OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
MINISTRY OF TERRITORIAL ADMINISTRATION AND DECENTRALIZATIONChapitre/Head
07MINISTERE DE L'ADMINISTRATION TERRITORIALE ET DE LA DECENTRALISATION
IDENAU: Reprogrammation des travaux de rénovation du centre d'état civil principal 9 700 9 700IDENAU: Reprogramming renovation works of the main civil status registery
IDENAU2 017
LIMBE 1er: Reprogrammation des travaux de rénovation du centre d'état civil principal 5 400 5 400LIMBE I: Reprogramming renovation works of the main civil status registery
LIMBE2 017
Idenau : Réhabilitation de la Sous-Préfecture 25 000 25 000Idenau: Rehabilitation of the Sub-Divisional Office
IDENAU2 017
Limbé III: Reprogrammation des travaux de construction de la résidence du Sous-Préfet 50 000 50 000Limbe III: construction of the Sub-Divisional officer's residence
LIMBE III2 017
Total Chapitre/Head MINATD 90 100 90 100
MINISTRY OF PUBLIC CONTRACTSChapitre/Head
10MINISTERE DES MARCHES PUBLICS
DR MINMAP SUD-OUEST: Sécurisation du site devant abriter la délégation 4 000 4 000RD MINPC South West : Sécuring the site to house the delegation
Buea2 017
DR MINMAP SUD-OUEST: Etudes géotehnique du site devant abriter la Délégation 12 000 12 000RD MINPC South West : Geotechnical studies of sites to house the delegation
Buea2 017
Total Chapitre/Head MINMAP 16 000 16 000
MINISTRY OF DEFENCEChapitre/Head
13MINISTERE DE LA DEFENSE
COPALCO: Prolongement du Slipway d'Issongo 25 000 25 000COLPALCO:Continuation of Slipway
ISSONGO2 017
EPAEM: Achèvement construction Salle de cours 17 000 17 000EPAEM: Completion construction classroom
ISSONGO2 017
Poste de Gendarmerie de BIMBIA: Travaux de construction du poste 60 000 30 000BDE GRIE BIMBIA : Construction of CP
BIMBIA2 017
Total Chapitre/Head MINDEF 102 000 72 000
MINISTRY OF ARTS AND CULTUREChapitre/Head
14MINISTERE DES ARTS ET DE LA CULTURE
Réhabilitation du musée du palais de Mokunda à Buéa 3 000 3 000Rehabilitation of the Bakweri Palace Museum in MOKUNDA Buea-Town
BUEA TOWN2 017
Total Chapitre/Head MINAC 3 000 3 000
MINISTRY OF BASIC EDUCATIONChapitre/Head
15MINISTERE DE L'EDUCATION DE BASE
GNS Ekona Yard - Construction des blocs maternels - Commune de Muyuka 25 000 25 000GNS Ekona Yard - Construction of nursry blocks - Muyuka Council
MUYUKA2 017
GNS Ekona Yard - Equipement d'un bloc maternel avec 40 tablettes, 120 petites-chaises, 6 tableaux sur chevalets, (02 tables + 04 chaises) pour enseignants - Communede Muyuka
2 000 2 000
GNS Ekona Yard - Equipment of a nursry block with 40 tablets, 120 small-chairs, 6 tableson trestles, (02 tables + 04 chairs) for teachers - Muyuka Council
MUYUKA
2 017
GS OF WOVIA : Réhabiliter les écoles Primaires COMMUNE DE LIMBE II 3 500 3 500GS OF WOVIA : Rehabilitating Primary Schools LIMBE II COUNCIL
LIMBE II2 017
GS OF BATOKE: Construire les Blocs Latrines dans les écoles primaires COMMUNE DELIMBE II
3 500 3 500
GS OF BATOKE: Blocks build latrines in primary schools LIMBE II COUNCIL
LIMBE II2 017
GS MAN O'WAR BAY: Construire les Blocs Latrines dans les écoles primairesCOMMUNE DE LIMBE III
3 500 3 500
GS MAN O'WAR BAY: Blocks build latrines in primary schools LIMBE III COUNCIL
LIMBE III2 017
GS ENYENGE : Construction d'un bloc de deux (02) salles de classe COMMUNED'IDENAU
17 000 17 000
GS ENYENGE : Construct the bloc of two (02) classroom IDENAU COUNCIL
WEST COAST2 017
GS IJAW MABETA : Construction d'un bloc de deux (02) salles de classe COMMUNEDE LIMBE III
20 000 20 000
GS IJAW MABETA : Construct the bloc of two (02) classroom LIMBE III COUNCIL
LIMBE III2 017
1
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
GS WOVIA : Construction d'un bloc de deux (02) salles de classe COMMUNE DE LIMBEII
20 000 20 000
GS WOVIA : Construct the bloc of two (02) classroom LIMBE II COUNCIL
LIMBE II2 017
GS MOKUNDA : Construction d'un bloc de deux (02) salles de classe COMMUNE DELIMBE II
20 000 20 000
GS MOKUNDA : Construct the bloc of two (02) classroom LIMBE II COUNCIL
LIMBE II2 017
GBPS MABETA NEW LAYOUT : Construction d'un bloc de deux (02) salles de classeCOMMUNE DE LIMBE I
20 000 20 000
GBPS MABETA NEW LAYOUT : Construct the bloc of two (02) classroom Limbe Icouncil
LIMBE I
2 017
GS BOANDA : Construction d'un bloc de deux (02) salles de classe COMMUNE DEBUEA
20 000 20 000
GS BOANDA : Construct the bloc of two (02) classroom Buea Council
BUEA2 017
EP BILINGUE MUEA : Construction d'un bloc de deux (02) salles de classe COMMUNEDE BUEA
20 000 20 000
EP BILINGUE MUEA : Construct the bloc of two (02) classroom Buea Council
BUEA2 017
EP BILINGUE MUEA : équiper les écoles publiques programmées en tables bancsCOMMUNE DE BUEA
1 800 1 800
EP BILINGUE MUEA : equip public schools scheduled benches tables Buea Council
BUEA2 017
GS BOANDA : équiper les écoles publiques programmées en tables bancs COMMUNEDE BUEA
1 800 1 800
GS BOANDA : equip public schools scheduled benches tables Buea Council
BUEA2 017
GBPS MABETA NEW LAYOUT : équiper les écoles publiques programmées en tablesbancs COMMUNE DE LIMBE I
1 800 1 800
GBPS MABETA NEW LAYOUT : equip public schools scheduled benches tables Limbe Icouncil
LIMBE I
2 017
GS WOVIA : équiper les écoles publiques programmées en tables bancs COMMUNE DELIMBE II
1 800 1 800
GS WOVIA : equip public schools scheduled benches tables LIMBE II COUNCIL
LIMBE II2 017
GS MOKUNDA : équiper les écoles publiques programmées en tables bancs COMMUNEDE LIMBE II
1 800 1 800
GS MOKUNDA : equip public schools scheduled benches tables LIMBE II COUNCIL
LIMBE II2 017
GS IJAW MABETA : équiper les écoles publiques programmées en tables bancsCOMMUNE DE LIMBE III
1 800 1 800
GS IJAW MABETA : equip public schools scheduled benches tables LIMBE III COUNCIL
LIMBE III2 017
GS ENYENGE : équiper les écoles publiques programmées en tables bancs COMMUNED'IDENAU
1 320 1 320
GS ENYENGE : equip public schools scheduled benches tables IDENAU COUNCIL
WEST COAST2 017
GPS DIBANDA: Acquisition des équipements dans les écoles pilotes(Tricycles,Planchesde lecture,Kits de matériels,Béquilles) COMMUNE DE BUEA
4 450 4 450
GPS DIBANDA: Acquisition of equipment in the pilot schools (Tricycles, reading boards,kits of equipment, Crutches) Buea Counci
BUEA
2 017
GPS BUEA TOWN GII: Acquisition des équipements dans les écolespilotes(Tricycles,Planches de lecture,Kits de matériels,Béquilles) COMMUNE DE BUEA
4 450 4 450
GPS BUEA TOWN GII: Acquisition of equipment in the pilot schools (Tricycles, readingboards, kits of equipment, Crutches) Buea Council
BUEA
2 017
EP LES CHAMPIONS FCB LIMBE: Acquisition des équipements dans les écolespilotes(Tricycles,Planches de lecture,Kits de matériels,Béquilles) COMMUNE DE LIMBE
4 450 4 450
EP LES CHAMPIONS FCB LIMBE: Acquisition of equipment in the pilot schools(Tricycles, reading boards, kits of equipment, Crutches) Limbe I council
LIMBE I
2 017
DREB SUD-OUEST : Collecte de données statistiques sur la Scolarisation et l'Educationde Base Non Formelle dans les 10 régions
4 000 4 000
DREB SOUTH-WEST : Collection of statistical data on the enrollment and non-formalbasic education in the 10 regions
BUEA
2 017
GS BOANDA : Construction d'un logements d'astreinte pour enseignant COMMUNE DEBUEA
14 500 14 500
GS BOANDA : Construction of one staff house for Buea Council
BUEA2 017
réhabilitation de la DREB Sud-ouest 20 000 20 000rehabilitation of DREB Sud-ouest
BUEA2 017
GS IJAW MABETA : Equipement en deux bureaux de maitre dans les EP COMMUNEDE LIMBE III
250 250
GS IJAW MABETA : Equipment two offices for teachers in EP LIMBE III COUNCIL
LIMBE III2 017
2
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
GS ENYENGE : Equipement en deux bureaux de maitre dans les EP COMMUNED'IDENAU
250 250
GS ENYENGE : Equipment two offices for teachers in EP IDENAU COUNCIL
WEST COAST2 017
GS WOVIA : Equipement en deux bureaux de maitre dans les EP COMMUNE DE LIMBEII
250 250
GS WOVIA : Equipment two offices for teachers in EP LIMBE II COUNCIL
LIMBE II2 017
GS MOKUNDA : Equipement en deux bureaux de maitre dans les EP COMMUNE DELIMBE II
250 250
GS MOKUNDA : Equipment two offices for teachers in EP LIMBE II COUNCIL
LIMBE II2 017
EP BILINGUE MUEA : Equipement en deux bureaux de maitre dans les EP COMMUNEDE BUEA
250 250
EP BILINGUE MUEA : Equipment two offices for teachers in EP Buea Council
BUEA2 017
GS BOANDA : Equipement en deux bureaux de maitre dans les EP COMMUNE DEBUEA
250 250
GS BOANDA : Equipment two offices for teachers in EP Buea Council
BUEA2 017
GBPS MABETA NEW LAYOUT : Equipement en deux bureaux de maitre dans les EPCOMMUNE DE LIMBE I
250 250
GBPS MABETA NEW LAYOUT : Equipment two offices for teachers in EP Limbe Icouncil
LIMBE I
2 017
Total Chapitre/Head MINEDUB 240 220 240 220
MINISTRY OF HIGHER EDUCATIONChapitre/Head
18MINISTERE DE L'ENSEIGNEMENT SUPERIEUR
UB-COT: Construction d'un bloc Administratif et Pedagogique combiné (en cours) 200 000 200 000UB-COT: Construction of a combined Administrative and Pedagogic Block
Buéa2 017
UB-COT: Supervision technique 20 000 20 000UB-COT: Technical supervision
Buéa2 017
UB- FET: Construction d'un bloc Administratif et Pedagogique combiné (en cours) 130 000 130 000UB-FET: Construction of a combined Administrative and Pedagogic Block
Buéa2 017
UB-FET: Supervision Technique 13 000 13 000UB-FET: Technical supervision
Buéa2 017
UB-ASTI: Construction d'un bâtiment administratif, academique et pedagogique 220 000 220 000UB-ASTI: Construction of administrative, academic and pedagogic building
Buéa2 017
UB-ASTI: Supervision technique 22 000 22 000UB-ASTI: Technical Supervision
Buéa2 017
UB-FS:Construction des bâtiments 50 000 50 000UB-FS:Construction of building
Buéa2 017
UB-FS: Achat équipements et mobiliers 50 000 50 000UB-FS: Purchase of equipment and furniture
Buéa2 017
UB: Etudes architecturales et d'ingénierie de cosntruction d'un bâtiment de recherche 30 000 30 000UB: Architectural and engeneering studies of construction of building
Buéa2 017
Total Chapitre/Head MINESUP 735 000 735 000
MINISTRY OF SCIENTIFIC RESEARCH AND INNOVATIONChapitre/Head
19MINISTERE DE LA RECHERCHE SCIENTIFIQUE ET DE L'INNOVATION
Diffusion des variétés améliorées de haricots aux agriculteurs dans la région du Sud-Ouest
10 000 10 000
Disseminating of Improved Bean Varieties to Farme
BUEA2 017
Amélioration de l'élévage de poissons d'eau douce dans la région du Sud-Ouest 10 000 10 000Enhancing freshwater fish farming in Fako Division
BUEA2 017
Acquisition de matériel de bureau au CRRI-Sud Ouest 4 500 4 500Acquisition of Office Equipment for CRRI-South West
BUEA2 017
Total Chapitre/Head MINRESI 24 500 24 500
3
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENTChapitre/Head
22MINISTERE DE L'ECONOMIE, DE LA PLANIFICATION ET DE L'AMENAGEMENT DU TERRITOIRE
DR SUD-OUEST: Appui au comité régional de suivi du BIP 10 000 10 000RD SOUTH-WEST: Support to the PIB follow-up regional Committee
BUEA2 017
DR SUD-OUEST: Appui aux comités communaux de suivi du BIP. 31 000 31 000RD SOUTH-WES: Support to the PIB follow-up Council Committees
BUEA2 017
DD FAKO: Appui au comité départemental de suivi du BIP 8 000 8 000DD FAKO: Support to the PIB follow-up Divisional Committee
BUEA2 017
DD FAKO: Suivi administratif du BIP 2 500 2 500DD FAKO: Admisnistrative monitoring of PIB
BUEA2 017
DR SUD-OUEST: Suivi administratif du BIP 5 500 5 500DR SUD-OUEST: Admisnistrative monitoring of PIB
BUEA2 017
Elaboration du SIGAT du Sud-Ouest 25 000 25 000Preparation of SIGAT for the South-West Region
BUEA2 017
Travaux de construction du marché frontalier d'Ekok (Région du Sud-Ouest) 135 000 135 000Construction works of border markets of Ekok (South West Région)
EKOK2 017
Maîtrise d'œuvre des travaux de construction du marché frontalier d'Ekok (Région duSud-Ouest)
15 000 15 000
Project management for construction of border works contract of Ekok (South WestRégion)
EKOK
2 017
Total Chapitre/Head MINEPAT 232 000 232 000
MINISTRY OF TOURISM AND LEISUREChapitre/Head
23MINISTERE DU TOURISME ET DES LOISIRS
LIMBE III : Equipement de la structure d’accueil et du centre d’interprétation 35 000 35 000Limbe III : Equipping of the reception facility and interpretation centre
Bimbia2 017
LIMBE III : Aménagement extérieur 35 000 35 000Limbe III : External works
Bimbia2 017
LIMBE III : Electrification du site par le raccordement au réseau Eneo 20 000 20 000Limbe III : Electricity supply through connection to the ENEO network
Bimbia2 017
LIMBE III : Alimentation du site en eau potable (forage, château et réseau dedistribution)
50 000 50 000
Limbe III : Potable water supply (borehole, water tower and distribution network)
Bimbia2 017
Maîtrise d'oeuvre des travaux 20 000 20 000supervision of works
LIMBE2 017
Réhabilitation et l’équipement sommaire du restaurant de l’hôtel Atlantic Beach de Limbédans le cadre de la CAN 2016 (phase 2)
300 000 300 000
rehabilitation works and partial equipping of the Atlantic Beach Hotel restaurant
LIMBE2 017
Sécurisation du site du village de vacances de Buéa 40 000 40 000Buea : Securing of the site
Buea2 017
Total Chapitre/Head MINTOURL 500 000 500 000
MINISTRY OF SECONDARY EDUCATIONChapitre/Head
