1
Background
Solid Waste is considered to be one of the most serious environmental and health challenge confronting
both rural and urban India. A typical reason for this is the prevalent attitude of communities, households
and institutions who generate the waste but take no responsibility for its management.
In response to the waste management challenge, ITC through its Social Investments Programme,
Mission Sunehra Kal has designed, and implemented the Decentralised Solid Waste Management
(DSWM) programme in several locations with the end objective of “minimal waste to landfill”. The
focus is on maximizing processing and recycling of waste at source by the generators themselves
through four models designed for large cities, towns, villages and temples and based on the principle of
“My Waste, My Responsibility”. A key differentiator is the goal of minimising waste to landfills rather
than the dominant but unsustainable model of collection and dumping of waste, even if it is at designated
sites. The approach targets:
Sustainable management of total waste – both bio-degradable and non-bio-degradable –
by making communities responsible for their waste at source;
Execution of projects in partnership with Municipal Corporations / Gram Panchayats to
leverage existing infrastructure / facilities including land, utilities and transportation;
Behaviour change through Information, Education, Communication (IEC) to drive source
segregation of waste at the household level;
Social and financial inclusion and HDI indicators of the rag-pickers and waste collectors,
and marginalized communities including women, involved in the project; and
Financial viability through revenue generation by household levy and sale of compost and
recyclables.
The SWM Programme is aligned to Sustainable Development Goals 6 (Clean Water & Sanitation),
SDG 11 (Sustainable Cities and Communities) and SDG 12 (Sustainable Consumption & Production),
as well as to the Government of India’s flagship Swachh Bharat Mission.
On successful demonstration of the decentralized SWM model of ITC MSK across 17 districts of 9
states in India, the Government of Uttar Pradesh expressed interest in partnering with ITC for
amplification of the programme across different districts of U.P.
In FY 2019-20, ITC Mission Sunehra Kal signed a MoU with the Urban Development Department
of Government of Uttar Pradesh for 3 years’ duration to build capacity of 652 Urban Local Bodies
(ULBs) of the state, to enable them to implement the community driven Decentralized Solid Waste
Management Programme. ITC will provide technical support to ULBs and will build capacity of
the officials of these ULBs in planning and implementation of the decentralised SWM programme.
The training will follow a cascading approach for which Super Trainers from ITC and NGO
partners will train Master Trainers of selected ULBs who will further train the rest of the ULBs’
officials.
This entire process will follow a systematic plan comprising multiple phases. The broadly defined
phases are:
1. Partnership Planning Phase
2. Programme Preparatory Phase
3. Training Phase
2
4. Actualization at Field Level
5. Scale up of ITC MSK’s SWM Model
Objective of the Assignment
In this backdrop, ITC has planned to develop a detailed process document on the execution of this
partnership, which may act as a reference document to ITC and other organizations who plan
similar large scale partnerships in SWM or in any other areas in future. The agency is required to
develop a Document that clearly defines, documents and analyses ITC Mission Sunehra Kal’s Solid
Waste Management (SWM) Amplification Programme in Uttar Pradesh. The broadly defined
objectives of this assignment are to:
1. Document the processes that are adopted in this partnership with UP Government so that it
can be used elsewhere in future in such large scale partnerships for operational consistency.
2. Create this as a reference knowledge document for ITC MSK, for future use in amplification
programme.
3. Capture key learnings that have significant bearing on output and outcome.
4. Determine if the processes that are followed are efficient or can be eliminated or changed.
5. Use this document for improving processes adopted in amplification partnership.
Scope of Assignment
The agency will document and critically assess the processes involved and activities undertaken
in ITC MSK’s SWM Amplification Programme during its five phases (as stated above) and
document key learnings at each stage – what worked, what didn’t work, reasons of variance from
original plan, challenges faced in implementation, etc. Based on the analysis of these areas,
recommendations for improvements are to be made by the agency. Brief overview of what these
five phases will entail in terms of documentation and assessment activities to be undertaken by
the agency is detailed ahead. It may be noted that these activities are indicative and may vary as
the programme evolves. The agency engaged for this assignment will be responsible for
documentation of all activities and processes and critically analysing each of the activities and
making future recommendations.
