting,

Aw

ard

CM

C

ontra

ct (3

/9/2

016)

0 da

ysW

ed3/

9/16

Wed

3/9/

16

22C

M N

otic

e to

Pro

ceed

(lim

ited

Pre

-Con

stru

ctio

n S

ervi

ces

scop

e), 3

/24

12 days

Wed

3/9/

16Th

u3/

24/1

6

23C

M C

ontra

ct A

ppro

ved

by

ES

D (A

pril

19, 2

016)

30 days

Wed

3/9/

16Tu

e4/

19/1

6

24 25D

ESIG

N30

2da

ys?

Thu

9/17

/15

Thu

11/1

0/16

26K

icko

ff C

hare

ttes

with

E

CH

DC

Arc

hite

ct a

nd

Ope

rato

rs, 9

/17

1 da

yTh

u9/

17/1

5Th

u9/

17/1

5

27C

once

pt D

esig

n/S

pace

P

rogr

amm

ing

(4 w

eeks

)21 da

ysFr

i9/

18/1

5Fr

i10

/16/

15

28S

chem

atic

Des

ign

(4 w

eeks

)21 da

ysM

on10

/19/

15M

on11

/16/

15

29S

chem

atic

/RFP

Add

enda

21 days

Tue

11/1

7/15

Tue

12/1

5/15

30S

chem

atic

Des

ign

Val

ue

Eng

inee

ring

(EC

HD

C, E

MC

M,

CM

)

19 days

Fri

3/25

/16

Wed

4/20

/16

31D

esig

n D

evel

opm

ent (

8 w

eeks

)41 da

ysTh

u4/

21/1

6W

ed6/

15/1

6

32D

esig

n D

evel

opm

ent V

alue

E

ngin

eerin

g (E

CH

DC

, EC

MC

,C

M)

21 days

Thu

6/16

/16

Thu

7/14

/16

33C

onst

ruct

ion

Doc

umen

ts (1

2 w

eeks

)63 da

ysFr

i7/

15/1

6Tu

e10

/11/

16

34C

onst

ruct

ion

Doc

umen

t Val

ueE

ngin

eerin

g11 da

ysW

ed10

/12/

16W

ed10

/26/

16

35C

anal

side

DR

C R

evie

w 1

- S

chem

atic

10 days

Tue

11/1

7/15

Mon

11/3

0/15

36C

anal

side

DR

C R

evie

w 2

- D

esig

n D

evel

opm

ent

10 days

Thu

6/16

/16

Wed

6/29

/16

37C

anal

side

DR

C R

evie

w 3

(F

inal

) - C

onst

ruct

ion

Doc

umen

ts

21 days

Wed

10/1

2/16

Wed

11/9

/16

38C

ity o

f Buf

falo

Site

Pla

n R

evie

w, 1

1/10

1da

y?Th

u11

/10/

16Th

u11

/10/

16

39 40C

ON

STR

UC

TIO

N53

1da

ys?

Fri

11/1

1/16

Fri

11/2

3/18

41B

id/A

war

d Ti

me

or A

dditi

onal

B

d A

ctio

n to

Acc

ept D

RC

R

ecom

men

datio

n ??

?

1da

y?Fr

i11

/11/

16Fr

i11

/11/

16

42C

ore

& S

hell

(15

Mon

ths)

315

days

Fri

12/9

/16

Thu

2/22

/18

43In

terio

r Fit-

out (

4 m

onth

s)84 da

ysTh

u1/

25/1

8Tu

e5/

22/1

8

44E

xhib

its (6

mon

ths)

126

days

Wed

5/23

/18

Wed

11/1

4/18

45C

hild

ren'

s M

useu

m S

oft

Ope

ning

5 da

ysTh

u11

/15/

18W

ed11

/21/

18

46C

hild

ren'

s M

useu

m G

rand

O

peni

ng (N

ovem

ber 2

3,

2018

)

1 da

yFr

i11

/23/

18Fr

i11

/23/

18

47 48M

USE

UM

FU

ND

RA

ISIN

G70

0da

ys?

