Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs An initiative of Ministry of Power, Government of India Restructured Accelerated Power Development and Reforms Programme (R-APDRP) of Govt. of India Request For Proposal (RfP) for Selection of ‘SCADA/DMS Implementation Agency (SIA)’ for implementation of SCADA/DMS System in the State Electricity Distribution Utility For further details, please visit the website www.apdrp.gov.in OR www.pfcindia.com Nodal Agency Power Finance Corporation Ltd. Request for Proposal Under GoI’s R-APDRP Volume V Purchaser: Madhya Gujarat Vij Company Ltd,Baroda On behalf of: Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Uttar Gujarat Vij Company Ltd, Ahmdabad (UGVCL) Paschim Gujarat Vij Company Ltd, Rajkot(PGVCL) Dakshin Gujarat Vij Company Ltd, Surat (DGVCL) RFP Identification No: MGVCL/RAPDRP/SIA/199 Single Stage – Single Envelope Two stage Selection Procedure (This document is meant for the exclusive purpose of RFP and shall not be transferred, reproduced or otherwise used for purposes other than that for which it is specifically issued.) (This section is part of the bid)

Upload: others

Post on 18-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

An initiative of

Ministry of

Power,

Government of

India

Restructured Accelerated Power Development and

Reforms Programme (R-APDRP) of Govt. of India

Request For Proposal (RfP)

for Selection of ‘SCADA/DMS Implementation Agency

(SIA)’ for implementation of SCADA/DMS System in the

State Electricity Distribution Utility

For further details, please visit the website

www.apdrp.gov.in OR www.pfcindia.com

Nodal Agency

Power Finance

Corporation

Ltd.

Request for Proposal

Under GoI’s R-APDRP

Volume V

Purchaser: Madhya Gujarat Vij Company Ltd,Baroda

On behalf of:

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL)

Uttar Gujarat Vij Company Ltd, Ahmdabad (UGVCL)

Paschim Gujarat Vij Company Ltd, Rajkot(PGVCL)

Dakshin Gujarat Vij Company Ltd, Surat (DGVCL)

RFP Identification No: MGVCL/RAPDRP/SIA/199

Single Stage – Single Envelope Two stage Selection Procedure

(This document is meant for the exclusive purpose of RFP and shall not be transferred, reproduced

or otherwise used for purposes other than that for which it is specifically issued.)

(This section is part of the bid)

Page 2: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 2 of 16

Volume-IV

Utility Information

Page 3: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 3 of 16

Table of Contents

1. About utility .................................................................................................................................. 4

2. Existing DMS and IT systems of utilities...................................................................................... 4

2.1. Existing Systems in Baroda under MGVCL............................................................................... 5

2.1.1. SCADA/DMS Control Centre Architecture at MGVCL (Baroda).......................................... 6

2.2. Existing ERP (e-Urja) in all the DISCOMs............................................................................... 6

2.3. R-APDRP IT System under implementation .............................................................................. 8

3. SCADA/DMS system integrations with other existing SCADA and IT system ........................... 9

3.1. Existing SCADA/DMS integrations at MGVCL ...................................................................... 10

3.1.1. Integration Option ............................................................................................................... 10

3.2. Integration with R-APRDP IT System ..................................................................................... 10

• GIS data exchange between IT and SCADA/DMS..................................................................11

• Breaker status data exchange....................................................................................................11

• Daily Energy data. ....................................................................................................................11

The daily energy data of each feeder shall be stored in the SCADA/DMS database. This data

will be shared with the billing system of IT part. This Exchange will be on demand or by daily....11

• Load Priority table....................................................................................................................11

3.3. Integration with SLDC System .................................................................................................11

Appendix A: Existing SCADA/DMS Signal list................................................................................. 13

Appendix B: recommended Integration architecture........................................................................... 15

List of figures

Figure 1: Existing system overview ...................................................................................................... 5

Figure 2: Existing SCADA/DMS Control room Architecture............................................................... 6

Figure 3: Reference application architecture of IT system.................................................................... 9

Figure 4: Recommended Integration architecture ............................................................................... 15

List of Tables

Table 4: Hardware equipments at existing control centre ..................................................................... 6

Page 4: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 4 of 16

1. About utility

Gujarat state power distribution network was unbundled into four regional distribution companies

namely Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) , Uttar Gujarat Vij Company Ltd,

Ahmadabad (UGVCL) ,Paschim Gujarat Vij Company Ltd, Rajkot (PGVCL) and Dakshin Gujarat

Vij Company Ltd, Surat (DGVCL) .