Agencies are required to provide details of the key tasks for each activity listed below, outputs of
each task and its significance, based on their prior experience of similar process documentation
assignments.
1. Partnership Planning Phase:
Activities under Phase 1 Tentative tasks for the agency
1 ITC signed MoU with the
Government of Uttar Pradesh for
amplification of ITC’s
decentralised SWM model in 652
ULBs
Develop understanding on the evolution of the
MoU with focus on the development of the
concept, the advocacy method followed, the
features that appealed to the Government & the
manner in which the MoU and the partnership
project was co-created by ITC and the
government
3
Activities under Phase 1 Tentative tasks for the agency
2 End objective & scope of the
partnership
Clearly highlight the long term, medium term and
short term objectives of the partnerships
3 Role & Responsibilities of each
partner
Document process of finalising the roles &
responsibilities of each partner (including
financial contribution by each partner if it forms
part of the MoU) i.e. ITC, Government of Uttar
Pradesh and partner NGO;
4 Develop Broad road map/ action
plan: identification of other
stakeholders, identification and
selection of ULBs, clustering of
identified ULBs and key drivers
for messaging
Documenting and critically analysing the process
adopted for developing action plan, identification
of stakeholders, identification & selection of ULBs
in different phases, etc.
2. Programme Preparatory Phase:
Activities under Phase 2 Tentative tasks for the agency
1 Project Management Committee:
formation and composition, roles
& responsibilities, review
mechanism, timelines, activities
planned & undertaken;
Documentation and analysis of processes
adopted for formation, assignment of roles &
responsibilities, development of review
mechanism, and understand if the laid down
process was followed, any deviation in the
processes, mid-course corrections if any with
identification of triggers for such changes, etc.
Capturing the processes, analysing it and making
future recommendations.
2 Preparation of Detailed Project
Report (DPR) by the
Implementing Agency in
collaboration with ITC MSK: steps
& approach, activities to be
undertaken, timelines &
milestones, etc.;
Documentation and analysis of processes
adopted in preparation of DPR, person/partner
responsible, timeliness of activities, etc.
Capturing the processes, analysing it and making
future recommendations.
3 Developing of training modules Documentation and analysis of processes
adopted in developing training material, types of
IEC material developed, content of IEC materials,
how was its appropriateness and effectiveness
determined, etc.
4 Identification of Super Trainers Documentation and analysis of processes
adopted in identification of super trainers:
sources for obtaining STs, approach adopted,
criteria for selection, etc.
5 Training of the Super Trainers
(STs)
Documentation and analysis of processes
adopted in training of STs, highlighting best
practices - what worked, learnings & areas for
4
Activities under Phase 2 Tentative tasks for the agency
improvement, analysing effectiveness of IEC
materials, etc.
Capturing the processes, variations, and
analysing it to make future recommendations.
6 Establishment of SWM Resource
Centre: Knowledge Resource
Centre
Documentation and analysis of processes
adopted in conceptualising and establishing the
KRC, its objective, purpose, expected outcomes,
physical attributes, and getting buy-in of the
government, Capturing the process and
variations from plan and analysing it to make
future recommendations.
7 Baseline study initiation –
baseline study to map current
practices of waste management
and quantum of waste generated
will be carried out at the selected
ULBs in direct supervision of ITC
and the NGO partner. Apart from
this, ULB officials will be trained
on how to conduct such baselines
in SWM, which will form a
component of the cascading
training programme.
Capturing the process adopted in baseline study
initiation by different ULBs, variations observed
in processes trained on and actual processes
followed by ULBs, analysing processes and
making future recommendations.
8 Development of Evaluation
Mechanism: evaluation
parameters & indicators;
timelines; evaluation matrix;
frequency of data collection &
analysis, etc.
Documentation of process followed in
development of evaluation matric and critically
analysing its different components;
person/partner responsible, etc. and making
recommendations for future.
3. Training Phase:
Activities under Phase 3 Tentative tasks for the agency
1 Identification of ULB personnel
for training and selecting ULBs for
training in different phases –
Certain logics were used and
processes were designed in
finalising who among the cadres of
ULB officials will be trained as
master trainer and which will be
the ULBs that will be selected in
different phases of training. As per
the design of training cascade
planned, some of the ULBs after
Documentation and analysis of processes
adopted in identification of ULB personnel for
training, approach adopted, criteria for selection,
etc.