25MINISTERE DES ENSEIGNEMENTS SECONDAIRES
GHS MOTOMBOLOBO-Tiko: construction d'un bloc de 2 salles de classe + bureauordinaire
20 000 20 000
GHS MOTOMBOLOBO-Tiko: construction of a bloc of 2 classrooms + an office
TIKO2 017
CES DE LIONGO: construction de 2 salles de classe + bureau ordinaire 20 000 20 000GSS OF LIONGO: construction of 2 classroom + regular office
LIONGO-BUEA2 017
CETIC D'EKONA: Branchement au réseau électrique ENEO 17 000 17 000GTC OF EKONA: Connexion to ENEO électricity network
EKONA2 017
LEG D'IDENAU: Branchement au réseau électrique ENEO 6 300 6 300GHS IDENAU: Connexion to ENEO électricity
IDENAU2 017
CETIC DE MUNYENGE: Construction d’un atelier 25 000 25 000GTC OF MUNYENGE: Construction for workshop
MUNYENGE2 017
CES DE MABETA: Equipement des salles de classe en table bancs 1 800 1 800GSS DE MABETA : Equipment of classrooms with bench
LIMBE I2 017
LT DE MOLYKO-BUEA: Equipement des salles de classe en table bancs 1 800 1 800GTHS MOLYKO-BUEA: Equipment of classrooms with ben
MOLYKO BUEA2 017
4
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
Equipement d'un atelier en Kit petits matériels didactiques LYCÉE TECHNIQUE DEBUÉA (MOLYKO)
3 000 3 000
Equipment of a workshop with basic tools kit Technical High School, BUÉA (MOLYKO)
MOLYKO2 017
Equipement d'un atelier en Kit petits matériels didactiques LYTECH MUYUKA 3 000 3 000Equipment of a workshop with basic tools kit THS MUYUKA
MUYUKA2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC DE MUYENGUE 3 000 3 000Equipment of a workshop with basic tools kit TECH IND AND COMM SCHOOL,MUYENGUE
MUYENGUE2 017
Equipement d'un atelier en Kit petits matériels didactiques LT TIKO 3 000 3 000Equipment of a workshop with basic tools kit GTHS TIKO
TIKO2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC DE BAKINGUILI 3 000 3 000Equipment of a workshop with basic tools kit GTC, BAKINGUILI
BAKINGUILI2 017
LYCEE BILINGUE DE TIKO: Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full com GOVERNMENT BILINGUAL HIGH SCHOOL OFTIKO
TIKO2 017
Lycée de Great Soppo: Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full com GHS GREAT SOPPO-BUEA
GREAT SOPPOBUEA2 017
CES DE LIONGO-BUEA: Construction des blocs latrines 4 500 4 500GSS LIONGO-BUEA: Construction of sanitary block
LIONGO2 017
LEG DE BUEA: Construction des blocs latrines 4 500 4 500GHS OF BUEA: Construction of sanitary
BUEA2 017
LYCEE TECHNIQUE DE LIMBE: Equipement de l'atelier metaux en feuilles etconstruction métallique
100 000 100 000
GTHS LIMBE: Equipment of the sheet metal and metal
LIMBE I2 017
Total Chapitre/Head MINESEC 219 900 219 900
MINISTRY OF YOUTH AFFAIRS AND CIVIC EDUCATIONChapitre/Head
26MINISTERE DE LA JEUNESSE ET DE L'EDUCATION CIVIQUE
Equipement de l'atelier informatique du CMPJ DEPARTEMENTAL DU FAKO 3 000 3 000Equipment Computer workshop of DEPARTEMENTAL MYEC FAKO
LIMBE2 017
Equipement l'atelier infomatique CMPJ BUEA 3 000 3 000Equipment Computer workshop MYEC BUEA
BUEA2 017
Mobiliers de bureau de la DRJEC du SUD-OUEST 4 850 4 850DRJEC SUD-OUEST: Office furniture equipment
BUEA2 017
Total Chapitre/Head MINJEC 10 850 10 850
MINISTRY OF ENVIRONMENT , PROTECTION OF NATURE AND SUSTAINABLE DEVELOPMENTChapitre/Head
28MINISTERE DE L'ENVIRONNEMENT, DE LA PROTECTION DE LA NATURE ET DU DEVELOPPEMENT DURABLE
Appui aux clubs des amis de la nature dans la region du Sud-Ouest 6 000 6 000Support to the cubfriends of Nature in South West Region
Buea2 017
Commune de Limbe I : Appui aux communes dans la lutte contre les emballagesplastiques
4 000 4 000
Limbe I Council : support to council in the fight
LIMBE I2 017
Commune de Limbe II : Appui aux communes dans la lutte contre les emballagesplastiques
4 000 4 000
Limbe II Council : support to council in the fight
LIMBE II2 017
Commune de Limbe III : Appui aux communes dans la lutte contre les emballagesplastiques
4 000 4 000
Limbe III Council : support to council in the figh
LIMBE III2 017
Total Chapitre/Head MINEP 18 000 18 000
MINISTRY OF MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENTChapitre/Head
29MINISTERE DES MINES, DE L'INDUSTRIE ET DU DEVELOPPEMENT TECHNOLOGIQUE
Travaux de construction du réseau d’assainissement de la zone industrielle d'Ombé 100 000 100 000Construction of sewerage system
OMBE2 017
Total Chapitre/Head MINIMIDT 100 000 100 000
5
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENTChapitre/Head
30MINISTERE DE L'AGRICULTURE ET DU DEVELOPPEMENT RURAL
Organisation du mini comice agropastoral de la région du Sud-Ouest 25 000 25 000Organisation of South West Region agropastoral comice
BUEA2 017
Acquisition des herbicides 100 000 100 000Acquisition of herbicides
BUEA2 017
Acquisition des tubes 15 000 15 000Acquisition of the tubes
BUEA2 017
Renforcement du parc d’engins lourds de la PAMOL 600 000 600 000Strengthening of the heavy machinery park at PAMOL
BUEA2 017
Appui à la fertilisation des plantations de la PAMOL 630 000 630 000ukSupport the fertilization of PAMOL plantations
BUEA2 017
Acquisition de 10 tracteurs avec attelage 350 000 350 000Acquisition of 10 tractors with towing
BUEA2 017
Acquisition de 200 herses (matériel de récolte des régimes de palme) 30 000 30 000Acquisition of 200 hours ( harvested material of the palm schemes)
BUEA2 017
Acquisition des sachets plastiques de pilinisation 15 000 15 000Purchase of plastic bags for polination
BUEA2 017
Organisation des journées portes ouvertes de la Région du Sud-Ouest 5 000 5 000Organizing open days in the South west region
Buéa2 017
LISOKA VILLAGE: Construction d'un forage équipé d'un PMH 8 000 8 000LISOKA VILLAGE: Construction of a bore hole with HPM
LISOKA Village2 017
Appui à la réalisation des infrastructures de développement rural 100 000 100 000Support to realisation of rural development infrastructures
BUEA2 017
Bokova: Equipement du CEAC 5 000 5 000Bokova: Equipment of CEAC
Bokova2 017
SOWEDA (Mise en œuvre du contrat Plan) 324 000 324 000SOWEDA: Implamentation of contrat-plan
BUEA2 017
Appui au Projet de Développement des Infrastructures et de la chaîne des Valeurs duSud-Ouest
75 000 75 000
Support to development project of the agricultural values system in South-West region
BUEA2 017
Sécurisation du patrimoine foncier des services déconcentrés du MINADER dans larégion du Sud Ouest
4 500 4 500
Securing of the land heritage sites of MINADER in the decentralised services in theSouth West region
Buea
2 017
Total Chapitre/Head MINADER 2 286 500 2 286 500
MINISTRY OF LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIESChapitre/Head
31MINISTERE DE L'ELEVAGE, DES PECHES ET DES INDUSTRIES ANIMALES
Finalisation de l'abattoir de LIMBE I par l'équipement en rails aériens 20 000 20 000Complete Limbe I slaughterhouse equipped with overhead rail
LIMBE I2 017
Finalisation de l'abattoir de Buea par l'équipement en rails aériens 20 000 20 000Complete a slaughterhouse equipped with overhead rail at Buea
BUEA2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE TIKO
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearer TikoCOUNCIL
TIKO
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE BUEA
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearer BueaCouncil
BUEA
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE LIMBE III
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerLIMBE III COUNCIL
LIMBE III
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE LIMBE I
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerLimbe I council
LIMBE I
2 017
6
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE MUYUKA
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerMUYUKA COUNCIL
MUYUKA
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE LIMBE II
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerLIMBE II COUNCIL
LIMBE II
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'IDENAU
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerIDENAU COUNCIL
WEST COAST
2 017
Equipement CZV-Idenau 1 500 1 500Equipments of Idenau VZC
Idenau2 017
Appui au fonctionnement de Limbe Nautical Arts and Fisheries Institute (LINAFI) 150 000 150 000Support toLimbe Nautical Arts and Fisheries Institute (LINAFI) operation
LIMBE2 017
Construction d'un halle de vente de poisson à Debuncha 15 000 15 000Construction of indoor markets for fish dealing at Debuncha
DEBUNCHA2 017
Total Chapitre/Head MINEPIA 213 500 213 500
MINISTRY OF WATER RESOURCES AND ENERGYChapitre/Head
32MINISTERE DE L'EAU ET DE L'ENERGIE
NA'ANGA-BWASSA-LIKOMBE : Electrification Rurale 120 329 60 329NA'ANGA-BWASSA-LIKOMBA : Rural electrification
NA'ANGA-BWASSA-LIKOMBE
2 017
LIMBE: installation de lampadaire solaire 80 000 80 000LIMBE: Installation of solar street lights
LIMBE2 017
KIE : Réalisation d'un Adduction d'Eau Potable (Phase 2) 84 000 84 000KIE: realisation of water supply (Phase 2)
KIE2 017
BOKOVA BWITEVA : Réalisation d'une Adduction d'Eau Potable (Phase 2) 20 000 20 000BOKOVA BWITEVA : realisation of water supply (Phase 2)
BOKOVABWITEVA2 017
DR Sud-ouest: acquisition d'un copieur multifonction 2 500 2 500DR Sud-ouest :Acquisition of copier
BUEA2 017
Total Chapitre/Head MINEE 306 829 246 829
MINISTRY OF FORESTRY AND WILDLIFEChapitre/Head
33MINISTERE DES FORETS ET DE LA FAUNE
Appui au Programme de Gestion durable des ressources naturelles au Cameroun,Région du Sud-ouest PSMNR-SW phase II (Fonds de contrepartie)
25 000 25 000
Support to the Programme for the Sustainable Manag
BUEA2 017
Appui au Programme de Gestion durable des ressources naturelles au Cameroun,Région du Sud-ouest PSMNR-SW phase II (FINEX)
700 000 700 000
Support to the Programme for the Sustainable Manag
BUEA2 017
Total Chapitre/Head MINFOF 725 000 725 000
MINISTRY OF EMPLOYMENT AND VOCATIONAL TRAININGChapitre/Head
35MINISTERE DE L'EMPLOI ET DE LA FORMATION PROFESSIONNELLE
Amélioration des VRD et divers aménagements au CFPE de Limbe 51 800 51 800Amélioration of VRD, stabilisation of slope and of Limbé
LIMBE2 017
Construction de la clôture au CFPE de Limbé 50 000 50 000Construction of the fence of the CFPE of Limbé
LIMBE2 017
Total Chapitre/Head MINEFOP 101 800 101 800
7
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
MINISTRY OF PUBLIC WORKSChapitre/Head
36MINISTERE DES TRAVAUX PUBLICS
Aménagement de la route Limbé-Bibia 200 000 150 000renovation of the road Limbé-Bibia
LIMBE2 017
Commune de LIMBE III : Entretien Routier 27 000 27 000LIMBE III Council : Road Maintenance
LIMBE III2 017
Commune de LIMBE II : Entretien Routier 27 000 27 000LIMBE II Council : Road Maintenance
LIMBE II2 017
Commune de LIMBE I : Entretien Routier 27 000 27 000LIMBE I Council : Road Maintenance
LIMBE I2 017
Commune de TIKO : Entretien Routier 27 000 27 000TIKO Council : Road Maintenance
TIKO2 017
Commune de BUEA : Entretien Routier 27 000 27 000BUEA Council : Road Maintenance
BUEA2 017
Commune de MUYUKA : Entretien Routier 27 000 27 000MUYUKA Council : Road Maintenance
MUYUKA2 017
Commune d' IDENAU : Entretien Routier 27 000 27 000IDENAU Council : Road Maintenance
WEST COAST2 017
Etude en vue de la réhabiliation de la nationale n°3 Troncon Bekoko-Limbé-Idenao 200 000 200 000Study for the National réhabiliation 3 Troncon Bek
limbé2 017
Appui en investissement à l'ENSTP de BUEA 200 000 200 000Budget support ENSTP of BUEA
BUEA2 017
Total Chapitre/Head MINTP 789 000 739 000
MINISTRY OF HOUSING AND URBAN DEVELOPMENTChapitre/Head
38MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN
Sécurisation des sites à Fako (Limbé / Clerks Quarter et Moluko) 113 050 113 050Sites securing in Fako (Limbé / Clerks Quar
CLERKSQUARTER ETMOLUKO
2 017
Total Chapitre/Head MINHDU 113 050 113 050
MINISTRY OF SMALL AND MEDIUM-SIZED ENTERPRISES,SOCIAL ECONOMY AND HANDICRAFTChapitre/Head
39MINISTERE DES PETITES ET MOYENNES ENTREPRISES, DE L'ECONOMIE SOCIALE ET DE L'ARTISANAT
Appui financier à "Happpy Family Symplified Cooperative" 3 500 3 500Financial support to "Happpy Family Symplified Cooperative"
LIMBE2 017
Appui financier à "RESCUE MISSION (RESMI)" 10 000 10 000Financial support to RESCUE MISSION (RESMI)
BUEA2 017
Appui financier à "Ayonghe Livestock And Palms Garden Fast Car Wash SimplifiedCooperative Society"
5 000 5 000
Financial support to Ayonghe Livestock And Palms Garden Fast Car Wash SimplifiedCooperative Society"
BUEA
2 017
Appui financier à l'incubateur d'entreprise de la Faculté de Médécine de l'Université deBuéa
150 000 150 000
Appui financier à l'incubateur d'entreprise de la
Buéa2 017
Equipement en matériel informatique pour la délégation régionale du Sud-Ouest 4 200 4 200Provision of computer equipment to the South West regional delegation
BUEA2 017
Equipements en mobilier de bureau de la délégation régionale du SUD OUEST 4 400 4 400Provision of office furniture to the South West regional delegation
BUEA2 017
Total Chapitre/Head MINPMEESA 177 100 177 100
MINISTRY OF PUBLIC HEALTHChapitre/Head
40MINISTERE DE LA SANTE PUBLIQUE
CSI MKPOT : CONSTRUCTION DU LAM 35 000 35 000MKPOT IHC: LAM construction
BUEA2 017
CSI DE EKPOR : CONSTRUCTION LAM 35 000 35 000EKPOR IHC: LAM construction
BUEA2 017
ACHÈVEMENT DES CONSTRUCTIONS DES CENTRES D’IMAGERIE DES HR DEMAROUA ET DE LIMBÉ.