2. Existing DMS and IT systems of utilities

To monitor and operate power system network and to mange different business process and daily

activities, different IT & OT (Operations Technology) systems have been implemented under various

initiatives of DISCOMs. Following sections give details on the existing infrastructure owned by the

utility or under implementation which shall be integrated and operated with the proposed system.

Following are the systems to be integrated.

i. SCADA system existing at Baroda under MGVCL implemented for monitoring &

operation of distribution substations and distribution assets like RMUs.

ii. ERP system (e-Urja) is implemented by GUVNL which is covered all the DISCOMs.

iii. R-APDRP-IT System being implemented in all the DISCOMs

Page 5: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 5 of 16

2.1. Existing Systems in Baroda under MGVCL

At present, 15 substations at Baroda city are monitored and operated from a centralized

SCADA/DMS system. The SCADA/DMS system is built on Siemens Sinaut Spectrum(V4.5)

connected to the RTU’s (make: Siemens SAT TM 1703) at substations with BSNL leased

line(2Mbps).And the same system is connected to 21 FRTUs (make: Siemens SAT TM 1703) which

are located in the 21 RMU location. The connectivity to the FRTU is BSNL ADSL with broad band

speed. The RTU and FRTU is communicating with the main control center through IEC-60870-104

Protocol. There are MFTs installed in the Substation feeders for fetching the analog data of the

feeders and those data is sending to the RTU by using modbus RS485 loop.

Figure 1: Existing system overview

Page 6: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 6 of 16

2.1.1. SCADA/DMS Control Centre Architecture at MGVCL (Baroda)

Figure 2: Existing SCADA/DMS Control room Architecture

SCADA/DMS at the control centre consists of SCADA servers, ISR server, DMS server,

Communication server and Development server. All the servers except Development and ISR are

working in the Hot-Standby mode. There is operator workstation for the dispatchers. The

communication servers are dedicated for data fetching from RTU and FRTUs. The data processing,

monitoring and control are doing by the ISR servers (SCADA servers).The data will be storing in the

ISR server. The DMS server is handling all the DMS application and related data processing.

100Mbps dual redundant LAN. The switches are DX2811 from DAX networks.

Sl.No Hardware Manufacturer Quantity Interface

1 Work

stations(Dual

monitor)

SUN 3 Nos.

2 Servers(Redu

ndant)

IBM 8 Nos

3 RTU Siemens SAT 15 Nos. IEC104

4 FRTU Siemens SAT 21Nos. IEC104

5 Meters

(MFTs)

At all 15

substations

MODBUS

Table 1: Hardware equipments at existing control centre

2.2. Existing ERP (e-Urja) in all the DISCOMs

In 2008 GUVNL (Gujarat Urja Vikas Nigam Limited) and its subsidiary companies started using

ERP solution, named “e-Urja” project, which is being implemented with all integrated modules first

time in power utility sector in India across wide spread area of Gujarat. The e-Urja, is the name given

to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is

Page 7: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 7 of 16

implemented in all the seven companies for delivering efficient and effective services to the END

consumers.

ERP Modules:

i. HR Modules

• Employee Self Service

• Manager Self Service

• HRMS Manager

• Payroll

ii. Finance Modules

• Accounts Payable

• Accounts Receivable

• Fixed Asset

• Fund / Cash Management (Loans, bill discounting, cash flow analysis)

• General Ledger

• Fuel Accounting

iii. Technical Modules

• Projects Tracking & Costing

• Customer Relationship Management

• Enterprise Asset Management (Equipment Maintenance)

• Procurement

• Inventory

• Order Management (Scrap and Ash Disposal)

• OPM (Operations)

• Network Analysis solution

iv. Others

• Energy billing

• Quality-Lab/Environment

• Legal

• Oracle Collaboration Suite

• Trading Solution

Page 8: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 8 of 16

2.3. R-APDRP IT System under implementation

The Ministry of Power, Govt. of India has sanctioned RAPDRP PART-A IT implementation projects

schemes against DPRs of eligible towns under the distribution companies MGVCL, UGVCL,

PGVCL and DGVCL in Gujarat. The implementation project contract is already awarded to ITIA

including R-APDRP approved. The system implementation is in progress. The sanctioned scheme

mainly comprises of the following functional items.

