reproductions supplied by edrs are the best that can be madedistrict-wide renovations 49 ... to...

88
DOCUMENT RESUME ED 482 498 JC 030 658 TITLE The Austin Community College District Master Plan: FY 2004-2006. INSTITUTION Austin Community Coll., TX. PUB DATE 2003-00-00 NOTE 87p. PUB TYPE Reports Descriptive (141) EDRS PRICE EDRS Price MF01/PC04 Plus Postage. DESCRIPTORS *Change Strategies; Community Colleges; *Educational Planning; Enrollment; Institutional Administration; Long Range Planning; Policy Formation; *Strategic Planning; Trend Analysis; Two Year Colleges IDENTIFIERS *Austin Community College TX ABSTRACT This Austin Community College (ACC) District Master Plan for 2004-2006 continues ACC's efforts to manage growth and change through a comprehensive planning process. The planning process was coordinated with the ACC Southern Association of Colleges and Schools (SACS) Alternate Self Study. This study addresses the following areas: (1) Fiscal Resources; (2) Instructional Programs; (3) Instructional Support Services; (4) Administrative Services; (5) Strategies for Enrollment; (6) External Partnerships and Collaborations; and (7) Facilities. Some of the highlights of the study follow: ACC's tuition rates are among the highest of any community college in Texas, creating access issues for many who most need the community college. ACC experienced a budget shortfall of $3.3 million in FY01, and in the 2 subsequent years, cut its operating budget. The report recommends that ACC seek voter approval for increasing the College's tax rate and to issue general obligation bonds to address facilities and equipment needs. The report also recommends that ACC improve its strategies for tracking the progress of underrepresented students once they leave ACC, and that ACC should increase the transfer rates of underrepresented populations, especially African American and Hispanic students. (Contains 16 tables and figures.) (NB) Reproductions supplied by EDRS are the best that can be made from the original document.

Upload: others

Post on 23-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DOCUMENT RESUME

ED 482 498 JC 030 658

TITLE The Austin Community College District Master Plan: FY 2004-2006.

INSTITUTION Austin Community Coll., TX.

PUB DATE 2003-00-00

NOTE 87p.

PUB TYPE Reports Descriptive (141)

EDRS PRICE EDRS Price MF01/PC04 Plus Postage.

DESCRIPTORS *Change Strategies; Community Colleges; *Educational Planning;Enrollment; Institutional Administration; Long Range Planning;Policy Formation; *Strategic Planning; Trend Analysis; Two YearColleges

IDENTIFIERS *Austin Community College TX

ABSTRACT

This Austin Community College (ACC) District Master Plan for 2004-2006continues ACC's efforts to manage growth and change through a comprehensive planningprocess. The planning process was coordinated with the ACC Southern Association ofColleges and Schools (SACS) Alternate Self Study. This study addresses the followingareas: (1) Fiscal Resources; (2) Instructional Programs; (3) Instructional SupportServices; (4) Administrative Services; (5) Strategies for Enrollment; (6) ExternalPartnerships and Collaborations; and (7) Facilities. Some of the highlights of thestudy follow: ACC's tuition rates are among the highest of any community college inTexas, creating access issues for many who most need the community college. ACCexperienced a budget shortfall of $3.3 million in FY01, and in the 2 subsequent years,cut its operating budget. The report recommends that ACC seek voter approval forincreasing the College's tax rate and to issue general obligation bonds to addressfacilities and equipment needs. The report also recommends that ACC improve itsstrategies for tracking the progress of underrepresented students once they leave ACC,and that ACC should increase the transfer rates of underrepresented populations,especially African American and Hispanic students. (Contains 16 tables and figures.)(NB)

Reproductions supplied by EDRS are the best that can be madefrom the original document.

Page 2: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Austin Community College MasterPlan: Fiscal Year 2004-2006

Austin Community College

U.S. DEPARTMENT OF EDUCATIONOffice of Educational Research and ImprovementEDUCATIONAL RESOURCES INFORMATION

CENTER (ERIC)This document has been reproduced asreceived from the person or organizationoriginating it.Minor changes have been made to improvereproduction quality

Points of view or opinions stated in thisdocument do not necessarily representofficial OERI position or policy.

1

PERMISSION TO REPRODUCE ANDDISSEMINATE THIS MATERIAL HAS

BEEN GRANTED BY

M. Oburn

TO THE EDUCATIONAL RESOURCESINFORMATION CENTER (ERIC)

BEST COPY AWLAB IF

Page 3: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

MASTER PLAN: FY 2004-2006The Austin Community College District

INDEXIntroduction 1

Overview of the Master Plan 2

Mission 3

CARES: Our Core Values 4

Vision 6

Benchmarking Summary 7

Enrollment 7

Facilities 7

Library and Learning Resources 8

Faculty 8

Staffing and Compensation 8

Revenue and Expenditures 9

Tax Base, Tax Collections, and Service Area 9

Fiscal Resources 11

Grants/Foundation 11

FY2004 FY2010 ProjectedRevenues vs. Expenditures 13

Charts/Financial Challenges 18

FY03 Value of One 20

2002-03 Tax Valuation Texas Public Community Colleges 21

The SACS Strategic Focus 230Instructional Programs 24

0Closing the Gaps Statewide 24

FY03 Priorities: Limited Resources Scenario 25

Service Learning 25

02/03/03

Page 4: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Learning Communities 25

Honors Program 25

Internationalizing the Curriculum 25

Academic Advising 26

FY04-06 Priorities: Expanded Resources Scenario 27

Academic Programs 27

Workforce Education Programs 28

Adult Basic Education 30

Distance Learning 30

Credit Sections 30

Continuing Education 31

Instructional Support Services 33

Instructional Resources and Technology 33

Library Services 33

Video Services 33

Learning Labs 34

Testing Centers 34

Administrative Services 35

Communication and Decision-Making Model 35

Institutional Effectiveness 35

Information Technology 36

District-wide Management Information System Server 36

Human Resources 37

Marketing and Public Information 37

Strategies for Enrollment 39

02/03/03

Page 5: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Access and Outreach 39

Enrollment Management 40

Retention and Goal Achievement 40

Services for Students with Disabilities 41

Services for Distance Learning Students 41

Student Life 42

Transition Services 42

External Partnerships and Collaborations 43

Independent School Districts 43

Alternative Teacher Certification 43

Early College Start 44

Community Organizations 45

Service Area Collaboration and Annexation 45

Higher Education Institutions 46

Facilities 47

General and Education Space 49

Eastview Campus 49

Proposed South Austin Campus 49

Cypress Creek Campus 49

Rio Grande Campus 49

District-wide Renovations 49

Parking Improvements 49

Unfunded Proj ects 50

ACC Capital Improvements Programs 2003-2010 Planning Schedule 51

2002-03 Tax and Valuation Texas Public Community Colleges 51

iii

502/03/03

Page 6: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

MASTER PLAN: FY 2004-2006The Austin Community College District

INTRODUCTION

The Austin Community College District (ACC) Master Plan for 2004-2006 continues the College'sefforts to manage growth and change through a comprehensive strategic planning process.

This process follows the College's previous Master Plan which resulted from the work of an externalCitizen's Advisory Committee, as well as the recommendations of faculty, staff, and students.

ACC was careful to integrate and coordinate its master planning process with its SACS (SouthernAssociation of Colleges and Schools) Alternate Self Study as well. The resulting Master Plan wasstrengthened by this approach.

Key components in the master planning process included:

review of regional demographics and workforce trends;

analysis of State and national benchmarks in core areas of college operations;

analysis of internal feedback garnered through the Baldrige continuous qualityimprovement process;

campus forums involving faculty, staff and students;

participation by external community individuals and business representatives;

campus forums to review the mission statement of the College;

campus forums to develop a shared strategic vision statement;

use of existing Councils, employee organizations, and Student Government Association inreviewing the recommendations of the Master Plan;

use of the reports from the SACS Self-Study Strategic Focus Committees

The Board of Trustees and the President of the College thank the faculty and staff, and externalcommunity and business members, who helped develop and review ACC's Master Plan.

Addendum Al: Master Plan

Addendum A2: Master Plan process and calendar

Addendum A3: SACS Alternate Self-Study process and calendar

02/03/03

Page 7: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

OVERVIEW OF THE MASTER PLAN

This updated Master Plan echoes the central conclusion of the previous Master Plan: ACC ISSERIOUSLY UNDER-FUNDED AND CANNOT MEET THE MULTIPLE DEMANDS THECOMMUNITY ASKS IT TO ADDRESS. The following challenges will continue to limit theeffectiveness of the College:

the amount of State reimbursement as a total percentage of ACC's budget continues todecline;

ACC's tax rate of five cents remains the lowest in the State of Texas barely one-third ofthe State average;

ACC's tuition rate is among the highest of community colleges in Texas, and imposesbarriers to access as well as to the College's desire to attract a more diverse studentpopulation;

ACC's regional importance will continue to grow;

ACC's previous strategy to incrementally address its multiple demands is in jeopardy wehave an unscalable wall of community needs and expectations and inadequate fiscalresources.

Limited resources impact the College in many ways inadequate numbers of faculty and staff, agingand over-used facilities, difficulty in maintaining state-of-the-art equipment, difficulty expanding highdemand programs, and difficulty attracting more traditionally under-served populations.

One can also observe keen competition internally for the limited resources of the district. Thiscompetitiveness, in one sense, serves the institution by forcing closer scrutiny of how its limitedresources are best used. This competition also impairs the district in its efforts to forge a consensus ofpriorities and to implement a shared vision. The Master Plan calls for increased efforts to foster dialog,communication, and cooperation among the administration, faculty and staff.

Austin Community College faces two choices (1) retrenchment and decline, as evidenced by currentbudget limitations and necessary reductions in operating budgets and (2) move forward in seekingadditional resources to allow the College to respond responsibly to growth.

The College lacks the ability to make significant impact in many critical areas of its Mission due to thelack of fiscal resources. Until ACC's resources are significantly expanded, through (1) a successfulreferendum effort to increase its tax rate and, (2) through additional annexations of out-of-district independent school districts, its ability to meet its full potential as a community resourcewill continue to be impaired. These two action items constitute the highest priority of the District,and are the single most important recommendations in the Master Plan.

27 02/03/03

Page 8: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

MISSION

The Master Plan must be closely aligned with the institution's purpose or mission, its values, and itsvision. Community colleges are mandated through the Education Code of the State of Texas toprovide the following programs as part of their core mission:

workforce programsvocational and technical programs leading to certificates or degreesacademic transferfreshman and sophomore level academic courses leading to an associate degree or servingas the base of a baccalaureate degree program at a four-year institutioncontinuing adult educationacademic, occupational, professional, and cultural enhancementfoundation skillsspecial instructional programs and tutorial service to assist under-prepared students andothers who wish special assistance to achieve their educational goalssupport services to studentsa continuing program of counseling and advising designed to assist students in achievingtheir individual educational and occupational goalsinstructional supporta program of technology, library, media, and testing services to support instructioncontract trainingcontracted instructional programs and services for area employers that promote economicdevelopment

A primary achievement of the Fy04-06 Master Plan is the revision of Board Policy A-1Vision/Mission/Values Statement, and a revision of A-2, Intended Outcomes has been submitted to theBoard. Through a district-wide forum of faculty, staff, and students the former policies were discussedand a writing team was selected to take the input of the larger group and to draft new policy statementsfor the Board of Trustees for review and adoption.

MISSION RECOMMENDATION 1:The Master Plan calls for the College to continue, in all its strategic planning and operationalinitiatives, to offer and maintain a balance of the core mission elements required by State law andwhich are essential to the regional constituencies it serves.

MISSION RECOMMENDATION 2:ACC should include its revised Policy A-I, Vision/Mission/Values Statement, in all officialpublications and widely publicize it via the web, campus signage, and other promotional venues.

MISSION RECOMMENDATION 3:ACC must work to help the State of Texas achieve the access and equity goals outlined in the"Closing the Gap" report issued by the Texas Higher Education Coordinating Board.

Addendum Bl: previous Mission Statement.

Addendum B2: revised Mission Statement

3

8 02/03/03

Page 9: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

CARES: OUR CORE VALUES

Another significant process related to strategic master planning has been the development of theStrategic Communications and Marketing Plan, designed to communicate our core values.

This process was the outgrowth of previous Board Retreat topics, and is intended to focus theCollege's communication strategies, both internally and externally, to reinforce the key conclusion ofthe prior Citizens' Advisory Committee recommendation that ACC must seek to expand its tax rateand its tax base.

The Strategic Communications and Marketing Plan focuses on image-building for the College, andaddresses three core communications challenges: (1) reaching target populations most in need ofeducational programs and services, (2) overcoming a general lack of public understanding of our rolein the community, and (3) increasing the public's awareness of ACC's value and return on investment.It also includes a group of core messages, and strategies for communicating them to the multipleconstituencies in our community.

Values

The core values of Austin Community College are summarized in the acronym CARESThese are the core values that guide ACC's internal and external interactions with each other and ourcommunity:

C Communication

A Access

R Responsiveness

E Excellence

S Stewardship

Communication: Open, responsible exchange of ideas.

a. Nurturing collaborationsb. Creating policyc. Guiding changed. Respecting all

Access: An open door to educational potential.

a. Achieving goalsb. Fostering diversityc. Balancing programs and servicesd. Ensuring affordability

402/03/03

Page 10: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Responsiveness: Targeted actions to address Service Area and internal needs within availableresources.

a. Seeking information and ideasb. Recruiting under-served populationsc. Developing partnershipsd. Connecting resources and needs

Excellence: A commitment to integrity and exemplary standards.

a. Empowering students, faculty, and staff to be self-directed toward excellenceb. Emphasizing training, development and lifelong learningc. Establishing and measuring outcomes linked to continuous improvementd. Encouraging innovation and creativity

Stewardship: Personal and professional ownership that generates accountability.

a. Exercising responsible and accountable leadershipb. Anticipating future needs and trendsc. Protecting, seeking, and using resources wiselyd. Providing a safe and challenging learning environment

Addendum Cl: Strategic Communications and Marketing Plan

5

1 0 02/03/03

Page 11: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

VISION

From the review of the Mission/Vision/Values Statement, the College also focused on its strategicvision of ACC as part of the master planning process.

The President and Executive Vice President hosted several campus focus groups in which faculty,staff, and students discussed a long-range vision for ACC. A draft statement was shared at the Fall 01General Assembly, and then seven focus groups were held across the district, open to all. An eighthfocus group was then held in February 2002, consisting of representatives from the previous sevenmeetings, to refine a final document entitled A Future Vision for Austin Community College.

The final document incorporates the mission/vision/values statements which were revised as BoardPolicy A-1, and reflects the consensus gathered during the master planning process as well as duringthe SACS Alternate Self-Study process:

ACC is a regional resource;

ACC must seek to balance its instructional components of academic transfer, workforceeducation, and basic foundation skills;

ACC must have adequate and comprehensive services for students which enable them toremain in school and to achieve their educational goals;

ACC must continue outreach efforts to its communities to ensure that it understands theirneeds and appropriately addresses them to the extent possible

ACC must expand its fiscal resources in order to fulfill its destiny.

ACC must have adequate and state-of-the-art technology for instruction as well as districtoperations

VISION RECOMMENDATION 1:The College's Mission/Vision/Values Statement should be viewed as a fluid scenario whichwill be reviewed in a collaborative manner, on a regular basis, as part of the master planningprocess.

Addendum Dl: A Future Vision for Austin Community College

61 1 02/03/03

Page 12: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

BENCHMARKING SUMMARY

In Spring, 1999, ACC contracted with MGT of America to develop peer benchmarks for key indicatorsof College effectiveness. These were updated in Spring 2002. Data were collected from eight (8) Texaspeer community colleges and four (4) non-Texas institutions. These colleges represent a sample oflarge, comprehensive urban community colleges similar to Austin Community College.

A summary of how ACC compares to other institutions follows:

ENROLLMENT

Each semester ACC turns away students who cannot get the classes they want. In Fall 02, the numberwas 3,882. In addition to not meeting current needs, the Texas Higher Education CoordinatingBoard's (THECB) Closing the Gaps report has set a statewide goal of enrolling 150,000 additionalnew students by 2005. Benchmarks:

A larger percentage of the headcount students at peer colleges are enrolled as full-time students:33.6% compared to 24.3% at ACC.

A larger percentage of the headcount students at peer colleges are minority students: 49.3%compared to 35.2% at ACC.

When compared to the adult population in the service area, ACC enrolls a smaller percentage ofminority students than are represented in the adult population.

In terms of serving the service area, ACC enrolled 1.49% of the service area population comparedto an average of 1.55% for the Texas peer colleges.

When taxing district is used as the basis of comparison, ACC enrolls a higher percent of the taxingdistrict population: 2.86% compared to an average of 1.83% for the Texas peer colleges.

The implications are that larger headcount enrollment further stresses limited resources and inadequatefacilities, and that ACC will not be able to meet State enrollment goals without more resources.

FACILITIES

ACC's assignable square feet of classroom space per Full-Time Student Equivalent (FTSE) isbelow the space planning benchmarks suggested by the Association of Physical PlantAdministrators (APPA): ACC has about 11 square feet of classroom space per FTSE. The APPAbenchmark is 14 to 22 square feet of classroom space per FTSE and the THECB benchmark is 11.

ACC's classroom utilization rates at all campuses are higher than the suggested rate of 60% of thehours available made by the Council of Educational Facilities Planners, International. The Fall2001 classroom utilization rates for Monday Friday from 7 am 10pm were Cypress-79%;Eastview-71%; Northridge-83%; Pinnacle-79%; Rio Grande-72%; Riverside-73%

ACC has a plant value of about $4,024 per headcount student compared to $9,487 for peercolleges and $8,906 for the Texas peer colleges; ACC would need to more than double its planinvestment to reach the level of the Texas peer colleges.

7 12 02/03/03

Page 13: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

The implication is that ACC is more crowded and has less instructional and support services space;these conditions negatively impact the teaching/learning environment.

LIBRARY AND LEARNING RESOURCES

ACC's libraries/learning resource centers are open an average of 70.5 hours per week, while theaverage hours per week at peers was 74.4 hours.

ACC is below the seating capacity standard set by the Association of College and ResearchLibraries (ACRL). In FY2000, ACC had seating for about 5% of the full-time equivalent studentswhile the minimum is 10%.

Based on FTSE, the benchmark space in learning resources for ACC would be 114,380 squarefeet; ACC has a total of 41,354 or about 40% of the benchmark.

ACC has 1.61 square feet of learning center space per headcount student compared to an averageof 3.99 square feet at peer colleges.

ACC expends less on libraries and learning resources than the recommended American LibraryAssociation, Association of College and Research Libraries (ACRL) standard. The standard is 6%of the Educational and General Budget. ACC's actual FY2000 expenditures on libraries andlearning resources was only about 3%.

The implication is that ACC libraries are too small and too crowded.

FACULTY

The headcount student to available full-time faculty ratio at ACC has improved from 88.2 in1997-98 to 68.1 in 2000-01, but is still greater than the peer average of 60.4 headcount studentsper full-time faculty member.

For ACC to reach the average headcount student to full-time faculty ratio, an additional 45 full-time faculty members would need to be added.

The implication is that ACC has less full-time faculty to appropriately meet student needs and toaddress the full range of curriculum responsibilities. This creates an over reliance of adjunct facultyand increases the workload responsibilities of full-time faculty (i.e., there's not enough full-timefaculty to share the total scope of work).

STAFFING AND COMPENSATION

ACC has fewer non-instructional staff to meet student needs than peer colleges. For ACC the ratioof headcount students to non-instructional staff was 23.2, while it was 11.1 for the peer collegesand 9.1 for the Texas peers.

The implication is that the institution is under-staffed in support areas, and that resources forstudents consequently are limited.

8 1302/03/03

Page 14: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

REVENUES AND EXPENDITURES

In FY2000, ACC received about $1,200 less in total revenue per student than did the peercolleges. If ACC were to be funded at the level of its peers, about $15.6 million more each yearwould be available to meet student needs.

ACC receives a smaller proportion of revenue from property taxes than peer colleges; $500 lessper FTSE in revenues derived from property taxes than peer colleges.

ACC is more dependent on tuition and fees paid by students than peer colleges; ACC receivedabout $700 more per FTSE in tuition and fee revenues than did peer colleges.

On average, tuition and fees at ACC are higher than that charged at the Texas peer colleges.ACC's out-of-district- tuition is the highest in the State, among all community colleges.

Since 1997-98, ACC's tuition and fees per credit hour have increased differentially, especiallycompared to its Texas peers: ACC in-district 17.3% compared to 28.3% for its Texas peers; ACCout-of-district 50.1% compared to 25.6% for its Texas peers;

ACC expended about $120 more per FTSE on Instruction than did its peers, and $102 more perFTSE on Academic Support, which includes the Library and Learning Resource Center.

ACC spent $643 more per FTSE in Institutional Support than did peer colleges.

ACC spent about $244 less per FTSE in Student Services and $221 less per FTSE in PlantOperation than did the peer colleges.

ACC received about $220 less per FTSE student in federal financial aid than did its peers. Sincefederal financial aid is based on need, this may reflect differences in the make-up of the currentstudent body.

The implication is the continued decline in the percent of overall budget provided by local taxes andState reimbursements. The College must increase and expand its fiscal resources.

TAX BASE, TAX COLLECTIONS AND SERVICE AREA

ACC is supported by a taxing district that is much smaller in terms of population than other large,urban Texas community colleges. ACC had the highest ratio of population served to taxing districtpopulation (1.92) among the large, urban Texas community college districts, whose average ratiowas 1.18.

The net assessed valuation of ACC's taxing district is about 33% less per student than for otherlarge, urban Texas community colleges: $1,844,132 for ACC compared to $2,425,400 for otherlarge, urban Texas community colleges.

ACC's tax rate per $100 is .05, the lowest rate in the State.

9

14 02/03/03

Page 15: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

In FY2000, ACC collected less than half the taxes per full-time student equivalent than did theother large, urban college: $1,021 per FTSE at ACC compared to an average of $2,059 for theother colleges.

