REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III - DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
C.Y. 2021 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT -
BRGY. MANLAMPONG - BRGY. MAGUITING SECTION
SAN NARCISO, QUEZON
K0262+393 - K0265+141
2,760.00 L.M.
S02043LZ
REGION IV - A
SECONDARY ROADS - K0262+393 - K0265+141
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
1
I N D E X O F D R A W I N G S
INDEX OF DRAWINGS
A. GENERAL
LEGEND & ABBREVIATIONS
GENERAL NOTES
B. ROADS
PLAN & PROFILE K0262+380 - K0262+720
TYPICAL ROADWAY SECTION, REBLOCKING WORKS
DESIGN CRITERIA & TWO LANE PAVEMENT
3
G
11
4
G
11
G
115
G
116
G
117
G
11
G
11
R
24
TRAFFIC MANAGEMENT PLAN
2
R
24
1
SUMMARY OF QUANTITIES
HORIZONTAL AND VERTICAL CURVES
8
G
11
STOP PASSING SIGHT DISTANCE
9
G
11
THERMOPLASTIC DETAILS
3
R
24
4
R
24
10
G
11
FIELD OFFICE
INDEX OF DRAWINGS
1
1
2
G
11
KEY MAP, VICINITY MAP & LOCATION MAP
11
5
R
24
R
246
R
247
R
248
R
249
R
2410
R
24
R
24
R
24
R
24
R
24
R
24
R
24
R
24
R
24
R
24
R
24
STRAIGHT LINE DIAGRAM K0263+000
R
24
PLAN & PROFILE K0262+720 - K0263+060
PLAN & PROFILE K0263+060 - K0263+400
PLAN & PROFILE K0263+400 - K0263+740
PLAN & PROFILE K0263+740 - K0264+080
PLAN & PROFILE K0264+080 - K0264+420
PLAN & PROFILE K0264+420 - K0264+760
PLAN & PROFILE K0264+760 - K0265+100
PLAN & PROFILE K0265+100 - K0265+440
CROSS-SECTION K0262+393 - K0262+640
CROSS-SECTION K0262+660 - K0262+920
CROSS-SECTION K0262+940 - K0263+200
CROSS-SECTION K0263+220 - K0263+480
CROSS-SECTION K0263+500 - K0263+760
CROSS-SECTION K0263+780 - K0264+040
CROSS-SECTION K0264+060 - K0264+320
CROSS-SECTION K0264+340 - K0264+620
CROSS-SECTION K0264+640 - K0264+900
CROSS-SECTION K0264+920 - K0265+141
R
24
R
24
PROJECT BILLBOARD
STRAIGHT LINE DIAGRAM K0264+000
STRAIGHT LINE DIAGRAM K0265+000
11
12
13
14
15
16
17
18
19
20
21
22
24
23
STRAIGHT LINE DIAGRAM K0262+393
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
KEY MAP
PADRE BURGOS
AGDANGAN
UNISAN
PITOGOMACALELON
GEN. LUNA
CATANAUAN
MULANAY
SAN NARCISO
SAN FRANCISCO
SAN ANDRES
FISH PORT
BUENAVISTA
SIBUYAN SEA
RAGAY GULP
MOMPOG PASS
TAYABAS BAY
TO PAGBILAO
MALICBOY
GUITONG
SIPA
HINGUIWIN
MARAO
KINAGUNAN
PANAON
KALILAYAN
SUMMIT
CAIGDAL
RIZAL
AMONTAY
POTOTANIN
POCTOL
GANGAHIN
PACATIN PINAGBAYANAN
TAGUIN
OLONGTAO
SAN VICENTE
SAN IGNACIO
SAN JOSE
SAN VICENTE
SAN ISIDRO PIDAC
BACONG
SAN ISIDRO
BOLO
M.SABANG SIL.
M.SABANG KAN.
SAN ANTONIO
PALA
PACABIT
MADULAO
CAMANDISON
CAMANDISON
TAGBAKAN ILA.
CAWAYANINDAHICAN
NAVITAS
CANCULAJAO
ILA. DOONGAN
STA. MARIA
MALAYA
MILAGROSA
SAN PABLO
SUHA
BATABAT
MAGALLANES
DELA PAZ
BAGONG SILANG
LILUKIN
CATULIN
RIZAL
SAN DIEGO
MALIGAYA
BUKAL
SAN ROQUE
ANUSAN
SAN JOSE ANYAO
MAGUITING
BURGOS
CALWIT
LAKDAYAN
CAMBUGAMAGSAYSAY
ANDRES BONIFACIO
BUENAVISTA
SAN JUAN
BINAY
BIGO
WHITE CLIFF
BOTANIOG
AMOGUIS
SAN ISIDRO
BUENAVISTA
F.NANADIEGO
PAKIING
ILA.YUNI
ILA. TAYUMAN
IBA. TAYUMAN
CAWAYANIN I
MATATAJA
CANUYEP
TALA
VILLA REYES
SABIT
RIZAL
PUNTA
PUGSO POINT
VIGO CENTRAL
CAMFLORA
INABUAN
SILONGIN
CASAY
DON JUAN VERCELOS
BUTANGUIAD
PUGON
NASALAAN
PAGSANGAHAN
TALISAY
MANGERO
PANSOY
ALIBIHABAN
TO A
TIMO
NA
N
TO G
UMA
CA
TO L
OPE
Z
VICINITY MAP
PROJECT SITE
KEY MAP
NENW
SW SE
EW
N
S
NENW
SW SE
EW
N
S
BEG. OF PROJECT
K0262 + 393
VICINITY MAP
LOCATION MAP 2
2
END OF PROJECT
K0265 + 141
BEG. OF PROJECT
K0262 + 393
NENW
SW SE
EW
N
S
LOCATION MAP
END OF PROJECT
K0265 + 141
B
R
G
Y
.
M
A
N
L
A
M
P
O
N
G
B
R
G
Y
.
M
A
G
U
I
T
I
N
G
SAN NARCISO, QUEZON
B
R
G
Y
.
A
B
U
Y
O
N
SHALL BE CONSIDERED AS THE FINAL PLAN.
1 . THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERMENT
2 . THE ITEM OF WORK IDENTIFIED WITH THE CORRESPONDING COMPUTED QUANTITIES
NOTE:
IN THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE THE BASIS OF PAYMENT.
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
SUMMARY OF QUANTITIES
3
3
S U M M A R Y O F Q U A N T I T I E S
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
LEGEND AND ABBREVIATIONS
4
4
A B B R E V I A T I O N S :
ACP ASPHALT CONCRETE PAVEMENT
AZIM AZIMUTH
BLDG BUILDING
BM BENCH MARK
BOQ BILL OF QUANTITIES
BR BRIDGE
BRDY BOUNDARY
BRGY BARANGAY
BVCE BEGIN OF VERTICAL CURVE ELEV.