388 000 388 000
COMPLETION OF THE CONSTRUCTION OF MAROUA AND LIMBE IMAGERYCENTER
LIMBE
2 017
8
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
CSI DE EWONGO : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000EWONGO IHC : equipment with medical aparatus
EWONGO2 017
CSI DE EKPOR : EQUIPEMENT EN ENERGIE SOLAIRE 15 000 15 000EKPOR IHC: Equipment in solar energy
BUEA2 017
CSI DE BUÉA ROAD : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000BUÉA ROAD IHC: Equipment in medical aparatus
BUEA2 017
CSI DE TOLE : EQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000TOLE IHC: Equipment in medical aparatus
BUEA2 017
CMA DE MUEA : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 15 000 15 000MUEA IHC: Equipment in medical aparatus
BUEA2 017
CSI DE GREAT SOPPO : ÉQUIPEMENT EN MATERIEL MEDICAL 8 000 8 000GREAT SOPPO IHC: Equipment in medical aparatus
BUEA2 017
CSI DE EKPOR : EQUIPEMENT EN MATERIEL MEDICAL 8 000 8 000EKPOR IHC: Equipment in medical aparatus
BUEA2 017
CSI DE MISSELLELE : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000MISSELLELE IHC: Equipment in medical aparatus
MISSELLELE2 017
CSI GREAT MOQUO : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000GREAT MOQUO IHC: Equipment in medical aparatus
GREAT MOQUO2 017
TRAVAUX ADDITIONNELS DANS LES CENTRES D'IMAGERIE MEDICAL DE LIMBE 50 000 50 000LIMBE ADDITIONAL WORK IN THE BUILDING OF MEDICAL I
LIMBE2 017
CSI DE MALENDE: Construction d'un forage 8 500 8 500IHC of MALENDE: Construction of a drill
MALENDE2 017
CSI DE EKPOR: Construction d'un forage 8 500 8 500IHC of EKPOR : Construction of a drill
EKPOR2 017
Appui financier à la FMSB de Buéa 10 000 10 000Financial support to FMSB of Buea
buéa2 017
Total Chapitre/Head MINSANTE 621 000 621 000
MINISTRY OF SOCIAL AFFAIRSChapitre/Head
42MINISTERE DES AFFAIRES SOCIALES
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE BUEA
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon Buea Council
BUEA
2 017
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE D'IDENAU
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon IDENAU COUNCIL
WEST COAST
2 017
Total Chapitre/Head MINAS 3 000 3 000
MINISTRY OF WOMEN'S EMPOWERMENT AND THE FAMILYChapitre/Head
43MINISTERE DE LA PROMOTION DE LA FEMME ET DE LA FAMILLE
EQUIPEMENT CPF BUEA 10 000 10 000EQUIPEMENT WEC BUEA
BUEA2 017
Total Chapitre/Head MINPROFF 10 000 10 000
MINISTRY OF POSTS AND TELECOMMUNICATIONSChapitre/Head
45MINISTERE DES POSTES ET TELECOMMUNICATIONS
Réfection des bureaux des services déconcentrés (Sud-Ouest) 7 000 7 000Office refurbishment of decentralized services (So
Buea2 017
Total Chapitre/Head MINPOSTEL 7 000 7 000
9
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
FAKODivision
Département
MINISTRY OF TRANSPORTChapitre/Head
46MINISTERE DES TRANSPORTS
Etude en vue de la construction d’une gare routière pilote à Limbé 20 000 20 000Study for the construction of pilot road station in Limbe
LIMBE2 017
Total Chapitre/Head MINT 20 000 20 000
MINISTRY OF PUBLIC SERVICE AND ADMINISTRATIVE REFORMChapitre/Head
50MINISTERE DE LA FONCTION PUBLIQUE ET DE LA REFORME ADMINISTRATIVE
Equipements de la DR/SO (03 ordinateurs complets, 1000 hamacs) 6 500 6 500Equipments of the RD/SW (03 complete computers and 1000 hammocks)
BUEA2 017
Total Chapitre/Head MINFOPRA 6 500 6 500
NATIONAL COMMISSION ON HUMAN RIGHTS AND FREEDOMSChapitre/Head
52COMMISSION NATIONALE DES DROITS DE L'HOMME ET DES LIBERTES
Aménagement de l'Antènne de Buéa 4 999 4 999Set up of the Buea branch
BUEA2 017
Total Chapitre/Head COM. NAT. DROIT HOM & LIB 4 999 4 999
7 676 848Total Département/Division FAKO 7 536 848
10
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MANYUDivision
Département
MINISTRY OF TERRITORIAL ADMINISTRATION AND DECENTRALIZATIONChapitre/Head
07MINISTERE DE L'ADMINISTRATION TERRITORIALE ET DE LA DECENTRALISATION
EYUMODJOK: Réhabilitation de la Sous-Préfecture 16 665 16 665EYUMODJOK: Rehabilitation of the Sub-Divisional Office
EYUMOJOCK2 017
Total Chapitre/Head MINATD 16 665 16 665
GENERAL DELEGATION OF NATIONAL SECURITYChapitre/Head
12DELEGATION GENERALE A LA SURETE NATIONALE
Suite et fin des travaux de construction du Poste Frontière d'EKOK-Mamfé 17 500 17 500Continuation of finalization of works construction of the NS Border Post at EKOK-Mamfé
EKOK-MAMFE2 017
Total Chapitre/Head DGSN 17 500 17 500
MINISTRY OF BASIC EDUCATIONChapitre/Head
15MINISTERE DE L'EDUCATION DE BASE
GNS Small Mamfe - Construction des blocs maternels - Commune de Mamfe 25 000 25 000GNS Small Mamfe - Construction of nursry blocks - Mamfe Council
MAMFE2 017
GNS Small Mamfe - Equipement d'un bloc maternel avec 40 tablettes, 120 petites-chaises, 6 tableaux sur chevalets, (02 tables + 04 chaises) pour enseignants - Communede Mamfe
2 000 2 000
GNS Small Mamfe - Equipment of a nursry block with 40 tablets, 120 small-chairs, 6tables on trestles, (02 tables + 04 chairs) for teachers - Mamfe Council
MAMFE
2 017
GNS Fotabe - Construction des salles de classe dans les écoles maternelles en zonerurale - Commune de Tinto
18 000 18 000
GNS Fotabe - Construction of classrooms in nursry schools in rural - Tinto Council
UPPER-BAYANG2 017
GNS Fotabe - Equipement des salles de classe EM en zone rurale avec 20 tablettes, 60petites-chaises, 3 tableaux sur chevalets, (02 tables + 02 chaises) pour enseignants -Commune de Tinto
900 900
GNS Fotabe - Equipment of a nursery classroom in rural area wit Tinto Council
Tinto
2 017
GS BESONGABANG: Construire les Blocs Latrines dans les écoles primairesCOMMUNE DE MAMFE
3 500 3 500
GS BESONGABANG: Blocks build latrines in primary schools MAMFE COUNCIL
MAMFE2 017
GS BACHE : Construction d'un bloc de deux (02) salles de classe COMMUNED'AKWAYA
18 000 18 000
GS BACHE : Construct the bloc of two (02) classroom AKWAYA COUNCIL
AKWAYA2 017
GS EKEMAWA : Construction d'un bloc de deux (02) salles de classe COMMUNED'AKWAYA
18 000 18 000
GS EKEMAWA : Construct the bloc of two (02) classroom AKWAYA COUNCIL
AKWAYA2 017
GS FOTABE : Construction d'un bloc de deux (02) salles de classe Commune de TINTO 18 000 18 000GS FOTABE : Construct the bloc of two (02) classroom TINTO COUNCIL
UPPER-BAYANG2 017
GS MAMBO : Construction d'un bloc de deux (02) salles de classe Commune de TINTO 18 000 18 000GS MAMBO : Construct the bloc of two (02) classroom TINTO COUNCIL
UPPER-BAYANG2 017
GS OKOROBA : Construction d'un bloc de deux (02) salles de classe COMMUNED'EYOU MODJOCK
18 000 18 000
GS OKOROBA : Construct the bloc of two (02) classroom Eyou modjock council
EYUMOJOCK2 017
GS ONAKU : Construction d'un bloc de deux (02) salles de classe COMMUNE D'EYOUMODJOCK
18 000 18 000
GS ONAKU : Construct the bloc of two (02) classroom Eyou modjock council
EYUMOJOCK2 017
GS OKOROBA : équiper les écoles publiques programmées en tables bancs COMMUNED'EYOU MODJOCK
1 320 1 320
GS OKOROBA : equip public schools scheduled benches tables Eyou modjock council
EYUMOJOCK2 017
GS ONAKU : équiper les écoles publiques programmées en tables bancs COMMUNED'EYOU MODJOCK
1 320 1 320
GS ONAKU : equip public schools scheduled benches tables Eyou modjock council
EYUMOJOCK2 017
GS MAMBO : équiper les écoles publiques programmées en tables bancs Commune deTINTO
1 320 1 320
GS MAMBO : equip public schools scheduled benches tables TINTO COUNCIL
UPPER-BAYANG2 017
GS FOTABE : équiper les écoles publiques programmées en tables bancs Commune deTINTO
1 320 1 320
GS FOTABE : equip public schools scheduled benches tables TINTO COUNCIL
UPPER-BAYANG2 017
GS BACHE : équiper les écoles publiques programmées en tables bancs COMMUNED'AKWAYA
1 320 1 320
GS BACHE : equip public schools scheduled benches tables AKWAYA COUNCIL
AKWAYA2 017
11
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MANYUDivision
Département
GS EKEMAWA : équiper les écoles publiques programmées en tables bancs COMMUNED'AKWAYA
1 320 1 320
GS EKEMAWA : equip public schools scheduled benches tables AKWAYA COUNCIL
AKWAYA2 017
GS BANYA: Acquisition des équipements dans les écoles pilotes(Tricycles,Planches delecture,Kits de matériels,Béquilles) COMMUNE D'AKWAYA
4 450 4 450
GS BANYA: Acquisition of equipment in the pilot schools (Tricycles, reading boards, kitsof equipment, Crutches) AKWAYA COUNCIL
AKWAYA
2 017
réhabilitation IAEB Mamfé 4 920 4 920rehabilitation IAEB Mamfe
MAMFE2 017
GS OKOROBA : Equipement en deux bureaux de maitre dans les EP COMMUNED'EYOU MODJOCK
250 250
GS OKOROBA : Equipment two offices for teachers in EP Eyou modjock council
EYUMOJOCK2 017
GS ONAKU : Equipement en deux bureaux de maitre dans les EP COMMUNE D'EYOUMODJOCK
250 250
GS ONAKU : Equipment two offices for teachers in EP Eyou modjock council
EYUMOJOCK2 017
GS MAMBO : Equipement en deux bureaux de maitre dans les EP Commune de TINTO 250 250GS MAMBO : Equipment two offices for teachers in EP TINTO COUNCIL
UPPER-BAYANG2 017
GS FOTABE : Equipement en deux bureaux de maitre dans les EP Commune de TINTO 250 250GS FOTABE : Equipment two offices for teachers in EP TINTO COUNCIL
UPPER-BAYANG2 017
GS BACHE : Equipement en deux bureaux de maitre dans les EP COMMUNED'AKWAYA
250 250
GS BACHE : Equipment two offices for teachers in EP AKWAYA COUNCIL
AKWAYA2 017
GS EKEMAWA : Equipement en deux bureaux de maitre dans les EP COMMUNED'AKWAYA
250 250
GS EKEMAWA : Equipment two offices for teachers in EP AKWAYA COUNCIL
AKWAYA2 017
Total Chapitre/Head MINEDUB 176 190 176 190
MINISTRY OF COMMERCEChapitre/Head
21MINISTERE DU COMMERCE
Acquisition du mobilier pour la DDC de la Manyu 3 000 3 000Acquisition of furniture for the Manyu TDD
MANFE2 017
Total Chapitre/Head MINCOMMERCE 3 000 3 000
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENTChapitre/Head
22MINISTERE DE L'ECONOMIE, DE LA PLANIFICATION ET DE L'AMENAGEMENT DU TERRITOIRE
DD MANYU: Appui au comité départemental de suivi du BIP 8 000 8 000DD MANYU: Support to the PIB follow-up Divisional Committee
MAMFE2 017
DD MANYU: Suivi administratif du BIP 2 500 2 500DD MANYU: Admisnistrative monitoring of PIB
MAMFE2 017
Total Chapitre/Head MINEPAT 10 500 10 500
MINISTRY OF TOURISM AND LEISUREChapitre/Head
23MINISTERE DU TOURISME ET DES LOISIRS
DDTL MANYU : Réalisation des travaux de finition (peinture, VRD et autres) 25 000 25 000DDTL MANYU : Finishings (painting, external works and others)
MAMFE2 017
Total Chapitre/Head MINTOURL 25 000 25 000
MINISTRY OF SECONDARY EDUCATIONChapitre/Head
25MINISTERE DES ENSEIGNEMENTS SECONDAIRES
LEG D'AFAB: construction de 2 salles de classe + bureau ordinaire 20 000 20 000GHS AFAB: construction of 2 classrooms + regular office
AFAB2 017
CES BIL DE NTENAKO: construction de 2 salles de classe + bureau ordinaire 22 000 22 000GBSS OF NTENAKO: construction of 2 classroom + regular office
NTENAKO2 017
CES BILINGUE OKOROBA : Equipement des salles de classe en table bancs 1 800 1 800GBHS OKOROBA : Equipment of classrooms with benche
EYUMMOJOCK2 017
CETIC DE AMASSI: Equipement des salles de classe en table bancs 1 800 1 800GTC AMASSI : Equipment of classrooms with benches
AKWAYA2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC AMASSI 3 000 3 000Equipment of a workshop with basic tools kit GTC AMASSI
AMASSI2 017
Equipement d'un atelier en Kit petits matériels didactiques LYCÉE TECHNIQUE MAMFÉ 3 000 3 000Equipment of a workshop with basic tools kit Technical High School, MAMFÉ
MANFE2 017
12
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MANYUDivision
Département
Equipement d'un atelier en Kit petits matériels didactiques LT NDEKWAI 3 000 3 000Equipment of a workshop with basic tools kit GTHS NDEKWAI
NDEKWAI2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC DE OKOROBA-OBANG
3 000 3 000
Equipment of a workshop with basic tools kit GTSS, OKOROBA-OBANG
OKOROBA-OBANG2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC DE DADI 3 000 3 000Equipment of a workshop with basic tools kit GTSS, DADI
DADI2 017
LYCÉE BILINGUE MAMFÉ : Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full com GOVERNMENT BILINGUAL HIGH SCHOOL,MAMFÉ
MANFE2 017
LEG D'AFAB: Construction d’un forage 8 500 8 500GHS D'AFAB: Construction of a bore hole
AFAB2 017
CES BIL DE NTENAKO: Construction des blocs latrines 4 500 4 500GBSS OF NTENAKO
NTENAKO2 017
Total Chapitre/Head MINESEC 75 600 75 600
MINISTRY OF YOUTH AFFAIRS AND CIVIC EDUCATIONChapitre/Head
26MINISTERE DE LA JEUNESSE ET DE L'EDUCATION CIVIQUE
Équipement en mobilier de bureau de la DDJEC de MANYU 4 753 4 753DDJEC MANYU: Office furniture equipment
MAMFE2 017