Addendum El: MGT of America Report

Addendum E2: Benchmark Charts

1015 02/03/03

Page 16: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

FISCAL RESOURCES

ACC has serious budget issues which are rooted in the historical characteristics of the Collegedramatic growth, continued demands for more programs and services, inadequate tax rate, and alimited tax base (only three ISDs constitute the in-district taxing boundaries) and declining Staterevenues as a percent of the total budget. In addition to the benchmarking summary financial data, thelevel of State reimbursement funding to ACC has declined from 60% of the total budget in 1984 to39% in FY02. ACC's tax rate of 5 cents per $100 valuation is the lowest in Texas, and has beenunchanged since it was first established in 1986. These budget issues are reflected by the followingchallenges:

ACC moved to the new State-mandated accounting system for public community colleges effectivethe FY03 academic year. It also expanded its monthly financial reports in both format andcomprehensiveness, and widened the distribution of them internally. The Board of Trustees alsoreceives monthly financial reports in its public meetings.

The State Comptroller conducted a Performance Review of ACC, as it does for public ISDs andcommunity colleges, in Fall 02. The College appreciates the review and will seriously consider allrecommendations which can enhance efficiencies. It also appreciates the numerous commendationsreceived, and the Comptroller's support for ACC acquiring additional resources. ACC has an internalBudget Committee, consisting of faculty, staff, and students, who will review carefully allrecommendations included in the Performance Review. In addition, the Board of Trustees hasdiscussed the possibility of establishing an external budget committee to assist in reviewing collegeoperations. While these efforts can further improve the College's financial reporting systems andcan identify potential operating efficiencies, the reality is that ACC cannot do all that it is askedto do, nor all that it should be doing as a key regional educational resource, without changes toits tax rate and without expanding its tax base.

ACC'S tuition rates are among the highest of any community college in Texas, creating accessissues for many who most need the community college;In FY01, the College experienced a budget shortfall of $3.3 million dollars which placed theCollege below its Board policy directive of maintaining a 15% fund reserves balance;In FY02, ACC cut its operating budget by $2.9 million to end with a balanced budget;In FY03, ACC further reduced operating budgets by $1.8 million in order to ensure ending theyear with a balanced budget.

Grants/Foundation

The critical limitations inherent with ACC's tax rate, the lowest in the State, add to the impetus to seekexternal funding. The College has a Grants Development Office as well as an ACC Foundation toassist in these regards. Grants are pursued aggressively, and the Board receives a monthly report onthe goals and achievements of this unit. The ACC Foundation recently surpassed the million dollarfigure in securing resources to support students and instructional programs.

FISCAL RESOURCES RECOMMENDATION 1:The Board of Trustees should seek voter approval to increase the College 's tax rate.

FISCAL RESOURCES RECOMMENDATION 2:The Board of Trustees should seek, in addition to voter approval of an increased tax rate, voterapproval to issue general obligation bonds to address facilities and equipment needs.

" 1 s 02/03/03

Page 17: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

FISCAL RESOURCES RECOMMENDATION 3:ACC should continue to develop strategies which encourage out-of-district ISDs to pursueannexation.

FISCAL RECOURCES RECOMMENDATION 4:The College should continue to aggressively seek external grant finding opportunities. Thisapproach should be aligned with a collaborative prioritization of programs and services to besupported by grants pursuance.

FISCAL RESOURCES RECOMMENDATION 5:The ACC Foundation should expand its find-raising efforts to secure additional studentscholarships as well as instructional equipment to support high priority program enhancementneeds.

FISCAL RESOURCES RECOMMENDATION 6:The College will meet compensation goals as established by the Board of Trustees within 3 yearsif the referendum increasing the tax cap is successful.

FISCAL RESOURCES RECOMMENDATION 7:In recognition that ACC 's in-district and out-of-district tuition rates are among the highest inTexas, the College should strive to minimize both in-district and out-of-district tuition increases.

Addendum FL February 8, 2002 FY02Budget Revision Process

Addendum F2: February 16, 2002Austin American-Statesman editorial

Addendum F3: March 4, 2002Austin American-Statesman editorial

1217 02/03/03

Page 18: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

AUSTIN COMMUNITYFY2004 - FY2006 Projected---Revenues

($0.05 Tax

Projected Revenues

COLLEGE Attachment Cvs. Expenditures Agenda Item 7643

Rate) - No Annexations February 3, 2003

FY03 FY04 FY05 FY06

Tuition and FeesCredit Tuition and Fees (3%, 2%, 1%) $ 35,543,147 $ 36,609,441 $ 37,341,630 $ 37,715,047Continuing Education 1,100,000 900,000 900,000 900,000

Net Contract Training 100,000 100,000 100,000 100,000

Total Tuition and Fees $ 36,743,147 $ 37,609,441 $ 38,341,630 $ 38,715,047State Appropriation (2.5%) 38,821,532 39,792,070 39,792,070 40,786,872

Interest Income 600,000 200,000 200,000 200,000

Property Taxes (-4%, 0%, 0%) 24,846,034 23,852,193 23,852,193 23,852,193

Annexation 0 0 0 0

Indirect Cost Recovery 125,000 125,000 125,000 125,000

Other (3%, 2%, 1%) 1,968,400 2,027,452 2,068,001 2,088,681

Transfer from Bonds 1,500,000 0 0 0

Total Projected Revenues $ 104,604,113 $ 103,606,156 $ 104,378,894 $ 105,767,792Revenue Increase -0.95% 0.75% 1.33%

Projected ExpendituresPolicy F-10, Employee Comp. & Prof. Dev. (4%)

Professional Development 1,893,640 1,950,449 2,008,963 2,069,232Stipends 326,159 326,159 326,159 326,159Residual 1,995,224 1,867,638 1,840,034 1,835,321

Total, Policy F-10 $ 4,215,023 $ 4,144,246 $ 4,175,156 $ 4,230,712Policy G-4, Facilities Improvement (Building Fee)

Debt Service Payment 4,038,145 3,987,896 3,061,041 3,308,680Preventive Maintenance/In-House Team 1,099,000 1,099,000 1,099,000 1,099,000Residual 299,582 908,303 1,435,382 1,525,277

Total, Policy G-4 $ 5,436,727 $ 5,995,199 $ 5,595,423 $ 5,932,957Policy G-5, Capital Equipment (4%)

Prior Multi Year Commitments 2,747,814 2,553,724 2,422,896 2,421,856Capital, Non-Technology 516,693 518,031 521,894 528,839Residual 535,037 1,072,491 1,230,365 1,280,017

Total, Policy G-5 $ 3,799,544 $ 4,144,246 $ 4,175,156 $ 4,230,712Policy G-6, Reserves

Total, Policy G-6 $ 1,393,000 $ 1,899,000 $ 1,708,000 $ 1,493,000

Total Board Policies $ 14,844,294 $ 16,182,691 $ 15,653,734 $ 15,887,380

Balance: Revenue less Board Policies $ 89,759,819 $ 87,423,465 $ 88,725,160 $ 89,880,412

Less: Board of Trustees Bi-Annual Election 0 250,000 0 250,000Less: Utility Increases 300,000 300,000 300,000 300,000Less: Matching Items (TPEG, SEOG, Workstudy) 1,818,589 1,873,147 1,929,341 1,987,221Less: Total Budgeted Operations 87,641,230 89,936,454 92,104,092 94,244,126

Projected Revenues less Projected Expenditures $ (4,936,136) $ (5,608,273) $ (6,900,936)

Assumptions- No new initiatives or staff- Policy F-10 will be used for compensation increases and Professional Development.- The number of Full-Time/Adjunct Faculty will remain constant eventhough projecting an enrollment increase.- Utilities will continue to rise due to higher rates and increases in facilities.- Vacancies remain unfilled through FY06- Enrollment projections decrease due to capicity limitations

Business Services 1/27/03 13 ig

Page 19: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Pro

ject

ed R

even

ues

AU

ST

IN C

OM

MU

NIT

YF

Y20

04 -

FY

2010

Pro

ject

ed--

Rev

e$0

.09

M8.

0 T

ax R

ate

with

out A

nnex

atio

ns (

$0.0

7 in

FY

03F

Y04

FY

05

CO

LLE

GE

nues

vs.

Exp

endi

ture

sF

Y04

, $0.

08 in

FY

05, a

nd $

0.09

in F

Y06

)

FY

06F

Y07

FY

08F

Y09

FY

10C

redi

t Tui

tion

and

Fee

s (3

.5%

)$

35,5

43,1

47$

36,7

87,1

57$

39,5

14,7

08$

43,2

37,7

22$

44,7

51,0

43$

46,3

17,3

29$

47,9

38,4

36$

49,6

16,2

81C

ontin

uing

Edu

catio

n1,

100,

000

900,

000

900,

000

900,

000

900,

000

900,

000

900,

000

900,

000

Net

Con

trac

t Tra

inin

g10

0,00

010

0,00

010

0,00

010

0,00

010

0,00

010

0,00

010

0,00

010

0,00

0T

otal

Tui

tion

and

Fee

s$

36,7

43,1

47$

37,7

87,1

57$

40,5

14,7

08$

44,2

37,7

22$

45,7

51,0

43$

47,3

17,3

29$

48,9

38,4

36$

50,6

16,2

812

Sta

te A

ppro

pria

tion

38,8

21,5

3239

,792

,070

39,7

92,0

7041

,184

,793

41,1

84,7

9346

,486

,901

46,4

86,9

0148

,113

,942

Inte

rest

Inco

me

600,

000

1,50

0,00

01,

000,

000

1,00

0,00

060

0,00

060

0,00

060

0,00

060

0,00

03

Pro

pert

y T

axes

(-4

%,0

%,0

%,5

% th

ru F

Y10

)24

,846

,034

33,3

93,0

7038

,163

,508

42,9

33,9

4745

,080

,644

47,3

34,6

7649

,701

,410

52,1

86,4

81A

nnex

atio

ns0

00

00

00

0In

dire

ct C

ost R

ecov

ery

125,

000

125,

000

125,

000

125,

000

125,

000

125,

000

125,

000

125,

000

Oth

er (

3.5%

)1,

968,

400

2,03

7,29

42,

108,

599

2,18

2,40

02,

258,

784

2,33

7,84

22,

419,

666

2,50

4,35

5T

rans

fer

from

Bon

ds1,

500,

000

00

00

00

0T

otal

Pro

ject

ed R

even

ues

$ 10

4,60

4,11

3$

114,

634,

591

$ 12

1,70

3,88

5$

131,

663,

862

$ 13

5,00

0,26

4$

144,

201,

748

$ 14

8,27

1,41

3$

154,

146,

058

Rev

enue

Incr

ease

9.59

%6.

17%

8.18

%2.

53%

6.82

%2.

82%

3.96

%

Pro

iect

ed E

xpen

ditu

res

4P

olic

y F

-10,

Em

ploy

ee C

omp.

& P

rof.

Dev

.*P

rofe

ssio

nal D

evel

opm

ent

1,89

3,64

01,

959,

917

2,02

8,51

52,

099,

513

2,17

2,99

52,

249,

050

2,32

7,76

72,

409,

239

Stip

ends

326,

159

337,

575

349,

390

361,

618

374,

275

387,

375

400,

933

414,

965

Res

idua

l for

com

pens

atio

n1,

995,

224

2,28

7,89

23,

707,

290

5,43

8,70

12,

852,

740

3,13

1,64

53,

202,

157

3,34

1,63

8T

otal

, Pol

icy

F-1

0$

4,21

5,02

3$

4,58

5,38

4$

6,08

5,19

4$

7,89

9,83

2$

5,40

0,01

1$

5,76

8,07

0$

5,93

0,85

7$

6,16

5,84

2P

olic

y G

-4, F

acili

ties

Impr

ovem

ent

Deb

t Ser

vice

Pay

men

t4,

038,

145

3,98

7,89

63,

061,

041

3,30

8,68

04,

734,

002

4,75

9,63

14,

781,

094

4,75

4,66

6P

rey.

Mai

nt. &

In-H

ouse

Tea

m1,

099,

000

1,09

9,00

01,

099,

000

1,09

9,00

01,

099,

000

1,09

9,00

01,

099,

000

1,09

9,00

0R

esid

ual

299,

582

908,

303

1,43

5,38

21,

525,

277

1,71

2,73

41,

913,

477

2,12

5,17

72,

391,

763

Tot

al, P

olic

y G

-4$

5,43

6,72

7$

5,99

5,19

9$

5,59

5,42

3$

5,93

2,95

7$

7,54

5,73

6$

7,77

2,10

8$

8,00

5,27

1$

8,24

5,42

9P

olic

y G

-5, C

apita

l Equ

ipm

ent (

4%)

Prio

r M

ulti

Yea

r C

omm

itmen

ts2,

747,

814

2,55

3,72

42,

422,

896

2,50

0,00

02,

500,

000

2,50

0,00

02,

500,

000

2,50

0,00

0C

apita

l, N

on-T

echn

olog

y51

6,69

357

3,17

360

8,51

965

8,31

967

5,00

172

1,00

974

1,35

777

0,73

0R

esid

ual

535,

037

1,45

8,48

71,

836,

740

2,10

8,23

52,

225,

009

2,54

7,06

12,

689,

499

2,89

5,11

2T

otal

, Pol

icy

G-5

$3,

799,

544

$4,

585,

384

$4,

868,

155

$5,

266,

554

$5,

400,

011

$5,

768,

070

$5,

930,

857

$6,

165,

842

Pol

icy

G-6

, Res

erve

sT

otal

, Pol

icy

G-6

$1,

393,

000

$3,

299,

000

$2,

858,

000

$2,

593,

000

$50

0,46

0$

1,38

0,22

3$

610,

450

$88

1,19

7

Tot

al B

oard

Pol

icie

s$

14,8

44,2

94$

18,4

64,9

66$

19,4

06,7

72$

21,6

92,3

43$

18,8

46,2

17$

20,6

88,4

70$

20,4

77,4

34$

21,4

58,3

11

Bal

ance

: Rev

enue

less

Boa

rd P

olic

ies

$89

,759

,819

$96

,169

,625

$ 10

2,29

7,11

3$

109,

971,

519

$ 11

6,15

4,04

7$

123,

513,

278

$ 12

7,79

3,97

9$

132,

687,

747

Less

: Boa

rd o

f Tru

stee

s B

i-Ann

ual E

lect

ion

025

0,00

00

250,

000

025

0,00

00

250,

000

Less

: Util

ity In

crea

ses

300,

000

300,

000

300,

000

300,

000

300,

000

300,

000

300,

000

300,

000

Less

: Mat

chin

g Ite

ms

1,81

8,58

91,

882,

240

1,94

8,11

82,

016,

302

2,08

6,87

32,

159,

913

2,23

5,51

02,

313,

753

Less

: Tot

al B

udge

ted

Ope

ratio

ns87

,641

,230

92,3

36,4

5496

,325

,277

103,

184,

383

112,

326,

676

116,

479,

416

121,

411,

061

126,

413,

218

Rev

enue

s le

ss E

xpen

ditu

res

$1,

400,

931

$3,

723,

718

$4,

220,

834

$1,

440,

498

$4,

323,

948

$3,

847,

408

$3,

410,

777

Page 20: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Use

of A

dditi

onal

Res

ourc

esO

n-go

ing

cost

FY

04F

Y05

FY

06F

Y07

FY

08F

Y09

FY

105

Par

tial R

esto

ratio

n of

prio

r bu

dget

cut

sY

es23

4,93

119

1,51

625

0,00

0O

pera

ting

Incr

ease

sY

es35

0,00

048

0,89

225

0,00

025

0,00

025

0,00

06

Sec

tion

incr

ease

sY

es21

6,00

051

0,30

029

7,70

01,

000,

000

1,00

0,00

01,

000,

000

1,00

0,00

07

Ful

l-Tim

e F

acul

tyY

es45

0,00

050

0,00

01,

375,

000

Sup

port

Sta

ffY

es20

0,00

01,

000,

000

1,00

0,00

025

0,00

025

0,00

025

0,00

0H

ourly

Incr

ease

sY

es30

0,00

030

0,00

0-

Fac

ilitie

s Im

prov

emen

tsN

oT

echn

olog

yN

o87

1,90

281

7,24

244

0,49

82,

823,

948

2,34

7,40

81,

910,

777

$1,

400,

931

$3,

723,

718

$4,

220,

834

$1,

440,

498

$4,

323,

948

$3,

847,

408

$3,

410,

777

Tot

al a

fter

Use

of A

dditi

onal

Res

ourc

es0

$0

$0

$0

$0

$(0

)$

(0)

Sha

red

Gov

erna

nce

Com

mitt

ee w

ill r

evie

w fi

gure

s.

Ass

umpt

ions

- T

ax R

ate

will

incr

ease

to $

0.07

in F

Y04

, $0.

08 in

FY

05, $

0.09

in F

Y06

.-

Set

-asi

de fo

r P

olic

y G

-6 R

eser

ves

will

incr

ease

due

to h

ighe

r ex

pend

iture

bud

get i

n F

Y04

.-

Pol

icy

F-1

0 w

ill b

e us

ed fo

r co

mpe

nsat

ion

incr

ease

s an

d P

rofe

ssio

nal D

evel

opm

ent.

- U

tiliti

es w

ill c

ontin

ue to

ris

e du

e to

hig

her

rate

s an

d in

crea

ses

in fa

cilit

ies.

- N

o hi

ring

free

ze

Foo

tnot

es:

1 A

dditi

onal

enr

ollm

ent i

ncre

ase

for

Sout

h A

ustin

($1

,440

,000

) an

d C

ypre

ss (

$2,3

40,0

00)

in F

Y05

& F

Y06

, res

pect

ivel

y.2

App

ropr

iatio

n w

ill in

crea

se b

y 2.

5% in

FY

06, a

nd 3

.5%

in F

Y08

& F

Y10

. Plu

s an

incr

ease

of

$3,8

60,6

40 in

FY

08/F

Y09

do

toco

ntac

t hou

r in

crea

se f

rom

new

cam

puse

s.

3 T

ax R

ate

will

incr

ease

to $

0.07

in F

Y04

, $0.

08 in

FY

05, $

0.09

in F

Y06

.4

Polic

y F-

10 is

set

at 4

% in

FY

04, 5

% in

FY

05, 6

% in

FY

06, t

hen

at 4

% f

or ih

e re

mai

ning

yea

rs.

5 R

esto

re s

ome

oper

atin

g bu

dget

cut

s

6 Pr

ojec

ted

at a

djun

ct f

acul

ty c

ost o

f $2

,700

(04

), $

2,83

5 (0

5), $

2,97

7 (0

6).

7 B

ench

mar

k to

ave

rage

is 4

5; P

roje

cted

cos

t of

$45,

000

(04)

, $50

,000

(05

), $

55,0

00 (

06)

Page 21: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

AU

ST

IN C

OM

MU

NIT

Y C

OLL

EG

EF

Y20

04 -

FY

2010

Pro

ject

ed--

Rev

enue

s vs

. Exp

endi

ture

s$0

.09

M&

O T

ax R

ate

with

Ann

exat

ions

($0

.07

in F

Y04

, $0.

08 in

FY

05, a

nd $

0.09

in F

Y06

)

Pro

iect

ed R

even

ues

FY

03F

Y04

FY

05F

Y06

FY

07F

Y08

FY

09F

Y10

Cre

dit T

uitio

n an

d F

ees

(3.5

%)

$35

,543

,147

$36

,787

,157

$39

,514

,708

$43

,237

,722

$44

,751

,043

$46

,317

,329

$47

,938

,436

$49

,616

,281

Con

tinui

ng E

duca

tion

1,10

0,00

090

0,00

090

0,00

090

0,00

090

0,00

090

0,00

090

0,00

090

0,00

0N

et C

ontr

act T

rain

ing

100,

000

100,

000

100,

000

100,

000

100,

000

100,

000

100,

000

100,

000

Tot

al T

uitio

n an

d F

ees

$36

,743

,147

$37

,787

,157

$40

,514

,708

$44

,237

,722

$45

,751

,043

$47

,317

,329

$48

,938

,436

$50

,616

,281

2S

tate

App

ropr

iatio

n38

,821

,532

39,7

92,0

7039

,792

,070

41,1

84,7

9341

,184

,793

46,4

86,9

0146

,486

,901

48,1

13,9

42In

tere

st In

com

e60

0,00

01,

500,

000

1,00

0,00

01,

000,

000

600,

000

600,

000

600,

000

600,

000

3P

rope

rty

Tax

es (

-4%

,0%

,0%

,5%

thru

FY

10)

24,8

46,0

3433

,393

,070

38,9

06,3

6544

,500

,911

47,4

08,4

5750

,461

,379

53,6

66,9

4857

,032

,796

Ann

exat

ions

065

0,00

065

0,00

065

0,00

065

0,00

065

0,00

065

0,00

065

0,00

0In

dire

ct C

ost R

ecov

ery

125,

000

125,

000

125,

000

125,

000

125,

000

125,

000

125,

000

125,

000

Oth

er (

3.5%

)1,

968,

400

2,03

7,29

42,

108,

599

2,18

2,40

02,

258,

784

2,33

7,84

22,

419,

666

2,50

4,35

5T

rans

fer

from

Bon

ds1,

500,

000

00

00

00

0T

otal

Pro

ject

ed R

even

ues

$ 10

4,60

4,11

3$

115,

284,

591

$ 12

3,09

6,74

3$

133,

880,

826

$ 13

7,97

8,07

6$

147,

978,

451

$ 15

2,88

6,95

1$

159,

642,

373

Rev

enue

Incr

ease

10.2

1%6.

78%

8.76

%3.

06%

7.25

%3.

32%

4.42

%

Pro

ject

ed E

xpen

ditu

res

4P

olic

y F

-10,

Em

ploy

ee C

omp.

& P

rof.

Dev

.P

rofe

ssio

nal D

evel

opm

ent

1,89

3,64

01,

959,

917

2,02

8,51

52,

099,

513

2,17

2,99

52,

249,

050

2,32

7,76

72,

409,

239

Stip

ends

326,

159

337,

575

349,

390

361,

618

374,

275

387,

375

400,

933

414,

965

Res

idua

l1,

995,

224

2,31

3,89

23,

776,

933

5,57

1,71

92,

971,

853

3,28

2,71

33,

386,

778

3,56

1,49

1T

otal

, Pol

icy

F-1

0$

4,21

5,02

3$

4,61

1,38

4$

6,15

4,83

7$

8,03

2,85

0$

5,51

9,12

3$

5,91

9,13

8$

6,11

5,47

8$

6,38

5,69

5P

olic

y G

-4, F

acili

ties

Impr

ovem

ent

Deb

t Ser

vice

Pay

men

t4,

038,

145

3,98

7,89

63,

061,

041

3,30

8,68

04,

734,

002

4,75

9,63

14,

781,

094

4,75

4,66

6P

rey.