BVCS BEGIN OF VERTICAL CURVE STATION
BW BOTHWAYS
CIM CURB INLET MANHOLE
CL CENTERLINE
cm CENTIMETER
CS CURB TO SPIRAL
CU CULVERT
D DEGREE OF CURVE
DIST. DISTANCE
DLI - 01 DRAINAGE MANHOLE MEMBER
DPWH DEPARTMENT OF PUBLIC WORKS AND HIGHWAY
E EXTERNAL DISTANCE/EASTING
e SUPERELEVATION
EB EAST BOUND
ELEV. ELEVATION
EXTG. EXISTING
g GRADIENT
HOR HORIZONTAL
I INTERSECTION ANGLE
I I E INLET INVERT ELEVATION
INT'L INTERNATIONAL
KMS KILOMETERS
L LEFT/LENGTH
Lc LENGTH OF HORIZONTAL CURVE
Lm LINEAR METER
LT LEFT
LVC LENGTH OF VERTICAL CURVE
M METER
Max MAXIMUM
MH MANHOLE
mm MILLIMETER
Mo MIDDLE ORDINATE
MUN MUNICIPAL
NB NORTH BOUND
O.C. ON CENTER
OIE OUTLET INVERT ELEVATION
PC POINT OF CURVATURE
PCCP PORTLAND CONCRETE CEMENT PAVEMENT
PI POINT OF INTERSECTION
PT POINT OF TANGENCY
PVI POINT OF VERTICAL INTERSECTION
PVC POINT OF VERTICAL CURVE
PVT POINT OF VERTICAL TANGENCY
R RADIUS
RC REINFORCED CONCRETE
RCBC REINFORCED CONCRETE BOX CULVERT
RCPC REINFORCED CONCRETE PIPE CULVERT
RD ROAD
RROW ROAD RIGTH - OF - WAY
RIGHTRT
NORMAL CROSSFALLS
SOUTH BOUNDSB
SHOULDERSHLDR
STATIONSTA
STANDARDSTD
SOUTH WESTSW
TANGENTT
TEMPORARY BENCH MARKTBM
VERTICAL CURVEVC
VERTICAL VERT , V
WIDENINGW
WEST BOUNDWB
WINGWALLWW
DIAMETERØ
NORMAL CROWNN C
STONE MASONRY
CUT AND FILL SECTION
ROAD SIGN
TREES
POINT OF INTERSECTION
ORIGINAL GROUND
KILOMETER POST
NORTH SIGN
(PLAN)
GROUTED RIPRAP EXISTING
L E G E N D :
P I
( PLAN )
KM
7
(EXISTING)
BENCH MARK
RECTANGULAR CULVERT
(PLAN)
FLOW
PLAN FULL KM STATION
PROJECT ROAD
EXISTING BRIDGE
RIVER / CREEK
COMMERCIAL
REFERENCE POINT
STATION
LENGTH OF VERTICAL CURVE
RROW
PIPE CULVERT EXISTING
PIPE CULVERT NEW
PIPE CULVERT EXISTING
(PLAN) (PROFILE)
PIPE CULVERT NEW
(PLAN) (PROFILE)
KM
4 9
C
L
C
0 + 100
PROPOSED BRIDGE
GOOD / NEW PCCP
PARAPET WALL PLAN
R1
R2
EXISTING PCCP
NENW
SW SE
EW
N
S
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
GENERAL NOTES
5
5
4.1 IT WAS RECKONED FROM THE CENTERLINE OF EXISTING PCCP ROAD ALONG ABUYON - BUENAVISTA ROAD
STATION K0262+393.00. THE AZIMUTH OF THE SUCCEEDING TANGENT WERE DETERMINED
BY ADDING AND/ MEASURED DEFLECTON ANGLE.
1.1 ALL WORKS SHALL COMPLY WITH THE "DPWH STANDARD AND SPECIFICATION, 2013 EDITION, D.0. 179 S. 2015
FOR THE DESIGN GUIDELINES, CRITERIA AND STANDARD, 2015 EDITION", SPECIAL PROVISIONS AND SUPPLEMENTAL
2.1 ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
2.0 DIMENSIONS:
2.2 DIMENSION ON DRAINAGE, TYPICAL ROAD SECTION AND STANDARD DRAWINGS ARE IN METERS UNLESS OTHERWISE
INDICATED ON THE DRAWING.
3.0 STATIONINGS AND RADIUS OF HORIZONTAL CURVE:
3.1 THE STATIONING OF THE HORIZONTAL ALIGNMENT OF THE PROJECT ROADS ARE RELATIVE TO THE CENTERLINE SHOWN ON
THE PLANS
3.2 STATIONINGS OF CIM, MH AND OTHER STRUCTURES ARE RECKONED AT THE STATIONINGS OF THE CENTERLINE SHOWN ON
THE PLANS
3.3 THE RADIUS OF HORIZONTAL CURVE SHOWN ON THE PLAN WERE BASED ON THE LAID-OUT ROADWAY CENTERLINE.
SPECIFICATION TO THIS PROJECT.
A. SPECIFICATION
4.0 HORIZONTAL CONTROL:
5.0 VERTICAL CONTROL
6.0 ELEVATION AND GRADES
6.1 FINISHED GRADE ELEVATIONS ARE RELATIVE TO CENTERLINE OF EACH ROAD .
6.2 THE ELAVATIONS SHOWN ON THE ORIGINAL GROUND ON THE PLAN AND PROFILE ARE RELATIVE TO THE CENTERLINE OF THE
ROAD
7.0 ROAD SIGNS
10.1 ROAD SIGN SHALL CONFORT WITH THE LATEST MANUAL ON PHILIPPINES ROAD SIGN (REVISED EDITION)
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS. TRAFFIC ENGINEERING AND MANAGEMENT PROJECTS.
8.0 GENDER AND DEVELOPMENT
11.1 THE DESIGN SHALL CONFORMS WITH THE REPUBLIC ACT 7192
11.2 THE DESIGN SHALL CONFORMS WITH THE REPUBLIC ACT 9710
1.0 DESIGN REFERENCES:
1.1 DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS (ORANGE BOOK), REVISED EDITION, 2015
1.2 AMERICAN ASSOCIATION OF THE STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) STANDARD
SPECIFICATIONS FOR HIGHWAY AND BRIGES, LATEST EDITION .
1.3 AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS, LATEST EDITION.
1.4 TECHINICAL STANDARDS AND GUIDELINES FOR PLANNING AND DESIGN OF FLOOD CONTROL AND SABO WORKS,
VOLUMES I AND II, MARCH 2002, BY THE FLOOD CONTROL AND SABO ENGINEERING CENTER, DPWH.
1.5 NATIONAL BUILDING CODE OF THE PHILIPPINES AND ITS IMPLEMENTING RULES AND REGULATIONS. AS AMENDED.
1.6 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, LATEST EDITION.
1.7 BATAS PAMBANSA (BP) 344 (ACCESSIBILITY LAW).
1.8 MEMORANDUM DATED JUNE 11, 2011, SUBJECT FOR UPGRADE OF FLOOD CONTROL AND ROAD DRAINAGE STANDARD.
B. DESIGN CRITERIA
1.0 ROAD CONNECTIONS AND PRIVATE ENTRANCES
1.1 APPROACHES AND CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLANS OR AS DIRECTED
BY THE ENGINEER IN SUCH MANNER AS INSURE SMOOTH CONNECTION AND RIDING QUALITY
1.2 EXACT LOCATIONS OF INTERSECTIONS ROAD AND PRIVATES ENTRACES OR DRIVEWAYS WHERE ITEM 1.1 ABOVE APPLIES
SHALL BE VERIFIED BY THE ENGINEER.