� Meter Data Acquisition

� Energy Audit

� New Connection

� Disconnection & Dismantling

� GIS based customer Indexing and asset mapping

� GIS based integrated network analysis module

� Centralized Customer Care Services

� Management Information System (MIS)

� Web Self Service

� Identity and Access Management system

� System Security Requirement

� Development of Commercial Database of Consumers

� Billing

� Collections

� Metering

� Asset Management

� Maintenance Management

Proposed solution is an integrated single platform based system, which caters to various business

stacks through single window. IT user will need to authenticate him to access the applications. Based

on his profile he will be shown the applications for which he is authorized. Portal will provide the

common front-end for all applications. Providing the solution for all the modules including the

optional modules as per below table. Other than GIS application all integrated over middleware and

GIS have network model and geographical information.

Page 9: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 9 of 16

Middle Tier Database Tier

Presentation Tier

Desktop

users

Mobile

users

Web

users

Laptop

users

External systems

IVR

Aud

iting

Service

s

Rep

ortin

g Service

s

Service Lifecycle M

anagement

Service G

overnance Processes

Business Integration S

ervices

Data Integration Services

GIS Data Store

Application

Logging

Services

Business

Exception

Management

Job

Scheduling,

Alerts,

Reminders

Session

Tracking

App

lication an

d Infra Mon

itorin

g Service

s

Queue

Management

Transaction

Management

Metadata

Management

Web Self Service Portal

External Business Services (Web services)

Application Services

Internet Portal

Content Management / Portal Services

Content /

Document

Management

Business Process Orchestration

Business Services

/ Implementation Logic

Event

Management

Desktop Application

Content Delivery Platform (Desktops, Mobile, Web browser etc)

Automated

Meter

GIS

Kiosk

Online Data Store Operational Data Store Analytical Data Store

Meter

ReadingBilling

CollectionMMNew

Connection

Disconnection &

Dismantling

CCS

Energy

Audit

Meter Data

AcquisitionCommercial

Database Creation

GIS

Token

dispenser

machine

Enterprise m

anagement services(E

mail, IV

R, etc)

MIS

MDM

Application

server services

Authe

ntication

Autho

rization

SS O

Provision

ing

SCADA

MIS

Application Tier

Figure 3: Reference application architecture of IT system

In addition to above software functional modules, IT Implementation Agency ( ITIA) is

providing following facilities to utility as a part of implementation.

i. Establishment of Data Center at Baroda city

ii. Establishment of Disaster Recovery Center at Baroda

iii. GPS based GIS survey in the identified towns under R-APDRP

iv. Establishment of LAN, MPLS-VPN and other Networking in the identified

towns

3. SCADA/DMS system integrations with other existing SCADA and IT

system

As explained in the section 8 there are different IT/ERP and SCADA/DMS systems existing in utility.

The proposed solution has to share data with these applications. Opportunities of utilizing the

existing or planned infrastructures of the Utility shall be explored and utilized during implementation

of SCADA/DMS system. Space is available at the Baroda city (MGVCL) existing control room for

installing new SCADA/DMS system. Suitability of these spaces along with other requirements of

power supply, cooling, lighting etc. shall be studied by SIA before proposing the utilization to Utility.

Page 10: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 10 of 16

3.1. Existing SCADA/DMS integrations at MGVCL

Existing SCADA/DMS System at Baroda City need to be integrated seamlessly with proposed R-

APDRP system ensuring maximum utilization of available resources at substations as well as control

centre . Best possible options assumed are given below for assisting the SIA, but SIA has to design

the correct integration solution broadly in line with the suggested option according the their proposed

system. However deviations are limited and the purchaser reserves the right to accept or reject the

integration solution proposed by the SIA during technical evaluation. Any additional hardware or

software required for this integration shall be purchased by the bidder.