5
Activities under Phase 3 Tentative tasks for the agency
training will be developed as
learning hub and officials from
these ULBs will act as master
trainers
2 Training of relevant ULB
personnel from selected 80 ULBs
of AMRUT and Namami Gange
cities
Documentation and analysis of processes
adopted in training of ULB Personnel,
effectiveness of training module, mode of
training, training method, training plan,
timelines, participants feedback etc. highlighting
best practices - what worked & areas for
improvement and making recommendations for
future.
3 Identification of Hub ULBs based
on the agreed Action Plan (MoU &
DPR) including Rapid Baseline
report; and
Documentation of processes adopted, variations
if any from the plan, critical analysis of the
activities and processes and make
recommendations.
4 Training of Master Trainers in
identified and selected Hub ULBs:
identification of Master Trainers,
training module, frequency of
training, effectiveness of IEC
material; feedback from
participants and way forward.
Documentation and analysis of processes
adopted in training of MTs in Hub ULBs,
effectiveness of training module, mode of
training, training method, timelines, periodicity,
participants’ feedback, etc. highlighting best
practices - what worked & areas for improvement
and making recommendations for future.
4. Actualization at Field Level:
Activities under Phase 4 Tentative tasks for the agency
1 Training cascade by Master
Trainers from 80 ULB to other
remaining ULB officials
responsible for waste
management. Once trained these
officials will form Mohalla
Committee,, train them as well as
to Waste Collectors in their
respective ULBs
Documenting and analysing training cascade
plans and processes, training module, training
methodology and frequency, training sessions,
feedbacks, etc. Capturing training effectiveness
and making recommendations, Learning
management system and its effectiveness
2 Post Training, roll out of the
community based decentralized
solid waste management
programme/activities including
infrastructure support & capacity
building;
Documenting and analysing processes adopted in
roll out of the community based decentralized
solid waste management programme.
Highlighting best practices and gaps and making
recommendations for future.
3 Supervision and monitoring of the
Hubs for successful
demonstration:.
Documenting and analysing processes adopted in
supervision and monitoring of the Hubs for
successful demonstration of the activities - steps
6
Activities under Phase 4 Tentative tasks for the agency
taken, monitoring process & methodology,
stakeholder involved, course corrections made as
per original plan, etc. Highlighting best practices
and gaps and making recommendations for
future.
5. Scale up of ITC MSK SWM Model:
Activities under Phase 5 Tentative tasks for the agency
1 Implementation of Hub & Spoke
Model – out of the 80 ULBs which
are trained directly by ITC Super
trainer, 20 will be developed as
learning Hubs with handholding
support. These hubs will
demonstrate best practices and
will act as the proof of concept for
other ULBs. With this hub and
spoke model, decentralised SWM
programme will amplify to all
ULBs of UP
Documentation and analysis of the essential
elements of the model, approach and process of
cascading to other ULBs (Spokes) using the Hub
ULBs, best practices, gaps and recommendations
This will also include analysis of the plan for
cascading to other ULBs, identification of ULBs,
challenges faced, corrective actions taken, review
mechanism placed, monitoring of outcome, etc.
3 Plan to leverage Swachh
Sarvekshan and Swachh Ward
Pratispardha for digitalization
and Reward & recognition,
respectively.
Documentation and analysis of the plan and
activities undertaken for leveraging the two
schemes, outcome of the activities, etc. and
making recommendations.
Apart from what, why, where, who and how, at every stage, agency should also compare processes
that were designed v/s actually followed to understand the deviation in process, and record the
reasons of deviations and outcomes of such deviations compared to standard defined processes.
Delays, if any should also form part of the documentation activity with reasons. Also, learning at
every stage needs to be documented by the agency.
Broadly defined Key Tasks:
a. Detailed documentation of the entire implementation process for the entire duration of the
amplification programme, which is three years. However, duration will depend on timely
completion of activities. Therefore, agencies must take into account that their engagement
will be from initiation to completion of the programme deliverables, irrespective of the
tenure.
b. Critical analysis of each of the activities undertaken during the implementation of the
partnership in terms of effectiveness, efficiency, timeliness, etc. Suggesting ways of
improvement for future programmes.
c. Documentation of learnings at every stage of project life cycle so that it can be referred by
others implementing similar amplification projects.