1.3 PROVIDE A DROP CURB AND GUTTER TO EXISTING ENTRACES AS SHOWN ON THE STANDARD CURB AND GUTTER DRAWINGS.
2.0 DRAINAGE STRUCTURE:
2.1 LOCATIONS OF EXISTING DRAINAGE STRUCTURES REFLECTED IN THE PLAN WAS BASED ON THE TOPO SURVEY
2.2 EXACT LOCATIONS, GRADIENT OUTFALLS, TOP AND INVERT ELEVATIONS OF DRAINAGE STRUCTURE SHALL BE
CHECKED AND VERIFIED IN THE FIELD DURING CONSTRUCTION BY THE ENGINEER. FIELD ADJUSTMENT MAY
BE MADE BY THE ENGINEER TO SUIT ACTUAL FIELD CONDITION .
2.3 EXTENSION AND OTHER IMPROVEMENTS OF EXISTING DRAINAGE STRUCTURES ARE SUBJECT TO CHANGE AND
SHALL BE VERIFIED BY THE ENGINEER.
2.4 PRIOR TO INSTALLATION OF RCPC AND OTHER DRAINAGE STRUCTURES. ALL MATERIALS MUST BE TESTED
AND CONFORMING WITH THE TECHICAL SPECIFICATION.
2.5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT OF ANY MATERIALS INSTALLED AND FOUND
TO BE DEFICIENT IN WORKMANSHIP AND QUALITY OF WORKS.
2.6 RCPC DIAMETERS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
3.0 REMOVAL OFEXISTING STRUCTURES AND RELOCATION OF EXISTING UTILITIES:
3.1 REMOVAL OF EXISTING BUILDING, HOUSES AND FENCES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR,
THEY WILL BE PAID ACCORDING TO THE CONTRACT.
3.2 PORTION OF EXISTING UTILITIES, SUCH AS WATER LINES. TELEPHONES TRUCK LINES ELECTRIC LINES ETC. THAT
MAY OBSTRUCT THE CONSTRUCTION OF THE PROJECT SHALL BE RELOCATED BY THE ENTITIES OR OWNERS'S
CONCERNED. EXTREME PRECAUTIONS SHALL BE EXERCISED BY THE CONTRACTOR SO AS NOT DAMAGE THE
EXISTING UTILITIES DURING CONSTRUCTION, ANY DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF THE
CONTRACTOR.
C. CONSTRUCTION REQUIREMENT
2.0 DESIGN METHODOLOGY
2.1 RIGID PAVEMENT DESIGN FOR CONCRETE PAVEMENT
2.2 FLEXIBLE PAVEMENT DESIGN FOR ASPHALT PAVEMENT
3.0 DESIGN LOADINGS
1. RIGID TRUCK 2 AXLES
2. RIGID TRUCK 3 + AXLES
3. TRUCK SEMI-TRAILER 3 & 4 AXLES
5. TRUCK TRAILER 4 AXLES
6. TRUCK TRAILER 5 + AXLES
4. TRUCK SEMI-TRAILER 5 + AXLES
5.1 THE DATUM USED IN THIS PROJECT WAS DETERMINED. IT WAS REFERRED FROM CENTER LINE OF EXISTING PCCP ROAD.
4.0 OFF - CARRIAGEWAY / PAVED SHOULDER
4.1 THE MINIMUM PAVED SHOULDER SHOULD BE 1.50m ON BOTH SIDE IF NOT CONSTRAINED BY THE RROW PROBLEM.
4.2 ALL LINED CANAL AND RETAINING WALL SHALL BE SEALED BY PAVED SHOULDER TO THE EXTENT OF EXISTING OR
PROPOSE STRUCTURES.
4.3 PROVISION OF TIE BARS WITH 16mmØ DEFORMED BARS SHALL BE DRILL TO EXISTING EDGE OF CARRAIGEWAY
AT EVERY 600mm SPACING ON CENTER WITH 600mm LONG.
4.4 ELEVATION OF SHOULDER SHALL BE FOLLOWED TO THE EDGE OF FINISHED SURFACE PAVEMENT AND AUTOMATICALLY
APPLIED THE SUPER ELEVATION IN CASE IT IS LOCATED TO THE CURVES.
G E N E R A L N O T E S
C
L
-2.0%
EXISTING PAVEMENT
"A"-2.0%
ITEM 311 (230mm THICK)
ITEM 200 (200mm THICK)
C
L
-2.0%
EXISTING PAVEMENT
"A"
-2.0%
ITEM 311 (230mm THICK)
ITEM 200 (200mm THICK)
C
L
-2.0%
EXISTING PAVEMENT
"A"-2.0%
ITEM 311 (230mm THICK)
ITEM 200 (200mm THICK)
EXISTING LINED CANALEXISTING LINED CANAL
EXISTING SLOPE PROTECTION EXISTING SLOPE PROTECTION
STIFFENER BEAMSTIFFENER BEAM
ITEM 200 ( 200mm. thk. )
AGGREGATE SUB BASE COURSE
ITEM 311 ( 230mm. thk. )
PORTLAND CEMENT CONCRETE PAVEMENT
"A"
36mmØ 800 @ 300 O.C.
PLAIN DOWEL BARS FOR 280mm THICK PCCP
LANE SHOWING TRANSVERSE CONSTRUCTION
JOINT AT LOCATION OF WEAKENED PLANE JOINT
TRANSVERSE CONSTRUCTION JOINT
LANE SHOWING TRANSVERSE CONSTRUCTION JOINT
AT MIDDLE THIRD OF NORMAL JOINT INTERVAL
N O T E :
TRANSVERSE CONSTRUCTION ( CONTACT ) JOINT SHALL BE
PROVIDED AT THE END OF ANY RUN WHERE LAYING OF
CONCRETE HAS BEEN STOPPED FOR THIRTY ( 30 ) MINUTES OR
LONGER.
TRANSVERSE CONSTRUCTION JOINTS WHICH OCCUR AT
LOCATION OF WEAKENED PLANE JOINT SHOULD BE BUTT JOINTS
WITH DOWELS. IF JOINT OCCURS IN THE MIDDLE THIRD OF THE
WEAKENED JOINT INTERVAL ( 1500 - 3000 mm ) IT SHOULD BE
KEYED JOINTS WITH THE BARS.