Total Chapitre/Head MINJEC 4 753 4 753
MINISTRY OF ENVIRONMENT , PROTECTION OF NATURE AND SUSTAINABLE DEVELOPMENTChapitre/Head
28MINISTERE DE L'ENVIRONNEMENT, DE LA PROTECTION DE LA NATURE ET DU DEVELOPPEMENT DURABLE
Commune de Manfe : Appui aux communes dans la lutte contre les emballagesplastiques
4 000 4 000
Manfe Council : support to council in the fight ag
MAMFE2 017
Total Chapitre/Head MINEP 4 000 4 000
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENTChapitre/Head
30MINISTERE DE L'AGRICULTURE ET DU DEVELOPPEMENT RURAL
Ekwelle: Construction of an agricultural post 20 000 20 000Ekwele
EYUMOJOCK2 017
Total Chapitre/Head MINADER 20 000 20 000
MINISTRY OF LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIESChapitre/Head
31MINISTERE DE L'ELEVAGE, DES PECHES ET DES INDUSTRIES ANIMALES
Construction d’un forage pastoral à bachuo Akagbé 20 000 20 000Construction of pastoral borehole at bachuo Akagbé
UPPER-BAYANG2 017
Construction d'un forage pastoral à énergie solaire à KALUMO 20 000 20 000Construction of pastoral borehole with solar energy at Kalumo
KALUMO2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'AKWAYA
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerAKWAYA COUNCIL
AKWAYA
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) Commune de TINTO
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerTINTO COUNCIL
UPPER-BAYANG
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'EYOU MODJOCK
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearer Eyoumodjock council
EYUMOJOCK
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE MAMFE
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerMAMFE COUNCIL
MAMFE
2 017
Construction du CZV de MAMFE 30 000 30 000Construction of MAMFE veterinary and zootechnical center
MAMFE2 017
Total Chapitre/Head MINEPIA 74 000 74 000
13
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MANYUDivision
Département
MINISTRY OF WATER RESOURCES AND ENERGYChapitre/Head
32MINISTERE DE L'EAU ET DE L'ENERGIE
Village Ntenako : Electrification Rurale 61 514 61 514Village Ntenako : Rural electrification
Village Ntenako2 017
DIOCESE DE MAMFE : Forage équipé 8 500 8 500DIOCESE DE MAMFE : Equipped bore hole
DIOCESE DEMAMFE2 017
Total Chapitre/Head MINEE 70 014 70 014
MINISTRY OF FORESTRY AND WILDLIFEChapitre/Head
33MINISTERE DES FORETS ET DE LA FAUNE
DDFOF Manyu: Achèvement des travaux de construction de la DélégationDépartementale des Forêts et de la Faune de la Manyu
41 272 41 272
DDFOF Manyu: Achievement of construction works of the Manyu Divisional Delegation ofForestry and Wildlife
MANYU
2 017
Total Chapitre/Head MINFOF 41 272 41 272
MINISTRY OF EMPLOYMENT AND VOCATIONAL TRAININGChapitre/Head
35MINISTERE DE L'EMPLOI ET DE LA FORMATION PROFESSIONNELLE
SAR/SM OKOROBA-OBANG: Construction d'un Atelier 30 000 30 000SAR/SM EKONA: Building of a Workshop
OKOROBA-OBANG2 017
SAR/SM MAMFE: Réhabilitation de la machine à Menuiserie 4 602 4 602SAR/SM MAMFE: Rehabilitation of woodwork engine
MAMFE2 017
DDEFOP Manyu: acquisition du mobilier de bureau 6 000 6 000DDEFOP Manyu: purchase of office furniture
MAMFE2 017
Total Chapitre/Head MINEFOP 40 602 40 602
MINISTRY OF PUBLIC WORKSChapitre/Head
36MINISTERE DES TRAVAUX PUBLICS
Bitumage Bachuo Akagbé - Mamfé - Ekok (FINEX) 5 000 000 5 000 000Tarring Bachuo Akagbé - Mamfe - Ekok
MAMFE2 017
Bitumage Bachuo Akagbé - Mamfé - Ekok (FCP) 1 000 000 1 000 000Tarring Bachuo Akagbé - Mamfe - Ekok
MAMFE2 017
Bitumage Kumba-Mamfé (lot1 et lot2) (FINEX) 6 000 000 6 000 000Kumba-Mamfe asphalting (lot 1 and lot 2) (FINEX)
mamfé2 017
Bitumage Kumba-Mamfé (lot1 et lot2) (FCP) 2 000 000 2 000 000Tarring of Kumba-Mamfé (lot1 et lot2) (FCP)
mamfé2 017
Aménagement de la route Mamfé-Akwaya 200 000 150 000Renovation of the road Mamfé-Akwaya
MAMFE2 017
Commune d' EYOU MODJOCK : Entretien Routier 27 000 27 000EYOU MODJOCK Council : Road Maintenance
EYUMOJOCK2 017
Commune de MAMFE : Entretien Routier 27 000 27 000MAMFE Council : Road Maintenance
MAMFE2 017
Commune de TINTO : Entretien Routier 27 000 27 000TINTO Council : Road Maintenance
UPPER-BAYANG2 017
Commune d' AKWAYA : Entretien Routier 27 000 27 000AKWAYA Council : Road Maintenance
AKWAYA2 017
Total Chapitre/Head MINTP 14 308 000 14 258 000
MINISTRY OF HOUSING AND URBAN DEVELOPMENTChapitre/Head
38MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN
Entretien des voiries en terre à EYUKMODJOCK 40 000 40 000Maintenance of earth road network in EYUKMODJOCK
EYUMOJOCK2 017
Travaux de réhabilitation de la Délégation Départementale de la Mamfé 49 210 49 210Rehabilitation of the Mamfé divisional delegation
MAMFE2 017
Total Chapitre/Head MINHDU 89 210 89 210
14
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MANYUDivision
Département
MINISTRY OF PUBLIC HEALTHChapitre/Head
40MINISTERE DE LA SANTE PUBLIQUE
CSI D'INOKUN : CONSTRUCTION LOGEMENT D'ASTREINTE 35 000 35 000INOKUN IHC: Construction of standby Housing
EYUMOJOCK2 017
CSI D'AYUKAGBA : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000CSI DE AYUKAGBA :
AYUKAGBA2 017
Total Chapitre/Head MINSANTE 43 000 43 000
MINISTRY OF SOCIAL AFFAIRSChapitre/Head
42MINISTERE DES AFFAIRES SOCIALES
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE MAMFE
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon MAMFE COUNCIL
MAMFE
2 017
Total Chapitre/Head MINAS 1 500 1 500
15 020 806Total Département/Division MANYU 14 970 806
15
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
NDIANDivision
Département
MINISTRY OF TERRITORIAL ADMINISTRATION AND DECENTRALIZATIONChapitre/Head
07MINISTERE DE L'ADMINISTRATION TERRITORIALE ET DE LA DECENTRALISATION
Mundemba: Réhabilitation de la résidence du premier adjoint préfectoral 10 000 10 000Mundemba: Rehabilitation of the residence of the first deputy SDO
MUNDEMBA2 017
Total Chapitre/Head MINATD 10 000 10 000
MINISTRY OF DEFENCEChapitre/Head
13MINISTERE DE LA DEFENSE
Extension PC CIE ISANGUELE 40 100 40 100Extension PC CIE ISANGUELE
ISSANGUELE2 017
BDE GRIE IDABATO: Construction de la brigade 81 000 81 000BDE GRIE IDABATO: Construction of the CP
IDABATO2 017
Total Chapitre/Head MINDEF 121 100 121 100
MINISTRY OF ARTS AND CULTUREChapitre/Head
14MINISTERE DES ARTS ET DE LA CULTURE
Réhabilitation du musée du palais de Balondo à EKONDO TITI 3 000 3 000Rehabilitation of the Balondo Palace Museum in EKONDO TITI
EKONDO TITI2 017
Total Chapitre/Head MINAC 3 000 3 000
MINISTRY OF BASIC EDUCATIONChapitre/Head
15MINISTERE DE L'EDUCATION DE BASE
GS LIPENJA BAROMBI : Réhabiliter les écoles Primaires COMMUNE D'EKONDOTITI 4 071 4 071GS LIPENJA BAROMBI : Rehabilitating Primary Schools EKONDOTITI COUNCIL
EKONDO-TITI2 017
GS BWEME NGOLO: FABRIQUER LES TABLES BANCS POUR LES ECOLESPRIMAIRES. COMMUNE DE TOKO
1 800 1 800
GS BWEME NGOLO:MAKE TABLES BENCHES FOR PRIMARY SCHOOLS. TOKOCOUNCIL
TOKO
2 017
GPS NGAMOKI NGOLO : Construction d'un bloc de deux (02) salles de classeCOMMUNE DE TOKO
20 000 20 000
GPS NGAMOKI NGOLO: Construct the bloc of two (02) classroom TOKO COUNCIL
TOKO2 017
GS MOKONO BAROMBI : Construction d'une (01) salles de classe COMMUNED'EKONDOTITI
10 000 10 000
GS MOKONO BAROMBI : Construct one (01) classroom EKONDOTITI COUNCIL
EKONDO-TITI2 017
GS GOLO METOKO BALUE : Construction d'un bloc de deux (02) salles de classeCOMMUNE D'EKONDOTITI
20 000 20 000
GS GOLO METOKO BALUE: Construct the bloc of two (02) classroom EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS LIPENJA BAROMBI : Construction d'un bloc de deux (02) salles de classeCOMMUNE D'EKONDOTITI
20 000 20 000
GS LIPENJA BAROMBI : Construct the bloc of two (02) classroom EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS MOKOKO CDC : Construction d'un bloc de deux (02) salles de classe COMMUNEDE BAMUSSO
20 000 20 000
GS MOKOKO CDC : Construct the bloc of two (02) classroom BAMUSSO COUNCIL
BAMUSO2 017
GS DIBOKI BALUE : Construction d'un bloc de deux (02) salles de classe COMMUNEDE DIKOME BALUE
20 000 20 000
GS DIBOKI BALUE : Construct the bloc of two (02) classroom DIKOME BALUECOUNCIL
DIKOME BALUE
2 017
GS NDIAN TOWN : Construction d'un bloc de deux (02) salles de classe COMMUNE DEMUDEMBA
23 000 23 000
GS NDIAN TOWN : Construct the bloc of two (02) classroom MUDEMBA COUNCIL
MUNDEMBA2 017
GS NDIAN TOWN : équiper les écoles publiques programmées en tables bancsCOMMUNE DE MUDEMBA
1 800 1 800
GS NDIAN TOWN : equip public schools scheduled benches tables MUDEMBACOUNCIL
MUNDEMBA
2 017
GS DIBOKI BALUE : équiper les écoles publiques programmées en tables bancsCOMMUNE DE DIKOME BALUE
1 320 1 320
GS DIBOKI BALUE : equip public schools scheduled benches tables DIKOME BALUECOUNCIL
DIKOME BALUE
2 017
16
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
NDIANDivision
Département
GS MOKOKO CDC : équiper les écoles publiques programmées en tables bancsCOMMUNE DE BAMUSSO
1 320 1 320
GS MOKOKO CDC : equip public schools scheduled benches tables BAMUSSOCOUNCIL
BAMUSO
2 017
GS MOKONO BAROMBI : équiper les écoles publiques programmées en tables bancsCOMMUNE D'EKONDOTITI
660 660
GS MOKONO BAROMBI : equip public schools scheduled benches tables EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS LIPENJA BAROMBI : équiper les écoles publiques programmées en tables bancsCOMMUNE D'EKONDOTITI
1 320 1 320
GS LIPENJA BAROMBI : equip public schools scheduled benches tables EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS GOLO METOKO BALUE : équiper les écoles publiques programmées en tablesbancs COMMUNE D'EKONDOTITI
1 320 1 320
GS GOLO METOKO BALUE : equip public schools scheduled benches tablesEKONDOTITI COUNCIL
EKONDO-TITI
2 017
GPS NGAMOKI NGOLO: équiper les écoles publiques programmées en tables bancsCOMMUNE DE TOKO
1 320 1 320
GPS NGAMOKI NGOLO: equip public schools scheduled benches tables TOKOCOUNCIL
TOKO
2 017
GBS MUNDEMBA TOWN: Acquisition des équipements dans les écolespilotes(Tricycles,Planches de lecture,Kits de matériels,Béquilles) COMMUNE DE
4 450 4 450
GBS MUNDEMBA TOWN: Acquisition of equipment in the pilot schools (Tricycles,reading boards, kits of equipment, Crutches) MUDEMBA COUNCIL
MUNDEMBA
2 017
GS NDIAN TOWN : Equipement en deux bureaux de maitre dans les EP COMMUNE DEMUDEMBA
250 250
GS NDIAN TOWN : Equipment two offices for teachers in EP MUDEMBA COUNCIL
MUNDEMBA2 017
GPS NGAMOKI NGOLO: Equipement en deux bureaux de maitre dans les EPCOMMUNE DE TOKO
250 250
GPS NGAMOKI NGOLO: Equipment two offices for teachers in EP TOKO COUNCIL
TOKO2 017
GS GOLO METOKO BALUE : Equipement en deux bureaux de maitre dans les EPCOMMUNE D'EKONDOTITI
250 250
GS GOLO METOKO BALUE : Equipment two offices for teachers in EP EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS LIPENJA BAROMBI : Equipement en deux bureaux de maitre dans les EPCOMMUNE D'EKONDOTITI
250 250
GS LIPENJA BAROMBI : Equipment two offices for teachers in EP EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS MOKONO BAROMBI : Equipement en un bureau de maitre dans les EP COMMUNED'EKONDOTITI
125 125
GS MOKONO BAROMBI : Equipment one office for teachers in EP EKONDOTITICOUNCIL
EKONDO-TITI
2 017
GS MOKOKO CDC : Equipement en deux bureaux de maitre dans les EP COMMUNEDE BAMUSSO
250 250
GS MOKOKO CDC : Equipment two offices for teachers in EP BAMUSSO COUNCIL
BAMUSO2 017
GS DIBOKI BALUE : Equipement en deux bureaux de maitre dans les EP COMMUNEDE DIKOME BALUE
250 250
GS DIBOKI BALUE : Equipment two offices for teachers in EP DIKOME BALUECOUNCIL
DIKOME BALUE
2 017
Total Chapitre/Head MINEDUB 154 006 154 006
MINISTRY OF COMMERCEChapitre/Head
21MINISTERE DU COMMERCE
Acquisition du matériel informatique pour la DDC du NDIAN 1 500 1 500Acquisition of computer equipment for the Ndian TDD
MUDEMBA2 017
Total Chapitre/Head MINCOMMERCE 1 500 1 500
17
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
NDIANDivision
Département
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENTChapitre/Head
22MINISTERE DE L'ECONOMIE, DE LA PLANIFICATION ET DE L'AMENAGEMENT DU TERRITOIRE
DD NDIAN: Appui au comité départemental de suivi du BIP 8 000 8 000DD NDIAN: Support to the PIB follow-up Divisional Committee
MUNDEMBA2 017
DD NDIAN: Suivi administratif du BIP 2 500 2 500DD NDIAN: Admisnistrative monitoring of PIB
MUNDEMBA2 017
Total Chapitre/Head MINEPAT 10 500 10 500
MINISTRY OF SECONDARY EDUCATIONChapitre/Head
25MINISTERE DES ENSEIGNEMENTS SECONDAIRES
CES DE KUMBE-BALUE: construction de 2 salles de classe + bureau ordinaire 21 000 21 000GSS OF KUMBE-BALUE: construction of 2 classroom + regular office