Thu

9/17

/15

Tue

5/22

/18

49C

ore

& S

hell

Con

tribu

tion

118

days

?Th

u9/

17/1

5M

on2/

29/1

6

50Fi

tout

Con

tribu

tion

303

days

Thu

9/17

/15

Fri

11/1

1/1 6

51Ex

hibi

ts C

ontr

ibut

ion

700

days

Thu

9/17

/15

Tue

5/22

/18

5233

% G

oal

171

days

Thu

9/17

/15

Wed

5/11

/16

5366

% G

oal

446

days

Thu

5/12

/16

Thu

1/25

/18

5410

0% G

oal

83 days

Fri

1/26

/18

Tue

5/22

/18

AG

REE

MEN

TS

Term

She

et D

evel

opm

ent

Boa

rd M

ater

ials

Due

, 8/3

1

Boa

rd M

eetin

g, A

ccep

t Ter

ms

and

Aut

horiz

e Si

gnat

ure

(Sep

tem

ber 1

6, 2

015)

Bin

ding

Agr

eem

ent

CM

PR

OC

UR

EMEN

T

CM

RFP

Dev

elop

ed b

y EC

HD

C

CM

RFP

to E

SD fo

r Rev

iew

/App

rova

l

Adv

ertis

e R

FP in

Con

trac

t Rep

orte

r (D

ecem

ber 1

, 201

5)

Pre-

Subm

ittal

Tou

r, 12

/9

Que

stio

ns D

ue, 1

2/15

Que

stio

ns &

Ans

wer

s Is

sued

, 12/

18

Prop

osal

s D

ue (

Janu

ary

19, 2

016)

Prop

osal

Rev

iew

to S

hort

list,

1/27

Not

ify S

hort

list,

1/27 Inte

view

s, 2

/10

Sele

ctio

n, 2

/15

Boa

rd M

ater

ials

Due

, 2/?

?

Boa

rd M

eetin

g, A

war

d C

M C

ontr

act (

3/9/

2016

)

CM

Not

ice

to P

roce

ed (l

imite

d Pr

e-C

onst

ruct

ion

Serv

ices

sco

pe),

3/24

CM

Con

trac

t App

rove

d by

ESD

(Apr

il 19

, 201

6)

DES

IGN

Kic

koff

Cha

rette

s w

ith E

CH

DC

Arc

hite

ct a

nd O

pera

tors

, 9/1

7

Con

cept

Des

ign/

Spac

e Pr

ogra

mm

ing

(4 w

eeks

)

Sche

mat

ic D

esig

n (4

wee

ks)

Sche

mat

ic/R

FP A

dden

da

Sche

mat

ic D

esig

n Va

lue

Engi

neer

ing

(EC

HD

C, E

MC

M, C

M)

Des

ign

Dev

elop

men

t (8

wee

ks)

Des

ign

Dev

elop

men

t Val

ue E

ngin

eerin

g (E

CH

DC

, EC

MC

, CM

)

Con

stru

ctio

n D

ocum

ents

(12

wee

ks)

Con

stru

ctio

n D

ocum

ent V

alue

Eng

inee

ring

Can

alsi

de D

RC

Rev

iew

1 -

Sche

mat

ic

Can

alsi

de D

RC

Rev

iew

2 -

Des

ign

Dev

elop

men

t

Can

alsi

de D

RC

Rev

iew

3 (F

inal

) - C

onst

ruct

ion

Doc

umen

ts

City

of B

uffa

lo S

ite P

lan

Rev

iew

, 11/

10

Bid

/Aw

ard

Tim

e or

Add

ition

al B

d A

ctio

n to

Acc

ept D

RC

Rec

omm

enda

tion

???

MU

SEU

M F

UN

DR

AIS

ING

Cor

e &

She

ll C

ontr

ibut

ion

Fito

ut C

ontr

ibut

ion

33%

Goa

l

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Qtr

3, 2

015

Qtr

4, 2

015

Qtr

1, 2

016

Qtr

2, 2

016

Qtr

3, 2

016

Qtr

4, 2

016

Qtr

1, 2

017

Chi

ldre

n's

Mus

eum

- Sou

th A

ud B

lock

Red

evel

opm

ent

Sche

dule

(8/2

1/15

)

Pag

e 1

IDTa

sk N

ame

Dur

atio

n

1A

GR

EEM

ENTS

80da

ys?

2Te

rm S

heet

Dev

elop

men

t20

days

?

3B

oard

Mat

eria

ls D

ue, 8

/31

1 da

y

4B

oard

Mee

ting,

Acc

ept T

erm

s an

d A

utho

rize

Sig

natu

re

(Sep

tem

ber 1

6, 2

015)

1 da

y

5B

indi

ng A

gree

men

t47 da

ys

6 7C

M P

RO

CU

REM

ENT

154

days

?

8C

M R

FP D

evel

oped

by

EC

HD

C37 da

ys

9C

M R

FP to

ES

D fo

r R

evie

w/A

ppro

val

10 days

10PR

OC

UR

EMEN

T PE

RIO

D55

days

?