MINIMUMTYPICAL BAR LAYOUT FOR 230mm THICK PAVEMENT
WEAKENED PLANE JOINT
DEFORMED THE BARS
16mm X 750 @ 750
1B
1D
1C
1F
1E
SE
CT
IO
N 1
SAWED GROOVE WITH
POURED JOINT FILLER
75
6
5
SAWED GROOVE WITH POURED JOINT FILLER
(@4.5m INTERVAL OR AS DIRECTED
75
6
5
BY THE ENGINEER)
36mmØ x 800 @ 300 (280mm)
FORMED GROOVE WITH
POURED JOINT FILLER
35
12.0
75
PLAIN DOWEL BAR
36mmØ x 800 @ 300
FOR t = 280mm
ONE HALF OF THE LENGTH
SHALL BE PAINTED WITH
APPROVED RED LEAD AND
THEN GREASED
FIRST SLAB
DEFORMED TIE BAR
FORMED GROOVE WITH KEYWAYS
FILL WITH POURED JOINT FILLER
T
12.0
75
1/3T
1/3T
1/3T
FIRST SLAB
35
35
300(280mm) 300(280mm)
DEFORMED TIE BAR
36mmØ x 800 @ 300 (280mm)
FORMED GROOVE WITH KEYWAYS
FILL WITH POURED JOINT FILLER
T
6
5
1/3T
1/3T
1/3T
FIRST SLAB
DEFORMED TIE BAR
36mmØ X 800 @ 300 (280mm)
C
L
-2.0%"A"
-2.0%
CONSTRUCTION LIMIT (Item 200,480mm thick)
ITEM 310(1)a1 (30mm THICK)
ITEM 310(2) (50mm THICK)
REFLECTORIZED THERMOPLASTIC
PAVEMENT MARKINGS
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
TYPICAL ROADWAY SECTION
6
6
SHOULDER PAVING AND ASPHALT OVERLAY
TWO LANE PAVEMENT
DESIGN CRITERIA
TYPICAL ROADWAY SECTION TWO LANE EXISTING PCCP W/ PROPOSED CONCRETE SHOULDER
SCALE 1:50
TYPICAL ROADWAY SECTION TWO LANE EXISTING PCCP AND LINED CANAL W/ PROPOSED CONCRETE SHOULDER
SCALE 1:50
TYPICAL ROADWAY SECTION TWO LANE EXISTING PCCP AND SLOPE PROTECTION W/ PROPOSED CONCRETE SHOULDER
SCALE 1:50
DETAIL " A "
SCALE 1:10
1B
A4-008 A4-008
TYPICAL PLAN OF A TWO LANE PAVEMENT
SCALE 1:50
1A
A4-008 A4-008
DETAIL " B "
SCALE 1:10
1C
A4-008 A4-008
DETAIL " C "
SCALE 1:10
1D
A4-008 A4-008
DETAIL " D "
SCALE 1:10
1E
A4-008 A4-008
SECTION
SCALE 1:10
1F
A4-008 A4-008
DESIGN PARAMETER
1.DESIGN LIFE PERIOD = 20 YRS
2.DESIGN TRAFFIC = 1.59 X 10
6
3.DESIGN RELIABILITY = 85 %
4.STANDARD DEVIATION = 0.35
5.DESIGN SERVICE ABILITY = 2.50
6.PCCP MODULUS OF RUPTURE = 636 PSI
7.PCCP MODULUS OF ELASTICITY = 3.37 x 10
6
PSI
8.SUBGRADE DESIGN CBR = 2.38
9.EFFECTIVE ROADBED RESILIENT = 3,570
10.SUB BASE ELASTIC MODULES = 15,000 PSI
11.SUB BASE THICKNESS = 200 MM
12.COMPOSITE & EFFECTIVE = 210 & 78
MODULES OF SUBGRADE REACTION
13. DRAINAGE COEFFECIENT = 1.0
14. LOAD TRANSFER COEFFECIENT = 3.60
15. LOSS OF SUPPORT = 1.0
16. STANDARD NORMAL DEVIATION = 1.037
TYPICAL ROADWAY SECTION TWO LANE EXISTING PCCP W/ PROPOSED ASPHALT OVERLAY
SCALE 1:50
T2 - 16
T1 - 1
T1 - 5
Yellow
Reflectorized
Line 1 - Black 200 DM
Line 2 - Black 160 DM
1800 x 600T2-16
BackgroundLetterSizeSign No.
WORKMEN AHEAD
Red / Orange
-Flourescent for
day use
-Reflectorized
for night use
Black
900 x 600T1-5
BackgroundLetterSizeSign No.
Yellow
Reflectorized
Line 1 - Black 200 DM
Line 2 - Black 160 DM
1800 x 600T1-1
BackgroundLetterSizeSign No.
DAEHA
R RWD O KAO
30.00
10.00
8.00
90.00
45.00
30.00
90.00
30.00
10.00
8.00
PART LANE CLOSURE - TWO LANE & TWO WAY ROAD
PLAN
COMPONENTS OF TRAFFIC MANAGEMENT PLAN
100 - m
eter length w
orksite area
Be
gin
nin
g o
f P
ro
je
ct
Barrier boards to inhibit
access to the worksite area
Temporary Bollards
spaced @ 5.0 meters
Barricade flasher
lights installed every
after 3 bollards
DE AA
R
H
RWD OO KA
DE AA
R
H
M
DOA
DSIO
R
N
RWD OO KA
E ARO D
ACHINERY
T1 - 3
M
R
30.00
5.00
60.00
Yellow
Reflectorized
Line 1 - Black 100 EM
Line 2 - Black 120 DM
1200 x 600T1-3
BackgroundLetterSizeSign No.
Line 3 - Black 100 EM
A
O A D
ACHINERY
H E A D
5.00
6.00
T1 - 25
Yellow
Reflectorized
Line 1 - Black 160 EN
Line 2 - Black 160 DN
1800 x 600T1-25
BackgroundLetterSizeSign No.
EDISO
R RWD O KAO
30.00
8.00
90.00
8.00
N DAOR
ROADWORKS SIGN
DE N
R RWD OO KA
D EA A
R
H
R WDO OK A
D EN
RR WDO OK A
DNE
KROWDAOR
D
D
D
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
TRAFFIC MANAGEMENT PLAN
7
7
T R A F F I C M A N A G E M E N T P L A N
HORIZONTAL CURVE (CIRCULAR)1A
SCALE NTS
R
D
P
T
L c
P
C
R
T
T
E
P1
2
5
m
P1 POINT OF INTERSECTION
INTERSECTION ANGLE (CENTRAL ANGLE)
Y TOTAL TANGENT DISTANCE
R HORIZONTAL RADIUS
Lc LENGTH OF CIRCULAR CURVE
E TOTAL EXTERNAL DISTANCE
D DEGREE OF CURVE (ARC DEFINITION)
PC POINT OF CURVATURE
PT POINT OF TANGENCY
I- NO HORIZONTAL CURVE IS REQUIRED WHEN
THE INTERSECTION (CENTRAL) ANGLE
IS LESS THAN ONE DEGREE (1° -00)
L / 2L / 2
VPC
VP1
MO
x
Yx
VPT
+
g
%
-
g
%
SYMMETRICAL
SCALE NTS
HORIZONTAL CURVE WITH TRANSITION
SCALE NTS
P1 POINT OF INTERSECTION
INTERSECTION ANGLE
Ø SPIRAL ANGLE
Lx LENGTH OF SPIRAL
XY COORDINATES OF CS OR SC WITH RESPECT TO MAIN TANGENT
K LENGTHENING OF TANGENT DUE TO INTERSECTION OF SPIRAL
F OFFSET BETWEEN CIRCULAR CURVE AND MAIN TANGENT
LT LONG TANGENT OF SPIRAL
ST SHORT TANGENT OF SPIRAL
T TOTAL TANGENT DISTANCE
TS BEGINNING OF SPIRAL CURVE
SC POINT OF CHANGE FROM SPIRAL TO CIRCULAR CURVE
CS
POINT OF CHANGE FROM CIRCULAR CURVE TO SPIRAL
ST
END OF SPIRAL CURVE
Ic
ANGLE OF CIRCULAR CURVE
Rc
RADIUS OF THE CIRCULAR CURVE
Lc
LENGTH OF THE CIRCULAR CURVE
P1
T
Y
Y
Lc
Tc
T
S
S
T
C
S
R
C
K
L
s
L
T
X
P
P
Ø
s
Ø
s
x
VPI
MO
Yx
L1 L2
-
g
%
+
g
%
L
VPT
UNSYMMETRICAL
SCALE NTS
VERTICAL PARABOLIC CURVE
SCALE NTS
LEGEND:
VP1
VERTICAL POINT OF INTERSECTION
VPC
VERTICAL POINT OF CURVATURE
VPTVERTICAL POINT OF TANGENCY
L
LENGTH OF VERTICAL CURVES IN METERS
L
GRADE IN PERCENT
MO
MIDDLE ORDINATE
X
DISTANCE FROM VPC OR VPT TO ANY POINT OF CURVE
Yx
VERTICAL OFFSET IN METERS
A
ALGEBRAIC DIFFERENCE OF GRADES
NOTE:
I
ALGEBRAIC DIFFERENCE IN GRADES IS LESS THAN 0.50%
NO VERTICAL CURVE IN REQUIRED WHEN THE
IN ANY VERTICAL PARABOLIC CURVE
SYMMETRICAL UNSYMMETRICAL
MO=
AL
8.00
MO=
AL1
200 L
AL2
Yx=
X² (MO)
(L/2)²
Yx=
X² (MO)
(L1)² OR (L2)²
D=8.65M. FOR
2
D
S
/
2
S
/
2
D
2XW
D
S
/
2
S
/
2
2
D
LW
P
C
L
1
P
T
L
d
HEAVY TRUCK
L1=Ld
S>/0.75Vd OR
S>/10(2W)
OC
WIDENING WHEN TRANSITION NOT USED
SCALE NTS
NOTE:
VALUES LESS THAN 0.60M MAYBE DISREGARDED
VALUES SHOWN BELOW ARE FOR 2 LANE PAVEMENT
ON CURVES FOR A WIDTH OF 6.10M PAVEMENT ON
TANGENT.