3.1.1. Integration Option

There are 15 numbers of Substation RTUs and 21 numbers of FRTUs presently connected to the

existing Siemens make SINAUT Spectrum SCADA/DMS. These are communicating with the

control center in IEC 60870-5-104 protocol. Redundant communication server interface the RTUs

and FRTUs with the SCADA/DMS servers. Successful bidder shall integrate the existing system with

the new R-APDRP control center to extend all functionalities to the existing locations of the network.

A suggested integration method is given below:

Establish connectivity between Communication FEP servers of new R-

APDRP SCADA/DMS with the existing communication servers. Real time data communication

between the systems shall be established using any standard protocol for achieving read and write

functions from the R-APDRP system to the existing 15 RTUs and 21 FRTUs. Any hardware/software

addition required for the communication between the systems shall be done by the bidder. Selection

of protocol and overall integration shall be done in such a way that all performance and functional

requirements of the complete system are achieved as specified in the MTS. Suggested integration

architecture is given in Appendix B for the reference. Successful bidder has to execute any upgrade

or modifications required in the existing RTU /FRTU hardware/software to ensure that all signals are

connected to the RTU or FRTU for fulfilling all the DMS function as per the MTS. The exiting

SCADA/DMS signal list is given in the Appendix-A.

3.2. Integration with R-APRDP IT System

SCADA/DMS system shall exchange data with IT system using CIM/XML and IEC 61968 series of

standards. The system shall utilize an IEC 61968 and IEC 61970 compliant interface. The system

shall enable export of all data via a CIM-XML interface and shall utilize modeling from IEC 61968

as appropriate. This data exchange shall be done using SOA/ESB Enterprise Services Bus already

provided by ITIA, over Open XML Models defined by CIM/XML.

Data exchange between IT system and SCADA/DMS shall be over model neutral messaging services

and CIM/XML model based data exchange for real-time or historical data will be used. The following

standards as applicable will be used to achieve the above requirements: Messaging interfaces shall be

based on model neutral interfaces based on the IEC 61970-40X series for access to real-time and

historical data and use the IEC 61968-3 and IEC 61968-9 standards for messaging interfaces that are

model dependent for network operations and metering respectively. More over implementation shall

be based on the EPRI specification document, “Enterprise Service Bus Implementation profile

(1018795)”, which defines the implementation profile for IEC 61968 using technologies commonly

found on an Enterprise Service Bus.

Any non IEC-61968-1compliant interface part of the adapter may be interacting with SCADA/DMS

over:

Page 11: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 11 of 16

� ICCP

� OPC

� ODBC

Min data exchanges are

• GIS data exchange between IT and SCADA/DMS

The GIS survey of the entire city distribution is conducted and saved as a part of IT

implementation. The updated GIS data is available in the IT GIS server. The same GIS data is

using for the SCADA/DMS application. The data exchange shall be in a common modem

(CIM-XML) data exchange format. The coding using for each distribution asset should be

same in all the application (IT, ERP, SCADA/DMS) in order to avoid the use of adaptors for

exchanging the data

• Breaker status data exchange

All the substation /RMU Breaker status, Tripping details, Tripping time and date will be

available in the Breaker status table associated with the SCADA/DMS application database.

This data has to exchange with the Customer care system of the IT part. This will be on

demand or by exception exchange. This information exchange also is in a common model

format like CIM.

• Daily Energy data.

The daily energy data of each feeder shall be stored in the SCADA/DMS database. This data

will be shared with the billing system of IT part. This Exchange will be on demand or by

daily.

• Load Priority table The SCADA/DMS have load feeder data containing Breaker name, number of consumers

connected to each breaker and load priority .This database will be shared by IT and

SCADA/DMS. The load priority information will be updated by the SCADA/DMS and

consumer data will be updated by the IT

3.3. Integration with SLDC System

Integration with State Load Dispatch centre (SLDC) for the state for exchanging relevant real time

data & scheduling data over ICCP shall be done by SIA. The data which has to be shared with SLDC

will be giving by the Utility at the time of implementation .Data requirement and bilateral agreement

with SLDC shall be done by the utility. SIA shall demonstrate the data integration to both owners of

SLDC and each DISCOM for approval of the function. Any hardware or software requirement shall

be met by the SIA.