KUMBE-BALUE2 017
CES DE KUMBE BALUE : Equipement des salles de classe en table bancs 1 800 1 800GSS KUMBE BALUE : Equipment of classrooms with ben
EKONDO TITI2 017
LYCEE DE BAFAKA BALUE: Equipement des salles de classe en table bancs 1 800 1 800GHS BAFAKA BALUE : Equipment of classrooms with be
BAFAKA BALUE2 017
Equipement d'un atelier en Kit petits matériels didactiques LT EKONDO TITI 3 000 3 000Equipment of a workshop with basic tools kit GTHS EKONDO TITI
EKONDO-TITI2 017
Equipement d'un atelier en Kit petits matériels didactiques LYCÉE TECHNIQUE DEMUNDEMBA
3 000 3 000
Equipment of a workshop with basic tools kit Technical High School, MUNDEMBA
MUNDEMBA2 017
LYCÉE TECHNIQUE DE MUNDEMBA: Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full com Technical High School, MUNDEMBA
MUNDEMBA2 017
Lycée de Bafaka Balue: Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full com Government High School, Bafaka Blue
BAFAKA BALUE2 017
Total Chapitre/Head MINESEC 34 600 34 600
MINISTRY OF MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENTChapitre/Head
29MINISTERE DES MINES, DE L'INDUSTRIE ET DU DEVELOPPEMENT TECHNOLOGIQUE
Achat de matériel informatique DD Ndian 4 000 4 000Acquisition of computers for DD Ndian
MUNDEMBA2 017
Total Chapitre/Head MINIMIDT 4 000 4 000
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENTChapitre/Head
30MINISTERE DE L'AGRICULTURE ET DU DEVELOPPEMENT RURAL
LOBE Village: Construction d'un forage équipé d'un PMH 8 000 8 000Construction of a bore hole with HPM
LOBE Village2 017
Construction d'un ponceau à Bisorolribina 10 000 10 000Construction of a culvert in Bisorolribina
EKONDO2 017
Axe NGOLO METOKO- KITTA : ouverture d'une piste Agricole 10 000 10 000NGOLO METOKO- KITTA : Opening of a agricultural ro
NGOLO METOKO-KITTA2 017
Total Chapitre/Head MINADER 28 000 28 000
MINISTRY OF LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIESChapitre/Head
31MINISTERE DE L'ELEVAGE, DES PECHES ET DES INDUSTRIES ANIMALES
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE BAMUSSO
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerBAMUSSO COUNCIL
BAMUSO
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'ISANGELE
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerISANGELE COUNCIL
ISANGUELE
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE de KOMBO-ITINDI
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerCOUNCIL of KOMBO-ITINDI
KOMBO-ITINDI
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'IDABATO
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerIDABATO COUNCIL
IDABATO
2 017
18
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
NDIANDivision
Département
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE TOKO
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerTOKO COUNCIL
TOKO
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE DIKOME BALUE
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerDIKOME BALUE COUNCIL
DIKOME BALUE
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'EKONDOTITI
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerEKONDOTITI COUNCIL
EKONDO-TITI
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE KOMBO-ABEDIMO
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerKOMBO-ABEDIMO COUNCIL
KOMBO-ABEDIMO
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE MUDEMBA
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerMUDEMBA COUNCIL
MUNDEMBA
2 017
Equipement CZV-Kombonne 1 500 1 500Equipments of Kombonne VZC
Kombonne2 017
Construction du poste de contrôle de pêche de New Beach à Isangele (Modèle 2) 45 000 45 000Construction of fishing checkpoint at New Beach Isangele (Model 2)
NEW BEACH2 017
Transfert de fonds à la Commune de Bakassi pour l’organisation des Journées depromotion des activités de pêche à Bakassi.
15 000 15 000
Tund transfert to Bakassi Council for organizing days for fihery activities promotion atBakassi.
Bakassi
2 017
Construction d'un halle de vente de poisson à Isanguele 15 000 15 000Construction of indoor markets for fish dealing at Isanguele
Isanguele2 017
Total Chapitre/Head MINEPIA 85 500 85 500
MINISTRY OF WATER RESOURCES AND ENERGYChapitre/Head
32MINISTERE DE L'EAU ET DE L'ENERGIE
Construction de deux systèmes d'alimentation en eau potable dans la peninsule deBAKASSI
200 000 200 000
Construction of two power systems in drinking water in the Bakassi Peninsula
Bakassi2 017
Total Chapitre/Head MINEE 200 000 200 000
MINISTRY OF FORESTRY AND WILDLIFEChapitre/Head
33MINISTERE DES FORETS ET DE LA FAUNE
PCFC Ekok: Achèvement des travaux de construction du Poste de Contrôle Forestier etde Chasse d’Ekok
15 000 15 000
PCFC Ekok: Achievement of construction works of the Ekok Forestry and Hunting Post
EKOK2 017
PCFC Isanguele: Construction du Poste de Contrôle Forestier et de Chasse deIsanguele
35 000 35 000
PCFC Isanguele: Construction of the Isanguele Forestry and Hunting
ISANGUELE2 017
Total Chapitre/Head MINFOF 50 000 50 000
MINISTRY OF EMPLOYMENT AND VOCATIONAL TRAININGChapitre/Head
35MINISTERE DE L'EMPLOI ET DE LA FORMATION PROFESSIONNELLE
SAR/SM BEKORA BAROMBI: Finition de construction d'un bloc de 2 salles de classes 9 000 9 000SAR/SM BEKORA BAROMBI: Ending the construction of
BEKORABAROMBI2 017
Total Chapitre/Head MINEFOP 9 000 9 000
19
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
NDIANDivision
Département
MINISTRY OF PUBLIC WORKSChapitre/Head
36MINISTERE DES TRAVAUX PUBLICS
Aménagement de la route Ekondo iti-Mundemba-Isanguele-Akpwa 200 000 150 000Renovation of the road Ekondo Titi-Mundemba-Isang
EKONDO-TITI2 017
Aménagement de la route Man o'war Bay-Bimbia-Dikolo 3 500 000 500 000Man O'War road improvement project Bimbia-Bay-Diko
dikolo2 017
Planut : travaux de bitumage de la route Ekondo Titi - Kumba 10 850 000 10 850 000Planut: tarring of the road Ekondo Titi - Kumba
munemba2 017
Commune de KOMBO-ABEDIMO : Entretien Routier 27 000 27 000KOMBO-ABEDIMO Council : Road Maintenance
KOMBO-ABEDIMO2 017
Commune de EKONDOTITI : Entretien Routier 27 000 27 000EKONDOTITI Council : Road Maintenance
EKONDO-TITI2 017
Commune de BAMUSSO : Entretien Routier 27 000 27 000BAMUSSO Council : Road Maintenance
BAMUSO2 017
Commune de DIKOME BALUE : Entretien Routier 27 000 27 000DIKOME BALUE Council : Road Maintenance
DIKOME BALUE2 017
Commune de MUDEMBA : Entretien Routier 27 000 27 000MUDEMBA Council : Road Maintenance
MUNDEMBA2 017
Commune de KOMBO-ITINDI : Entretien Routier 27 000 27 000KOMBO-ITINDI Council : Road Maintenance
KOMBO-ITINDI2 017
Commune de ISANGELE : Entretien Routier 27 000 27 000ISANGELE Council : Road Maintenance
ISANGUELE2 017
Commune de IDABATO : Entretien Routier 27 000 27 000IDABATO Council : Road Maintenance
IDABATO2 017
Commune de TOKO: Entretien Routier 27 000 27 000TOKO Council : Road Maintenance
TOKO2 017
Total Chapitre/Head MINTP 14 793 000 11 743 000
MINISTRY OF HOUSING AND URBAN DEVELOPMENTChapitre/Head
38MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN
Entretien des voiries en terre à Kombo Abedimo 40 000 40 000Maintenance of earth road network in Kombo Abedimo
KOMBO-ABEDIMO2 017
Total Chapitre/Head MINHDU 40 000 40 000
MINISTRY OF SMALL AND MEDIUM-SIZED ENTERPRISES,SOCIAL ECONOMY AND HANDICRAFTChapitre/Head
39MINISTERE DES PETITES ET MOYENNES ENTREPRISES, DE L'ECONOMIE SOCIALE ET DE L'ARTISANAT
Appui financier à "Ekondo Titi Palm Oil Farmers Co-Operative Union “Epofcu”" 5 000 5 000Financial support to EKONDO Titi Palm Oil Farmers Co-Operative Union “Epofcu”"
EKONDO-TITI2 017
Total Chapitre/Head MINPMEESA 5 000 5 000
MINISTRY OF PUBLIC HEALTHChapitre/Head
40MINISTERE DE LA SANTE PUBLIQUE
CSI D'EKONDO TITI : ÉQUIPEMENT EN MATÉRIEL HOSPITALIER 8 000 8 000D'EKONDO TITI IHC : equipment with hospital material
EKONDO-TITI2 017
CMA D'ISANGELE : ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000D'ISANGELE AMC : acquisition of solar panels
ISANGUELE2 017
CSI DE MBENGMONG : ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000MBENGMONG IHC: acquisition of solar panels
KOMBO-ITINDI2 017
CSI DE KOMBO ITINDI: ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000KOMBO ITINDI IHC : acquisition of solar panels
KOMBO-ITINDI2 017
CSI DE NGOSSO: ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000NGOSSO IHC : acquisition of solar panels
NGOSSO2 017
CSI DE JABANE: ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000JABANE IHC : acquisition of solar panels
IDABATO2 017
CSI DE KOMBO AMUNJA III : ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000KOMBO AMUNJA III IHC: acquisition of solar panels
IDABATO2 017
CSI DE KOMBO AMUNJA I : ACQUISITION DES PLAQUES SOLAIRES 15 000 15 000KOMBO AMUNJA I IHC : acquisition of solar panels
KOMBO AMUNJA I2 017
20
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
NDIANDivision
Département
CSI DE MOSONGISELI NGOLO: Construction 50 000 50 000IHC of MOSONGISELI NGOLO : construction
MOSONGISELINGOLO2 017
CSI DE GREAT MOQUO: Construction d'un forage 8 500 8 500HIC of GREAT MOQUO: Constuction of a drill
GREAT MOQUO2 017
CSI DE MISSELLELE: Construction d'un forage 8 500 8 500IHC of MISSELLELE : construction of a drill
MISSELLELE2 017
Total Chapitre/Head MINSANTE 180 000 180 000
MINISTRY OF SOCIAL AFFAIRSChapitre/Head
42MINISTERE DES AFFAIRES SOCIALES
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE KOMBO-ABEDIMO
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon KOMBO-ABEDIMO COUNCIL
KOMBO-ABEDIMO
2 017
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE D'EKONDOTITI
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon EKONDOTITI COUNCIL
EKONDO-TITI
2 017
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE MUDEMBA
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon MUDEMBA COUNCIL
MUNDEMBA
2 017
Total Chapitre/Head MINAS 4 500 4 500
MINISTRY OF WOMEN'S EMPOWERMENT AND THE FAMILYChapitre/Head
43MINISTERE DE LA PROMOTION DE LA FEMME ET DE LA FAMILLE
CONSTRUCTION CPF BAMUSSO 100 000 100 000CONSTRUCTION WEC BAMUSSO
BAMUSO2 017
Total Chapitre/Head MINPROFF 100 000 100 000
15 833 706Total Département/Division NDIAN 12 783 706
21
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MEMEDivision
Département
MINISTRY OF TERRITORIAL ADMINISTRATION AND DECENTRALIZATIONChapitre/Head
07MINISTERE DE L'ADMINISTRATION TERRITORIALE ET DE LA DECENTRALISATION
MBONGE:Indemnisation suite au déguerpissement du site de construction de larésidence du Sous-préfet
4 900 4 900
MBONGE: Compensation result to the eviction of the construction site of DO residence
MBONGE2 017
Total Chapitre/Head MINATD 4 900 4 900
MINISTRY OF DEFENCEChapitre/Head
13MINISTERE DE LA DEFENSE
CS KUMBA: Construction et achèvement centre de secours 175 000 100 000CS KUMBA: Construction of help's centre
KUMBA2 017
Total Chapitre/Head MINDEF 175 000 100 000
MINISTRY OF ARTS AND CULTUREChapitre/Head
14MINISTERE DES ARTS ET DE LA CULTURE
Réhabilitation du musée du palais Bafaw à KUMBA 3 000 3 000Rehabilitation of the Bafaw Palace Museum in KUMBA
Kumba2 017
Total Chapitre/Head MINAC 3 000 3 000
MINISTRY OF BASIC EDUCATIONChapitre/Head
15MINISTERE DE L'EDUCATION DE BASE
GNS MARUNBA BOWA : Construction d'un bloc latrine dans les EM COMMUNE DEMBONGE
3 500 3 500
GNS MARUNBA BOWA : Building a latrine block in EM MBONGE COUNCIL
MBONGE2 017
GNS Bombe Bakundu - Construction des blocs maternels - Commune de Mbonge 25 000 25 000GNS Bombe Bakundu - Construction of nursry blocks - Mbonge Council
MBONGE2 017
GNS Bombe Bakundu - Equipement d'un bloc maternel avec 40 tablettes, 120 petites-chaises, 6 tableaux sur chevalets, (02 tables + 04 chaises) pour enseignants - Communede Mbonge
2 000 2 000
GNS Bombe Bakundu - Equipment of a nursry block with 40 tablets, 120 small-chairs, 6tables on trestles, (02 tables + 04 chairs) for teachers Mbonge Council
MBONGE
2 017
GNS Marunba Bowa - Construction des salles de classe dans les écoles maternelles enzone rurale - Commune de Mbonge
18 000 18 000
GNS Marunba Bowa - Construction of classrooms in nursry schools in rural - MbongeCouncil
MBONGE
2 017
GNS Marumba Bawa - Equipement des salles de classe EM en zone rurale avec 20tablettes, 60 petites-chaises, 3 tableaux sur chevalets, (02 tables + 02 chaises) pourenseignants - Commune de Mbonge
900 900
GNS Marumba Bawa - Equipment of a nursery classroom in rural area with - MbongeCouncil
MBONGE
2 017
GS EKEMBA FIANGO: FABRIQUER LES TABLES BANCS POUR LES ECOLESPRIMAIRES. COMMUNE DE KUMBA II
1 800 1 800