DESIGN VALUES FOR WIDENING OF CURVES
DEGREE
OF
CURVE
RADIUS
IN
METERS
DESIGN SPEED
40 KPH 65 KPH
1°00"
2°00"
3°00"
4°00"
5°00"
6°00"
7°00"
8°00"
9°00"
10°00"
11°00"
1432.39
716.19
477.46
358.10
286.48
238.73
204.63
179.05
159.15
143.24
130.22
0
0.60
0.60
0.75
0.75
0.90
0.90
0.90
1.00
1.00
0
0
0
0
0
0.60
0.80
0.90
0.90
0.90
1.10
Lx
Ln
W
I=KW
FOR - SEE TABLE OR "K"
OC
3
D
D
D
D
3
D
S
T
D
D
D
WIDENING
L
1
L
d
c
s
LW
S
C
T
S
D= 8.65M FOR
HEAVY TRUCK
L1 = TRANSITION LENGTH OF WIDENING INCREASING SECTION
Ld = TRANSITION LENGTH OF WIDENING DECREASING SECTION
Lw = LENGTH WITH FULL WIDENING
WIDENING WHEN TRANSITION ARE USED4A
SCALE NTS
INCREASING DECREASING
Ln/Lx K Ln/Lz K
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.32
0.34
0.36
0.38
0.40
0.42
0.44
0.46
0.48
0.50
0.52
0.54
0.56
0.58
0.60
0.62
0.64
0.66
0.68
0.70
0.72
0.74
0.76
0.78
0.80
0.82
0.84
0.86
0.88
0.90
0.92
0.94
0.96
0.98
1.00
0.00
0.2
0.4
0.6
0.8
0.10
0.12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.32
0.34
0.36
0.38
0.40
0.42
0.44
0.46
0.48
0.50
0.52
0.54
0.56
0.58
0.60
0.62
0.64
0.66
0.68
0.70
0.72
0.74
0.76
0.78
0.80
0.82
0.84
0.86
0.88
0.90
0.92
0.94
0.96
0.98
1.00
0.000
0.0010
0.0020
0.0047
0.0077
0.0114
0.0156
0.0217
0.0300
0.0390
0.0499
0.0612
0.0760
0.0908
0.1110
0.1315
0.1574
0.1849
0.2161
0.2496
0.2846
0.3215
0.3586
0.3965
0.4344
0.4724
0.5103
0.5470
0.5836
0.6194
0.6548
0.6888
0.7217
0.7522
0.7789
0.8050
0.8286
0.8521
0.8741
0.8947
0.9128
0.9293
0.9440
0.9580
0.9691
0.9775
0.9849
0.9903
0.9952
0.9982
1.00
1.0000
0.9964
0.9905
0.9810
0.9660
0.9438
0.9200
0.8920
0.8602
0.8238
0.7816
0.7374
0.6822
0.6340
0.5848
0.5365
0.4912
0.4478
0.4092
0.3748
0.3443
0.3144
0.2888
0.2610
0.2375
0.2163
0.1967
0.1784
0.1613
0.1453
0.1304
0.1162
0.1034
0.0916
0.0807
0.0708
0.0622
0.0543
0.0473
0.0407
0.0348
0.0288
0.0236
0.0190
0.0150
0.0116
0.0182
0.0052
0.0020
0.0012
0.0000
5.0
5.0
13.5
15.0
18.5
21.0
30.0
41.5
45.0
54.5
56.5
74.0
74.0
101.0
102.5
129.5
137.5
156.0
167.5
179.0
184.5
185.5
189.5
189.5
190.0
189.5
183.5
183.0
179.0
177.0
170.0
164.5
152.8
133.8
130.8
118.0
117.5
110.0
103.0
90.5
82.5
73.5
70.0
55.0
42.0
37.0
27.0
24.5
15.9
9.0
10.0
29.5
47.5
75.0
111.0
119.0
140.0
159.0
182.0
221.0
246.0
251.0
241.0
246.0
241.5
226.5
217.0
193.0
172.0
152.5
149.5
138.0
129.0
118.5
105.0
98.0
91.5
85.5
80.0
74.5
71.0
64.0
59.0
54.5
49.5
43.0
39.5
35.0
33.0
29.5
30.0
26.0
23.0
20.0
17.0
17.0
15.0
12.0
0.0
6.0
Lz Lz
HORIZONTAL AND VERTICAL CURVES
SCALE NTS
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
HORIZONTAL AND VERTICAL CURVES
8
8
20
18
16
14
12
10
8
6
4
2
0
500 1000 1500 2000
16
14
12
10
8
6
4
2
0
20
18
AG
AG
HEIGHT OF EYE ABOVE ROADWAY SURFACE = 1.15M
HEIGHT OF OBJECT ABOVE ROADWAY SURFACE = 1.40M
= REDUCED PASSING SIGHT DISTANCE (LRP)
= NORMAL PASSING SIGHT DISTANCE (LFP)
Lvc > S: Lvc =
AGS²
Lvc > S: Lvc = 2S-
1040
AG
PASSING SIGHT DISTANCE FOR CREST VERTICAL CURVES
SCALE NTS
Vo =
120(k
m/h
) R
vc =
47000 (
m)
V
o =
100 R
vc =
31800
V
o
=
8
0
R
v
c
=
2
1
7
0
0
V
o
=
1
2
0
R
v
c
=
1
9
5
0
0
V
o
=
7
0
R
v
c
=
1
5
4
0
0
V
o
=
1
0
0
R
v
c
=
1
3
6
0
0
V
o
=
8
0
R
v
c
=
1
0
2
0
0
V
o
=
6
0
R
v
c
=
1
0
2
0
0
V
o
=
7
0
R
v
c
=
7
2
5
0
V
o
=
6
0
R
v
c
=
6
0
0
0
V
o
=
6
0
R
v
c
=
4
9
0
0
V
o
=
5
0
R
v
c
=
2
9
5
0
L
v
c
L
v
c
20
18
16
14
12
10
8
6
4
2
0
AG
200 400 600 800
20
18
16
14
12
10
8
6
4
2
0