Page 12: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd, Baroda (MGVCL) Page 12 of 16

Page 13: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd (MGVCL)

Page 13 of 16

APPENDIX A: EXISTING SCADA/DMS SIGNAL LIST

Panel Type/Breaker Type Signal Description Signal

Digital Inputs (DI):

CB-OFF

CB-ON DPI

BUS ISO ON SPI

SPRING CHARGE SPI

TRIP CKT HEALTHY SPI

O/C RPH, BPH & E/F OPERATED(MASTER TRIP) SPI

LINE ISO ON SPI

66 KV LINE

EARTH ISO ON SPI

CB-OFF

CB-ON DPI

BUS ISO ON SPI

SPRING CHARGE SPI

66/11 kV TRANSFORMER

TRIP CKT HEALTHY SPI

O/C RPH, BPH & E/F OPERATED(MASTER TRIP) SPI

WTI TRIP SPI

OTI TRIP SPI

PRV TRIP SPI

MOG ALARM SPI

BUCHOLZ ALARM SPI

BUCHOLZ TRIP SPI

OLTC PRV TRIP SPI

OLTC BUCHOLZ TRIP SPI

DIFF.TRIP SPI

INTER.TRIP SPI

CB-OFF

CB-ON DPI

SPRING CHARGED SPI

TRIP CKT HEALTHY SPI

AC FAIL SPI

DC FAIL SPI

MASTER TRIP SPI

R PT HEALTHY SPI

Y PT HEALTHY SPI

11 kV MAIN

B PT HEALTHY SPI

Page 14: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd (MGVCL)

Page 14 of 16

CB-OFF

CB-ON DPI

SPRING CHARGED SPI

TRIP CKT HEALTHY SPI

11 kV FEEDER

MASTER TRIP SPI

Digital Outputs (DO):

CB TRIP 66 kV LINE

CB CLOSE DPO

CB TRIP 66/11 kV TRANSFORMER

CB CLOSE DPO

CB TRIP 11kV MAIN

CB CLOSE DPO

CB TRIP 11kV FEEDER PANEL

CB CLOSE DPO

Raise - P1 RTCC / OLTC

Lower - P2 DPO

Analog Input (AI):

66 kV LINE Vp-p,Vp-n,Ir,Iy,Ib,Freq,PF,P, Q, Active Energy Import, Active Energy Export as per PGCIL standard / order.

AI

66/11 kV TRANSFORMER Vp-p,Vp-n,Ir,Iy,Ib,Freq,PF,P, Q, Active Energy Import, Active Energy Export as per PGCIL standard / order.

AI

11kV MAIN Vp-p,Vp-n,Ir,Iy,Ib,Freq,PF,P, Q, Active Energy Import, Active Energy Export as per PGCIL standard / order.

AI

11kV FEEDER PANEL Vp-p,Vp-n,Ir,Iy,Ib,Freq,PF,P, Q, Active Energy Import, Active Energy Export as per PGCIL standard / order.

AI

RTCC / OLTC Vp-p,Vp-n,Ir,Iy,Ib,Freq,PF,P, Q, Active Energy Import, Active Energy Export as per PGCIL standard / order.

AI

RTCC#1 TR # OLTC Position as per PGCIL standard / order. AI

Page 15: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd (MGVCL)

Page 15 of 16

APPENDIX B: RECOMMENDED INTEGRATION ARCHITECTURE

Figure 4: Recommended Integration architecture

Page 16: Request For Proposal (RfP) Office/02052011/Volume... · to Oracle (Oracle’s E-Business Suite 11i )based Enterprise Resource Planning (ERP) suite, which is . Bid Document for Appointment

Bid Document for Appointment of SCADA/DMS Implementation Agency by Gujarat DISCOMs

Madhya Gujarat Vij Company Ltd (MGVCL)

Page 16 of 16