11A

dver

tise

RFP

in C

ontra

ct

Rep

orte

r (D

ecem

ber 1

, 20

15)

1 da

y

12P

re-S

ubm

ittal

Tou

r, 12

/91

day

13Q

uest

ions

Due

, 12/

151

day

14Q

uest

ions

& A

nsw

ers

Issu

ed, 1

2/18

3 da

ys

15P

ropo

sals

Due

(Ja

nuar

y 19

,20

16)

1da

y?

16P

ropo

sal R

evie

w to

S

hortl

ist,

1/27

6 da

ys

17N

otify

Sho

rtlis

t, 1/

270

days

18In

tevi

ews,

2/1

010 da

ys

19S

elec

tion,

2/1

53

days

20B

oard

Mat

eria

ls D

ue, 2

/??

10 days

21B

oard

Mee

ting,

Aw

ard

CM

C

ontra

ct (3

/9/2

016)

0 da

ys

22C

M N

otic

e to

Pro

ceed

(lim

ited

Pre

-Con

stru

ctio

n S

ervi

ces

scop

e), 3

/24

12 days

23C

M C

ontra

ct A

ppro

ved

by

ES

D (A

pril

19, 2

016)

30 days

24 25D

ESIG

N30

2da

ys?

26K

icko

ff C

hare

ttes

with

E

CH

DC

Arc

hite

ct a

nd

Ope

rato

rs, 9

/17

1 da

y

27C

once

pt D

esig

n/S

pace

P

rogr

amm

ing

(4 w

eeks

)21 da

ys

28S

chem

atic

Des

ign

(4 w

eeks

)21 da

ys

29S

chem

atic

/RFP

Add

enda

21 days

30S

chem

atic

Des

ign

Val

ue

Eng

inee

ring

(EC

HD

C, E

MC

M,

CM

)

19 days

31D

esig

n D

evel

opm

ent (

8 w

eeks

)41 da

ys

32D

esig

n D

evel

opm

ent V

alue

E

ngin

eerin

g (E

CH

DC

, EC

MC

,C

M)

21 days

33C

onst

ruct

ion

Doc

umen

ts (1

2 w

eeks

)63 da

ys

34C

onst

ruct

ion

Doc

umen

t Val

ueE

ngin

eerin

g11 da

ys

35C

anal

side

DR

C R

evie

w 1

- S

chem

atic

10 days

36C

anal

side

DR

C R

evie

w 2

- D

esig

n D

evel

opm

ent

10 days

37C

anal

side

DR

C R

evie

w 3

(F

inal

) - C

onst

ruct

ion

Doc

umen

ts

21 days

38C

ity o

f Buf

falo

Site

Pla

n R

evie

w, 1

1/10

1da

y?

39 40C

ON

STR

UC

TIO

N53

1da

ys?

41B

id/A

war

d Ti

me

or A

dditi

onal

B

d A

ctio

n to

Acc

ept D

RC

R

ecom

men

datio

n ??

?

1da

y?

42C

ore

& S

hell

(15

Mon

ths)

315

days

43In

terio

r Fit-

out (

4 m

onth

s)84 da

ys

44E

xhib

its (6

mon

ths)

126

days

45C

hild

ren'

s M

useu

m S

oft

Ope

ning

5 da

ys

46C

hild

ren'

s M

useu

m G

rand

O

peni

ng (N

ovem

ber 2

3,

2018

)

1 da

y

47 48M

USE

UM

FU

ND

RA

ISIN

G70

0da

ys?

49C

ore

& S

hell

Con

tribu

tion

118

days

?

50Fi

tout

Con

tribu

tion

303

days

51Ex

hibi

ts C

ontr

ibut

ion

700

days

5233

% G

oal

171

days

5366

% G

oal

446

days

5410

0% G

oal

83 days

CO

NST

RU

CTI

ON

Cor

e &

She

ll (1

5 M

onth

s)

Inte

rior F

it-ou

t (4

mon

ths)

Exhi

bits

(6 m

onth

s)

Chi

ldre

n's

Mus

eum

Sof

t Ope

ning

Chi

ldre

n's

Mus

eum

Gra

nd O

peni

ng (N

ovem

ber 2

3, 2

018)

66%

Goa

l

100%

Goa

l

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Qtr

2, 2

017

Qtr

3, 2

017

Qtr

4, 2

017

Qtr

1, 2

018

Qtr

2, 2

018

Qtr

3, 2

018

Qtr

4, 2

018

Chi

ldre

n's

Mus

eum

- Sou

th A

ud B

lock

Red

evel

opm

ent

Sche

dule

(8/2

1/15

)

Page

2