AG
V
o =
120(km
/h) R
vc =
3000 (m
)
V
o
=
1
0
0
R
v
c
=
7
0
0
0
V
o
=
8
0
R
v
c
=
3
5
0
0
V
o
=
7
0
R
v
c
=
2
6
5
0
V
o
=
6
0
R
v
c
=
1
4
0
0
V
o
=
5
0
R
v
c
=
7
5
0
V
o
=
4
0
R
v
c
=
4
0
0
HEIGHT OF EYE ABOVE ROADWAY SURFACE = 1.15M
HEIGHT OF OBJECT ABOVE ROADWAY SURFACE = 0.15M
K= =
RLvc
AG 100
, Lvc > Ls : Lvc =
AGLs²
400
Lvc (m)
, Lvc < Ls : Lvc =2Ls -
400
AG
STOPPING SIGHT DISTANCE FOR CREST VERTICAL CURVES
SCALE NTS
STOPPING SIGHT DISTANCE FOR SAG VERTICAL CURVES
SCALE NTS
20
18
16
14
12
10
8
6
4
2
0
AG
20
18
16
14
12
10
8
6
4
2
0
AG
0
0 100 200 300 400Lvc (m)
L
v
c
L
v
c
L
s
L
s
V
o
=
1
2
0
(km
/h
) R
vc =
5
7
0
0
(m
)
V
o
=
1
0
0
R
v
c
=
4
0
0
0V
o
=
8
0
R
v
c
=
2
5
0
0
V
o
=
7
0
R
v
c
=
2
0
0
0
V
o
=
6
0
R
v
c
=
1
5
0
0
V
o
=
5
0
R
v
c
=
1
0
0
0
V
o
=
4
0
R
v
c
=
6
0
0
Lvc Ls : Lvc =
AGLs²
120 + 55Ls
Lvc Ls : Lvc =2Ls -
120 + 3.5Ls
AG
SUPERELEVATION
T
R
A
N
S
I
T
IO
N
SUPERELEVATION
EXTENSION
3030
30
3
0
3
0
3
0
TRA
N
S
ITIO
N
S.S.
T.S.
NORMAL CROSSFALL
LEVEL
OFFSETS
FULL SUPERELEVATION
R
NOMIN
AL
SP
IR
A
L
(
P
L
A
N
VARI
ABLE
NO
.
OF
S
E
C
I
O
N
S
T
S
.
O
.
T.P.NOMI
NAL
C
EN
T
E
R
L
I
N
E
TRUE CE
NT
ER
L
I
N
E
NOTE: ALL LONGITUDINAL MEASUREMENTS ARE ALONG
THE NOMINAL CENTERLINE ALL TRANSVERSE
MEASUREMENTS ARE AT RIGHT ANGLES TO NO-
MINAL CENTERLINE.
LEGEND:
Lvc = LENGTH OF VERTICAL CURVE
Ls = STOPPING SIGHT DISTANCE
AG = ALGEBRAIC DIFFERENCE IN GRADES-PERCENT
S = SIGHT DISTANCE
POSITION OF PAVEMENT EDGES AND
CENTERLINE IF CURVED WAS NEITHER
TRANSITIONED NOR WIDENED.
DESIGN CRITERIA
HEADLIGHT BEAM DISTANCE IS EQUAL TO
STOPPING SIGHT DISTANCE.
HEIGHT OF HEADLIGHT = 0.60 M.
DISECTION OF BEAM = 1° UPWARDS
EASE
EASE
EASE
EASE
S.S. T.S. T.P. S.C.
INNER EDGE OF PAVEMENT
CENTERLINE
OU
TE
R E
DG
E O
F P
AV
EM
EN
T
HORIZONTAL CURVE TRANSITIONS
SCALE NTS
METHOD OF SETTING OUT
Lvc
Do
LOW POINT
BVC
EVC
VIP
HIGH POINT
X
VP
D
P
BVC
Do
Lvc
Lvc/2
EVC
P
'
g
'
m
g
d
IN ANY VERTICAL PARABOLIC CURVE:
1. m =
(g'-g)(LVC)
8
2. m = 1/2
Elev. PVC + Elev. PVT
2
( - Elev. PVI)
3. d =
D
LVC/2
m( )² =
4m
LVC²
D²
4. d =
D² (g'-g)
2(LVC)
5. x =
100 (H-P')
g'-g
6. s =
g-g'
LVC
g-D ( )
7. Do =
(LVC)g
g-g'
WHERE:
LVC = LENGTH OF CURVE - METERS + ICO
g & g' = GRADE RATES - PERCENT
m = MIDDLE ORDINATE - METERS
d = CORRECTION FROM GRADELINE TO CURVE
METERS
D = DISTANCE FROM PVT TO ANY POINT ON
CURVE - METERS ÷ 100
s = SLOPE OF THE TANGENT TO THE CURVE AT
ANY POINT - PERCENT
x = DISTANCE FROM P' TO PVT - METERS
H = ELEVATION OF GRADE 'g' PRODUCED TO
STATION OF P' - METERS
P & P' = ELEVATION OF RESPECTIVE GRADES - METERS
Do = DISTANCE TO LOW OR HIGH POINT FROM
EXTREMITY OF CURVE - METERS ÷ 100
NOTES:
1. A RISING GRADE CARRIES A PLUS SIGN WHILE A FALLING GRADE CARRIES A MINUS SIGN, THUS
IN A CREST VERTICAL CURVE AS ABOVE, (g) CARRIES A PLUS SIGN AND (g') A MINUS SIGN WHEN
PROGRESSING IN THE DIRECTION OF THE STATIONING, WHEN PROGRESSING IN THE OPPOSITE DIRECTION,
(g) BECOMES A MINUS GRADE AND (g') A PLUS GRADE.
2. NO VERTICAL CURVE IS REQUIRED WHERE THE ALGEBRAIC DIFFERENCE IN GRADES IS 0.50% OR
LESS.
VERTICAL CURVE TRANSITIONS
SCALE NTS
METHOD OF SETTING OUT
FOR MOST DRIVERS, THE REDUCED PASSING SIGHT DISTANCE IS ADEQUATE FOR OVERTAKING AND HENCE IT
IS CONSIDERED RATHER EXTRAVAGANT TO DESIGN ROADS TO FULL PASSING SIGHT DISTANCES ('FULL PAS-
SING SIGHT' IS ALSO TERMED 'NORMAL PASSING SIGHT').