Mai

nt. &

In-H

ouse

Tea

m1,

099,

000

1,09

9,00

01,

099,

000

1,09

9,00

01,

099,

000

1,09

9,00

01,

099,

000

1,09

9,00

0R

esid

ual

299,

582

908,

303

1,43

5,38

21,

525,

277

1,71

2,73

41,

913,

477

2,12

5,17

72,

391,

763

Tot

al, P

olic

y G

-4$

5,43

6,72

7$

5,99

5,19

9$

5,59

5,42

3$

5,93

2,95

7$

7,54

5,73

6$

7,77

2,10

8$

8,00

5,27

1$

8,24

5,42

9P

olic

y G

-5, C

apita

l Equ

ipm

ent (

4%)

Prio

r M

ulti

Yea

r C

omm

itmen

ts2,

747,

814

2,55

3,72

42,

422,

896

2,50

0,00

02,

500,

000

2,50

0,00

02,

500,

000

2,50

0,00

0C

apita

l, N

on-T

echn

olog

y51

6,69

357

6,42

361

5,48

466

9,40

468

9,89

073

9,89

276

4,43

579

8,21

2R

esid

ual

535,

037

1,48

1,23

71,

885,

490

2,18

5,82

92,

329,

233

2,67

9,24

62,

851,

043

3,08

7,48

3T

otal

, Pol

icy

G-5

$3,

799,

544

$4,

611,

384

$4,

923,

870

$5,

355,

233

$5,

519,

123

$5,

919,

138

$6,

115,

478

$6,

385,

695

Pol

icy

G-6

, Res

erve

sT

otal

, Pol

icy

G-6

$1,

393,

000

$3,

299,

000

$2,

858,

000

$2,

593,

000

$61

4,58

7$

1,50

0,05

6$

736,

275

$1,

013,

313

Tot

al B

oard

Pol

icie

s$

14,8

44,2

94$

18,5

16,9

66$

19,5

32,1

30$

21,9

14,0

40$

19,1

98,5

69$

21,1

10,4

40$

20,9

72,5

02$

22,0

30,1

32

Bal

ance

: Rev

enue

less

Boa

rd P

olic

ies

$89

,759

,819

$96

,767

,625

$ 10

3,56

4,61

3$

111,

966,

787

$ 11

8,77

9,50

7$

126,

868,

011

$ 13

1,91

4,44

9$

137,

612,

241

Less

: Boa

rd o

f Tru

stee

s B

i-Ann

ual E

lect

ion

025

0,00

00

250,

000

025

0,00

00

250,

000

Less

: Util

ity In

crea

ses

300,

000

300,

000

300,

000

300,

000

300,

000

300,

000

300,

000

300,

000

Less

: Mat

chin

g Ite

ms

1,81

8,58

91,

882,

240

1,94

8,11

82,

016,

302

2,08

6,87

32,

159,

913

2,23

5,51

02,

313,

753

Less

: Tot

al B

udge

ted

Ope

ratio

ns87

,641

,230

92,3

36,4

5496

, 616

,346

104,

353,

579

114,

378,

889

118,

900,

742

124,

783,

455

130,

770,

233

Rev

enue

s le

ss E

xpen

ditu

res

1,99

8,93

1$

4,70

0,14

9$

5,04

6,90

6$

2,01

3,74

5$

5,25

7,35

6$

4,59

5,48

3$

3,97

8,25

4

Page 22: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Use

of A

dditi

onal

Res

ourc

esO

n-go

ing

cost

FY

04F

Y05

FY

06F

Y07

FY

08F

Y09

FY

105

Par

tial R

esto

ratio

n of

prio

r bu

dget

cut

sY

es50

0,00

050

0,00

050

0,00

0O

pera

ting

Incr

ease

sY

es35

0,00

048

0,89

250

0,00

050

0000

500,

000

6S

ectio

n in

crea

ses

Yes

216,

000

510,

300

297,

700

1,00

0,00

01,

000,

000

1,00

0,00

01,

000,

000

7F

ull-T

ime

Fac

ulty

Yes

450,

000

500,

000

1,37

5,00

0S

uppo

rt S

taff

Yes

200,

000

1,50

0,00

01,

500,

000

250,

000

500,

000

500,

000

500,

000

Hou

rly In

crea

ses

Yes

300,

000

300,

000

-30

0,00

030

0,00

030

0,00

0F

acili

ties

Impr

ovem

ents

No

Tec

hnol

ogy

No

332,

931

1,03

9,84

989

3,31

476

3,74

52,

957,

356

2,29

5,48

31,

678,

254

$1,

998,

931

$4,

700,

149

$5,

046,

906

$2,

013,

745

$5,

257,

356

$4,

595,

483

$3,

978,

254

Tot

al a

fter

Use

of A

dditi

onal

Res

ourc

es0

$0

$0

$(0

)$

(0)

$0

$0

Ass

umpt

ions

- T

ax R

ate

will

incr

ease

to $

0.07

in F

Y04

, $0.

08 in

FY

05, $

0.09

in F

Y06

.-

Set

-asi

de fo

r P

olic

y G

-6 R

eser

ves

will

incr

ease

due

to h

ighe

r ex

pend

iture

bud

get i

n F

Y04

.-

Pol

icy

F-1

0 w

ill b

e us

ed fo

r co

mpe

nsat

ion

incr

ease

s an

d P

rofe

ssio

nal D

evel

opm

ent.

- U

tiliti

es w

ill c

ontin

ue to

ris

e du

e to

hig

her

rate

s an

d in

crea

ses

in fa

cilit

ies.

- N

o hi

ring

free

ze

Foo

tnot

es:

1 A

dditi

onal

enr

ollm

ent i

ncre

ase

for

Sout

h A

ustin

($1

,440

,000

) an

d C

ypre

ss (

$2,3

40,0

00)

in F

Y05

& F

Y06

, res

pect

ivel

y.2

App

ropr

iatio

n w

ill in

crea

se b

y 2.

5%in

FY06

, and

3.5

% in

FY

08 &

FY

10. P

lus

an in

crea

se o

f $3

,860

,640

in F

Y08

/FY

09 d

o to

cont

act h

our

incr

ease

fro

m n

ew c

ampu

ses.

r\>

Tax

Rat

e w

ill in

crea

seto

$0.

07 in

FY

04, $

0.08

in F

Y05

, $0.

09 in

FY

06.

N.)

Pol

icy

F-10

is s

et a

t 4%

inFY

04, 5

% in

FY

05, 6

% in

FY

06, t

hen

at 4

% f

or th

e re

mai

ning

yea

rs.

5R

esto

re s

ome

oper

atin

g bu

dget

cut

s6

Proj

ecte

d at

adj

unct

fac

ulty

cos

t of

$2,7

00 (

04),

$2,

835

(05)

, $2,

977

(06)

.7

Ben

chm

ark

to a

vera

ge is

45;

Pro

ject

ed c

ost o

f $4

5,00

0 (0

4), $

50,0

00 (

05),

$55

,000

(06

)

Page 23: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

The following charts clearly illustrate the financial challenges facing Austin Community College.

College Tax Rates Over Time

14

12

10

8

6

4

2

1986-87 2001-02

While ACC's rate hasn't changed In 16 years, the other colleges'

OHoustonOTarrantDitlamo

North HarrisEl PasoSan JacintoDallas

OAustin

14

12

10

8

6

4

2

0

College Tax Rates Over Time

Sari 441,111 AIMS .141111112

Hou ton Tar ant Dallas Alamo Au th Nbrth El Paso SanHarris Jacinto

Taxing District Valuations

$2,500,000

$2,000,000

$1,500,000

$1,000,000

$500,000

$0Equalized Valuation

OTexas PeersACC

*Equalized valuation: the sum value of assessedreal property in our taxing district.

1823

1986-872001 -02

02/03/03

Page 24: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

i Texas Metropolitan Commtnity ColegeTax Revenues

$2,500

$2,000

$1,500

$1,000

$500

Tax/ FTSE*

00ther 8Colleges

OACC

.* Dallas, Tarrant,Housbon, El Paso,Alamo, Collin, No.Harris/Montgomery,San Jacinto

F1SE (full-time student equivalent) convers the total number of students (Pill- and part-time) In a full-timeequivalency by taking the number of credit hours being taken by at stip:lents and dividing it by 12.

Perceniage of S ervice Area TaxedjlACC vs. otter Texas Melropolitan

t Community Colleges

Local Tax Rages over Time

1.6

1.4

1.2

1

0.8

0.6

0.4

0.2

0ACC City Travis AISD

70%

60%

50%

40%

30%

20%

10%

0%

01986-8702001-02

Percent Taxed (AISD, LISD, MISD)

19

24

OState Avg.OACC

02/03/03

Page 25: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

°\AUSTINLPMMUNITY

COLLEGE

State Appropriations

Austin Community CollegeFY03 Value of One

FY03 Projection $ 38,624,377

Percent Increase 1%

Value of 1% 386,244

Tuition and FeesFY03 Projected Tuition & Fees $ 35,543,147

Percent Increase 1%

Value of 1% 355,431

FY03 Projected Building Fee $ 6,551,644

Building Fee per SCH 12.00

FY03 Projected SCH 545,970

Dollar Increase 1.00

Value of $1 545,970

Property TaxFY03 Projected Tax Base $ 49,692,068,000

FY03 Tax Rate 0.0005

FY03 Projected Taxes $ 24,846,034

Percent Increase 1%

Value of 1% 248,460

FY03 Projected Tax Base $ 49,692,068,000

Tax Rate Increase 0.0001

Value of 1 cent $ 4,969,207

AnnexationAverage Increase in Property Tax Revenue 825,000

Average Decrease in Tuition Revenue (175,000)

Net Value of 1 average annexation 650,000

Funding from Bonds$1 in Bonds 1.00

Interest Rate 5.5%

Number of Years 20

Annual Debt Service per $1 in Bonds 0.084

2003 2005 2006

Coastal Securities, 10114/02 Series Series Series Total

Bonds funded by 1 cent (25 year debt) $ 50,000,000 $ 25,000,000 $ 25,000,000 $ 100,000,000

Business Services 10/4/02

25

Page 26: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

2002

-03

Tax

and

Val

uatio

nT

exas

Pub

lic C

omm

unity

Col

lege

s

Col

lege

Val

uatio

n20

02-0

3M

&O

Rat

e20

02-0

3 D

ebt

Rat

e20

02-0

3 T

otal

Rat

e20

02-0

3 Le

vyA

lam

o$5

4,65

5,20

2,84

50.

0923

0.01

480.

1071

"$58

,535

,722

Alv

in$2

,548

,171

,278

0.25

530.

2553

$6,5

05,4

81A

mar

illo

$6,7

99,6

39,3

170.

1235

70.

0326

40.

1562

1$1

0,62

1,71

7M

aint

enan

ce T

ax D

istr

ict

'

$1,5

50,0

50,6

130.

0460

80.

0460

8$7

14,2

63A

ngel

ina

F$2

,679

,341

,289

0.07

870.

0293

0.10

8$2

,893

,689

Aus

tin$4

7,67

0,37

0,58

10.

050.

05$2

3,83

5,18

5B

linn

$1,7

10,3

40,0

730.

0549

0.05

49$9

38,9

77B

razo

spor

t$5

,338

,449

,798

0.08

50.

085

$4,5

37,6

82C

entr

al T

exas

$3,7

53,3

46,8

260.

1475

0.14

75$5

,536

,187

Cis

co$1

28,9

12,3

500.

1701

60.

1701

6$2

19,3

57C

lare

ndon

$151

,792

,932

0.18

324

0.18

324

$278

,145

Coa

stal

Ben

d$7

74,5

97,5

000.

1222

0.12

22$9

46,5

58C

olle

ge o

f the

Mai

nlan

d$6

,141

,892

,616

0.23

187

0.23

187

$14,

241,

206

Col

lin$4

6,73

3,20

5,94

10.

080.

0119

460.

0919

46$4

2,96

9,31

4D

alla

s$1

30,9

32,3

66,6

270.

060.

06$7

8,55

9,42

0D

el M

ar$1

0,57

5,92

9,42

80.

2018

660.

0180

140.

2198

8$2

3,25

4 35

4E

l Pas

o$1

9,78

2,74

9,96

00.

1313

890.

1313

89$2

5,99

2,35

7F

rank

Phi

llips

$490

,698

,090

0.22

0.22

$1,0

79,5

36M

aint

enan

ce T

ax D

istr

ict

$621

,215

,276

0.03

0.03

$186

,365

Gal

vest

on$2

,834

,180

,528

0.19

520.

1952

$5,5

32,3

20G

rays

on1

$4,2

12,0

55,3

500.

120.

12$5

,054

,466

Hill

'

$974

,129

,364

0.07

2924

0.07

2924

$710

,374

Mai

nten

ance

Tax

Dis

tric

t$3

,218

,364

,473

0.04

5878

0.04

5878

$1,4

76,5

21H

oust

on$6

9,68

2,37

8,06

60.

0813

30.

0813

3$5

6,67

2,67

8H

owar

d$1

,134

,369

,124

0.26

985

0.26

985

$3,0

61,0

95K

ilgor

e$1

,974

,755

,960

0.16

890.

1689

$3,3

35,3

63La

redo

$5,6

92,0

18,0

440.

174

0.05

250.

2265

$12,

892,

421

Lee

McL

enna

n$6

645

329

440

i"

'$7

,019

,596

,897

0.18

0413

0.09

477

0.02

80.

0217

570.

2084

130.

1165

27$1

3,84

9,73

0$8

,179

,726

Page 27: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

2002

-03

Tax

and

Val

uatio

nT

exas

Pub

lic C

omm

unity

Col

lege

s

Col

lege

Val

uatio

n20

02-0

3M

&O

Rat

e20

02-0

3 D

ebt

Rat

e20

02-0

3 T

otal

Rat

e20

02-0

3 Le

vy_

Mid

land

$5,0

72,0

92,2

940.

1852

0.00

540.

1906

$9,6

67,4

08N

avar

ro$1

,485

,635

,578

0.14

050.

1405

$2,0

87,3

18N

orth

Cen

tral

$1,5

03,7

22,4

550.

1042

80.

1042

8$1

,568

1082

Nor

th H

arris

Mon

tgom

ery

$66,

031,

057,

467

0.07

420.

0313

0.10

55$6

9,66

2,76

6N

orth

east

Tex

as$2

,819

,454

,079

0.06

20.

038

0.10

$2,8

19,4

54O

dess

a$4

,490

,860

,666

0.20

0.20

$8,9

81,7

21P

anol

a$2

,569

,624

,153

0.11

647

0.11

647

$2,9

92,8

411

Par

is$1

,080

,489

,364

0.17

830.

0021

0.18

04$1

,949

,203

Ran

ger

$66,

323,

360

0.24

0.24

$159

,176

San

Jac

into

$23,

989,

965,

980

0.10

128

0.02

943

0.13

071

$31,

357,

285

Sou

th P

lain

s.

$1,7

87,9

10,3

990.

2816

50.

2816

5$5

,035

,650

Sou

th T

exas

$16,

471,

686,

559

0.11

0.06

760.

1776

$29,

253,

715

Sou

thw

est T

exas

$1,1

52,9

99,4

920.

090.

09$1

,037

,700

Tar

rant

$76,

803,

883,

942

0.12

876

0.01

062

0.13

938

$107

,049

,253

Tem

ple

$2,1

88,8

51,5

320.

1776

0.04

690.

2245

$4,9

13,9

72le

xark

ana

$922

,107

,640

0.08

310.

0831

$766

,271

Tex

Js S

outh

,nos

t$5

,810

,141

,434

0.11

012

0.02

128

0.13

14$7

,634

,526

Trin

ity V

alle

y$5

,728

,794

,666

0.06

150.

0615

$3,5

23,2

09M

aint

enan

ce T

ax D

istr

ict

$809

,882

,069

0.04

410.

0441

$357

,158

Tyl

er$6

,718

,662

,571

0.12

230.

1223

$8,2

16,9

24V

erno

n$7

20,2

51,7

450.

2865

20.

2865

2. $

2,06

3,66

5V

icto

ria$3

,555

,335

,656

0.10

70.

0324

0.13

94$4

,956

,138

Wea

ther

ford

$4,1

15,5

73,6

350.

1104

0.01

740.

1278

$5,2

59,7

03W

este

rn T

exas

$849

,854

,629

0.27

0.27

$2,2

94,6

07W

hart

on$1

,980

,942

,601

0.16

738

0.16

738

$3,3

15,7

02T

otal

Val

uatio

n &

Lev

y$6

85,1

51,5

54,5

52$7

29 5

33 6

57A

vera

ge R

ates

0.14

308

0.01

023

0.15

331

# of

col

lege

s re

spon

ding

50

Page 28: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

THE SACS STRATEGIC FOCUS

The Commission on Colleges of the Southern Association of Colleges and Schools is the accreditingagency under which Austin Community College is accredited. The college is undergoing a self-studyfor re-accreditation which includes a strategic focus, Infusing 21s' Century Innovation into Learning:A Student-Centered Examination of New Technologies, Faculty Roles, and Institutional Structures. Asthese committees have focused on what ACC needs to be doing to be prepared for the Student in 2012,ACC has ensured that proposals and recommendations from these committees are reflected in theMaster Plan as appropriate.

Three trends which will impact ACC significantly in the future are projected changes in studentpopulations, emerging technologies, and the movement to a "learning paradigm," without abandoningany of our pedagogic strengths. Faculty and staff serving on the strategic focus committees of theSACS Alternate Self-Study believe that a transformational change from the "instruction paradigm" tothe "learning paradigm" is rooted in the central principle that a college exists to produce learning.Key implications of the SACS recommendations include:

Emerging technologies will transform education at ACC. These will include wireless networking,collaboration tools, digital video, Internet2, handheld devices, videoconferencing, and simulations;

Learning-centered technologies that promote the transition to learning-centered communitiesinclude interactivity; a variety of information formats; electronic communication tools; variedformative assessments ranging from structured assessments for basic information to open-endedassessments to promote student reflection; authoring tools for the construction of knowledge; andsimulations to develop critical thinking skills;

Distributed Learning a model that allows instructor, students, and content to be located indifferent, non-centralized locations so that instruction and learning occur independent of time andplace will further reduce traditional distinctions between campus instruction and distancelearning;

Increased commitment of support for Distance Learning;

Increased investment in faculty and staff development to emphasize learning-centered activities,course management systems, mastery of technologies and multiple instructional deliveries.

The SACS Alternate Self-Study recommendations are integrated into the Master Plan, and alltechnology requests have been reviewed by the Technology Committee. A summary is included inAddendum.

SACS Compliance Committees Reports:http ://www. austin cc. edu/sacs/Compli an ce/Compl i an ce. htmSACS Strategic Focus Committees Reports:http://www. austin cc. edu/sacs/Addendum Sl: SACS New Technologies Recommendations Summary

2302/03/03

Page 29: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

INSTRUCTIONAL PROGRAMS

ACC has an impressive array of instructional programs, offering both degree and certificate options tostudents, which are provided in multiple instructional delivery modes. The College structures itscampus programming with the following philosophical guidelines:

ACC will offer a balance of academic transfer, workforce education, development education, andadult education programs.

Each ACC campus will offer a wide variety of general education core curriculum courses so thatstudents can complete the majority of their degree or certificate courses at the campus of theirchoice.

Workforce programs will not be duplicated at every campus because of costs, facilities limitations,and/or insufficient enrollment to justify program duplication (this means that many students, uponcompleting the core curriculum at the campus of their choice, may have to attend another campusto complete the courses associated with their declared major).

The ACC Board of Trustees, per Board Policy E-1, is presented a program cost analysis report as partof the master planning process. This information is used by the Board to establish its community"program priorities" declaration. The Board has endorsed the balanced offerings required of our Statemandate, and declared priorities which include using institutional funds to supplement adult educationgrant funding, increasing access to health sciences programs as well as programs which contribute tothe health and safety of the community.

On-going challenges for the institution include the following:inadequate funding to develop and offer new programs as requested by the local community andbusinesses;limited facilities for expanding high-demand programs;lack of adequate resources to support equipment-intensive programs in offering state-of-the-artinstruction;high costs associated with technological infrastructure necessary to support quality teaching andlearning.

Closing the Gaps Statewide

While the College copes with the challenges noted above, it faces a larger problem with statewideimplications. The Texas Higher Education Coordinating Board, with the input of colleges anduniversities statewide, has issued a report entitled Closing the Gaps. This report outlines thedemographic changes affecting Texas, and notes that by the year 2015 an additional half millionpeople will impact the State's higher education system. The majority of these new students will befrom traditionally under-served populations, which will necessitate additional institutional resources tohelp ensure success in meeting educational goals. In the Central Texas area, this equates to anestimated 50,000 additional students. The majority of these new students will seek access to ACCsince the majority of entering college students, locally and nationally, begin at a community college.ACC estimates that it will need to serve an additional 10,000 students by the year 2010. The challengecannot be met without additional resources to create new classrooms and to add or expand programs.

2402/03/03

Page 30: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

FY03 Priorities: Limited Resources Scenario

While the College can document its instructional quality in a variety of ways, from the performance ofour transfer students to the high level of support from business and industry representatives who seekour workforce education students, the fact remains that ACC cannot do all that it is asked to do with itscurrent level of funding.

In FY03, due to severe budget constraints, few new degree or certificate programs will be developed.ACC will concentrate on five important initiatives which were begun in FY02.