7
d. Documentation of Best Practices/Case Studies (drivers of success in the identified ULBs).
e. Primary data collection and analysis of data collected from ULB representatives, Ward
representatives & other government officials pertaining to their roles, responsibilities,
participation, etc. and for taking their feedback on different components/ activities of the
programme.
f. Documentation and analysis of the processes followed, challenges identified & faced,
solutions implemented, what worked and what didn’t, reasons for variance and
recommendations for effective implementation & way forward.
Methodology
Methodology will mainly include desk review and primary data collection.
I. Desk review
The agency will carry out a comprehensive desk review for developing an understanding
of ITC’s SWM programme & its amplification, approach, operational modalities, etc. The
agency should also compare it with similar programmes and other large-scale successful
amplification partnerships in development sector implemented by other organizations in
India. Based on the comparative analysis, suggestions and recommendations to improve
processes at every stage/phase of implementation should be made.
II. Primary Data Collection
a. Key Person Interview (KPI) with various stakeholders:
ITC Limited Team (HO level, Regional Manager, Programme Managers,
Programme Officer/Programme Executive);
Implementing NGOs
Other ITC Partners: Communication developing partner
Government Officials (ULB representatives, GoUP Project Nodal Officer, other
involved officials), including PMC members
Super Trainers and Master Trainers (MTs)
Mohalla Committee members, Households, Supervisors and Waste Collectors
involved in the programme
Any other identified key stakeholder
b. Capturing Real-Time Activities for each step i.e. planning, preparatory, training,
actualization and scale-up.
In view of the scope of work and deliverables, agencies are required to suggest appropriate
detailed methodology, implementation plan, agencies’ experience & expertise in similar
assignments, team deployed along with their experience (years) and expertise in similar
assignments and their role & responsibilities in the proposed assignment.
Timeline
The overall timeline for the entire assignment is 3 years; however, the timeline of the assignment
is based on the above mentioned 5 milestones/phases.
8
S.
No. Task Timeline Note
1. Planning Phase 4- 5 months a) Desk Review
b) Key Interaction with ITC Team
2. Preparatory Phase 6-7 months a) Key Interaction with ITC Team at all levels;
b) Visit to the field to understand the
implementation Model
3. Training Phase During the
Training
a) Attending the training sessions;
b) Interaction with the involved stakeholders-
trainers & participants
4. Actualization at Field
Level
6-7 months a) Key Interaction with all Stakeholders;
b) Field visit to sample locations to capture
real time implementation process
5. Scale up to other
ULBs
To be decided
Outputs of the Assignment
Phase-wise, quarterly reports and yearly reports during the entire duration of the
programme for sharing of progress and feedback
Final report – compilation of all phases, documentation of processes, photographs, analysis
on different components of the programme and recommendations
The content and structure of the reports shall be decided at a later stage in consultation with ITC
MSK team.
Implementation Plan
The agency is required to propose a detailed implementation plan for the assignment with
activities to be carried out, time lines, outputs of each activity, etc. The implementation plan
proposed by the agency will be finalised at the time of inception in consultation with ITC MSK
team.
Team Composition
The agency is required to present the structure of the team proposed for the assignment with
snapshot on years of experience, areas of expertise, roles and responsibilities assigned to each
of the team members. Detailed CVs are to be attached as annexure.
Organizational Expertise
i. The agency should hold experience in carrying out similar assignments in process
documentation – concurrent and post completion documentation.
ii. Agency should highlight their experience in impact assessments, multi-stakeholder
engagements, large-scale capacity building programmes, consultations, etc.
iii. Agencies should highlight their experience in carrying out assignments in solid waste
management, WASH and public health
9
iv. Agency and proposed team members should have experience in desk review and primary
data collection, documentation, collation, compilation and analysis.
v. The agency should deploy a gender balanced team, having experience and expertise in
carrying out assignments of similar nature with a team leader having rich desired
experience.