THE DIFFERENCE BETWEEN FULL PASSING SIGHT DISTANCE AND REDUCED PASSING SIGHT DISTANCE IS SHOWN
IN THE FOLLOWING FIGURE:
NORMAL PASSING SIGHT
REDUCED NORMAL PASSING SIGHT
AS GUIDE TO THE EXTENT TO WHICH REDUCED PASSING SIGHT DISTANCE SHOULD BE PROVIDED, THE
FOLLOWING TABLE CAN BE USED:
DESIGN SPEED
(km/h)
MINIMUM PROPORTION OF ROAD WITH REDUCED PASSING SIGHT DISTANCE
ADT < 1000 ADT = 1000 - 3000 ADT > 3000
< 50
60
80
100 - 120
1/5 1/4
1/4
1/3
1/8
1/3
1/4
1/2
1/8
REDUCED PASSING SIGHT DISTANCE
SCALE NTS
8.0
7.0
6.0
5.0
4.0
3.0
2.5
2.0
25 30 40 50 60 70 80 100 200 300 400 500 600 800 1000 2000 3000
3
0
4
0
5
0
6
0
7
0
1
0
0
V
D
=
1
2
0
(
k
m
/
h
)
8
0
SU
PE
RE
LE
VA
TIO
N R
AT
E (%
)
RADIUS OF CURVE (m)
DESIGN SUPERELEVATION RATES7A
SCALE NTS
STOPPING AND PASSING SIGHT DISTANCES, SUPERELEVATION RATES
NOT SCALETO
Lvc
Ls
Lvc
Ls
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
STOP PASSING SIGHT DISTANCE
9
9
L1 = 300 L1 = 300
L2
RURAL AREA TYPEURBAN AREA TYPE
PAVED SHOULDER
TR
AV
ELE
D W
AY
PAVED SHOULDER
L
V < 80 KPH
L > 100 m
L > 50 m
V < 60 KPH
L
B
A
B
A
SHOULDER
7000
100
100
3000 3000
4500 (60 KPH)
CURB OR TRAVELLED WAY EDGE
SEPERATE LINE 150mm WIDE, UNBROKEN, WHITE
LANES LINES - 150mm WIDE, 3m LENGTH, 4.5m GAP, WHITE
EDGE LINES - 100 WIDE, UNBROKEN, WHITE
3m 3m 3m 3m4.5m4.5m4.5m
150mm
150mm
100mm
L L
3000 3000
3000
L
I
N
E
O
F
S
I
G
H
T
D
I
S
T
.
F
O
R
D
E
S
I
G
N
S
P
E
E
D
M
I
N
.
P
A
S
S
I
N
G
S
I
G
H
T
N
O
P
A
S
S
I
N
G
Z
O
N
E
,
A
'
T
O
B
N
O
P
A
S
S
I
N
G
Z
O
N
E
,
A
'
T
O
B
1.08
HE
IG
HT
O
F O
BS
ER
VE
R
1.08
1. THE MATERIALS, DIMENSION, SHAPE, COLOR, SIZE OF NUMERALS, LETTERS
AND INSTALLATION SHALL CONFORM IN ACCORDANCE WITH SPECIFICATION OF
DPWH MANUAL ON PAVEMENT MARKINGS, 2004 EDITION
2. REFER TO DWG. NO F-3 AND DWG. E-3 FOR SPECIFICATION OF
PAVEMENT MARKINGS.
NOTES:
10 cm
10 cm
L
I
N
E
O
F
S
I
G
H
T
D
I
S
T
.
F
O
R
D
E
S
I
G
N
S
P
E
E
D
M
I
N
.
P
A
S
S
I
N
G
S
I
G
H
T
L
V < 80 KPH
L > 100 m
L > 50 m
V < 60 KPH
L
B, B' END NO-PASSING ZONE
SIGHT DISTANCE BECOMES LESS THAN MINIMUN
MEASURED BETWEEN POINTS 1.20 m ABOVE PAVEMENT
NOTES:
1. "NO PASSING ZONES" IN OPPOSITE DIRECTIONS MAY OR MAY NOT
2. "NO PASSING ZONES" HAVE TO BE MARKED FOR ALL THE PROJECT ROAD
3. LOCATIONS OF BEGINNINGS AND ENDS OF "NO PASSING ZONE"
OVERLAP DEPENDING ON ALIGNMENT
WILL BE DEFINED BY THE ENGINEER
A, A' BEGIN NO- PASSING ZONE
SIGHT DISTANCE AGAIN
EXCEEDS MINIMUN
NOTES:
1. THE MATERIALS, DIMENSION, SHAPE, COLOR, SIZE, OF NUMERALS, LETTERS
2. REFER TO DWG. NO F-3 AND DWG. NO. E-3 FOR SPECIFICATION OF
PAVEMENT MARKINGS.
AND INSTALLATION SHALL CONFORM IN ACCORDANCE WITH SPECIFICATION OF
DPWH MANUAL ON PAVEMENT MARKINGS, 2004 EDITION
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
THERMOPLASTIC DETAILS
10
10
CENTER AND BORDER LINES MARKINGS
SCALE NTS
1
A4-006 A4-006
NO PASSING LINE ON HORIZONTAL CURVES
SCALE NTS
2
NO PASSING LINE ON VERTITAL CURVES
SCALE NTS
2
PAVEMENT MARKINGS DETAILS
SCALE NTS
2
PEDESTRIAN LANE
SCALE NTS
2
A4-006 A4-006
A4-006 A4-006
A4-006 A4-006
A4-006 A4-006
CENTER AND EDGE LINE MARKINGS
RURAL HIGHWAY, TWO WAY
GA 26 COOR. ROOFING
¼' THK.PLYWOOD
4'CHB WALL
¼' THK. PLYWOOD
4' CHB WALL
GA. 26 CORR. ROOFING
4' CHB WALL
¼' THK. PLYWOOD
2"x3" coco lumber Space @
600mm horizontally
2"x3" coco lumber Space @
600mm vertically
ROOM
LA
BO
RA
TO
RY
O F F I C E
CR
ROOF LINE
W1
W1 W1
W1
W1
W1
CURING TANK
W3W2
MAT'LS
TECH.
MAT'LS
ENGR.
4" CHB IN THREE
LAYER PLASTERED
FINISHED
C-F
WFWF
WFWF
WF
WF
WF
WF
C-FC-F
C-FC-FC-F
C-F
C-F
2"x6" Wood Rafter
2"x3" Coco Lumber Purlins
@ every 0.75m O.C.
4 -12mm dia. RSB w/
10mm. dia ties sp. 1-50mm..,
3-100mm., 200mm. rest...
4 - 12mm. dia RSB B.W.
FIN. FLR. LINE
4 - 12mm. dia. RSB w/ 10mm.
dia. tie
sp. 1-50mm., 3-100mm.,
200mm. rest....
4 - 12mm. dia. RSB B.W.
2-5mm. x 50mm. x 300mm. POST
STRUP
0.15m. x 0.15m. COCO POST
4" CHB WALL
in two layer
2"x6" Coco Lumber
2"x3" Coco Lumber Purlins
Space @0.75 m O.C.