1. Service Learning2. Learning Communities3. Honors Program4. Internationalizing the Curriculum5. Academic Advising

1. Service Learning integrates student learning and college outreach to the community at large. Asa high priority, the College will expand the use of such learning opportunities and communityservice instructional components as requirements for students to complete their degrees andcertificates. Greater attention will be given to specific community-based, practical learningexperiences for students. Managed through the Governmental and Community Relations office asof August 2002, the Service Learning initiative will draw on the contacts and presence establishedby the ACC Center for Community Based and Nonprofit Organizations, as well as the expertise ofvarious faculty members, Student Life, and other staff. While needs are identified through anumber of community forums and partnerships, greater focus will be placed on recruiting andorienting both academic and workforce faculty and students. A manual describing and facilitatingthe service learning concept, will be distributed; the availability of service learning will beincluded in all college catalogues; and participating students and faculty will be recognized in anappropriate college-wide effort.

2. Learning Communities is the concept of linking courses, many of which on the surface mayappear not to be closely related, into common instructional learning experiences for students.Faculty of these courses plan mutual learning objectives across disciplines, and teach a commongroup of students who have selected the learning community courses. ACC has had goodexperience with this project in FY02, and is ready to build on the general assembly and facultydevelopment day activities presented in Spring 02.

3. Honors Program - ACC has many gifted students and the Honors Program has been establishedto recruit and retain these top-performing students by offering enhanced curricula, smaller classes,merit-based scholarships, and special educational opportunities. Also, through articulationagreements it gives ACC honors students the chance to transfer to honors programs at four-yearinstitutions. The Honors Program will be expanded to allow more students to pursue advancedlearning activities in a wide variety of courses.

4. Internationalizing the Curriculum

ACC will continue to recognize the importance of helping students gain an internationalperspective through their educational experiences. The College will also seek to expand itsservices to increasing numbers of international students.

25302/03/03

Page 31: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

In FY03, increased curriculum focus will be placed on internationalizing the curriculum so thatour students are well-prepared to meet the challenges of a global society. Task Forces andProgram Coordinators will be given specific charges for expanding curriculum to include a globalperspective, and these will be linked to a coordinated series of professional development activitiesfor faculty and staff.

Plans for the internationalization of the curriculum at Austin Community College would includethe development and implementation of an Associate of Arts degree in Global Studies. This wouldbe a two-year degree that would include the state-mandated Core Curriculum as well as othercourses that would fill out a 60 plus hour degree plan. The state-mandated Core Curriculum of 42semester credit hours is mandatory for anyone who wishes to receive a degree from a state-supported institution in Texas. The core must include courses from a variety of areas such asComposition, Math, Natural Sciences, Social and Behavioral Sciences, Humanities, and the Visualand Performing Arts. Although state-mandated, it is not unlike general education requirementsfound in many other institutions. Some of the courses required by the Core Curriculum can bedirectly related to the internationalization of the curriculum. The remainder of the 18 or so hoursof the degree plan will be taken up with foreign language courses and other courses aimed directlyat the acquiring of a global perspective.

A one-year academic certificate of 30 semester hours could also be developed that utilizes thecoursework from the Associate's degree that is directly related to the internationalization of thecurriculum. While the Associate's degree is clearly aimed at those individuals who want to pursuea four year degree, the certificate will be aimed at those who already have a bachelor's degree andwant to broaden their knowledge of the international community or those who have no degree andhave no desire for one, but nevertheless wish to widen their horizons in this regard.

A companion piece to the development of and revision of academic courses would be thedevelopment of modules of instruction that would be available through the colleges' ContinuingEducation department for those in the community or business and industry that wish to gain someknowledge of the world at large or some particular part of it. Another part of theinternationalization of the curriculum will be the development and revision of existing courses.Also integral to the internationalization of the curriculum is the strengthening of the foreignlanguage department at Austin Community College.

One of the more important aspects of the internationalization of the curriculum is to infuse aninternational perspective into those courses that do not directly relate to global studies. To thatend, a series of professional development activities could occur that teach faculty how to infusetheir curriculum with a global perspective. Finally, in the spirit of being a community college, thedevelopment of two public forums is anticipated. One will be a forum on foreign policy issues thatwill be open to the faculty, staff, and community at large. The forums will consist of presentationsand discussions on foreign policy issues of importance to the United States and the world at large.The presentation will be made by faculty and staff from Austin Community College, along withexperts drawn from the community. The Austin area has one public university and four privateuniversities from which experts can be drawn. A second forum devoted to world religions alsowould be developed. Again, the area has substantial expertise to draw on.

5. Academic Advising

The Academic Advising program will assist students in the development of meaningfuleducational plans that are compatible with their life goals, will aid in retention and reduce barriers

26

31 02/03/03

Page 32: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

encountered when transferring to four year colleges or universities. The advising program willconsist of face-to-face and web-based advising. In numerous studies both within ACC and inother institutions, a strong faculty advising system has been a central element in student retentionand student success. While it is obvious that faculty already advise students, it has been apparentfor some time that we could improve the overall quality and consistency of advising by makingthe process more explicit and systematic. The purpose of this initiative is to devise and implementa comprehensive faculty advising model.

This model will work in conjunction with Student Services, taking advantage of and integratingtheir work on advising while expanding the model to include "major" advising for students whohave completed 25 semester credit hours. The model will also include an emphasis on electronicadvising mediated via centralized and departmental web pages.

Components of the program will include:Advising Delivery Systems, Face-to-face advising and electronicTraining for faculty advisersEvaluation of both advisers and the systemSupport for the advising systemMonitoring student progressThe role of faculty in a comprehensive advising systemThe role of technology in student advising

The program will respond to and provide answers to the following questions:When will faculty become involved in advising majors?How often will students be advised?Which faculty will become involved in advising and when?Will there be compensation for faculty advisors?Will faculty who participate in advising receive release time?Will all faculty have to participate in the advising program?How will advising fit into the faculty workload?How will the effectiveness of the program be evaluated?

Timeline: The project will be completed by May 2004 and ready to implement in Fall 2004.

FY04-06 Priorities: Expanded Resources Scenario

While none of the FY03 initiatives will require large financial commitment from the College for themaster planning cycle, the following budget items have been identified by faculty and staff asnecessary to provide quality instruction and support service to students. Details of the requests areincluded in the Addendum as noted. It is acknowledged that few of the following requests can befunded in FY04 and that an increase in fiscal resources (i.e., tax increase) is required for ACC tobe able to achieve program and service goals outlined in the following sections.

Academic Programs

Academic Programs support students who are transferring to a four-year college or university to pursuea baccalaureate or higher degree, but also provide courses in support of workforce education students.In addition, developmental communications programs help students who are not yet ready to enter

2732 02/03/03

Page 33: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

college credit classes to gain the necessary skills to be successful in credit degree or certificateprograms. With this perspective, academic courses clearly support all levels and categories ofinstruction at Austin Community College.

The primary needs in academic programs are for additional full-time faculty (forty five new positionsare needed for the College to meet benchmark standards), additional course sections to allow high-demand programs to expand, additional instructional space, significant renovations to existing space,upgrade to existing equipment, and the need to acquire new equipment.

Significant facilities renovations are needed in many academic program areas, particularly science labswhich need additional prep and storage space, as well as enhanced safety training for faculty, students,and staff. All the campus developmental education programs need larger Learning Labs as well asadditional software and equipment to support the credit programs in which they offer tutorialassistance to help students meet their educational goals. ACC has no language support labs for itsforeign languages, nor to support other communications areas such as English, creative writing,journalism, and other programs in which open labs coupled with appropriate software and hardwarewould enhance student learning and retention.

Limited sections and limited facilities space make it difficult to expand many academic programs,including sciences, especially biology and chemistry; mathematics, especially developmental math;English-as-a-Second-Language; foreign languages; social and behavioral sciences courses, especiallyhistory, government and psychology; journalism and creative writing; and performing arts space,especially drama, dance and music. The College also lacks adequate faculty offices and facultyworkroom areas.

Workforce Education Programs

Workforce Education programs are extremely important to the community. Not only are they a state-mandated element of the community college mission, they play key roles in the overall economicdevelopment of our local region. ACC's workforce education programs not only supply the localworkforce with trained, skilled workers, they also help those individuals who are under-employed orunemployed make important changes in their lives. Many working adults who already possess a four-year degree (or more) come to ACC for specialized workforce training, to acquire certifications inspecialized areas, or to secure a certificate or degree in a workforce program which offers improvedcareer opportunities. A strong workforce education component is also highly desirable to the localcommunity in that many businesses will not expand or locate in areas in which there is not a strongcommunity college to assist in training, retraining, and helping under-employed individuals move intothe local workforce.

As is the case with ACC's academic programs, the workforce programs areas also needs additionalfull-time faculty, additional course sections to expand high-demand programs, additional instructionalspace, significant renovations to existing space, upgrades to existing equipment, and the need toacquire new equipment.

Significant facilities renovations are needed in many workforce program areas, especially HealthSciences and high-tech programs. Emerging technology areas will require new instructional space andadditional open-lab facilities to support student learning. In Health Sciences areas, the College mustreplace old and out-of-date equipment in key areas such as Diagnostic Medical Imaging-Radiology, inwhich none of our equipment is state-of-the-art digital (as is used in hospitals and clinics). Likewise,equipment in Diagnostic Medical Sonography is not state-of-the-art. The Emergency Medical Servicesprogram operates in woefully inadequate space, which endangers its program accreditation. The

28

33 02/03/03

Page 34: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Medical Coding program needs a lab environment which mirrors what students will experience in theworkplace, in addition to additional computers, scanners, and specialized software. Many programsneed additional or replacement microscopes, centrifuges, glassware, sterilization equipment, andcomputer support for students in labs.

The electronics and semi-conductor programs will require additional support in the future, as well.While there is a slump in this area due to the local economic downturn at this time, all demographerspredict this slump is only temporary. The College and the community should also be cognizant that,even during the downturn, high tech remains the number one employer in the Austin area.

Workforce Education programs with priorities for expansion include high technology areas such ascomputer sciences, visual communication design, photography, and commercial music management. Inaddition, the College must expand its growing hospitality and culinary arts programs at the EastviewCampus. Health careers are also a targeted area due to high community need, with the addition ofdental hygiene in FY04. The College is building a new Health Sciences Building at the EastviewCampus, approved in the last Master Plan, as part of its bond refinancing program.

If the College had additional resources new programs would be added that have been requested bybusiness and industry. Two examples of programs that have been requested are veterinary technicianand manufacturing technology. With limited resources, ACC established a veterinary assistantprogram in continuing education but veterinarians are now requesting that we expand this certificateprogram to an associate degree where graduates will be veterinary technicians. This would require afull-time faculty member and additional facilities and equipment with startup costs totaling more than$90,000.00. Manufacturing technology has been requested for several years. The college has beenunable to meet this need due a lack of facilities, equipment, and personnel. Establishing amanufacturing program will require hiring additional faculty and establishing a laboratory costingmore that $100,000.00.

Other programs that have been requested and could be offered with additional resources include anautomated manufacturing program in electronics costing approximately $145,000.00. A newcertificate and degree program in e-commerce could be established as well as a program in turf andgolf course management. These programs would require additional operational costs and personnel.Microelectronics Manufacturing Systems, a new specialty in semiconductor manufacturing technologyis needed to support the Nanotechnology industry.

External business industry representatives provide an invaluable service to ACC's workforce programsby serving on Advisory Committees and helping to ensure that the curriculum and equipment meetindustry standards. They highlight several factors the College must address:

technology changes rapidly, necessitating that the College be able to anticipate andincorporate curriculum changes rapidly;equipment and software changes are also often rapid; the College's systematic technologyreplacement plan (every three years) may not to soon enough for some disciplines; thus,contingency funding to address such needs is important;AC's facilities limitations often hamper instruction and the ability of programs to grow inresponse to community needs. This is especially true in the health sciences area, makingPhase II of the Health Sciences Building a priority.

29

3 4 02/03/03

Page 35: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Advisory Committee members also compliment ACC on its expanded workforce programs over thepast five years; its efforts to promote change in K-12 curriculum, particularly promotion of theRecommended High School Plan which requires more math and science, and on its fund raising effortsthrough the ACC Foundation.

The expansion and increase of programs and services obviously impact facilities. The FacilitiesSection of this Master Plan highlights, on a campus-by-campus basis, the implications for facilities.

Adult Basic Education

ABE is a high priority for the institution because it responds to a significant and growing communityliteracy need and, also, because ABE programs represent an enrollment stream into certificate andcredit programs as well. ACC partners with many local community organizations to expand access toABE and ESL programs. It also supplements its adult education budget with institutional fundingrather than relying solely on grant funding.

Distance Learning

Distance Learning continues to be a high growth program area for ACC. Not only does it provide alearning experience for many students whose schedules or personal commitments do not allow atraditional, on-campus college experience, Distance Learning also helps the College to growenrollment in a non-facilities based arena. This is especially important given ACC's extremely highfacility usage rates, which limit the ability to continue to meet enrollment growth demands.

The College's SACS Alternate Self-Study has numerous implications for distance learning technology,which would be used for distance learning courses but also would be incorporated into all academicareas of the College. As noted in the SACS Strategic Focus reports, "Distributed Learning" willinvolve a merging of instructional methodologies and technologies.

Credit Sections

ACC operates within a section guidelines formula, to accurately project and control its costs of full-time and adjunct faculty salaries and overloads. Tuition and fees and State reimbursements often donot recapture the full direct and indirect costs of instruction.

While the College offered more sections in FY03 than in FY02 (and more that year than in FY01), thereality is that for FY04, absent additional resources, the College will offer only the same number ofsections as in FY03. This flat profile will not help address the situation in which many students seek toenroll at ACC but cannot find space in a class they need, and thus do not enroll. In the past, theCollege averaged about 2000 students a semester who attempt to enroll but were unable to do so. InFY03, that number has climbed to nearly 4000 students in Fall 02.

As the College maintains a limit of sections it can afford to offer, the class efficiency factor hasincreased. ACC has very high section enrollments in comparison to like institutions over 21 studentsper average section in Fall 03. As the section enrollments grow, the available seats decline; thus, thegrowing number of students unable to find a section.

30 3502/03/03

Page 36: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

With additional resources, the College would anticipate offering more sections of courses.Determination of sections to be added would be based on our data of high-demand classes and courseswhich students wanted to attend but could not. An analysis of the students turned away in Social andBehavioral Sciences in Fall 03, for example, demonstrates the need to add an additional eightysections. Taking into account the entire academic and workforce program areas, the College would addsections incrementally in FY04, 05, and 06 with the goal of reducing the number of students presentlyturned away because of lack of course availability by a significant percentage (50-70%) over this sametime line.

Continuing Education

Community colleges are required, as part of their State mandate, to provide continuing education.ACC's priorities in continuing education are workforce programs which also generate Statereimbursements. Those continuing education programs which are primarily avocational in nature, butalso required under State mandate for community colleges, must operate on a break-even or profitbasis (i.e., no subsidization by College funds).

Instructional Programs Recommendation 1:ACC must continue to balance its instructional programs by offering an appropriate mix ofacademic transfer, workforce education, developmental education, adult education, andcontinuing education to meet the critical needs of the local region.

Instructional Programs Recommendation 2:The College should impose a moratorium on offering any new instructional programs until its taxbase and tax rate are expanded and increased unless there is a demonstrated need and thedocumentation that the program can be self-sufficient.

Instructional Programs Recommendation 3:The College should establish specific full-time to adjunct faculty teaching ratios for everydiscipline.

Instructional Programs Recommendation 4:ACC should accelerate its instructional program review process to ensure that all programs arecarefully and regularly evaluated regarding effectiveness in responding to local needs. Programswhich do not merit continuation should be closed to allow instructional resources to bereallocated to higher priority needs.

Instructional Programs Recommendation 5:The College should continue to have as high priorities, development and maintenance ofprograms which respond to the local economy (especially in high technology and health careersfields).

Instructional Programs Recommendation 6:ACC Department Chairs and faculty should continue to expand the curriculum to include a globalperspective, and offer related professional development opportunities for faculty and staff

31 3602/03/03

Page 37: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Instructional Programs Recommendation 7:ACC should expand its distance learning technology training among interested adjunct faculty.

Addendum GI : Academic and Workforce Education Programs FY03-05 Budget Requests

Addendum G2: Adult Basic Education FY04-06 Budget Requests

Addendum G3: International Education FY04-06 Budget Requests

Addendum G4: Continuing Education FY04-06 Budget Requests

Addendum G5: Full-Time/Adjunct Faculty Teaching Ratios byDiscipline

Addendum G6: Department Unit Plans

Addendum G7: Distance Learning Plan

Addendum G8: Program Cost Analysis Report

Addendum G9: Board of Trustees Program Priorities Resolution(02/03/03)

323702/03/03

Page 38: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

INSTRUCTIONAL SUPPORT SERVICES

Instructional Resources and Technology

Instructional Resources and Technology (IRT) provides critical resources in support of qualityteaching and learning environments. These include the familiar resources of libraries and media, aswell as the ever-increasing use of technology to support teaching.

Included in IRT is distance education, instructional development specialists to help faculty developand/or adapt curriculum for the integration of technologically-assisted learning, and faculty/staffdevelopment and training.

Instructional Resources and Technology faculty and staff have identified $3,387,250 in needs over thenext three years, in addition to $894,000 requested for improvements to libraries and video services.

Library Services

Library Services are a critical instructional support service, for both credit and non-credit programs.ACC's libraries, while recognized for their excellence in previous accreditation reports, do not meetnational standards for seating and are generally under-sized. As technology impacts instruction, itlikewise affects support areas. Libraries increasingly require additional technological support to accessand expand databases and instructional references.

The College has also had to adjust library hours downward in order to meet the budget reductions ofFY02 and FY03. With expanded resources, ACC would include its libraries in renovation andexpansion plans and seek to reinstate operating budget reductions to expand hours of service tostudents.

Video Services

Video Services provides full-service studio facilities and on-location video production services to meetACC's educational needs. In this capacity they deliver a variety of college credit instructionaltelecourses and offer educational cable programming 7 days a week, up to 20 hours a day. They designand manage the Interactive Video Conferencing (IVC) network of teleconferencing classrooms forACC instructional activities, intercampus meetings and for school districts taking advantage of theinteractive system to offer ACC Early College Start classes. Expert staff skilled in production anddesign assist faculty in creating Instructional Television courses, video orientations, "virtual fieldtrips", and other instructional audio or video programs as well as marketing videos. Formats includevideo, cablecast, and streaming media technology.

INSTRUCTIONAL SUPPORT SERVICES RECOMMENDATION 1:ACC should continue to develop and offer technology training for all faculty and staff as a keyinstitutional effectiveness strategy.

INSTRUCTIONAL SUPPORT SERVICES RECOMMENDATION 2:ACC should increase its technology training outreach to adjunct faculty.

INSTRUCTIONAL SUPPORT SERVICES RECOMMENDATION 3:The College should implement staff development activities which promote the Master Planinitiatives.

02/03/03

Page 39: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Learning Labs

The state mandate for community colleges includes provision of services which promote studentsuccess. Learning Labs are a key student retention strategy for promoting student success. These labsprovide free tutorial and supplemental instruction in most disciplines offered by the College, over awide array of day, evening, and weekend schedules. The Learning Lab Managers and staff haverequested approximately $50,000 to supplement staffing and operating costs across the district.

INSTRUCTIONAL SUPPORT SERVICES RECOMMENDATION 4:The College should continue its strong support of Learning Labs which promote student success.ACC, as it continues its facilities planning, must address the need for expanded space in itsLearning Labs, especially at the Northridge Campus.

Testing Centers

Testing Centers are a critical student support service, and also a resource for faculty. They are valuedby ACC as an important retention strategy in that they allow extended classroom instructional time,and provide flexible opportunities for students in distance learning courses as well as students whoneed to re-test or do make-up testing.

ACC's Testing Centers are too small at each campus, and experience high volumes of students whooften have to wait extended periods to access testing.

INSTRUCTIONAL SUPPORT SERVICES RECOMMENDATION 5:In planning for the future, the College should expand the size of Testing Centers and increase thetechnological and staff support necessary to operate them effectively.

Addendum Hl: Learning Labs FY04-06 Budget Requests

3439 02/03/03

Page 40: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

ADMINISTRATIVE SERVICES

Communication and Decision-Making Model (Shared Governance)

ACC has an established communication and decision-making model characterized by three councils,through which all College committees and task forces report. All employee organizations and theStudent Government Association appoint their own representatives to the councils, committees, andtask forces.

In Spring 2002, the College administration initiated a review process in which faculty and staffrepresentation was increased on the various councils, committees, and task forces. Representatives arechosen by the Full-Time Faculty Senate, Adjunct Faculty Association, Association of ProfessionalTechnical Employees, Classified Employees Association, and Student Government Association. Inaddition, many councils and committees are now co-chaired by an elected faculty or staffrepresentative.

The model is posted on the College web site and updated annually. Minutes of meetings are posted onthe web as well.

The Board of Trustees, in Spring 2002, also initiated discussion of shared governance in an effort toestablish district-wide policy directive in this important area. Several district-wide meetings, open toall faculty, staff, and students, were held to discuss shared governance principles, concerns andsuggestions. From these meetings, a Shared Governance Working Group was appointed and thesefaculty, staff, and students will work to propose a Board policy and administrative rule to help guidethe institution as it expands collaboration and communication throughout the organization.

ADMINISTRATIVE SERVICES RECOMMENDATION 1:The College should adopt a policy clanfting the values of Shared Governance.

Addendum Il : Communication and Decision-Making Model

Institutional Effectiveness

At ACC, quality initiatives provide a framework for the College to evaluate its current performanceand to determine the steps needed to improve. These initiatives are critical to help us reach the pointwhere performance excellence permeates the institution. They are important not only to raise ourawareness, reflect our current performance, and help us attain higher levels of performance but forseveral other reasons as well. Our accreditation body, SACS, requires us to assess, report, and improveon our instruction, services, and processes. Further, as the College mission is "to provide a wide rangeof high quality educational services that meet the needs of our willing partners in learning, both thosewho seek our services and those whom we must seek out," it is critical that we are able to determinewhether we are providing the services to meet the needs of those partners.

3502/03/03

Page 41: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Over the past several years, quality initiatives have included environmental scanning surveys, programreviews, effectiveness updates, and college-wide assessments. We have used these tools to providedata for analysis and improvement. For example, the annual Internal Customer Survey providesinformation that administrative offices use to enhance the services they provide to meet the needs ofthe College's employees. Overall employee satisfaction is measured in a climate survey, conducted byan independent third party, and provides feedback on overall perceptions of how well employee needsare being met.