GS EKEMBA FIANGO:MAKE TABLES BENCHES FOR PRIMARY SCHOOLS. KUMBAII COUNCIL
KUMBA II
2 017
GBPS GR II KUMBA STATION: Construire les Blocs Latrines dans les écoles primairesCOMMUNE DE KUMBA I
3 500 3 500
GBPS GR II KUMBA STATION: Blocks build latrines in primary schools Kumba I Council
KUMBA I2 017
GS MARUMBA BOWA : Construction d'un bloc de deux (02) salles de classeCOMMUNE DE MBONGE
18 000 18 000
GS MARUMBA BOWA : Construct the bloc of two (02) classroom MBONGE COUNCIL
MBONGE2 017
GS BOSAKA : Construction d'un bloc de deux (02) salles de classe COMMUNE DEKONYE
18 000 18 000
GS BOSAKA : Construct the bloc of two (02) classroom KONYE COUNCIL
KONYE2 017
GS MUNDAME : Construction d'un bloc de deux (02) salles de classe COMMUNE DEKUMBA III
21 000 21 000
GS MUNDAME : Construct the bloc of two (02) classroom KUMBA III COUNCIL
KUMBA III2 017
GS DIPENDA BAKUNDU : Construction d'un bloc de deux (02) salles de classeCOMMUNE DE KONYE
18 000 18 000
GS DIPENDA BAKUNDU : Construct the bloc of two (02) classroom KONYE COUNCIL
KONYE2 017
GS MUNDAME : équiper les écoles publiques programmées en tables bancsCOMMUNE DE KUMBA III
1 800 1 800
GS MUNDAME : equip public schools scheduled benches tables KUMBA III COUNCIL
KUMBA III2 017
22
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MEMEDivision
Département
GS MARUMBA BOWA : équiper les écoles publiques programmées en tables bancsCOMMUNE DE MBONGE
1 320 1 320
GS MARUMBA BOWA : equip public schools scheduled benches tables MBONGECOUNCIL
MBONGE
2 017
GS BOSAKA : équiper les écoles publiques programmées en tables bancs COMMUNEDE KONYE
1 320 1 320
GS BOSAKA : equip public schools scheduled benches tables KONYE COUNCIL
KONYE2 017
GS DIPENDA BAKUNDU : équiper les écoles publiques programmées en tables bancsCOMMUNE DE KONYE
1 320 1 320
GS DIPENDA BAKUNDU : equip public schools scheduled benches tables KONYECOUNCIL
KONYE
2 017
GS TANCHA: Acquisition des équipements dans les écoles pilotes(Tricycles,Planches delecture,Kits de matériels,Béquilles) COMMUNE DE KUMBA III
4 450 4 450
GS TANCHA: Acquisition of equipment in the pilot schools (Tricycles, reading boards,kits of equipment, Crutches) KUMBA III COUNCIL
KUMBA III
2 017
GS MBU BAKUMDU : Construction d'un logements d'astreinte pour enseignantCOMMUNE DE KONYE
14 500 14 500
GS MBU BAKUMDU : Construction of one staff house for KONYE COUNCIL
KONYE2 017
GS DIPENDA BAKUNDU : Equipement en deux bureaux de maitre dans les EPCOMMUNE DE KONYE
250 250
GS DIPENDA BAKUNDU : Equipment two offices for teachers in EP KONYE COUNCIL
KONYE2 017
GS BOSAKA : Equipement en deux bureaux de maitre dans les EP COMMUNE DEKONYE
250 250
GS BOSAKA : Equipment two offices for teachers in EP KONYE COUNCIL
KONYE2 017
GS MUNDAME : Equipement en deux bureaux de maitre dans les EP COMMUNE DEKUMBA III
250 250
GS MUNDAME : Equipment two offices for teachers in EP KUMBA III COUNCIL
KUMBA III2 017
GS MARUMBA BOWA : Equipement en deux bureaux de maitre dans les EPCOMMUNE DE MBONGE
250 250
GS MARUMBA BOWA : Equipment two offices for teachers in EP MBONGE COUNCIL
MBONGE2 017
Total Chapitre/Head MINEDUB 155 410 155 410
MINISTRY OF COMMERCEChapitre/Head
21MINISTERE DU COMMERCE
Refection de la DDC de la Mémé 4 500 4 500Repairing the Mémé TDD
KUMBA2 017
Acquisition du mobilier pour la DDC de la Meme 3 000 3 000Acquisition of furniture for the Meme TDD
KUMBA2 017
Total Chapitre/Head MINCOMMERCE 7 500 7 500
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENTChapitre/Head
22MINISTERE DE L'ECONOMIE, DE LA PLANIFICATION ET DE L'AMENAGEMENT DU TERRITOIRE
DD MEME: Appui au comité départemental de suivi du BIP 8 000 8 000DD MEME: Support to the PIB follow-up Divisional Committee
KUMBA2 017
DD MEME: Suivi administratif du BIP 2 500 2 500DD MEME: Admisnistrative monitoring of PIB
KUMBA I2 017
Total Chapitre/Head MINEPAT 10 500 10 500
MINISTRY OF TOURISM AND LEISUREChapitre/Head
23MINISTERE DU TOURISME ET DES LOISIRS
Equipement de la DDTL de la Mémé en mobiliers et matériel de bureau 1 500 1 500Equipping the DDTL of Meme with furniture and office equipment
KUMBA2 017
Equipement de la DDTL de la Mémé en matériel Informatique 1 500 1 500Purchase of computer equipment for the MEME DDTL
KUMBA2 017
Total Chapitre/Head MINTOURL 3 000 3 000
23
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MEMEDivision
Département
MINISTRY OF SECONDARY EDUCATIONChapitre/Head
25MINISTERE DES ENSEIGNEMENTS SECONDAIRES
LT DE BOMBE BAKUNDU: construction de 1 bloc de 2 salles de classe + bureauordinaire
21 000 21 000
GTHS OF BOMBE BAKUNDU: construction of of 2 classrooms + regular block office
BOMBEBAKUNDU2 017
LEG DE KONYE: Réahabilitations des infrastructures pédagogiques 4 500 4 500GHS OF KONYE: Renovation of pedagogics infrastruct
KONYE2 017
ENIET DE KUMBA: Branchement au réseau électrique ENEO 11 070 11 070GTTTC OF KUMBA: Connexion to ENEO électricity network
KUMBA2 017
CES DE BOLE: Equipement des salles de classe en table bancs 1 800 1 800GSS BOLE: Equipment of classrooms with benches
MBONGE2 017
LYCEE DE MATOH: Equipement des salles de classe en table bancs 1 800 1 800LYCEE DE MATOH : Equipment of classrooms with benc
MATOH2 017
Equipement d'un atelier en Kit petits matériels didactiques Lycée Technique KUMBABAROMBI KANG
3 000 3 000
Equipment of a workshop with basic tools kit Govt Tech High School KUMBA BAROMBIKANG
KUMBA BAROMBIKANG
2 017
Equipement d'un atelier en Kit petits matériels didactiques LT BOMBE BAKUNDU 3 000 3 000Equipment of a workshop with basic tools kit GTHS BOMBE BAKUNDU
BAKUNDU2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC de MOFAKOBEKONDO
3 000 3 000
Equipment of a workshop with basic tools kit GTC MOFAKO BEKONDO
MOFAKOBEKONDO2 017
ENIET DE KUMBA Equipement d'un atelier en Kit petits matériels didactiques 3 000 3 000GTTTC KUMBA : Equipment of a workshop with basic t
KUMBA I2 017
LEG MATOH : Equipement en ordinateur complet 2 000 2 000GHS MATOH: Equipment of a school with a full com
MATOH2 017
CES DE MARUMBA II: Construction des blocs latrines 4 500 4 500GSS OF MARUMBA II: Construction of sanitary
MARUMBA 22 017
CETIC DE MATOH BUTU: Construction des blocs latrines 4 500 4 500GTC MATOH BUTU: Construction of sanitary block
MATOH BUTU2 017
LYCEE TECHNIQUE DE KUMBA: Equipement de l'atelier de géomètre-topographe 50 000 50 000GTHS KUMBA: Equipment of the surveys workshop
KUMBA2 017
Total Chapitre/Head MINESEC 113 170 113 170
MINISTRY OF ENVIRONMENT , PROTECTION OF NATURE AND SUSTAINABLE DEVELOPMENTChapitre/Head
28MINISTERE DE L'ENVIRONNEMENT, DE LA PROTECTION DE LA NATURE ET DU DEVELOPPEMENT DURABLE
Commune de Kumba I : Appui aux communes dans la lutte contre les emballagesplastiques
4 000 4 000
Kumba I Council : support to council in the fight
KUMBA I2 017
Total Chapitre/Head MINEP 4 000 4 000
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENTChapitre/Head
30MINISTERE DE L'AGRICULTURE ET DU DEVELOPPEMENT RURAL
Acquisition des engins de génie civil 900 000 900 000Acquisition of civil engineering machinery
KUMBA2 017
Appui à la fertilisation du palmier à huile et du bananier 1 000 000 1 000 000Support to the fertilization of oil palm and banana
KUMBA2 017
Mise en œuvre effective des Agropoles de Kumba (palmier à huile) 200 000 200 000Effective implementation of agropoles at Kumba (oil palm)
KUMBA2 017
MUNDAME : Construction d'un forage équipé d'un PMH 8 000 8 000MUNDAME :
MUNDAME2 017
MPENYE Street mile I: Construction d'un forage équipé d'un PMH 8 000 8 000MPENYE Street mile I: Construction of a bore hole with HPM
MPENYE StreetMile I2 017
KOSALA : Construction d'un forage équipé d'un PMH 8 000 8 000KOSALA : Construction of a bore hole with HPM
LISOKA Village2 017
Construction des ouvrages d'assainissement et de drainage sur la route Meyos - YemvanElig - Niang
15 000 15 000KUMBA II2 017
24
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MEMEDivision
Département
Construction d'un ponceau au quartier Forgong au Village Fiango 15 000 15 000Construction of a culvert on Forgong on Fiango vil
KUMBA II2 017
Construction d'un ouvrage d'art à Ongoa (Akok) (4km) 15 000 15 000Construction d'un ouvrage d'art à Ongoa (Akok) (4km)
KUMBA I2 017
Kake I -Barombi Mbo farm to Market road in Kumba I council area: Ouverture d'une pisteagricole
10 000 10 000
Kake I -Barombi Mbo farm to Market road in Kumba I council area: Opening ofagricultural road
Kake I
2 017
Plantation- route du marché shabla-matoh: Réhabilitation 10 000 10 000farm to market road: shabla-matoh: Rehabilitation
Matoh2 017
Kake I -Plantation Barombi Mbo et la route du marché de la Maire de Kumba I:Réhabilitation
10 000 10 000
Kake I -Barombi Mbo farm to Market road in Kumba I: Renovation of agricultural road
KAKE I2 017
Plantation- route Chef Epie et Matoh: Réhabilitation 10 000 10 000Farm to market road Chief Epie to Matoh: Renovation of agricultural road
Matoh2 017
Koba-Bosaka-Old Town Mbu Bakundu: réhabikitation d'une piste rurale 20 000 20 000Koba-Bosaka-Old Town Mbu Bakundu: Renovation of ag
Koba-Bosaka-OldTown MbuBakundu:
2 017
Total Chapitre/Head MINADER 2 229 000 2 229 000
MINISTRY OF LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIESChapitre/Head
31MINISTERE DE L'ELEVAGE, DES PECHES ET DES INDUSTRIES ANIMALES
Finalisation de l'abattoir de KUMBA par l'équipement en rails aériens 20 000 20 000Complete Kumba slaughterhouse equipped with overhead rail
KUMBA I2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE KUMBA III
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerKUMBA III COUNCIL
KUMBA III
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE KUMBA I
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerKumba I Council
KUMBA I
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE KONYE
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerKONYE COUNCIL
KONYE
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE MBONGE
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerMBONGE COUNCIL
MBONGE
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE KUMBA II
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerKUMBA II COUNCIL
KUMBA II
2 017
Appui à la Communauté Urbaine de Kumba pour la lutte contre la rage 5 000 5 000Support to councils and urban communities against rabies
Kumba2 017
Total Chapitre/Head MINEPIA 30 000 30 000
MINISTRY OF WATER RESOURCES AND ENERGYChapitre/Head
32MINISTERE DE L'EAU ET DE L'ENERGIE
FINEX: projet ERD-RUMPI (finalisation des Travaux de Construction de la petite CentraleHydroélectrique (2,9 MW))
832 000 832 000
External Funds: Electricity for Rural Development in Rumpi Area (ERD-RUMPI)
MBOA BAKUNDU2 017
FCP : ERP-RUMPI (Finalisation des Travaux de Construction de la petite CentraleHydroélectrique (2,9 MW))
1 000 000 1 000 000
Counterpart Funds: Electricity for Rural Development in Rumpi Area (ERD-RUMPI)
MBOA BAKUNDU2 017
Total Chapitre/Head MINEE 1 832 000 1 832 000
25
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
MEMEDivision
Département
MINISTRY OF PUBLIC WORKSChapitre/Head
36MINISTERE DES TRAVAUX PUBLICS
Commune de MBONGE : Entretien Routier 27 000 27 000MBONGE Council : Road Maintenance
MBONGE2 017
Commune de KUMBA III : Entretien Routier 27 000 27 000KUMBA III Council : Road Maintenance
KUMBA III2 017
Commune de KUMBA I : Entretien Routier 27 000 27 000KUMBA I Council : Road Maintenance
KUMBA I2 017
Commune de KUMBA II : Entretien Routier 27 000 27 000KUMBA II Council : Road Maintenance
KUMBA2 017
Commune de KONYE : Entretien Routier 27 000 27 000KONYE Council : Road Maintenance
KONYE2 017
Total Chapitre/Head MINTP 135 000 135 000
MINISTRY OF SMALL AND MEDIUM-SIZED ENTERPRISES,SOCIAL ECONOMY AND HANDICRAFTChapitre/Head
39MINISTERE DES PETITES ET MOYENNES ENTREPRISES, DE L'ECONOMIE SOCIALE ET DE L'ARTISANAT
Equipement en matériel informatique pour la délégation départementale de la Meme 3 200 3 200Provision of computing equipment to the Meme divisional delegation
KUMBA I2 017
Total Chapitre/Head MINPMEESA 3 200 3 200
MINISTRY OF PUBLIC HEALTHChapitre/Head
40MINISTERE DE LA SANTE PUBLIQUE
CSI DE BOA BALONDO : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000BOA BALONDO IHC : equipment in medical aparatus
MBONGE2 017
CMA DE NTAM : ÉQUIPEMENT BLOC DE MATERNITÉ 15 000 15 000NTAM AMC : Equipment of maternity block
NTAM2 017
CMA DE KUMBA : REHABILITATION 28 085 28 085CMA DE KUMBA : RENOVATION
KUMBA II2 017
Total Chapitre/Head MINSANTE 51 085 51 085
MINISTRY OF SOCIAL AFFAIRSChapitre/Head
42MINISTERE DES AFFAIRES SOCIALES