w/ 2 - 2"x2" cleats
GA 26 CORR. ROOFING
2"x6" Wood Rafter
2"x6" Coco Lumber
2 - 2"x6" Coco Lumber
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD - OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
G
11 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
FIELD OFFICE
11
11
FRONT ELEVATION
SCALE 1:75
LEFT SIDE ELEVATION
SCALE 1:75
DETAILS AND SECTION COLUMN FOOTING
SCALE
1:20
REAR ELEVATION
SCALE
1:75
RIGHT SIDE ELEVATION
SCALE
1:75
RAFTERS AND PURLINS SECTION DETAILS
SCALE
1:50
FLOOR PLAN
SCALE
1:75
FOUNDATION PLAN
SCALE
1:75
ROOF FRAMING PLAN
SCALE
1:75
9.23
9.231
9.75
9.750
10.44
10.439
11.77
11.775
13.60
13.598
15.01
15.007
16.52
16.517
17.48
17.478
17.65
17.651
16.93
16.932
16.96
16.963
15.95
15.951
15.35
15.352
15.61
15.606
16.15
16.151
16.78
16.782
17.26
17.259
16.96
16.960
262+
400
2
6
2
+
5
0
0
262+600
2
6
2
+
7
0
0
5.00
10.00
15.00
STATION262+380 +480 262+580 +680
ELE
VA
TIO
N
+400 262+420 +440 262+460 262+500 +520 262+540 +560 +600 262+620 +640 262+660 262+700 +720
FINISHED GRADE
ELEVATION
NATURAL GROUND
ELEVATION
SUPERELEVATION
WIDENING OF CURVE
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
R
24 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
PLAN & PROFILE
1
12
STA. 262+380 STA. 262+720
BEG. OF PROJECT
STA. 262+393.00
MATCHLINE
STA. 262+720.00
MATCHLINE
10.00
15.00
20.00
16
.9
61
6.9
60
17
.5
81
7.5
77
16
.2
51
6.2
48
18
.6
41
8.6
38
15
.4
21
5.4
17
14
.8
91
4.8
90
14
.2
61
4.2
64
13
.5
91
3.5
93
13
.2
41
3.2
40
12
.5
51
2.5
53
12
.2
11
2.2
12
12
.6
11
2.6
14
14
.4
11
4.4
06
13
.1
51
3.1
46
11
.6
71
1.6
74
11
.2
21
1.2
20
11
.2
61
1.2
64
10
.5
61
0.5
61
262+
800
262+
900
263+000
10.00
15.00
20.00
STATION262+720 +820 262+920 +020
ELE
VA
TIO
N
+740 262+760 +780 262+800 262+840 +860 262+880 +900 +940 262+960 +980 263+000 263+040 +060
FINISHED GRADE
ELEVATION
NATURAL GROUND
ELEVATION
SUPERELEVATION
WIDENING OF CURVE
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
R
24 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
PLAN & PROFILE
2
13
STA. 262+720 STA. 263+060
MATCHLINE
STA. 263+060.00
MATCHLINE
STA. 262+720.00
10
.5
61
0.5
61
10
.5
71
0.5
72
9.7
89
.7
82
9.6
49
.6
40
9.3
09
.3
00
8.7
08
.6
96
8.5
08
.5
04
8.3
88
.3
85
8.3
68
.3
63
8.6
48
.6
42
8.3
58
.3
46
8.1
38
.1
34
9.6
39
.6
28
10
.9
11
0.9
06
9.1
89
.1
85
9.0
99
.0
91
7.0
17
.0
13
8.6
28
.6
19
263+100
263+200
263+300
263+400
5.00
10.00
15.00
STATION263+060 +160 263+260 +360
ELE
VA
TIO
N
+080 263+100 +120 263+140 263+180 +200 263+220 +240 +280 263+300 +320 263+340 263+380 +400
FINISHED GRADE
ELEVATION
NATURAL GROUND
ELEVATION
SUPERELEVATION
WIDENING OF CURVE
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
R
24 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
PLAN & PROFILE
3
14
STA. 263+060 STA. 263+400
MATCHLINE
STA. 263+400.00
MATCHLINE
STA. 263+060.00
8.6
28
.6
19
9.6
89
.6
83
8.1
38
.1
26
8.7
68
.7
59
9.0
09
.0
03
10
.3
91
0.3
94
10
.8
21
0.8
22
10
.3
21
0.3
22
10
.3
41
0.3
43
10
.4
21
0.4
19
10
.8
21
0.8
16
10
.7
31
0.7
29
10
.2
71
0.2
67
10
.4
51
0.4
54
10
.4
01
0.4
03
9.0
69
.0
60
11
.5
41
1.5
40
10
.2
31
0.2
29
263+
400
263+
500
2
6
3
+
6
0
0
263+
700
5.00
10.00
15.00
STATION263+400 +500 263+600 +700
ELE
VA
TIO
N
+420 263+440 +460 263+480 263+520 +540 263+560 +580 +620 263+640 +660 263+680 263+720 +740
FINISHED GRADE
ELEVATION
NATURAL GROUND
ELEVATION
SUPERELEVATION
WIDENING OF CURVE
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
R
24 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
PLAN & PROFILE
4
15
STA. 263+400 STA. 263+740
MATCHLINE
STA. 263+740.00
MATCHLINE
STA. 263+400.00
10
.2
31
0.2
29
9.5
79
.5
67
9.6
19
.6
11
9.0
49
.0
36
8.8
48
.8
44
9.4
99
.4
90
8.8
88
.8
75
9.0
39
.0
31
9.2
09
.1
99
9.5
79
.5
65
8.5
68
.5
56
9.9
79
.9
69
9.3
99
.3
93
10
.4
61
0.4
57
10
.6
41
0.6
38
10
.8
71
0.8
73
10
.9
91
0.9
95
11
.6
11
1.6
12
263+
800
263+
900
264+
000
5.00
10.00
15.00
STATION263+740 +840 263+940 +040
ELE
VA
TIO
N
+760 263+780 +800 263+820 263+860 +880 263+900 +920 +960 263+980 +000 264+020 264+060 +080
FINISHED GRADE
ELEVATION
NATURAL GROUND
ELEVATION
SUPERELEVATION
WIDENING OF CURVE
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
R
24 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
PLAN & PROFILE
5
16
STA. 263+740 STA. 264+080
MATCHLINE
STA. 264+080.00
MATCHLINE
STA. 263+740.00
11
.6
11
1.6
12
12
.1
61
2.1
60
11
.5
11
1.5
08
11
.0
01
0.9
98
11
.2
31
1.2
33
11
.1
41
1.1
42
11
.0
21
1.0
23
11
.1
71
1.1
72
11
.0
51
1.0
46
13
.6
81
3.6
81
11
.5
11
1.5
07
11
.0
11
1.0
13
11
.1
31
1.1
25
10
.8
71
0.8
74
10
.3
31
0.3
35
10
.2
51
0.2
49
9.3
09
.2
97
9.0
79
.0
66
264+
100
264+
200
264+
300
264+
400
5.00
10.00
15.00
STATION264+080 +180 264+280 +380
ELE
VA
TIO
N
+100 264+120 +140 264+160 264+200 +220 264+240 +260 +300 264+320 +340 264+360 264+400 +420
FINISHED GRADE
ELEVATION
NATURAL GROUND
ELEVATION
SUPERELEVATION
WIDENING OF CURVE
PROJECT NAME AND LOCATION SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDING: APPROVED: SET NO. SHEET NO.DRAFTED:
PREPARED:
OLIVER P. FORNESTE
ENGINEER II
ROSE-ANN A. REANZARES
CAD OPERATOR
DOMINGO P. VILLARUEL
ENGINEER II
MICHAEL P. ROSARIA
CHIEF: PLANNING AND DESIGN SECTION
JORGE C. PASIA
ASSISTANT DISTRICT ENGINEER
CAROLINA D. PASTRANA
OIC - DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
REGIONAL IV-A
R
24 35
NETWORK DEVELOPMENT PROGRAM:
OFF CARRIAGEWAY IMPROVEMENT - SECONDARY
ROADS - ABUYON - BUENAVISTA ROAD
K0262+393 - K0265+141
PLAN & PROFILE
6
17
STA. 264+080 STA. 264+420
MATCHLINE
STA. 264+420.00
MATCHLINE
STA. 264+080.00