Other surveys focus on students and their perceptions of the learning experiences and environmentprovided by the College. These include benchmarking studies, such as the Gulf Coast ConsortiumStudent Survey, which compares the perceptions and preferences of students at eight colleges in Texasand provides information used to evaluate and improve the quality of services for students. TheCommunity College Survey of Student Engagement is used to capture students' evaluations of theireducational experiences to provide feedback to instructional staff.

Program reviews are conducted every four years for each instructional department and are staggeredso that each year one fourth of all departments are being reviewed. Program reviews document theneed, cost, and effectiveness of each program in order to answer the question, "Does the instructionalquality of the program meet institutional standards?"

Effectiveness updates are used to assess the college-wide measures that are tied to the missionstatement. These assessments examine intended outcomes, assessment criteria, and methodologies formeasuring the effectiveness of college-wide functions.

College-wide assessments, such as the internal Baldrige assessment, provide an opportunity for theinstitution to take a systemic review of its processes and performance, recognizing strengths and areasfor improvement.

Information Technology

Over the upcoming three-year planning cycle, Information Technology (IT) foresees over $3 million inneeded improvements to the College's information technology system. This includes not only thedistrict-wide management information system server, in which all ACC areas utilize a common andintegrated database system, but also the institution's voice and communication systems, which includeenhanced disaster recovery functions.

The College is also enhancing its technology infrastructure to accommodate instructional uses oftechnology. A key goal is use of Blackboard to allow all faculty syllabi and other materials to beaccessible via ACCNet.

District-wide Management Information System Server

During peak usage times, the current administrative server for the Datatel system is running slowly.Queries and processes are taking longer to complete and causing delays in deregistration, cancelledclass processing, and class rolls. This is attributed to disk contention, processor speed and memorycaching.

3641 02/03/03

Page 42: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

ADMINISTRATIVE SERVICES RECOMMENDATION 2:The College should continue to offer a comprehensive college-wide voice, video, and data networksystem to support faculty, staff and students.

ADMINISTRATIVE SERVICES RECOMMENDATION 3:ACC should continue environmental scanning activities to ensure its responsiveness to key localneeds for education and training.

ADMINISTRATIVE SERVICES RECOMMENDATION 4:ACC should continue to develop and implement quality initiatives to assess its effectiveness and toimprove individual units and the College as well as coordinate and provide data for operationaland strategic planning activities. Although no additional resources are requested at this time,future plans may require additional resources to be requested.

ADMINISTRATIVE SERVICES RECOMMENDATION 5:FY04: ACC should continue to administer a faculty and staff climate survey and employeesatisfaction surveys to assist in establishing district-wide performance goals.

Human Resources

Human Resources has made progress in automating numerous human resources functions, and inexpanding communication via its web and print sources, and through college workshops with keypersonnel. An automated eTime timesheet and absence reporting process was successfully introducedrecently. A series of Focus Groups were held with faculty and staff at all campuses to identifyadditional goals for improvements (such as 24-hour follow-up requests).

ADMINISTRATIVE SERVICES RECOMMENDATION 6:FY04 ACC should implement an automated applicant tracking system for all position vacancies,to enhance the efficiency of the hiring process.

ADMINISTRATIVE SERVICES RECOMMENDATION 7:ACC should continue to assess annually its faculty and staff diversity, and promote understandingof the value of diversity in the workplace and its effect on learning environments.

Marketing and Public Information

Significant challenges impair ACC's ability to meet its full potential. Among these are the followinglong-standing issues:

Lack of understanding regarding ACC's comprehensive mission:

The comprehensive mission of community colleges, and the legislative mandate whichestablishes multiple purposes, is not well-known or well-understood in the generalcommunity. Many people think ACC is primarily a transfer institution. Others think itprimarily serves those who cannot meet university entrance requirements. Some think itonly provides career training, etc.

37

4202/03/03

Page 43: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Misunderstanding of ACC's unique programs and services:

While the public level of confidence in the community college as measured by externalsources is quite high, that confidence does not translate to an understanding of the uniqueand essential role the community college plays in the local region. Simply put, while manyin the community feel good about ACC, they believe if it were not here the community'seducation and training needs would be met through local four-year colleges anduniversities. The mission elements which are unique to community colleges (i.e., not part ofa four-year college and university mission) must be consistently communicated to thepublic.

Through a series of discussions in past Board of Trustees Retreats, the College has developed aStrategic Communications and Marketing Plan designed to help address the above fundamentalchallenges, with the goal of promoting public awareness and public support for increasing the fiscalresources necessary for ACC to meet local needs. The Strategic Communications and Marketing Planemphasizes ACC's CORE values in support of its mission and vision (see Mission, Core Values, andVision sections of this document for additional information).

The Board of Trustees uses the Strategic Communications and Marketing Plan in an organized,aggressive effort to share "the ACC story" with multiple organizations throughout the service area.

MARKETING AND PUBLIC INFORMATION RECOMMENDATION 1:The Master Plan recommends that the College continue to focus its communications andmarketing strategies to emphasize its core mission and its core values.

MARKETING AND PUBLIC INFORMATION RECOMMENDATION 2:The Master Plan recommends that ACC focus its communications strategies on image-building.

MARKETING AND PUBLIC INFORMATION RECOMMENDATION 3:The Master Plan recommends that the College continue to support an aggressive communityoutreach program to its multzple constituencies.

Addendum 13: Strategic Communications and Marketing Plan

38

4 3

02/03/03

Page 44: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

STRATEGIES FOR ENROLLMENT

Strategies for Enrollment (Retention)

One of the core missions of community colleges is to provide support services which promote successof the student in meeting educational goals.

ACC has grouped its planning in this area under six core areas. In addition, its master planning isaligned with the State goals reflected in the THECB Report Closing the Gap which addressessignificant access and equity issues.

ACC's student services units have collaboratively developed a Student Services Model which is thebasis of its planning and evaluation activities.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 1:ACC should continue its planning activities regarding meeting the goals established by the TexasHigher Education Coordinating Board regarding the Closing the Gaps report.

Access and Outreach

The Student Recruitment Office provides general and program-specific information to prospectivestudents, parents, and community members, as well as to area high school students, counselors andparents. Activities include a wide variety of outreach strategies including visits to high schools,participation in college fairs, arranging campus tours, coordinating open house visits, and providingassistance with admissions and financial aid processes.ACC's outreach efforts also extend to adult basic education populations, to assist them in transitioninginto college credit and certificate options.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 2:ACC should continue to support strong outreach efforts of both college-ready students and thoserequiring foundation skills prior to entering college credit and certificate programs.

Addendum J1: Student Services Model

Addendum J2: Enrollment Management Plan

Addendum J3: Student Services FY04-06 Budget Requests

Addendum J4 Student Recruitment Office Report, 2001-2002

39

4 4

02/03/03

Page 45: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Enrollment Management

During the next three-year cycle, the College will continue its efforts to close the gap for new students,especially those from populations traditionally underrepresented at ACC, by creating a seamlesssystem from recruitment to the first day of class and funding the infrastructure that Student Servicesdesperately needs.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 3:The College should increase the number of transcripts evaluated before the first day of the term,the number of registration calls returned within 24 hours, and clerical support available inCampus Admissions and Financial Aid Offices.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 4:The College should increase the number of students who use the web to register, decrease the timerequired to process assessment results and scholarship applications, and increase the entry-levelassessment services on the smaller campuses.

Retention and Goal Achievement

ACC is committed to helping all students reach their educational and career goals. During the nextthree years, the College will continue its efforts to close the gap for currently enrolled and returningstudents by creating and funding a seamless system from the day students enter ACC until theygraduate.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 5:The College should increase the retention and completion rates of all students, especially thosefrom populations historically underrepresented at ACC, and offer faculty and staff developmentopportunities to enhance their awareness of under-served populations.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 6:Research demonstrates that the earlier a student chooses a career or major the more likely thatstudent is to remain in college and graduate. The College should increase the career counselingservices available to students and decrease the number of undecided students.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 7:The College should expand the research information on student success factors available fromRetention and Student Services.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 8:The College should comply with INS tracking mandates, increase support services available tointernational students, and comply with Southern Association guidelines regarding the protectionof student records.

40

4 5

02/03/03

Page 46: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Services for Students With Disabilities

ACC will continue its efforts to provide quality support services for students with disabilities andcomply with Section 504 of the Americans with Disabilities Act. During the next three years, ACCwill need to allocate an additional $417,702 to meet the basic needs of this fast-growing population.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 9:The College should increase the funds available to provide mandatory accommodations forstudents with documented disabilities.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 10:The College should strengthen the infrastructure in place to support students with disabilities andthe faculty who teach them. This includes adding support staff at each campus, improving thestudent tracking system, and increased training faculty and staff

ACC continues to experience dramatic growth in the number of students requiring special services.This equates to additional costs which must be addressed in the budget planning cycle.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 11:The College should raise the level of awareness among faculty and staff of different learning stylesof students with special needs.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 12:The College should increase opportunities for professional development training in working withstudents with special needs.

Services for Distance Learning Students

A fast growing part of ACC's population, students who enroll only in Distance Learning classes shouldnot have to visit a campus to obtain basic services, unless they choose to do so.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 13:The College should provide distance learning students with opportunities to take web-based entry-level assessment tests and a streaming video orientation in addition to the web-based orientationcurrently available.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 14:The College should create a support service model for distance learning students that includesincreased advising services for students enrolled exclusively in Distance Learning courses as wellas students using web registration.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 15:The College should expand support services for "remote" students (distance learning,international, homebound OSD).

41

4 602/03/03

Page 47: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Student Life

"Student Life" refers to activities which enhance students' college experiences by providing extra-curricular activities which enhance curricular offerings, which provide leadership developmentopportunities for students, and which seek to promote educational and multicultural experiences.Space and budget for Student Life is extremely limited at all ACC campuses. Funds for enhancedprogramming are needed.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 16:Research demonstrates that a vibrant student activities program increases the retention rates of18-24 year-old students. ACC depends on revenue from the $3 student activity fee to support theStudent Life office, but this fee does not generate enough revenue to support the type of programthat ACC needs. The College should consider converting the Coordinator of Student Life positionand the Administrative Assistant II position to institutional funding in order to free funds forcampus events.

Transition Services

ACC's relationship with students should not end when students graduate, transfer or enter the labormarket. As the number of first-generation students and students from underrepresented populationsincreases so does the College's obligation to help these students navigate the process of finding a jobor transferring to another institution.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 17:The College should continue to streamline the degree-audit and graduation processes, and makeit easier for students to track progress toward their goals and complete the graduation process.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 18:The College should implement the Transfer Center Model at all campuses.

STRATEGIES FOR ENROLLMENT RECOMMENDATION 19:The College should increase the transfer rates of students from underrepresented populations,especially African-American and Hispanic students.

42

4 702/03/03

Page 48: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

EXTERNAL PARTNERSHIPS AND COLLABORATIONS

Independent School Districts

ACC has 30 independent and consolidated school districts (only 28 have high schools) in its definedService Area. The College devotes significant effort to fostering relationships with K-12 publicinstitutions to meet the following goals:

assist eligible junior and senior high school students in earning college credit prior to graduatingfrom high school;

facilitate the smooth transition of students from secondary institutions to enrollment in ACC;

collaborate with high school faculty to strengthen the high school curricula, especially in scienceand mathematics;

enhance school-to-careers educational awareness activities, and expand tech-prep articulatedprograms.

ISDs: Alternative Teacher Certification

The State of Texas has a crisis in public secondary schools, evidenced by the difficulty in attractingsufficient numbers of qualified, certified teachers. It has responded by encouraging alternative teachercertification programs aimed at assisting individuals in completing education and training leading toState teacher certification.

The Alternative Teacher Education Program responds to the severe lack of sufficient numbers ofcertified secondary school teachers. The law now allows and encourages community colleges toprovide alternative teacher certification programs. ACC has already implemented such a program inFY02 through a partnership with the Region XIII Service Center, and significantly expanded itsprogram in FY03. Not only does this program strengthen the institution's relationships with ServiceArea ISDs, it also provides a revenue stream from local participants.

Many states are experiencing teacher education shortages due to growth in the student population,teachers who leave the profession or who retire, and fewer individuals who make the decision to enterthe teaching profession, or of those who complete the teaching degree approximately 32% never enterthe profession. Academic Programs proposes to offer a Teacher Education Preparation Program. Thisinitiative will identify a pathway for students to begin their formal preparation to become teachers atthe community college. This program will build on the 42 hour Core Curriculum, the new Associateof Liberal Arts degrees and the Associate Degree in Early Childhood Education as a basis for the 4-year degree in Teacher Education. This will be a true pathway in that students will be able to obtainshort term certificates (Substitute Teacher Certificate, Teacher Aide) which allow them to either "stepout" to enter the workforce, or continue in the program building on knowledge and skills obtained toachieve the two year degree. With the two-year degree, graduates are better prepared as substituteteachers or to transfer to a four-year college or university.

43

4 8

02/03/03

Page 49: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Texas has projected a need for 40,000 public school teachers. Traditional teacher preparationprograms in the state are producing only about 25% of the teachers needed to meet this shortage.Community Colleges are uniquely and significantly placed to help alleviate this shortage by providingthe first two years of a baccalaureate teacher education program. Data reflect that more than one fifthof all future teachers start at the community college and 40% of the nation's teachers have completedat least part of math and science course work at the community college.

Key components of the program will include:Linking high schools, the community college and university undergraduate programs ineducation;Development of curriculum and articulation agreements with high schools and 4 year colleges;Recruitment and Advising of Students;Continuing Education for Professional Development of current teachers;Integration of emerging technologies;Developing career pathways for students who wish to build on their experience and education;Working closely with AISD to ensure that students who complete the Human Services Clusterare able to transition into the 2 year degree program.

Students become eligible to complete certificates or degrees as follows:Substitute Teacher CertificateTeacher Aide CertificateEducation Paraprofessional DegreeAssociate of Liberal Arts DegreeAssociate Degree in Early Childhood Education

EXTERNAL PARTNERSHIPS AND COLLABORATIONS RECOMMENDATION 1:ACC should continue its alternative teacher certification program collaboration with Region XIIIEducation Service Center.

EXTERNAL PARTNERSHIPS AND COLLABORATIONS RECOMMENDATION 2:The College should pursue SBOE (State Board of Education) authorization to operate its ownteacher certification program.

ISDs: Early College Start

ACC's Early College Start has grown dramatically. It is a key program in the College's efforts topromote the institution in the out-of-district Service Area, and is an entry step toward establishingprograms for out-of-district service area adults. As such, Early College Start is a powerful strategy forencouraging future annexation.

Regarding Early College Start, challenges include:high turnover among superintendents and principals throughout the region;some ISD faculty and staff are resistant to Early College initiatives;because of ACC's limited resources, there is sometimes resistance among faculty and staffto expanding services out-of-district;

44

4 902/03/03

Page 50: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

EXTERNAL PARTNERSHIPS AND COLLABORATIONS RECOMMENDATION 3:ACC should expand its analysis of effectiveness measures to demonstrate the performance of highschool students while in high school, and after graduation and continued enrollment in ACC.

Community Organizations

ACC successfully partners with external organizations which support core college missions. Perhapsmost critical are organizations which assist in promoting workforce education and ISD relationships.Primary among these would be the Capital Area Training Foundation (CATF), Capital Area Tech-PrepConsortium (CKTPC), Capital Area School-to-Careers Partnership (CASTCP), and WorkSource.Partnership agreements among these entities assist in curriculum development and faculty training, inshared grant initiatives, in transitioning high school students into ACC, and increasing enrollment invarious training programs.

In addition, the College partners with the Literacy Coalition, Community Action Network (CAN), theUrban League, and Capital Idea to promote access to college education and training.

EXTERNAL PARTNERSHIPS AND COLLABORATIONS RECOMMENDATION 4:ACC should continue to closely link its workforce education initiatives (credit and non-credit) toexternal worlOrce organizations, to leverage resources.

EXTERNAL PARTNERSHIPS AND COLLABORATIONS RECOMMENDATION 5:ACC should continue to facilitate communication and collaboration with appropriate externalorganizations by leasing HBC facility space to allow their alignment with college workforce staffif demonstrated benefit can be shown for both parties.

Service Area Collaboration and Annexation

Despite the connotation of "Austin" in its name, Austin Community College is a regional institutionserving a geographically large and diverse area. It is important that ACC establish and maintainpositive working relationships with key community organizations and institutions, including but notlimited to: chambers of commerce; independent and consolidated school districts; capital area and ruralcapital area worksource boards, school-to-careers partnerships; and key business executives to promotethe value of the community college to the entire service area.

There are challenges associated with the efforts to expand awareness of the value of ACC and toencourage voluntary annexation:

public misunderstanding of the differences between, and the need for both, the two-year and thefour-year higher education institutions;rising taxes: concern in out-of-district communities about increasing taxes, due to the frequency ofISD, City, and County bond elections;"Tepid Support" from most elected officials and most local leaders regarding advocacy of a taxrate increase and annexation:

few local higher education and local K-12 officials will publicly state the need to increasetax rate or to annex and pay taxes in support of ACC;

45

5002/03/03

Page 51: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

few local elected officials are willing to make public statements in support of tax rateincrease or annexation;

"Austin phobia:" many out-of-district residents resent the "Austin" in our name and fear that wewant to use them but will slight them in favor of Austin residents;Difficulty delivering services and programs in parts of the service Area: it is difficult to deliverout-of-district services in some cases due to limitations of on-site technology and, in some areas,finding SACS-qualified faculty is a challenge;Limited staff to concentrate on expansion: promoting the value of ACC in the out-of-districtservice area takes a great deal of time and effort, and we have limited staff devoted to theseactivities;Lack of a "war chest" public PAC to support expenses associated with annexation efforts.

EXTERNAL PARTNERSHIPS AND COLLABORATIONS RECOMMENDATION 6:As a regional community college serving all or parts of eight counties, ACC should continue todevelop positive relationships with its out-of-district communities which encourage futureannexation efforts.

Higher Education Institutions

ACC values the concept of a seamless educational system, with multiple and easily-facilitated entryand exit points. As it strives to enhance and maintain relationships which assist high school students ingaining access to higher education, it also seeks to assist its students in transferring to other institutionsof higher education.

EXTERNAL PARTNERSHIPS RECOMMENDATION 7:ACC should develop a priority list of programs which should be articulated with area highereducation institutions. This process should be coordinated by the Articulation Office, with inputfrom program Department Chairs.

46

5102/03/03

Page 52: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

FACILITIESGeneralACC operates six comprehensive campuses in its in-district service area, offering day, evening, andweekend classes. In addition, it operates seven evening centers at local high schools in the out-of-district Service Area (Bastrop, Fredericksburg, Hays, Georgetown, Lockhart, Round Rock, and SanMarcos). Additional classes are also offered at one in-district high school, the Highland BusinessCenter and the Downtown Education Center. The College's administrative functions are located at theHighland Business Center and the Service Center.

The facilities needs of the ACC District are significant. As noted by the benchmark comparisons, theCollege does so much more, with so much less than other comparable educational institutions. Whilethat is laudable and even desirable, there are limits to which an institution's facilities can be stretchedand ACC is at that limit. (It is interesting to note that ACC's campuses frequently exceed the averagesize of higher education campuses in Texas, which tends to be in the 5-6,000 student headcount range.)In summary:

ACC has more of its space devoted to instruction than other colleges. As a result:it has higher room utilization ratesit has less space for student servicesit has less space for instructional support servicesit has less space for student life (student activities)

Not only do the facilities limitations affect the ability to add or expand programs, it also affects theteaching and learning environment. ACC facilities are over-crowded, they are over-used, and thecapacity to accommodate additional demands is extremely limited. The high rate of utilizationpresents a major impediment to proper maintenance of the College's buildings and grounds. As aresult, the College must look toward further expansion of distance education and Early College Startclasses as a partial means to meet additional enrollment demands without further straining existingcampus facilities. While those goals make sense for the College because they respond to specificneeds in the community, they cannot address the College's overall needs that only proper maintenanceand facilities expansion can fulfill.

Parking is a problem at almost every ACC campus. While many campuses are "land-locked", thepossibility for constructing additional instructional space in the future exists by building on existingcampus parking lots. This would necessitate parking garages and/or elevated parking lots. There areways to construct and pay for parking garages that do not impact the College's bond capacity orfinancial ratings, and the College should explore those in a serious manner. While the College can andshould continue to stress alternative transportation means to campuses, it must recognize the realitythat automobiles will continue to be the primary travel mode for a largely part-time, adult studentpopulation.

All campuses have needs that must be addressed in future planning. These can be summarized as:improved preventative maintenance;improved deferred maintenance and capital renewal;improved safety and security improvements;renovations for more efficient use of instructional and support services space;

47

5202/03/03

Page 53: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

additional instructional space, especially for active learning(traditional classroom with technology/computer work areas);additional faculty office space;additional space for student support services such as admissions,counseling, learning labs and testing centers;additional space for student life activities; andadditional space for faculty support services such as offices for full-time and adjunct faculty,technology and professional development training parking

classroom environments

financial aid, advising and

In addition to the challenges noted, Austin Community College must also be able to plan for facilitiesgrowth in the Service Area. Because of its funding limitations, the College has no real estate assetsoutside its in-district taxing area. This significantly impacts its ability to address potential annexationsin a cost-effective manner. Ideally, the College would identify and purchase real estate in areas likelyto annex (or which would serve as a real estate investment for future sale should annexations not occurover a period of time). ACC is extremely vulnerable in its out-of-district Service Area for two keyreasons:

its non-competitive out-of-district tuition rate andother community college service areas are contiguous to ACC's outer edges of its Service Areaand offer lower tuition and, often, are also closer than the nearest ACC campus and center.

A summary of the challenges ACC faces with its facilities includes:Inadequate space to support or expand:

o instructional programs;o support services for students such as admissions, financial aid, assessment and

counseling;o student life activities (social, cultural, and instructional enhancement);

Inadequate parking for students, faculty, and staff;Insufficient funds:

o to provide adequate space for college operations;o to maintain and renew its existing facilities;o to support comprehensive, aggressive preventative maintenance measures to enhance

the life of its facilities; ando to purchase real estate for future growth and expansion of the district's operations.