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE KONYE
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon KONYE COUNCIL
KONYE
2 017
Total Chapitre/Head MINAS 1 500 1 500
4 758 265Total Département/Division MEME 4 683 265
26
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
LEBIALEMDivision
Département
MINISTRY OF JUSTICEChapitre/Head
08MINISTERE DE LA JUSTICE
prison de Menji:Travaux d'Aménagement 20 000 20 000Maintenance works for menji Prison
Menji2 017
Total Chapitre/Head MINJUSTICE 20 000 20 000
MINISTRY OF BASIC EDUCATIONChapitre/Head
15MINISTERE DE L'EDUCATION DE BASE
GNS Besali - Construction des salles de classe dans les écoles maternelles en zonerurale - Commune de Wabane
17 000 17 000
GNS Besali - Construction of classrooms in nursry schools in rural - Wabane Council
WABANE2 017
GNS Nwametaw - Construction des salles de classe dans les écoles maternelles en zonerurale - Commune de Alou
17 000 17 000
GNS Nwametaw - Construction of classrooms in nursry schools in rural - Alou Council
ALOU2 017
GNS Nwametaw - Equipement des salles de classe EM en zone rurale avec 20 tablettes,60 petites-chaises, 3 tableaux sur chevalets, (02 tables + 02 chaises) pour enseignants -Commune d'Alou
900 900
GNS Nwametaw - Equipment of a nursery classroom in rural area with - Alou Council
ALOU
2 017
GNS Besali - Equipement des salles de classe EM en zone rurale avec 07 tablettes,27petites-chaises, 2 tableaux sur chevalets, (01 tables + 02 chaises) pour enseignants -Commune de Wabane
900 900
GNS Besali - Equipment of a nursery classroom in rural area with - Wabane Council
WABANE
2 017
GBPS LEWOH FOTABONG : Réhabiliter les écoles Primaires COMMUNE D'ALOU 20 000 20 000GBPS LEWOH FOTABONG : Rehabilitating Primary Schools ALOU COUNCIL
ALOU2 017
GS KENKAH-FONKEM: Construire les Blocs Latrines dans les écoles primairesCOMMUNE DE WABANE
3 500 3 500
GS KENKAH-FONKEM: Blocks build latrines in primary schools Wabane Council
WABANE2 017
GS NCHINGANG : Construction d'un bloc de deux (02) salles de classe COMMUNE DEWABANE
17 000 17 000
GS NCHINGANG : Construct the bloc of two (02) classroom Wabane Council
WABANE2 017
GS FOSIMONDI : Construction d'un bloc de deux (02) salles de classe COMMUNED'ALOU
17 000 17 000
GS FOSIMONDI : Construct the bloc of two (02) classroom ALOU COUNCIL
ALOU2 017
GS ABEBUE : Construction d'un bloc de deux (02) salles de classe COMMUNE DEMENJI
20 000 20 000
GS ABEBUE : Construct the bloc of two (02) classroom MENJI COUNCIL
FONTEM2 017
GS KHOTI MBINDIA : Construction d'un bloc de deux (02) salles de classe COMMUNEDE MENJI
20 000 20 000
GS KHOTI MBINDIA : Construct the bloc of two (02) classroom MENJI COUNCIL
FONTEM2 017
GS ABEBUE : équiper les écoles publiques programmées en tables bancs COMMUNEDE MENJI
1 800 1 800
GS ABEBUE : equip public schools scheduled benches tables MENJI COUNCIL
FONTEM2 017
GS KHOTI MBINDIA : équiper les écoles publiques programmées en tables bancsCOMMUNE DE MENJI
1 800 1 800
GS KHOTI MBINDIA : equip public schools scheduled benches tables MENJI COUNCIL
FONTEM2 017
GS FOSIMONDI : équiper les écoles publiques programmées en tables bancsCOMMUNE D'ALOU
1 320 1 320
GS FOSIMONDI : equip public schools scheduled benches tables ALOU COUNCIL
ALOU2 017
GS NCHINGANG : équiper les écoles publiques programmées en tables bancsCOMMUNE DE WABANE
1 320 1 320
GS NCHINGANG : equip public schools scheduled benches tables Wabane Council
WABANE2 017
GBPS FONTEM I: Acquisition des équipements dans les écolespilotes(Tricycles,Planches de lecture,Kits de matériels,Béquilles) COMMUNE DE MENJI
4 450 4 450
GBPS FONTEM I: Acquisition of equipment in the pilot schools (Tricycles, readingboards, kits of equipment, Crutches) MENJI COUNCIL
FONTEM
2 017
GS FOSIMONDI : Equipement en deux bureaux de maitre dans les EP COMMUNED'ALOU
250 250
GS FOSIMONDI : Equipment two offices for teachers in EP ALOU COUNCIL
ALOU2 017
GS KHOTI MBINDIA : Equipement en deux bureaux de maitre dans les EP COMMUNEDE MENJI
250 250
GS KHOTI MBINDIA : Equipment two offices for teachers in EP MENJI COUNCIL
FONTEM2 017
27
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
LEBIALEMDivision
Département
GS ABEBUE : Equipement en deux bureaux de maitre dans les EP COMMUNE DEMENJI
250 250
GS ABEBUE : Equipment two offices for teachers in EP MENJI COUNCIL
FONTEM2 017
GS NCHINGANG : Equipement en deux bureaux de maitre dans les EP COMMUNE DEWABANE
250 250
GS NCHINGANG: Equipment two offices for teachers in EP Wabane Council
WABANE2 017
Total Chapitre/Head MINEDUB 144 990 144 990
MINISTRY OF COMMERCEChapitre/Head
21MINISTERE DU COMMERCE
Acquisition du mobilier pour la DDC du Lebialem 3 000 3 000Acquisition of furniture for the Lebialem TDD
FONTEM2 017
Total Chapitre/Head MINCOMMERCE 3 000 3 000
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENTChapitre/Head
22MINISTERE DE L'ECONOMIE, DE LA PLANIFICATION ET DE L'AMENAGEMENT DU TERRITOIRE
DD LEBIALEM: Appui au comité départemental de suivi du BIP 8 000 8 000DD LEBIALEM: Support to the PIB follow-up Divisional Committee
FONTEM2 017
DD LEBIALEM: Suivi administratif du BIP 2 500 2 500DD LEBIALEM: Admisnistrative monitoring of PIB
FONTEM2 017
Total Chapitre/Head MINEPAT 10 500 10 500
MINISTRY OF SECONDARY EDUCATIONChapitre/Head
25MINISTERE DES ENSEIGNEMENTS SECONDAIRES
LT DE FONTEM: construction de 2 salles de classe + bureau ordinaire 20 000 20 000GTHS OF FONTEM: construction of 2 classroom + regular office
FONTEM2 017
CETIC DE BECHATI: Branchement au réseau électrique ENEO 10 000 10 000GTC OF BECHATI: Connexion to ENEO électricity network
BECHATI2 017
LT DE LEWOH: Construction d’un atelier 25 000 25 000GTHC OF LEWOH: Construction for workshop
LEWOH2 017
LT DE FONTEM : Equipement des salles de classe en table bancs 1 800 1 800GTHS FONTEM: Equipment of classrooms with benches
FONTEM2 017
LB NDUNGNWA : Equipement des salles de classe en table bancs 1 800 1 800GTHS NDUNGNWA: Equipment of classrooms with bench
NDUNGNWA2 017
Equipement d'un atelier en Kit petits matériels didactiques LYTECH FONTEM 3 000 3 000Equipment of a workshop with basic tools kit GTSS FONTEM
FONTEM2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC ABEBBUE ESSOH 3 000 3 000Equipment of a workshop with basic tools kit GTC ABEBBUE ESSOH
ABEBBUE ESSOH2 017
Equipement d'un atelier en Kit petits matériels didactiques LT LEWOH 3 000 3 000Equipment of a workshop with basic tools kit GTHS LEWOH
ALOU2 017
Equipement d'un atelier en Kit petits matériels didactiques COLLEGE ENS TECHN INDET COMM DE NTEMNDZEM
3 000 3 000
Equipment of a workshop with basic tools kit GOV TECHN IND AND COMM COLLNTEMNDZEM
NTEMNDZEM
2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC DE FONGE 3 000 3 000Equipment of a workshop with basic tools kit GTC FONGE TECH G S
FONGE2 017
Equipement d'un atelier en Kit petits matériels didactiques Col d’Ens Tech Ind et Com deMMOCK-MBIE
3 000 3 000
Equipment of a workshop with basic tools kit Gov Tech Col MMOCK-MBIE
MMOCK- MBIE2 017
Equipement d'un atelier en Kit petits matériels didactiques CETIC de BESALI 3 000 3 000Equipment of a workshop with basic tools kit GTC BESALI
WABANE2 017
COLLEGE ENS TECHN IND ET COMM DE NTEMNDZEM: Equipement en ordinateurcomplet
2 000 2 000
Equipment of a school with a full GOV TECHN IND AND COMM COLL NTEMNDZEM
NTEMNDZEM2 017
CES de NKONG : Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full compu GSS NKONG
NKONG2 017
LEG D'ANYA-LEWOH: Construction d’un forage 8 500 8 500GHS ANYA-LEWOH: Construction of a bore hole
ANYA-LEWOH2 017
LB DE NDUNG-NWA: Construction des blocs latrines 4 500 4 500GBHS OF NDUNG-NWA: Construction of sanitary
NDUNG-NWA2 017
28
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
LEBIALEMDivision
Département
Total Chapitre/Head MINESEC 96 600 96 600
MINISTRY OF MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENTChapitre/Head
29MINISTERE DES MINES, DE L'INDUSTRIE ET DU DEVELOPPEMENT TECHNOLOGIQUE
Construction de la délégation départementale du Lebialem 41 000 41 000Construction of the Departmental Delegation Lebialem
FONTEM2 017
Total Chapitre/Head MINIMIDT 41 000 41 000
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENTChapitre/Head
30MINISTERE DE L'AGRICULTURE ET DU DEVELOPPEMENT RURAL
Mise en œuvre effective des Agropoles de Lebialem (pomme de terre) 250 000 250 000Effective implementation of agropoles at Lbialem (irrish potato)
ALOU2 017
Ngo-Njentse Essoh (Attah road): Réhabitlitation d'un puit 6 000 6 000Ngo-Njentse Essoh (Attah road): Renovation
Ngo-Njentse Essoh(Attah road)2 017
Nchingang-Funi-Akongkong-Tabot: Ouverture d'une piste agricole 10 000 10 000Nchingang-Funi-Akongkong-Tabot: Opening of agricultural roads
Nchingang-Funi-Akongkong-Tabot2 017
Alou: Construction case communautaire 15 000 15 000Alou: Construction of community hall
Melockmelig-Nwangong2 017
Total Chapitre/Head MINADER 281 000 281 000
MINISTRY OF LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIESChapitre/Head
31MINISTERE DE L'ELEVAGE, DES PECHES ET DES INDUSTRIES ANIMALES
Construction d'une unité de production des porcelets à Wabané- Aghem Besali (2èmephase)
39 500 39 500
construction of piglet production plant at Wabané- Aghem Besali (2nd phase)
AGHEM BESALI2 017
Construction d'un forage pastoral à énergie solaire à Ambo-Besali 20 000 20 000Construction of pastoral borehole with solar energy at Ambo-Besali
Ambo-Besali2 017
Construction d'un forage pastoral à énergie solaire à Emang (Anya-Lewoh) 20 000 20 000Construction of pastoral borehole with solar energy at Emang (Anya-Lewoh)
EMANG2 017
Construction d'un forage pastoral à énergie solaire à Alou 20 000 20 000Construction of ^pastoral borehole with solar energy at Alou
Alou2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE D'ALOU
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerALOU COUNCIL
ALOU
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE WABANE
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerWabane Council
WABANE
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE MENJI
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerMENJI COUNCIL
FONTEM
2 017
Construction du CZV de Nkongle 30 000 30 000Construction of Nkongle veterinary and zootechnical center
Nkongle2 017
Total Chapitre/Head MINEPIA 132 500 132 500
MINISTRY OF WATER RESOURCES AND ENERGYChapitre/Head
32MINISTERE DE L'EAU ET DE L'ENERGIE
LETIA FONTEM LEGNANG ET LEWI ATOUTENG QUARTIER : Electrification Rurale(phase 2)
14 903 14 903
LETIA FONTEM LEGNANG ET LEWI ATOUTENG QUARTIER :Rural electrification(phase 2)
LETIA FONTEMLEGNANG ETLEWI ATOUTENGQUARTIER
2 017
ATULIA LEKONG NDUNGWEH : Electrification Rurale (phase 2) 25 000 25 000ATULIA LEKONG NDUNGWEH : Rural Electrification (phase 2)
ATULIA LEKONGNDUNGWEH2 017
EMMALLAH NDOUNGATET/ électrification rurale 38 500 38 500EMMALLAH NDOUNGATET/ rural electrification
EMALLAHNDUNGATET2 017
BELLA NGEH VILLAGE : Renforcement Réhabilitation et extension du réseau d'AEP 41 255 41 255BELLA NGEH VILLAGE: Strengthening Rehabilitation and extension of water supplynetwork
BELLA NGEHVILLAGE2 017
29
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
LEBIALEMDivision
Département
DD LEBIALEM: Acquisition d'un copieur 1 500 1 500DD LEBIALEM :Acquisition of copier
FONTEM2 017
Total Chapitre/Head MINEE 121 158 121 158
MINISTRY OF EMPLOYMENT AND VOCATIONAL TRAININGChapitre/Head
35MINISTERE DE L'EMPLOI ET DE LA FORMATION PROFESSIONNELLE
SAR/SM LETIA FONTEM: Construction d'un Atelier 30 000 30 000SAR/SM LETIA FONTEM: Building of a workshop
LETIA FONTEM2 017
SAR/SM LETIA FONTEM: Extention du réseau électrique ENEO 8 213 8 213SAR/SM LETIA FONTEM: Extention of electric network ENEO
LETIA FONTEM2 017
Elaboration des plans prévisionnels locaux de recyclage, d'insertion et de réinsertionprofessionnelle au niveau communal COMMUNE D'ALOU
7 000 7 000
Elaboration of estimated local retrining, insertio ALOU COUNCIL
ALOU2 017
Total Chapitre/Head MINEFOP 45 213 45 213
MINISTRY OF PUBLIC WORKSChapitre/Head
36MINISTERE DES TRAVAUX PUBLICS
Commune de MENJI : Entretien Routier 27 000 27 000MENJI Council : Road Maintenance
FONTEM2 017
Commune d' ALOU : Entretien Routier 27 000 27 000ALOU Council : Road Maintenance
ALOU2 017
Commune de WABANE : Entretien Routier 27 000 27 000WABANE Council : Road Maintenance
WABANE2 017
Total Chapitre/Head MINTP 81 000 81 000
MINISTRY OF PUBLIC HEALTHChapitre/Head
40MINISTERE DE LA SANTE PUBLIQUE