Expected Deliverables
I. Inception report to be shared within 15 days from the date of signing the contract in
consultation with ITC.
II. Periodical sharing and presentation of documentation reports on each phase of the
programme, along with analysis of design, implementation, execution of the programme,
etc., as discussed in preceding sections.
III. Draft documentation report to be shared covering all phases. Report to be finalized after
incorporating changes suggested by ITC.
IV. The final report will be submitted in 2 hard copies (A4 Size preferably with bond paper
and coloured prints) and soft copy in form of CDs/pen drives. The agency to deliver a final
presentation to ITC explaining the findings, recommendations and way forward based on
the documentation assignment.
V. The data and information collected during the assignment, including photographs, will be
the property of ITC Limited and the agency shall not use it in any form without the written
permission from a competent authority in ITC.
Payment Conditions
The payment of fees will be made on job completed basis of the agreed sum, subject to
achievement of mutually agreed progress milestone. The agency may submit its proposal on
terms and conditions for payment.
Rejection Clause
ITC reserves the right to accept or reject any and all proposals, to negotiate contract terms with
various proposers, and to waive requirements at its sole discretion.
ITC also reserves the right to reject the offer without assigning any reason if found that the party
has submitted false information or found to promote vendors.
Confidentiality Clause
The agency will abide by confidentiality and non-discloser agreement to ensure that no
information shared with the agency or collected by the agency during the assignment are treated
strictly as confidential and the agency will ensure that there is no breach of confidentiality. The
information will not be used by the agency for any purpose other than the activities and
deliverables under the assignment, nor will it be shared by the agency to any person or entity
outside ITC.
10
Contact Details
For submission of RFP or any further queries all correspondence may be directed to:
11
Annexure 1: Format for Submission of Proposal Plan
1. Agency Details
a) Name of agency, address, Web site address and telephone number.
b) Number of the principal office that will manage this project.
c) Brief background of the agency and history. Include years in the sector/business and
number of employees and details of projects handled.
d) Experience details highlighting the experience and expertise of the agency relevant to
the current assignment.
e) A copy of the agency’s most recent Annual Report or Financial Statement, and/or any
other documentation that demonstrates financial solvency to be attached as annexure.
f) Any additional information that agency considers to be relevant.
2. Technical Methodology
a. Detailed methodology for undertaking the assignment including technical aspects;
strategies; tools & techniques to be used for collecting, collating and analysing the data,
etc.
b. Agencies may add any additional relevant information in this format and under
methodology section.
3. Implementation Plan and Team Structure
a. Detailed implementation plan with all the phases, activities and timelines
b. Team structure and snapshot of experience, expertise, roles and responsibilities
assigned for the proposed assignment.
4. Please specify the primary Executive point of contact for the work stated in this RFP.
12
Annexure 2: Format for Submission of Financial Estimate
Sl. No.
Particulars UoM Numbers Unit Cost
(Rs.) Total
Cost (Rs.)
1 Survey/Data Collection Charges Rs.
a. Key Informant Interviews Nos.
b. Focused Group Discussions Nos.
c. Consultations/Meetings* Nos.
d. Case Studies Nos.
e. Any Other…….. Nos.
2 Service Charges Rs.
a. Printing charges Rs.
b. Stationary, telephone, and other miscellaneous expenses
Rs.
c. Others……. Rs.
3 Professional Charges Rs.
a. Resource Type 1: Person-days
b. Resource Type 2: Person-days
c. Resource Type 3: Person-days
d. Resource Type 4: Person-days
e. Resource Type 5: Person-days
4 Estimate excluding travel (1+2+3)
Rs.
5 Travel Expenses Rs.
a. Outstation travel Person-days
b. Local Travel Person-days
c. Accommodation Nights
d. Food Days
Total Estimate with travel (4+5) (GST rates will be extra and applied as prevailing at the time of invoicing)
Rs.
Timeline Weeks
* Meetings and Consultations will be done with stakeholders for data collection and validation.
Note:
The agency will submit final bills as per the agreed unit rates as mentioned above.
In case of Travel, Boarding and Lodging Expenses, costs will be reimbursed based on
submission of actual bills. The upper limit for reimbursement to be restricted to the
budgeted limit mentioned in the estimate.