ACC's benchmark data, comparing it to other Texas and national community colleges, continues tohighlight the facts that (1) the College has higher facilities utilization rates, (2) less space to supportcollege operations, and (3) lower tax support than other comparable institutions.

ACC's current bond capacity will support facilities and operations needs only through FY03; absent atax rate increase and/or a student building use fee increase in the future it will not have adequateinstitutional funding to support facilities operations without significantly decreasing funding in otherareas of operations.

The Master Plan includes detailed analysis of facilities needs, and projected renovations andconstruction if the May, 2003 tax rate and bond referendum is successful. These are summarizedbelow, in priorities:

48

5302/03/03

Page 54: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

General & Educational Space

Priority Campus/Description Year Budget1 Eastview - Health Careers Building Ph. 2

Completes the Health Careers BuildingProjectClears the way for replacement of Bldg. Dat Riverside

2003-2004 $14,000,000

2 South Austin (Alt. 4) - Building (60,000 asf) &Parking Garage (500 cars)

Fastest option for increasing enrollmentBuilding for full 2010 enrollment

2003-2005 $21,000,000

3 Cypress - Campus Expansion (67,000 asf) &Parking Expansion (500 cars)

Permits expansion of programs &enrollment growthExpanded space for Library, StudentServices & Student Life

2005-2006 $25,000,000

4 Rio Grande Purchase - Estimate 2003 $4,000,000

5 Rio Grande RenovationsExterior replace windows, repoint & sealmasonry, enclose atria, reroof Annex;Interior repair plaster walls, enhanceaccessibility, add elevators, reconfigureinterior partitions for efficiency, renovatechemistry labs, upgrade restrooms;Infrastructure upgrade electrical & lighting,replace geothermal well with cooling tower,retrofit for energy conservation.

2004-2007 $11,000,000

6 Rio Grande Parking Structure $15,000,0007 DW Renovations (partial)

CurricularSafety & HealthDeferred Maintenance

2004-2009 $3,920,000

8 Eastview Surface Parking Expansion $800,0009 Northridge Surface Parking Expansion $580,00010 Pinnacle Surface Parking Expansion $650,00011 RGC Offices Over Parking Structure (approx.

17,000 asf)Provides new faculty offices & eliminatesneed for leased offices;Permits expansion of Student Services andprogram spaces

TBD $3,200,000

Total of Bond Referendum $99,150,000

49

5 402/03/03

Page 55: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Unfunded Projects

DW Renovations 2004-2009 $4,080,000Northridge - Student Center (43,000 asf)

Provides space for expanded Library,Student Services, Testing & Learning Labs,and Student Life.Permits later renovations in Buildings 1000 &2000 for new classrooms, labs, and facultyoffices

2006-2007 $11,000,000

Riverside - Building D Replacement (36,500 asf)Provides classrooms, faculty offices, andexpansion of Student ServicesPermits later renovation in Buildings A, B & C

2005-2006 $10,000,000

Northridge Instructional Building (19,000 asf)Provides space for additional labs,classrooms, & faculty offices;

2007-2008 $5,800,000

Eastview Instructional Building (17,000 asf)Provides space for additional labs,classrooms, & faculty offices

2006-2007 $5,300,000

Northridge Parking Structure $4,750,000Riverside - Parking Structure $5,300,000Total $46,230,000

The Master Plan suggests funding facilities improvements via a voter referendum of general obligationbonds, to be retired via a one-cent tax. The College may also need to explore an extension of itsBuilding Use Fee from the year 2022 to 2027 or beyond, to allow additional facilities bondingcapacity. The combination of these two would allow ACC to meet its projected facilities needsthrough the year 2010.

50

5502/03/03

Page 56: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

Auc

tin C

omm

unity

Col

lege

Cap

ital I

mpr

ovem

ents

Pro

gram

200

3-20

10P

lann

ing

Sch

edul

e

IDT

ask

Nam

eH

alf 2

, 200

2 H

alf 1

, 200

3 H

atf 2

, 200

3 H

alf 1

, 200

4 H

alf 2

, 200

4 H

alf 1

, 200

5 H

alf 2

, 200

5 H

alf 1

, 200

6 H

alf

2, 2

006

Hal

f 1, 2

007

Hal

f 2, 2

007

Hal

f 1JI

AIS

IOIN

IDIJ

IFIM

IAIM

IJIJ

lAIS

IOIN

IDIJ

IF M

AN

I,' IJ

IAIS

IDIN

IIDD

IF1M

IAIM

IJIJ

IAIS

IOIN

IDIJ

IFIM

IAIM

IJIJ

IAIS

IO1N

IDIJ

IFIO

AN

IJIJ

IAIS

IOIN

INJ

rim1

BO

ND

RE

FE

RE

ND

UM

5/3

2E

VC

- H

ealth

Car

eers

, Ph.

2ii/

C-

Hea

lth C

aree

rs, P

h. 2

9S

AC

Bui

ldin

g &

Par

king

SA

CB

uilif

ing

8 P

arki

ng

18C

YP

Cam

pus

Exp

ansi

onC

YP

Cam

pus

Exp

ansi

on

27R

VS

Bui

ldin

g D

VS

Bui

lcffn

g D

36N

RG

Stu

dent

Cen

ter

NR

O S

tude

nt C

ente

r

45R

GC

Pur

chas

eI

bcur

cias

.JJ

49R

GC

Ren

ovat

ions

RG

C R

enov

atio

ns

57D

W S

afet

y &

Def

erre

d M

aint

enan

ce R

enov

.O

W S

afet

y 8

Def

erre

d M

aint

enan

ce R

enov

.

58D

W C

urric

ular

Ren

ovat

ions

tO

W C

urric

ular

Ren

ovat

ions

1

59 60P

IN P

arki

ng L

otM

N P

arki

ng L

ot

r I

,,N

RG

Par

king

Lot

,66

NR

G P

arki

ng L

ot\

70E

VC

Par

king

Exp

ansi

onE

vc P

arki

ng E

xpan

sion

78R

GC

Par

king

Gar

age

& O

ffice

sR

GC

Par

king

Gar

age

& O

ffice

s1

86N

RG

Par

king

Str

uctu

reI N

RG

Par

king

Str

uctu

re

95R

VS

Par

king

Str

uctu

reR

VS

Par

king

Str

uctu

re

Fac

ilitie

s &

Ope

ratio

nsP

age

1T

ue 1

1/26

/02

Page 57: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

FACILITIES RECOMMENDATION 1:FY04: The College should seek to expand its tax rate and secure approval for a facilitiesimprovement plan through a public election within its taxing district.

FACILITIES RECOMMENDATION 2:FY04: The Facilities Task Force should continue to establish uniform guidelines for instructional,support services, library, faculty office space and build-out elements.

FACILITIES RECOMMENDATION 3:FY04: The College should complete the upgrade of all security, access control, and fire alarmsystems at all campuses and in all buildings and a process to test emergency procedures on aregular basis.

FACILITIES RECOMMENDATION 4:FY04-06: The College should establish and fund a comprehensive program for DeferredMaintenance and Capital Renewal.

FACILITIES RECOMMENDATION 5:FY04-06: ACC should continue to expand instruction, to the extent possible, in methodologieswhich are not dependent (or solely dependent) on traditional classroom space (i.e., distancelearning, Early College Start, Distributed Learning).

FACILITIES RECOMMENDATION 6:FY04: In opening a new Health Sciences Building at the Eastview Campus in FY04, the Collegeshould take care to emphasize this as Phase I of the total health care facilities needs and promotethe fact that it cannot meet additional expansion of health care programs without an increase ininstitutional funding.

FACILITIES RECOMMENDATION 7:FY04: The College should begin a process of "Right Sizing" all campuses to improve the utility ofinstructional space and increase the efficiency of the buildings.

FACILITIES RECOMMENDATION 8:ACC should plan to purchase or acquire real estate in three areas: north Williamson County,Hays County, and northern Bastrop County in anticipation offuture annexations which wouldallow an expansion of college programs and services in high-growth markets. Land donationsshould also be sought.

FACILITIES RECOMMENDATION 9:ACC should plan to double the size of the Cypress Creek Campus in recognition of significantgrowth in that quadrant of its in-district Service Area.

52

5 7

02/03/03

Page 58: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

FACILITIES RECOMMENDATION 10:ACC should expand parking at most campuses and should explore the possibility of constructingparking garages at some campuses, using a funding mechanism other than tax-supported bonds.Parking increases at the Pinnacle should conform to the City of Austin's SOS ordinance, withouttaking advantage of grandfathering.

Addendum Ll: Campus Chart

Addendum L2: ACC Campuses

Addendum L3: ACC Centers

Addendum L4: Facilities Planning 2002-2015

Addendum L5: Room Utilization Reports

58

02/03/03

Page 59: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

1

Inst

ruct

ion

New

Ful

l-tim

e F

acul

tyP

45 to

ach

ieve

ben

chm

ark;

new

prog

ram

s (F

Y04

-10;

FY

05-1

8;F

Y06

-17)

450,

000

500,

000

1,37

5,00

0

2D

istr

ict-

wid

eH

ourly

Adj

ustm

ents

PH

ourly

Adj

ustm

ents

300,

000

350,

000

400,

000

3D

istr

ict-

wid

eA

dditi

onal

Inst

ruct

iona

l Ass

ocia

tes

PIn

stru

ctio

nal/C

olle

ge A

ssoc

iate

s10

0,00

0

49

Aca

dem

icE

Lear

ning

Com

mun

ities

0O

ther

Exp

ense

s1,

000

1,00

01,

000

510

Aca

dem

icE

Ser

vice

Lea

rnin

g0

Long

Dis

tanc

e S

ervi

ce50

050

050

0

510

Aca

dem

icE

Ser

vice

Lea

rnin

g0

Prin

ting

500

500

500

510

Aca

dem

icE

Ser

vice

Lea

rnin

g0

Tra

vel

1,00

01,

000

1,00

0

610

Aca

dem

ic-B

iolo

gyN

Equ

ipm

ent

CN

ew E

quip

men

t/Too

ls10

7,00

0

711

Aca

dem

ic-B

iolo

gyN

Lab

CP

hysi

olog

y so

ftwar

e12

,000

88

Aca

dem

ic-B

iolo

gyLa

bF

Fac

ilitie

s R

enov

atio

ns fo

rad

ditio

nal b

iolo

gy la

b45

0,00

0

8A

cade

mic

-Bio

logy

Lab

PLa

b A

ssis

tant

s (2

)52

,000

940

Aca

dem

ic-B

iote

chno

logy

EE

quip

men

tC

New

Equ

ipm

ent/T

ools

156,

000

10A

cade

mic

-Che

mis

try

NT

rave

l Kit

0T

rave

ling

chem

istr

y fa

ir2,

000

500

500

118

Aca

dem

ic-C

hem

istr

yLa

bF

Fac

ilitie

s R

enov

atio

ns fo

rad

ditio

nal c

hem

istr

y la

b45

0,00

0

11A

cade

mic

-Che

mis

try

Lab

PLa

b A

ssis

tant

s (2

)52

,000

121

Aca

dem

ic-D

evel

opm

enta

l Rea

ding

EF

acul

ty0

Pho

ne, d

uplic

atio

n, s

uppl

y20

,000

36,0

0034

,000

13A

cade

mic

-Dev

elop

men

tal R

eadi

ngE

Pro

gram

Exp

ansi

on0

Dup

licat

ion

1,66

71,

667

1,66

7

13A

cade

mic

-Dev

elop

men

tal R

eadi

ngE

Pro

gram

Exp

ansi

on0

Sup

plie

s1,

000

1,00

01,

000

158

Aca

dem

ic-D

evel

opm

enta

l Writ

ing

EP

rogr

am E

xpan

sion

0D

uplic

atio

n1,

667

1,66

71,

667

0 15

Aca

dem

ic-D

evel

opm

enta

l Writ

ing

EP

rogr

am E

xpan

sion

0S

uppl

ies

1,00

01,

000

1,00

0

178

Aca

dem

ic-E

nviro

nmen

tal T

ech

ELa

bF

Con

vert

Spa

ce10

0,00

0

1744

Aca

dem

ic-E

nviro

nmen

tal T

ech

ELa

bP

Pro

fess

iona

l Tec

hnic

al-L

abA

ssis

tant

25,0

00

1745

Aca

dem

ic-E

nviro

nmen

tal T

ech

ELa

bC

Equ

ipm

ent

55,0

0014

0,00

0

17A

cade

mic

-Env

ironm

enta

l Tec

hE

Lab

0S

uppl

ies

& s

uppo

rt10

,000

1818

Aca

dem

ic-E

nviro

nmen

tal T

ech

NT

rave

l0

Tra

vel

3,00

03,

000

3,00

0

1929

Aca

dem

ic-F

orei

gn L

angu

age

NW

orld

Lan

guag

e In

stitu

teC

Sof

twar

e, N

etw

ork

Hub

, Lar

geS

cree

n, C

ompu

ters

, Prin

ters

52,2

00

1929

Aca

dem

ic-F

orei

gn L

angu

age

NW

orld

Lan

guag

e In

stitu

teP

Cla

ssifi

ed-L

ab T

echn

icia

n25

,000

25,0

00

1929

Aca

dem

ic-F

orei

gn L

angu

age

NW

orld

Lan

guag

e In

stitu

teP

Pro

fess

iona

l Tec

hnic

al-D

irect

or45

,000

45,0

00

1929

Aca

dem

ic-F

orei

gn L

angu

age

NW

orld

Lan

guag

e In

stitu

teP

Pro

fess

iona

l Tec

hnic

al-L

abM

anag

er30

,000

30,0

00

19A

cade

mic

-For

eign

Lan

guag

eN

Wor

ld L

angu

age

Inst

itute

0S

uppl

ies,

dup

licat

ion,

subs

crip

tions

, TV

, etc

.19

,120

3,00

03,

000

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 1

02/0

3/03

9:0

0AM

Page 60: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

2045

Aca

dem

ic-G

ISE

Ded

icat

ed L

abP

Pro

fess

iona

l Tec

hnic

al-L

abA

ssis

tant

24,0

00

2046

Aca

dem

ic-G

ISE

Ded

icat

ed L

abC

Com

pute

rs a

nd P

rinte

rs36

,000

20A

cade

mic

-GIS

ED

edic

ated

Lab

0S

oftw

are

Site

Lic

ense

12,0

00

20A

cade

mic

-GIS

ED

edic

ated

Lab

0S

uppl

ies

1,00

0

21

Aca

dem

ic-G

loba

l Stu

dies

ND

evel

op A

A a

nd c

ertif

icat

e0

Cos

t of h

onor

ariu

m a

nd o

ther

expe

nses

ass

ocia

ted

with

foru

m3,

000

3,00

0

2512

Aca

dem

ic-J

ourn

alis

mC

ompu

ter

Sta

ff S

uppo

rt0

1,00

025

Aca

dem

ic-J

ourn

alis

mC

ompu

ter

Sta

ff S

uppo

rtP

Non

-Fac

ulty

1,00

027

11A

cade

mic

-Jou

rnal

ism

Stu

dent

New

spap

er0

Pho

togr

aphy

2,00

027

11A

cade

mic

-Jou

rnal

ism

Stu

dent

New

spap

er0

Prin

ting

3,00

027

11A

cade

mic

-Jou

rnal

ism

Stu

dent

New

spap

er0

Pro

of S

heet

s4,

000

2711

Aca

dem

ic-J

ourn

alis

mS

tude

nt N

ewsp

aper

0S

uppl

ies

1,00

0

2817

Aca

dem

ic-M

ath

NLa

bP

Pro

fess

iona

l Tec

hnic

al-L

abM

anag

er40

,000

2842

Aca

dem

ic-M

ath

NLa

bC

Sof

twar

e lic

ense

s5,

000

28A

cade

mic

-Mat

hN

Lab

0R

epla

ce c

ompu

ter

hard

war

e5,

000

11,0

0012

,000

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Fla

mm

able

cab

inet

s (2

)In

clud

ed in

DW

Hea

lth/L

ife S

afet

y In

itiat

ive

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Inst

alla

tion

of fl

amm

able

Incl

uded

in D

W H

ealth

/Life

Saf

ety

Initi

ativ

e

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Inst

alla

tion

of g

ener

al a

cid

vent

ilatio

nIn

clud

ed in

DW

Hea

lth/L

ife S

afet

y In

itiat

ive

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Inst

alla

tion

of n

itric

aci

dve

ntila

tion

Incl

uded

in D

W H

ealth

/Life

Saf

ety

Initi

ativ

e

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

New

Eye

was

h an

d sh

ower

s fo

rR

GC

lab

Incl

uded

in D

W H

ealth

/Life

Saf

ety

Initi

ativ

e

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Rep

lace

eye

was

h/sh

ower

s at

RV

S la

bIn

clud

ed in

DW

Hea

lth/L

ife S

afet

y In

itiat

ive

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Ven

ted

gene

ral a

cid

cabi

nets

(8)

Incl

uded

in D

W H

ealth

/Life

Saf

ety

Initi

ativ

e

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Ven

ted

nitr

ic a

cid

cabi

nets

(3)

Incl

uded

in D

W H

ealth

/Life

Saf

ety

Initi

ativ

e

318

Aca

dem

ic-M

ath/

Sci

ence

NLa

bF

Ven

tilat

ion

impr

ovem

ents

for

Sci

ence

Lab

sIn

clud

ed in

DW

Hea

lth/L

ife S

afet

y In

itiat

ive

3112

Aca

dem

ic-M

ath/

Sci

ence

NLa

bC

Lapt

op C

ompu

ters

for

labs

at

NR

G a

nd R

VS

26,4

0026

,400

3112

Aca

dem

ic-M

ath/

Sci

ence

NLa

bC

UV

-pro

tect

ed g

oggl

e bo

xes

8,36

032

43A

cade

mic

-Mat

h/S

cien

ceN

Mon

itorin

g W

ell

CE

quip

men

t and

sup

plie

s4,

000

5,00

0

3527

Aca

dem

ic-S

cien

ceN

Lab

CG

as c

hrom

atog

raph

and

Infr

ared

spec

trop

hoto

met

er25

,000

21,0

0010

,000

3530

Aca

dem

ic-S

cien

ceE

Lab

PP

rofe

ssio

nal T

echn

ical

-Geo

logy

Lab

Ass

ista

nt25

,000

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 2

02/0

3/03

9:0

0AM

Page 61: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Pni

ority

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

3629

Aca

dem

ic-S

peec

hN

Cap

ital O

utla

yC

AV

Equ

ipm

ent f

or ta

ping

5,00

036

29A

cade

mic

-Spe

ech

NC

apita

l Out

lay

CC

ompu

ter

Tec

hnol

ogy

15,0

0039

44A

cade

mic

-Spe

ech

Hon

orar

ia0

Gue

st S

peak

ers

500

500

500

4045

Aca

dem

ic-S

peec

hO

rient

atio

n P

acka

ge0

Sup

plie

s/D

uplic

atio

n33

333

433

441

46A

cade

mic

-Spe

ech

Sup

plie

s0

Cla

ssro

om in

stru

ctio

nal a

ids

166

167

167

42A

cade

mic

-Tea

cher

Edu

catio

nE

Tea

cher

Edu

catio

n P

athw

ayP

rogr

am0

Dev

elop

men

t of p

rom

otio

nal a

ndre

crui

tmen

t mat

eria

ls5,

000

4,00

0

42A

cade

mic

-Tea

cher

Edu

catio

nE

Tea

cher

Edu

catio

n P

athw

ayP

rogr

am0

Tra

vel a

nd te

leph

one

cost

sas

soci

ated

with

pro

gram

deve

lopm

ent a

nd p

rom

otio

n

3,00

02,

000

44W

orkf

orce

-Aut

omot

ive

Tec

hnol

ogy

NA

utom

otiv

e eq

uipm

ent U

pdat

eC

Indu

stry

Lev

el E

quip

men

t58

,500

4525

Wor

kfor

ce-A

utom

otiv

e T

echn

olog

yE

Col

lisio

n R

epai

r0

Leas

e F

ee to

Tex

as S

choo

l for

Dea

f8,

400

8,40

08,

400

45W

orkf

orce

-Aut

omot

ive

Tec

hnol

ogy

EC

ollis

ion

Rep

air

CN

ew E

quip

men

t for

Col

lisio

nR

epai

r an

d P

aint

ing

cour

ses

79,4

0079

,400

46W

orkf

orce

-Aut

omot

ive

Tec

hnol

ogy

EM

anuf

actu

rer

Spo

nsor

ed P

rogr

am0

Leas

e F

ee

46W

orkf

orce

-Aut

omot

ive

Tec

hnol

ogy

EM

anuf

actu

rer

Spo

nsor

ed P

rogr

amC

Aut

omot

ive

Equ

ipm

ent

25,0

00

48W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EC

arpe

ntry

0c-

clam

ps1,

500

48W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EC

arpe

ntry

0ho

se a

nd p

ower

cor

d re

els

1,00

048

Wor

kfor

ce-B

uild

ing

Con

stru

ctio

nE

Car

pent

ryC

air

com

pres

sor

3,20

0

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CA

GC

Inst

ruct

or M

ater

ials

3,16

0

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CB

and

Saw

s4,

000

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CH

P P

lotte

r P

rinte

r4,

000

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CLa

ptop

com

pute

rs (

15)

17,6

00

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CP

rimav

era

and

Tim

berli

neso

ftwar

e an

d lic

ense

2,00

0

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CT

imbe

rline

trai

ning

and

upd

ates

1,60

0

50W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

NC

onst

ruct

ion

Man

agem

ent S

oftw

are

CT

rain

ing

and

Upd

atin

g A

GC

mat

eria

ls3,

250

51W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EO

SH

A C

onst

ruct

ion

Pro

gram

03-

AE

D S

imul

ator

and

Man

ikin

s1,

500

51W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EO

SH

A C

onst

ruct

ion

Pro

gram

0B

ackb

oard

s48

051

Wor

kfor

ce-B

uild

ing

Con

stru

ctio

nE

OS

HA

Con

stru

ctio

n P

rogr

am0

Fac

ulty

Tra

inin

g2,

500

51W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EO

SH

A C

onst

ruct

ion

Pro

gram

0M

isce

llane

ous

Mat

eria

ls2,

000

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 3

02/0

3/03

9:0

0AM

Page 62: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

51W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EO

SH

A C

onst

ruct

ion

Pro

gram

0T

rain

ing

Mat

eria

ls2,

000

51W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EO

SH

A C

onst

ruct

ion

Pro

gram

0U

pdat

e m

ater

ials

1200

,

52W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EP

rogr

am E

xpan

sion

Off-

Site

0ci

rcul

ar s

aws

720

52W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EP

rogr

am E

xpan

sion

Off-

Site

0C

ompr

esso

r40

052

Wor

kfor

ce-B

uild

ing

Con

stru

ctio

nE

Pro

gram

Exp

ansi

on O

ff-S

ite0

exte

nsio

n co

rds

200

52W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EP

rogr

am E

xpan

sion

Off-

Site

0ho

ses

200

52W

orkf

orce

-Bui

ldin

g C

onst

ruct

ion

EP

rogr

am E

xpan

sion

Off-

Site

0O

ff-si

te s

tora

ge c

onta

iner

1,20

052

Wor

kfor

ce-B

uild

ing

Con

stru

ctio

nE

Pro

gram

Exp

ansi

on O

ff-S

iteC

Hyd

raul

ic r

od a

nd b

ar c

utte

r3,

000

5323

Wor

kfor

ce-B

usin

ess

Stu

dies

NA

dditi

onal

Sta

ffP

Pro

fess

iona

l Tec

hnic

al-L

ab T

ech

III p

ositi

on fo

r E

VC

25,0

00

5553

Wor

kfor

ce-B

usin

ess

Stu

dies

EIn

tern

atio

nal e

xcha

nge

oppo

rtun

ities

0T

rave

l10

,000

56W

orkf

orce

-Bus

ines

s S

tudi

esN

Lapt

op C

ompu

ters

CLa

ptop

com

pute

rs fo

r P

rogr

amC

oord

inat

ors

18,0

00

5826

Wor

kfor

ce-B

usin

ess

Stu

dies

NS

oftw

are

Lice

nse

0A

cces

s, G

ener

al L

edge

r, A

ICP

A,

etc.