CMA DE WABANE : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 15 000 15 000WABANE AMC : Equipment with medical aparatus
WABANE2 017
CMA DE WABANE : ACQUISITION DE L'ENERGIE SOLAIRE 15 000 15 000WABANE AMC : Acquisition of solar energy
WABANE2 017
CSI DE NKONG : EQUIPEMENT MEDICAL 8 000 8 000NKONG IHC : Equipment with medical aparatus
WABANE2 017
Total Chapitre/Head MINSANTE 38 000 38 000
MINISTRY OF SOCIAL AFFAIRSChapitre/Head
42MINISTERE DES AFFAIRES SOCIALES
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE WABANE
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon Wabane Council
WABANE
2 017
Total Chapitre/Head MINAS 1 500 1 500
1 016 461Total Département/Division LEBIALEM 1 016 461
30
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
KOUPE ET MANENGOUBADivision
Département
MINISTRY OF TERRITORIAL ADMINISTRATION AND DECENTRALIZATIONChapitre/Head
07MINISTERE DE L'ADMINISTRATION TERRITORIALE ET DE LA DECENTRALISATION
TOMBEL: Reprogrammation des travaux de rénovation du centre d'état civil principal 11 600 11 600TOMBEL: Reprogramming renovation works of the main civil status registery
TOMBEL2 017
Total Chapitre/Head MINATD 11 600 11 600
MINISTRY OF JUSTICEChapitre/Head
08MINISTERE DE LA JUSTICE
Palais de Justice de Bangem : Etudes architecturales et géotechniques pour laconstruction
35 000 35 000
Bangme court: Architectural and technical studies for construction work
BANGEM2 017
Total Chapitre/Head MINJUSTICE 35 000 35 000
MINISTRY OF BASIC EDUCATIONChapitre/Head
15MINISTERE DE L'EDUCATION DE BASE
GS NGUSI GROUP 1: Construire les Blocs Latrines dans les écoles primairesCOMMUNE DE TOMBEL
3 500 3 500
GS NGUSI GROUP 1: Blocks build latrines in primary schools TOMBEL COUNCIL
TOMBEL2 017
GS NGUSI GROUP 2 : Construction d'un bloc de deux (02) salles de classe COMMUNEDE TOMBEL
17 000 17 000
GS NGUSI GROUP 2 : Construct the bloc of two (02) classroom TOMBEL COUNCIL
TOMBEL2 017
GS MUNGO NDOR : Construction d'un bloc de deux (02) salles de classe COMMUNEDE NGUTI
17 000 17 000
GS MUNGO NDOR : Construct the bloc of two (02) classroom NGUTI COUNCIL
NGUTI2 017
GS NZELETED : Construction d'un bloc de deux (02) salles de classe COMMUNE DENGUTI
17 000 17 000
GS NZELETED : Construct the bloc of two (02) classroom NGUTI COUNCIL
NGUTI2 017
GS NZELETED : équiper les écoles publiques programmées en tables bancsCOMMUNE DE NGUTI
1 320 1 320
GS NZELETED : equip public schools scheduled benches tables NGUTI COUNCIL
NGUTI2 017
GS MUNGO NDOR : équiper les écoles publiques programmées en tables bancsCOMMUNE DE NGUTI
1 320 1 320
GS MUNGO NDOR : equip public schools scheduled benches tables NGUTI COUNCIL
NGUTI2 017
GS NGUSI GROUP 2 : équiper les écoles publiques programmées en tables bancsCOMMUNE DE TOMBEL
1 320 1 320
GS NGUSI GROUP 2 : equip public schools scheduled benches tables TOMBELCOUNCIL
TOMBEL
2 017
GPS BANGEM: Acquisition des équipements dans les écoles pilotes(Tricycles,Planchesde lecture,Kits de matériels,Béquilles) COMMUNE DE BANGEM
4 450 4 450
GPS BANGEM: Acquisition of equipment in the pilot schools (Tricycles, reading boards,kits of equipment, Crutches) COUNCIL of BANGEM
BANGEM
2 017
ETS GUIBAI COMPUTER:payement des arriérés pour construction de salles de classesà GS TANGANG sur BIP 2014. COMMUNE DE NGUTI/KUPE MANENGOUBA/SUD-OUEST
15 805 15 805
ETS GUIBAI COMPUTER:pay the arrears of the markets for financial year 2013-2014NGUTI/KUPE MANENGOUBA/SUD-OUEST COUNCIL
NGUTI
2 017
GS MUNGO NDOR : Equipement en deux bureaux de maitre dans les EP COMMUNEDE NGUTI
250 250
GS MUNGO NDOR : Equipment two offices for teachers in EP NGUTI COUNCIL
NGUTI2 017
GS NZELETED : Equipement en deux bureaux de maitre dans les EP COMMUNE DENGUTI
250 250
GS NZELETED : Equipment two offices for teachers in EP NGUTI COUNCIL
NGUTI2 017
GS NGUSI GROUP 2 : Equipement en deux bureaux de maitre dans les EP COMMUNEDE TOMBEL
250 250
GS NGUSI GROUP 2 : Equipment two offices for teachers in EP TOMBEL COUNCIL
TOMBEL2 017
Total Chapitre/Head MINEDUB 79 465 79 465
31
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
KOUPE ET MANENGOUBADivision
Département
MINISTRY OF COMMERCEChapitre/Head
21MINISTERE DU COMMERCE
Acquisition du mobilier pour la DDC du Koupé Manengouba 3 000 3 000Acquisition of furniture for the Koupe Manengouba TDD
BANGEM2 017
Total Chapitre/Head MINCOMMERCE 3 000 3 000
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENTChapitre/Head
22MINISTERE DE L'ECONOMIE, DE LA PLANIFICATION ET DE L'AMENAGEMENT DU TERRITOIRE
DD KOUPE MANENGOUBA : construction de logement d'astreinte 25 000 25 000DD KOUPE MANENGOUBA : construction of an oncall duty accomodation
BANGEM2 017
DD KOUPE & MANENGOUBA: Appui au comité départemental de suivi du BIP 8 000 8 000DD KOUPE & MANENGOUBA: Support to the PIB follow-up Divisional Committee
BANGEM2 017
DD KOUPE & MANENGOUBA: Suivi administratif du BI 2 500 2 500DD KOUPE & MANENGOUBA: Admisnistrative monitoring of PIB
BANGEM2 017
Total Chapitre/Head MINEPAT 35 500 35 500
MINISTRY OF TOURISM AND LEISUREChapitre/Head
23MINISTERE DU TOURISME ET DES LOISIRS
Bangem : Construction d'un bar/restaurant (phase 1) 150 000 150 000Bangem : Construction of a bar/restaurant (1st phase)
Bangem2 017
Bangem : Maîtrise d'œuvre 10 000 10 000Bangem : Supervision of works
Bangem2 017
Total Chapitre/Head MINTOURL 160 000 160 000
MINISTRY OF SECONDARY EDUCATIONChapitre/Head
25MINISTERE DES ENSEIGNEMENTS SECONDAIRES
LEG DE NGUSI: construction de 2 salles de classe + bureau ordinaire 22 000 22 000GHS OF NGUSI: construction of 2 classroom + regular office
NGUSI2 017
LT DE TOMBEL: Equipement des salles de classe en table bancs 1 800 1 800GTHS TOMBEL : Equipment of classrooms with benches
TOMBEL2 017
Equipement d'un atelier en Kit petits matériels didactiques LT TOMBEL 3 000 3 000Equipment of a workshop with basic tools kit GTHS TOMBEL
TOMBEL2 017
Equipement d'un atelier en Kit petits matériels didactiques LT BANGEM 3 000 3 000Equipment of a workshop with basic tools kit GTHS BANGEM
BANGEM2 017
CETIC DE NGUTI: Equipement d'un atelier en kit pétits matériel didactiques 3 000 3 000GTC NGUTI: Equipment of a workshop with basic tool
NGUTI2 017
CES DE NDOM : Equipement en ordinateur complet 2 000 2 000Equipment of a school with a full compu GSS of NDOM
NDOM2 017
Total Chapitre/Head MINESEC 34 800 34 800
MINISTRY OF YOUTH AFFAIRS AND CIVIC EDUCATIONChapitre/Head
26MINISTERE DE LA JEUNESSE ET DE L'EDUCATION CIVIQUE
équipement de l'atelier informatique du CMPJ Départemental de BANGEM 3 000 3 000Equipment Computer workshop of DIVISIONAL MYEC KOUPEMANENGOUBA
KOUPEMANENGOUBA2 017
équipement en Matériel informatique de la DDJEC de KUPE MANENGUBA 4 800 4 800Acquisition of computer equipment for DDJEC koupe manengouba
BANGEM2 017
Total Chapitre/Head MINJEC 7 800 7 800
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENTChapitre/Head
30MINISTERE DE L'AGRICULTURE ET DU DEVELOPPEMENT RURAL
Plantation Moako-Nlog-Bekume- route du marché: Réhabilitation 10 000 10 000Moako-Nlog-Bekume Farm to Market road: Rehabilitation
Shabla-Matoh2 017
Total Chapitre/Head MINADER 10 000 10 000
32
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
KOUPE ET MANENGOUBADivision
Département
MINISTRY OF LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIESChapitre/Head
31MINISTERE DE L'ELEVAGE, DES PECHES ET DES INDUSTRIES ANIMALES
Construction d'un forage pastoral à énergie solaire à TOMBEL CENTRE 20 000 20 000Construction of pastoral borehole with solar energy at TOMBEL CENTRE
TOMBEL CENTRE2 017
Construction d'un forage pastoral à énergie solaire à MANENGUBA VILLAGE 20 000 20 000Construction of pastoral borehole with solar energy at MANENGUBA VILLAGE
MANENGOUBAVILLAGE2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE BANGEM
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerCOUNCIL of BANGEM
BANGEM
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE TOMBEL
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerTOMBEL COUNCIL
TOMBEL
2 017
Promotion de l'excellence (organisation du concours du plus bel élevage et du plus belanimal) COMMUNE DE NGUTI
1 000 1 000
Support to the organisation of the competition of the most attracting livestock rearerNGUTI COUNCIL
NGUTI
2 017
Total Chapitre/Head MINEPIA 43 000 43 000
MINISTRY OF WATER RESOURCES AND ENERGYChapitre/Head
32MINISTERE DE L'EAU ET DE L'ENERGIE
TOMBEL : Adduction d'Eau Potable et maîtrise d'oeuvre des travaux 250 000 150 000TOMBEL: Supply of Drinking Water
TOMBEL2 017
DD KOUPE MANENGOUBA: Acquisition du mobilier de bureau 4 000 4 000DD KOUPE MANENGOUBA :Acquisition of office furniture
BANGEM2 017
Total Chapitre/Head MINEE 254 000 154 000
MINISTRY OF EMPLOYMENT AND VOCATIONAL TRAININGChapitre/Head
35MINISTERE DE L'EMPLOI ET DE LA FORMATION PROFESSIONNELLE
SAR/SM BANGEM TOWN: Construction d'un atelier 30 000 30 000SAR/SM BANGEM TOWN: Building of workshop
BANGEM2 017
SAR/SM BANGEM TOWN: Construction d'un bloc de 02 salles de classe avec bureu duDirecteur
30 000 30 000
SAR/SM BANGEM TOWN: Building of bloc of 02 classrooms wIth the director office
BANGEM2 017
SAR/SM MANYEMEN: Finition de deux salles de classe + bloc administratif 6 050 6 050SAR/SM MANYEMEN: End of builiding two classroom + an
MANYEMEN2 017
Total Chapitre/Head MINEFOP 66 050 66 050
MINISTRY OF PUBLIC WORKSChapitre/Head
36MINISTERE DES TRAVAUX PUBLICS
Travaux de bitumage de la route Melong-Bangem 5 000 000 1 000 000Asphalting of the road Melong-Bangem
melom2 017
Construction de la route MUANGWEKAN-EDIENGO (depôt Café)-NZOBI-NLOG(16km),arrondissement de Nguti
98 794 98 794
Construction of the road Muang Wekan-EDENGO (depos
NGUTI2 017
Commune de BANGEM : Entretien Routier 27 000 27 000BANGEM Council : Road Maintenance
BANGEM2 017
Commune de NGUTI : Entretien Routier 27 000 27 000NGUTI Council : Road Maintenance
NGUTI2 017
Commune de TOMBEL : Entretien Routier 27 000 27 000TOMBEL Council : Road Maintenance
TOMBEL2 017
Ouverture de la route rurale NJUNGO-LEBE-MBETA 91 002 91 002Opening of the rural road JUNGO-LEBE-Mbeta
nguti2 017
" Etudes technique en vue de la construction de la route Melong-Bangem-Tombel-Nguti(193 km)
100 000 100 000
Technical studies for the construction of the road Melong-Bangem-Tombel-Nguti (193km)
bangem
2 017
Total Chapitre/Head MINTP 5 370 796 1 370 796
33
Exercice/ Financial year : 2017
REPUBLIQUE DU CAMEROUNPEACE - WORK - FATHERLAND
REPUBLIC OF CAMEROONPAIX - TRAVAIL - PATRIE
OPERATIONS BOOK PER REGION, DIVISION, HEAD, PROGRAMME AND ACTIONDETAILS DES PROJETS PAR REGION, DEPARTEMENT, CHAPITRE, PROGRAMME ET ACTION
Tâches Montant AE Montant CP
Montant CPMontant AETasks
In Thousand CFAFEn Milliers de FCFA
Année dedémarrage
Starting Year Locality
Localité
SUD OUESTSOUTH WESTRegion
Région
KOUPE ET MANENGOUBADivision
Département
MINISTRY OF HOUSING AND URBAN DEVELOPMENTChapitre/Head
38MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN
travaux de réhabilitation de la voirie de Tombel 150 000 150 000Rehabilitation of the Tombel road nandwork
TOMBEL2 017
maitrise d'œuvre travaux de réhabilitation de la voirie de Tombel 20 000 20 000Project management for rehabilitation of the Tombel road nandwork
TOMBEL2 017
Total Chapitre/Head MINHDU 170 000 170 000
MINISTRY OF PUBLIC HEALTHChapitre/Head
40MINISTERE DE LA SANTE PUBLIQUE
CSI DE BABONG : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000BABONG IHC : Equipment with medical aparatus
BABONG2 017
CSI D'EBONJI : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000EBONJI IHC : Equipment with medical aparatus
EBONJI2 017
CSI DE NYANDONG WESTERN BAKOSSI : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000NYANDONG WESTERN BAKOSSI IHC : Equipment with medical aparatus
NYANDONGWESTERNBAKOSSI
2 017
CSI DE MUABI: ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000MUABI IHC : Equipment with medical aparatus
MUABI2 017
CSI DE MBAT : ÉQUIPEMENT EN MATÉRIEL MÉDICAL 8 000 8 000MBAT IHC : Equipment with medical aparatus
MBAT2 017
Total Chapitre/Head MINSANTE 40 000 40 000
MINISTRY OF SOCIAL AFFAIRSChapitre/Head
42MINISTERE DES AFFAIRES SOCIALES
aides et secours en appareillages aux populations vulnérables des différentescommunes du Cameroun COMMUNE DE BANGEM
1 500 1 500
assistance and rescue equipement to vulnerable pupulations in different municipalities ofCameroon COUNCIL of BANGEM
BANGEM
2 017
Total Chapitre/Head MINAS 1 500 1 500
6 322 511Total Département/Division KOUPE ET MANENGOUBA 2 222 511
43 213 59750 628 597Total Region SUD OUEST/SOUTH WEST
Total 50 628 597 43 213 597