8,00

0

59W

orkf

orce

-Com

mer

cial

Mus

icE

Aud

io E

ngin

eerin

gC

10,0

001

60W

orkf

orce

-Com

mer

cial

Mus

icN

MID

I Lab

Upg

rade

Cke

yboa

rds

and

othe

r eq

uipm

ent

20,0

00

6128

Wor

kfor

ce-C

omm

erci

al M

usic

NS

tudi

o M

anag

emen

tP

Pro

fess

iona

l Tec

hnic

al-S

tudi

oM

anag

er30

,000

61W

orkf

orce

-Com

mer

cial

Mus

icN

Stu

dio

Man

agem

ent

03,

000

628

Wor

kfor

ce-C

omm

erci

al M

usic

NS

tudi

o U

pgra

deF

Fin

ish-

out f

or N

ew S

tudi

o15

,000

62W

orkf

orce

-Com

mer

cial

Mus

icN

Stu

dio

Upg

rade

0Le

ase

Spa

ce fo

r N

ew S

tudi

o40

,000

40,0

0063

Wor

kfor

ce-C

ompu

ter

Info

Tec

hE

Dat

abas

e C

urric

ulum

06,

000

63W

orkf

orce

-Com

pute

r In

fo T

ech

ED

atab

ase

Cur

ricul

um0

Pro

fess

iona

l Tec

hnic

al (

2)63

Wor

kfor

ce-C

ompu

ter

Info

Tec

hE

Dat

abas

e C

urric

ulum

CN

ew L

abs

90,0

0065

32W

orkf

orce

-Com

pute

r In

fo T

ech

EIn

tern

et C

urric

ulum

CN

ew L

ab45

,000

45,0

0045

,000

6542

Wor

kfor

ce-C

ompu

ter

Info

Tec

hE

Inte

rnet

Cur

ricul

um0

4,00

05,

000

5,00

065

Wor

kfor

ce-C

ompu

ter

Info

Tec

hE

Inte

rnet

Cur

ricul

umP

Pro

fess

iona

l Tec

hnic

al (

1)

66

Wor

kfor

ce-C

rimin

al J

ustic

eE

Fire

arm

s/D

rivin

g In

stru

ctio

n0

Leas

e G

ymna

sium

for

self-

defe

nse

and

phys

ical

trai

ning

/fire

arm

s tr

aini

ng s

imul

ator

50,0

0050

,000

66W

orkf

orce

-Crim

inal

Jus

tice

EF

irear

ms/

Driv

ing

Inst

ruct

ion

0Le

ase

Pol

ice

Aut

o D

rivin

g R

ange

and

Ski

d P

ad30

,000

30,0

00

6748

Wor

kfor

ce-C

ulin

ary/

Hos

pita

lity

NB

istr

o U

pgra

de0

Upg

rade

poi

nt-o

f-sa

les

syst

em6,

000

698

Wor

kfor

ce-C

ulin

ary/

Hos

pita

lity

EP

astr

y La

bF

Fac

ility

Incl

uded

in E

VC

Cam

pus

Ren

ovat

ions

69W

orkf

orce

-Cul

inar

y/H

ospi

talit

yE

Pas

try

Lab

CE

quip

men

tIn

clud

ed in

EV

C C

ampu

s R

enov

atio

ns

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 4

02/0

3/03

9:0

0AM

Page 63: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

701

Wor

kfor

ce-D

enta

l Hyg

iene

Pro

gram

Impl

emen

tatio

n-D

enta

lH

ygie

neP

Cla

ssifi

ed28

,000

28,0

00

701

Wor

kfor

ce-D

enta

l Hyg

iene

Pro

gram

Impl

emen

tatio

n-D

enta

lH

ygie

neP

Fac

ulty

701

Wor

kfor

ce-D

enta

l Hyg

iene

Pro

gram

Impl

emen

tatio

n-D

enta

lH

ygie

neP

Fac

ulty

702

Wor

kfor

ce-D

enta

l Hyg

iene

Pro

gram

Impl

emen

tatio

n-D

enta

lH

ygie

ne0

7,50

05,

000

7,50

0

7'1

27W

orkf

orce

-Dig

ital P

ublis

hing

EC

urric

ulum

dev

elop

men

t for

E-B

ook

Tec

hnol

ogy

0P

alm

Pilo

ts, s

oftw

are,

facu

ltyde

velo

pmen

t15

,000

7328

Wor

kfor

ce-D

igita

l Pub

lishi

ngE

On-

line

clas

s de

velo

pmen

t0

Sup

port

for

recr

uitin

g, e

xpan

ding

CE

and

onl

ine

cour

ses

3,50

0

748

Wor

kfor

ce-D

igita

l Pub

lishi

ngN

Ren

ovat

ion

of P

rogr

am S

pace

F25

0,00

075

Wor

kfor

ce-E

lect

roni

csE

Pro

gram

Exp

ansi

on0

12,5

0075

Wor

kfor

ce-E

lect

roni

csE

Pro

gram

Exp

ansi

onC

Equ

ipm

ent a

nd tr

aine

rs19

0,00

019

0,00

0

76W

orkf

orce

-Em

erge

ncy

Med

Svc

EC

urric

ulum

Dev

elop

men

t -B

iote

rror

ism

054

054

0

76W

orkf

orce

-Em

erge

ncy

Med

Svc

EC

urric

ulum

Dev

elop

men

t -B

iote

rror

ism

CB

iolo

gica

l Tra

inin

g S

uits

5,00

0

776

Wor

kfor

ce-E

mer

genc

y M

ed S

vcE

EM

S-R

N to

Par

amed

ic M

obili

tyT

rack

02,

400

776

Wor

kfor

ce-E

mer

genc

y M

ed S

vcE

EM

S-R

N to

Par

amed

ic M

obili

tyT

rack

05,

000

7715

Wor

kfor

ce-E

mer

genc

y M

ed S

vcE

EM

S-R

N to

Par

amed

ic M

obili

tyT

rack

PC

lass

ified

25,0

00

7718

Wor

kfor

ce-E

mer

genc

y M

ed S

vcE

EM

S-R

N to

Par

amed

ic M

obili

tyT

rack

C2

IV A

rms,

2 In

tuba

tion

head

s(a

dult)

, 2 in

tuba

tion

head

s (p

edi)

4,50

0

7718

Wor

kfor

ce-E

mer

genc

y M

ed S

vcE

EM

S-R

N to

Par

amed

ic M

obili

tyT

rack

CD

igita

l Vid

eo E

ditin

g S

oftw

are

1,50

0

77W

orkf

orce

-Em

erge

ncy

Med

Svc

EE

MS

-RN

to P

aram

edic

Mob

ility

Tra

ck0

Rid

e O

ut F

ees

6,50

0

78W

orkf

orce

-Em

erge

ncy

Med

Svc

EP

rogr

am E

xpan

sion

0R

ide

Out

Fee

s9,

500

78W

orkf

orce

-Em

erge

ncy

Med

Svc

EP

rogr

am E

xpan

sion

05,

000

78W

orkf

orce

-Em

erge

ncy

Med

Svc

EP

rogr

am E

xpan

sion

C2

code

sta

tions

, 2 IV

arm

s, 2

intu

batio

n he

ads

30,0

00

78W

orkf

orce

-Em

erge

ncy

Med

Svc

EP

rogr

am E

xpan

sion

PP

rofe

ssio

nal T

echn

ical

-Lab

Ass

ista

nt (

.5)

79W

orkf

orce

-Eng

inee

ring

DG

NP

ositi

on U

pgra

deP

Upg

rade

Com

pute

r T

ech

I to

ll6,

000

8055

Wor

kfor

ce-E

ngin

eerin

g D

GN

Pro

fess

iona

l Dev

elop

men

t0

6,00

06,

000

6,00

0

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 5

02/0

3/03

9:0

0AM

Page 64: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity*

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

818

Wor

kfor

ce-E

ngin

eerin

g D

GN

Ren

ovat

ion

of P

rogr

am S

pace

F25

,000

82W

orkf

orce

-Eng

inee

ring

DG

NR

epla

ce C

lass

room

Fur

nitu

reC

Lab

3220

and

320

210

,000

10,0

00

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

2 Li

cens

es fo

r M

icro

soft

Ser

ver

2,00

0

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Aut

oCA

D u

pgra

de31

,000

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

CN

C L

athe

10,0

00

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

ED

G S

erve

r5,

000

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Inve

ntor

(17

lice

nse)

22,0

15

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Land

Dev

elop

men

t Des

ktop

8,00

0

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Larg

e F

orm

at C

opie

r15

,000

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Mas

ter

CA

M6,

500

10,9

50

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Plo

tter

Prin

ter

5,00

0

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Prin

t Ser

ver

2,00

0

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Prin

ter

for

3202

2,00

0

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Prin

ters

15,0

00

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Pro

E L

icen

se5,

000

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Rap

id P

roto

typi

ng M

achi

ne40

,000

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Rob

otel

for

3202

10,0

00

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Sun

Sta

tions

for

3202

10,0

00

8319

Wor

kfor

ce-E

ngin

eerin

g D

GN

Upg

rade

Sof

twar

e/E

quip

men

t to

indu

stry

sta

ndar

dsC

Sun

Uni

x S

erve

r23

,800

83W

orkf

orce

-Eng

inee

ring

DG

NU

pgra

de S

oftw

are/

Equ

ipm

ent t

oin

dust

ry s

tand

ards

0C

onsu

mab

le S

uppl

ies

2,00

0

84W

orkf

orce

-Fire

Pro

tect

ion

NA

cade

my

Rel

ocat

ion

CF

urni

ture

3,40

085

2W

orkf

orce

-Fire

Pro

tect

ion

EA

dditi

onal

Cad

et C

lass

Day

PP

rofe

ssio

nal T

echn

ical

15,0

00

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 6

02/0

3/03

9:0

0AM

Page 65: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

852

Wor

kfor

ce-F

ire P

rote

ctio

nE

Add

ition

al C

adet

Cla

ss D

ayP

Upg

rade

Aca

dem

y D

irect

or to

FT

20,0

00

853

Wor

kfor

ce-F

ire P

rote

ctio

nE

Add

ition

al C

adet

Cla

ss D

ay0

Non

-Cap

ital P

ool

2,50

085

Wor

kfor

ce-F

ire P

rote

ctio

nE

Add

ition

al C

adet

Cla

ss D

ay0

Ope

ratin

g C

osts

Poo

l5,

500

85W

orkf

orce

-Fire

Pro

tect

ion

EA

dditi

onal

Cad

et C

lass

Day

0S

uppl

ies

7,50

086

Wor

kfor

ce-F

ire P

rote

ctio

nE

Add

ition

al C

adet

Cla

ss N

ight

0N

on-C

apita

l Poo

l2,

500

86W

orkf

orce

-Fire

Pro

tect

ion

EA

dditi

onal

Cad

et C

lass

Nig

htC

Bre

athi

ng A

ppar

atus

(20

)40

,000

86W

orkf

orce

-Fire

Pro

tect

ion

EA

dditi

onal

Cad

et C

lass

Nig

ht0

Ope

ratin

g C

osts

Poo

l5,

500

86W

orkf

orce

-Fire

Pro

tect

ion

EA

dditi

onal

Cad

et C

lass

Nig

htC

Pro

tect

ive

Clo

thin

g (2

0)16

,000

86W

orkf

orce

-Fire

Pro

tect

ion

EA

dditi

onal

Cad

et C

lass

Nig

ht0

Sup

plie

s7,

500

87W

orkf

orce

-Fire

Pro

tect

ion

NE

quip

men

t Rep

lace

men

t0

Bre

athi

ng A

ppar

atus

(5)

10,0

0087

Wor

kfor

ce-F

ire P

rote

ctio

nN

Equ

ipm

ent R

epla

cem

ent

0P

rote

ctiv

e C

loth

ing

(5)

4,00

0

87W

orkf

orce

-Fire

Pro

tect

ion

NE

quip

men

t Rep

lace

men

t0

Spa

re B

reat

hing

App

arat

usB

ottle

s3,

500

88W

orkf

orce

-Geo

mat

ics

NU

pgra

de S

oftw

are/

Equ

ipm

ent t

oin

dust

ry s

tand

ards

CD

igita

l Tot

al S

tatio

n P

acka

ges

(3)

16,0

00

88W

orkf

orce

-Geo

mat

ics

NU

pgra

de S

oftw

are/

Equ

ipm

ent t

oin

dust

ry s

tand

ards

CG

PS

sur

veyi

ng s

yste

m12

,000

898

Wor

kfor

ce-H

eatin

g/A

C/

NC

urric

ulum

Dev

elop

men

tF

Ele

vate

d co

ncre

te p

ad a

ndha

ndra

il20

,000

8938

Wor

kfor

ce-H

eatin

g/A

C/

NC

urric

ulum

Dev

elop

men

tP

Cla

ssifi

ed-T

echn

ical

Sta

ffA

ssis

tant

I24

,000

8939

Wor

kfor

ce-H

eatin

g/A

C/

NC

urric

ulum

Dev

elop

men

tC

R-1

1 R

efrig

eran

t Rec

over

yM

achi

ne5,

000

91W

orkf

orce

-Hum

an S

ervi

ces

EIn

tern

atio

nal L

angu

age

Lab

0C

arre

ls a

nd E

quip

men

t and

Sup

plie

s10

,000

91W

orkf

orce

-Hum

an S

ervi

ces

EIn

tern

atio

nal L

angu

age

Lab

0T

each

er S

tatio

n10

0,00

0

91W

orkf

orce

-Hum

an S

ervi

ces

EIn

tern

atio

nal L

angu

age

Lab

PC

ours

e lo

ad r

educ

tion

to d

evel

opla

b93

8W

orkf

orce

-Ind

ustr

ial T

echn

olog

yE

Art

Met

als

FF

acili

ties

Tot

al: 7

,057

sq.

ft.

Incl

uded

in R

VS

Cam

pus

Ren

ovat

ions

9339

Wor

kfor

ce-I

ndus

tfial

Tec

hnol

ogy

EA

rt M

etal

sC

Equ

ipm

ent

37,6

0093

39W

orkf

orce

-Ind

ustr

ial T

echn

olog

yE

Art

Met

als

C18

,800

9354

Wor

kfor

ce-I

ndus

tria

l Tec

hnol

ogy

EA

rt M

etal

s0

15,0

00

9446

Wor

kfor

ce-I

ndus

tria

l Tec

hnol

ogy

EJe

wel

ryP

Cla

ssifi

ed-T

echn

ical

Lab

Ass

ista

nt94

47W

orkf

orce

-Ind

ustr

ial T

echn

olog

yE

Jew

elry

CE

quip

men

t52

,500

9447

Wor

kfor

ce-I

ndus

tria

l Tec

hnol

ogy

EJe

wel

ryC

35,0

0017

,500

94W

orkf

orce

-Ind

ustr

ial T

echn

olog

yE

Jew

elry

015

,000

15,0

0095

41W

orkf

orce

-Kin

esio

logy

NR

epla

ce E

quip

men

tC

New

Equ

ipm

ent

10,0

0031

,000

30,0

0096

8W

orkf

orce

-Mac

hini

ng T

echn

olog

yE

Man

ual M

achi

ning

FF

acili

ties

Tot

al: 4

,557

sq.

ftIn

clud

ed in

RV

S C

ampu

s R

enov

atio

ns96

Wor

kfor

ce-M

achi

ning

Tec

hnol

ogy

EM

anua

l Mac

hini

ngC

Equ

ipm

ent

184,

000

*=P

(04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 7

02/0

3/03

9:0

0AM

Page 66: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

96W

orkf

orce

-Mac

hini

ng T

echn

olog

yE

Man

ual M

achi

ning

C9,

200

9,20

096

Wor

kfor

ce-M

achi

ning

Tec

hnol

ogy

EM

anua

l Mac

hini

ng0

8,00

0

96W

orkf

orce

-Mac

hini

ng T

echn

olog

yE

Man

ual M

achi

ning

PC

lass

ified

-Tec

hnic

al L

abA

ssis

tant

(1.

5 F

TE

)35

,000

97W

orkf

orce

-Man

ufac

turin

g T

echn

olo

NM

anuf

actu

ring

Tec

hnol

ogy

0E

quip

men

t10

0,00

0

98W

orkf

orce

-Med

ical

Cod

ing

EC

urric

ulum

Dev

elop

men

t/Enr

ollm

ent

Exp

ansi

onC

1,50

0

991

Wor

kfor

ce-M

edic

al C

odin

gN

Est

ablis

h a

Med

ical

Rec

ords

File

Roo

mF

File

s, s

oftw

are-

incl

ded

in H

ealth

Car

eer

Bui

ldin

g ll

30,0

00

100

29W

orkf

orce

-Med

ical

Lab

Tec

hE

Acc

eler

ated

MLT

0A

dditi

onal

Sup

plie

s35

010

029

Wor

kfor

ce-M

edic

al L

ab T

ech

EA

ccel

erat

ed M

LT0

Sof

twar

e lic

ense

s50

0

101

13W

orkf

orce

-Med

ical

Lab

Tec

hE

Clin

ical

Lab

Ass

ista

ntC

Dua

l-Hea

ded

teac

hing

mic

rosc

ope

4,00

0

101

30W

orkf

orce

-Med

ical

Lab

Tec

hE

Clin

ical

Lab

Ass

ista

nt0

Sof

twar

e50

010

331

Wor

kfor

ce-M

edic

al L

ab T

ech

EP

hleb

otom

y T

echn

icia

n0

Add

ition

al S

uppl

ies

150

103

Wor

kfor

ce-M

edic

al L

ab T

ech

EP

hleb

otom

y T

echn

icia

nC

Dum

my

Arm

s (5

)1,

000

104

45W

orkf

orce

-Mus

icN

Upg

rade

to n

atio

nal s

tand

ards

CN

ew In

stru

men

ts20

,800

24,5

0088

,000

105

14W

orkf

orce

-Occ

upat

iona

l Th

Ass

t.E

Cur

ricul

um C

hang

eC

2,50

010

532

Wor

kfor

ce-O

ccup

atio

nal T

h A

sst.

EC

urric

ulum

Cha

nge

01,

000

250

250

106

33W

orkf

orce

-Pha

rmac

y T

ech

EM

S0

Mat

eria

ls, s

uppl

ies,

in-d

istr

ict

trav

el4,

000

107

1W

orkf

orce

-Pha

rmac

y T

ech

EIn

crea

se e

nrol

lmen

t/dis

tanc

ele

arni

ngF

Che

mot

hera

py h

ood-

incl

uded

inH

ealth

Car

eers

Bui

ldin

g II

6,00

0

107

34W

orkf

orce

-Pha

rmac

y T

ech

EIn

crea

se e

nrol

lmen

t/dis

tanc

ele

arni

ng0

5,00

0

108

35W

orkf

orce

-Pha

rmac

y T

ech

Indu

stry

Mem

bers

hip

0M

embe

rshi

p in

Pha

rmac

yT

echn

icia

n E

duca

tors

Cou

ncil

2,50

02,

500

2,50

0

109

Wor

kfor

ce-P

hoto

grap

hyN

Dig

ital P

hoto

grap

hy C

urric

ulum

Dev

elop

men

tC

Equ

ipm

ent

230,

000

240,

000

109

Wor

kfor

ce-P

hoto

grap

hyN

Dig

ital P

hoto

grap

hy C

urric

ulum

Dev

elop

men

t0

9,00

0

110

8W

orkf

orce

-Pho

togr

aphy

ND

igita

l Tec

hnol

ogy

F75

0 sq

ft. a

t Pin

nacl

e-R

emod

elIn

clud

ed in

PIN

Cam

pus

Ren

ovat

ions

110

Wor

kfor

ce-P

hoto

grap

hyN

Dig

ital T

echn

olog

yC

Equ

ipm

ent

120,

000

120,

000

111

Wor

kfor

ce-P

hoto

grap

hyN

Pho

to E

quip

men

t Rep

lace

men

tC

Rep

lace

25

year

old

enl

arge

rsan

d ca

mer

as40

,000

40,0

00

112

22W

orkf

orce

-Phy

sica

l Fit

Tec

hC

Tea

chin

g M

odel

s1,

000

1,00

011

252

Wor

kfor

ce-P

hysi

cal F

it T

ech

03,

000

3,00

011

4W

orkf

orce

-Rad

iolo

gyE

Pro

gram

Exp

ansi

on0

Rep

air

Acc

t5,

000

114

Wor

kfor

ce-R

adio

logy

EP

rogr

am E

xpan

sion

CE

quip

men

t85

,000

85,0

00

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 8

02/0

3/03

9:0

0AM

Page 67: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

114

Wor

kfor

ce-R

adio

logy

EP

rogr

am E

xpan

sion

0su

pplie

s, tr

avel

, rep

airs

,du

plic

atio

n, p

hone

15,0

00

115

28W

orkf

orce

-RT

FN

Upg

rade

to in

dust

ry s

tand

ards

CF

ield

Pro

duct

ion

and

Edi

ting

Lab

Equ

ipm

ent

53,3

3012

1,40

034

,000

'

115

39W

orkf

orce

-RT

FN

Upg

rade

to in

dust

ry s

tand

ards

PP

rofe

ssio

nal T

echn

ical

30,0

0030

,000

30,0

00

116

8

Wor

kfor

ce-S

MT

NF

acili

ties

Upg

rade

FIn

stal

l cei

lings

in o

ffice

s an

dpu

rcha

se n

ew fu

rnitu

re a

ndre

osta

ts in

cla

ssro

oms

Incl

uded

in R

VS

Cam

pus

Ren

ovat

ions

116

8

Wor

kfor

ce-S

MT

NF

acili

ties

Upg

rade

FIn

stal

latio

n of

3 p

hase

AC

pow

erdi

scon

nect

s an

d in

stal

latio

n of

circ

ulat

ing/

clos

ed lo

op c

hille

dw

ater

sys

tem

Incl

uded

in R

VS

Cam

pus

Ren

ovat

ions

117

13W

orkf

orce

-Son

ogra

phy

EO

n-lin

e C

urric

ulum

02,

000

1,50

01,

500

118

20W

orkf

orce

-Son

ogra

phy

EP

rogr

am E

xpan

sion

03,

600

3,60

03,

600

118

Wor

kfor

ce-S

onog

raph

yE

Pro

gram

Exp

ansi

onC

Ultr

asou

nd U

nit

80,0

0011

936

Wor

kfor

ce-S

urgi

cal T

ech

EA

ssis

tant

Pro

gram

Coo

rdin

ator

03,

000

3,00

03,

000

120

37W

orkf

orce

-Sur

gica

l Tec

hE

Intr

aope

rativ

e C

ircul

atin

g C

ours

e0

Dup

licat

ion,

Pos

tage

, rec

ruitm

ent

activ

ity1,

500

121

25W

orkf

orce

-Sur

gica

l Tec

hE

Mat

eria

ls M

anag

emen

tC

Aut

ocla

ve5,

000

121

Wor

kfor

ce-S

urgi

cal T

ech

EM

ater

ials

Man

agem

ent

0S

uppl

ies/

Dup

licat

ion

1,50

012

221

Wor

kfor

ce-S

urgi

cal T

ech

EP

rece

ptor

ship

Tra

vel

0T

rave

l75

075

075

0

123

22W

orkf

orce

-Sur

gica

l Tec

hE

Pro

gram

Exp

ansi

on0

Dup

licat

ion,

Pos

tage

, rec

ruitm

ent

activ

ity1,

350

124

Wor

kfor

ce-S

urgi

cal T

ech

ES

urgi

cal F

irst A

ssis

tant

P20

,000

20,0

0020

,000

125

50W

orkf

orce

-Tra

vel &

Tou

rism

AC

C T

rave

l Age

ncy

037

,000

125

50W

orkf

orce

-Tra

vel &

Tou

rism

AC

C T

rave

l Age

ncy

P89

,318

126

Wor

kfor

ce-V

eter

inar

y T

echn

icia

nN

Vet

erin

ary

Tec

hnic

ian

0E

quip

men

t90

,000

127

8W

orkf

orce

-Vis

ual C

omm

Des

ign

EC

urric

ulum

Adv

ance

men

tF

Exp

and

lab

size

8,45

0

127

8W

orkf

orce

-Vis

ual C

omm

Des

ign

EC

urric

ulum

Adv

ance

men

tF

Fac

ilitie

s R

emod

elin

g at

EV

C32

17In

clud

ed in

EV

C C

ampu

s R

enov

atio

ns

127

8W

orkf

orce

-Vis

ual C

omm

Des

ign

EC

urric

ulum

Adv

ance

men

tF

Fac

ilitie

s R

emod

elin

g at

PIN

812

Incl

uded

in P

IN C

ampu

s R

enov

atio

ns

127

8

Wor

kfor

ce-V

isua

l Com

m D

esig

nE

Cur

ricul

um A

dvan

cem

ent

FF

acili

ties

Rem

odel

ing

for

wor

ksho

p ar

ea, o

ffice

, and

stor

age

at N

RG

, PIN

, and

EV

C

Incl

uded

in c

ampu

s re

nova

tions

127

38W

orkf

orce

-Vis

ual C

omm

Des

ign

EC

urric

ulum

Adv

ance

men

t0

Dep

artm

enta

l Sup

plie

s an

deq

uipm

ent m

aint

enan

ce1,

000

5,00

05,

000

127

50W

orkf

orce

-Vis

ual C

omm

Des

ign

EC

urric

ulum

Adv

ance

men

tC

Com

pute

r/D

raw

ing

Lab

55,8

5012

750

Wor

kfor

ce-V

isua

l Com

m D

esig

nE

Cur

ricul

um A

dvan

cem

ent

---C

Fur

nitu

re to

exp

and

lab

size

8,45

0

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 9

02/0

3/03

9:0

0AM

Page 68: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

128

20W

orkf

orce

-Vis

ual C

omm

Des

ign

EE

quip

men

t Upg

rade

CU

pgra

de E

quip

men

t33

,000

33,0

0033

,000

129

56W

orkf

orce

-Vis

ual C

omm

Des

ign

NP

rogr

am M

arke

ting

0C

D-R

om P

rodu

ctio

n C

osts

5,00

013

020

Wor

kfor

ce-V

isua

l Com

m D

esig

nE

Sta

ffP

Cla

ssifi

ed-L

ab S

uppo

rt30

,000

30,0

00

131

21W

orkf

orce

-Vis

ual C

omm

Des

ign

NU

pgra

de S

oftw

are/

Equ

ipm

ent t

oin

dust

ry s

tand

ards

CIn

tern

et s

erve

r5,

000

132

39W

orkf

orce

-Voc

atio

nal N

ursi

ngE

Acu

te C

are

02,

000

3,00

03,

000

133

8W

orkf

orce

-Wel

ding

EC

ode

Wel

ding

CE

quip

men

t70

,000

70,0

0013

38

Wor

kfor

ce-W

eldi

ngE

Cod

e W

eldi

ng0

15,0

0015

,000

133

8W

orkf

orce

-Wel

ding

EC

ode

Wel

ding

C68

,500

68,5

0013

38

Wor

kfor

ce-W

eldi

ngE

Cod

e W

eldi

ngF

Fac

ilitie

s T

otal

: 11,

057

sq. f

t.

134

Dis

tanc

e Le

arni

ngE

Pro

gram

Exp

ansi

on0

Leas

ing

ITV

and

PC

M C

lass

es40

,000

20,0

00

135

4D

ista

nce

Lear

ning

NP

rogr

am Im

prov

emen

t0

Sof

twar

e &

lice

nses

& p

er s

tude

ntfe

e55

,000

55,0

0025

,000

135

7D

ista

nce

Lear

ning

NP

rogr

am Im

prov

emen

tC

24x7

onl

ine

supp

ort

20,0

00

135

9D

ista

nce

Lear

ning

NP

rogr

am Im

prov

emen

tP

Cla

ssifi

ed-T

echn

ical

Ass

ista

nt29

,000

135

9D

ista

nce

Lear

ning

NP

rogr

am Im

prov

emen

tP

Pro

fess

iona

l Tec

hnic

al-D

ista

nce

Lear

ning

Sup

port

Spe

cial

ist

37,0

00

136

Inte

rnat

iona

lG

rant

Mat

chin

g0

Inte

rnat

iona

lize

Cur

ricul

um 6

AG

rant

50,0

00

137

58In

tern

atio

nal

EP

rogr

am E

xpan

sion

0T

rave

l and

oth

er m

arke

ting

activ

ities

to in

crea

se e

nrol

lmen

t62

,300

63,3

0063

,300

138

Ass

essm

ent

EP

rogr

am E

xpan

sion

CT

estin

g S

tatio

n C

arre

ls (

15)

15,0

0013

8A

sses

smen

tE

Pro

gram

Exp

ansi

onP

Pro

fess

iona

l Tec

hnic

al (

5.5)

75,0

0075

,000

140

8F

ound

atio

n S

kills

-Adu

lt E

duca

tion

EP

rogr

am E

xpan

sion

FP

orta

ble

Bui

ldin

g (lo

catio

ns T

BD

)17

5,00

0

140

21

Fou

ndat

ion

Ski

lls-A

dult

Edu

catio

nE

Pro

gram

Exp

ansi

onP

Fac

ulty

Pro

fess

iona

l Tec

hnic

al-O

utre

ach

Spe

cial

ist

30,0

0030

,000

142

49F

ound

atio

n S

kills

-Adu

lt E

duca

tion

NP

rogr

am Im

prov

emen

tP

Con

sulta

nts

for

Flo

rida

Cur

ricul

um a

nd N

ewT

echn

olog

ies

40,0

00

142

50F

ound

atio

n S

kills

-Adu

lt E

duca

tion

NP

rogr

am Im

prov

emen

tC

TA

SP

-pre

p C

urric

ulum

Mat

eria

ls50

,000

143

26F

ound

atio

n S

kills

-Adu

lt E

duca

tion

NP

rogr

am U

pgra

deC

Har

dwar

e, s

ound

card

s an

dhe

adse

ts fo

r co

mpu

ters

5,00

0

144

Fou

ndat

ion

Ski

lls-A

dult

Edu

catio

nE

Sel

f-P

aced

Lab

CC

ompu

ters

, Prin

ters

, and

Sof

twar

e19

,500

19,5

00

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 10

02/0

3/03

9:0

0AM

Page 69: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

144

Fou

ndat

ion

Ski

lls-A

dult

Edu

catio

nE

Sel

f-P

aced

Lab

PS

taff

35,0

00

145

14F

ound

atio

n S

kills

-Adu

lt E

duca

tion

EU

pgra

de a

nd S

yste

m M

aint

enan

ce-

Lite

racy

Pro

dat

a sy

stem

0P

rogr

amm

ing

and

Sof

twar

e18

,000

5,00

05,

000

147

Con

tinui

ng E

duca

tion

ED

EC

0Le

ase

Lot P

arki

ng fo

r fa

culty

and

stud

ents

11,0

0011

,000

148

48R

eten

tion

NA

llied

Hea

lth C

trP

Pro

fess

iona

l Tec

hnic

al-5

mon

thco

unse

ling

posi

tions

(10

)45

,826

148

48R

eten

tion

NA

llied

Hea

lth C

trP

Pro

fess

iona

l Tec

hnic

al-A

dvis

ing

26,5

15

149

22R

eten

tion

EC

leric

al S

uppo

rt R

GC

PC

lass

ified

-Adm

inis

trat

ive

Ass

ista

nt20

,600

150

Ret

entio

nN

Com

pute

rsC

Com

pute

rs fo

r ca

mpu

ses

(3/2

)18

,000

7,20

0

151

3R

eten

tion

ND

egre

e A

udit

PC

lass

ified

(2)

19,1

5019

,150

152

Ret

entio

nN

Dis

able

d A

ccom

mod

atio

nsC

10%

incr

ease

in c

ampu

sac

com

mod

atio

ns b

udge

t eac

hye

ar

Incl

uded

in c

ampu

s re

nova

tions

154

8R

eten

tion

NE

ntry

-Lev

elP

Cla

ssifi

ed-C

lerk

II19

,150

154

8R

eten

tion

NE

ntry

-Lev

elP

Pro

fess

iona

l Tec

hnic

al-

Ass

essm

ent S

peci

alis

t (2)

53,2

30

154

8

Ret

entio

nN

Ent

ry-L

evel

FS

pace

for

asse

ssm

ent c

ente

rs a

tC

YP

, EV

C, P

IN (

Ren

ovat

ions

)In

clud

ed in

cam

pus

reno

vatio

ns

155

8R

eten

tion

NH

earin

g Im

paire

dF

Incr

ease

spa

ce fo

r in

terp

rete

rse

rvic

esIn

clud

ed in

cam

pus

reno

vatio

ns

156

8R

eten

tion

EIn

crea

se F

inan

cial

Aid

FS

pace

at N

RG

, RG

C, R

VS

, and

HB

CIn

clud

ed in

cam

pus

reno

vatio

ns

156

Ret

entio

nE

Incr

ease

Fin

anci

al A

idP

Pro

fess

iona

l Tec

hnic

al-

Ass

essm

ent S

peci

alis

tC

lass

ified

-Cle

rk II

I (3)

Pro

fess

iona

l Tec

hnic

al-

Coo

rdin

ator

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

188,

500

188,

500

157

5R

eten

tion

EIn

crea

se tr

ansc

ript r

evie

ws

PC

lass

ified

-Cle

rk II

25,0

00

157

5R

eten

tion

EIn

crea

se tr

ansc

ript r

evie

ws

PP

rofe

ssio

nal T

echn

ical

-A

dmis

sion

s A

sst (

2)38

,000

40,0

00

158

4R

eten

tion

NIn

tern

atio

nal

PC

lass

ified

-Cle

rk il

l19

,150

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 11

02/0

3/03

9:0

0AM

Page 70: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

158

4R

eten

tion

NIn

tern

atio

nal

PP

rofe

ssio

nal T

echn

ical

-Adv

isor

32,0

00

159

6R

eten

tion

NG

radu

atio

n O

ffice

PC

lass

ified

-Cle

rk II

25,0

0016

06

Ret

entio

nN

OS

DC

Des

k, C

hair,

Com

pute

r5,

000

160

7R

eten

tion

NO

SD

PC

lass

ified

-Cle

rk II

I (6)

57,5

0057

,500

160

7R

eten

tion

NO

SD

PP

rofe

ssio

nal T

echn

ical

-OS

DS

peci

alis

t35

,000

161

8R

eten

tion

NP

erki

nsF

Spa

ce fo

r ne

w p

ositi

on(s

)In

clud

ed in

cam

pus

reno

vatio

ns

161

31R

eten

tion

NP

erki

nsP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

19,1

50

161

31R

eten

tion

NP

erki

nsP

Pro

fess

iona

l Tec

hnic

al-S

tude

ntS

uppo

rt S

peci

alis

t24

,335

161

Ret

entio

nN

Per

kins

050

% b

udge

t inc

reas

e fo

r M

Cul

tura

l Cen

ter

and

El C

entr

o6,

000

162

47R

eten

tion

NR

ecor

ds S

tora

geC

Ele

ctro

nic

Fili

ng S

yste

m20

,000

163

8R

eten

tion

NR

emot

eF

Spa

ce fo

r ne

w p

ositi

on(s

)In

clud

ed in

cam

pus

reno

vatio

ns

163

Ret

entio

nN

Rem

ote

PP

rofe

ssio

nal T

echn

ical

-Adv

isin

g(2

)30

,000

30,0

00

164

47R

eten

tion

NR

emot

e E

xter

nal F

undi

ngP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

20,6

00

164

47

Ret

entio

nN

Rem

ote

Ext

erna

l Fun

ding

PP

rofe

ssio

nal T

echn

ical

-C

oord

inat

or o

f Spe

cial

Pro

ject

san

d G

rant

Dev

elop

men

t

165

Ret

entio

nN

Rem

ote

Vid

eoC

Pro

duct

ion

Tim

e20

,000

166

8R

eten

tion

NS

AF

AR

IF

Spa

ce fo

r ne

w p

ositi

onIn

clud

ed in

cam

pus

reno

vatio

ns16

637

Ret

entio

nN

SA

FA

RI

PP

rofe

ssio

nal T

echn

ical

45,0

00

168

15R

eten

tion

Str

engt

hen

Infr

astr

uctu

re0

Incr

ease

ope

ratin

g bu

dget

by

5%62

,044

65,1

4768

,404

169

32R

eten

tion

NS

tude

nt L

ifeP

Con

vert

pos

ition

s to

inst

itutio

nal

fund

ing

60,6

00

169

32R

eten

tion

NS

tude

nt L

ifeP

Pro

fess

iona

l Tec

hnic

al-S

tude

ntLi

fe S

peci

alis

t (2)

57,4

10

170

33R

eten

tion

NT

rans

fer

Cen

ter

PP

rofe

ssio

nal T

echn

ical

-Adv

isin

gS

peci

alis

ts (

6)48

,670

73,0

05

171

34R

eten

tion

Nun

decl

ared

maj

ors

PP

rofe

ssio

nal T

echn

ical

-Car

eer

Spe

cial

ists

(31

3)91

,652

86,1

15

171

35R

eten

tion

Nun

decl

ared

maj

ors

CC

aree

r in

form

atio

n/ca

reer

cho

ice

inst

rum

ents

45,0

00

171

35R

eten

tion

Nun

decl

ared

maj

ors

CD

esk,

Cha

ir, C

ompu

ter

10,0

00

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 12

02/0

3/03

9:0

0AM

Page 71: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

173

27R

eten

tion

NIn

crea

se S

ervi

ces

at C

YP

, PIN

, and

EV

CP

Cla

ssifi

ed-C

lerk

II (

3)75

,000

173

27R

eten

tion

NIn

crea

se S

ervi

ces

at C

YP

and

PIN

PP

rofe

ssio

nal-T

echn

ical

-Adv

isor

s(2

)64

,000

173

27R

eten

tion

NIn

crea

se S

ervi

ces

at C

YP

and

PIN

PP

rofe

ssio

nal-T

echn

ical

-A

sses

smen

t Spe

cial

ists

(2)

54,0

00

174

42In

stru

ctio

nal R

esou

rce

Tec

hIn

tern

et 2

PP

rofe

ssio

nal T

echn

ical

-Tec

hnic

alS

taff

35,0

00

174

43In

stru

ctio

nal R

esou

rce

Tec

hIn

tern

et 2

CM

inim

um g

rant

mat

ch o

f 10%

for

a T

IF g

rant

for

equi

pmen

t to

inte

rcon

nect

FY

03 a

nd 0

4

40,0

00

174

Inst

ruct

iona

l Res

ourc

e T

ech

Inte

rnet

20

Min

imum

gra

nt m

atch

of 1

0% fo

rT

IF g

rant

for

mon

thly

leas

ed li

nes

and

conn

ect f

ees

for

FY

03 a

nd 0

4

40,0

00

175

5In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

0T

1 lin

e fe

es a

nd n

etw

ork

fees

20,0

0010

,000

10,0

00

175

24In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

C30

des

ktop

uni

ts fo

r fa

culty

and

adm

in s

taff

30,0

0030

,000

175

24In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

CM

CU

Car

ds15

0,00

010

0,00

0

175

24In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

CM

eetin

g ro

om s

yste

m fo

r ea

chca

mpu

s an

d H

BC

210,

000

175

24In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

CU

pgra

de 4

VT

EL

H.3

20 c

odec

toH

.323

to m

atch

199,

500

175

24In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

PP

rofe

ssio

nal T

echn

ical

-Mas

ter

Con

trol

Tec

h28

,000

29,0

00

175

24In

stru

ctio

nal R

esou

rce

Tec

hE

IVC

Net

wor

k E

xpan

sion

and

Upg

rade

PP

rofe

ssio

nal T

echn

ical

-Sch

ool

Dis

tric

t Dis

tanc

e Le

arni

ngM

anag

er

45,0

00

176

Fac

ulty

/Sta

ff D

evel

opm

ent

EE

quip

men

tC

10 la

ptop

s an

d vi

deo

proj

ecto

rsea

ch y

ear

60,0

0060

,000

177

57F

acul

ty/S

taff

Dev

elop

men

tE

Add

ition

al w

orks

hops

0E

xpan

d di

scip

line

spec

ific

activ

ities

10,0

0010

,000

10,0

00

177

57

Fac

ulty

/Sta

ff D

evel

opm

ent

EA

dditi

onal

wor

ksho

ps0

Sof

twar

e lic

ensi

ng fo

r te

chni

cal

trai

ning

, dev

elop

men

t day

s,ex

pens

es, e

xpan

ded

mat

eria

lsco

llect

ion

185,

000

178

19F

acul

ty/S

taff

Dev

elop

men

tE

Cam

pus

Tec

hnic

al S

uppo

rt0

Sof

twar

e lic

ensi

ng a

ndap

plic

atio

ns1,

200

600

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 13

02/0

3/03

9:0

0AM

Page 72: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

178

26

Fac

ulty

/Sta

ff D

evel

opm

ent

EC

ampu

s T

echn

ical

Sup

port

PP

rofe

ssio

nal T

echn

ical

-In

stru

ctio

nal T

ech

Sup

port

Coo

rdin

ator

, Med

ia G

raph

ics

Tec

hnic

ians

, IT

Man

ager

159,

000

178

26F

acul

ty/S

taff

Dev

elop

men

tE

Cam

pus

Tec

hnic

al S

uppo

rtP

Pro

fess

iona

l Tec

hnic

al-M

edia

Gra

phic

s T

echn

icia

ns88

,000

178

43

Fac

ulty

/Sta

ff D

evel

opm

ent

EC

ampu

s T

echn

ical

Sup

port

CIn

crea

se A

V R

epla

cem

ent P

lan

budg

et a

nd p

rovi

de c

ompu

ters

for

prof

essi

onal

sta

ff

13,0

0011

,500

179

24F

acul

ty/S

taff

Dev

elop

men

tE

Inst

ruct

iona

l Dev

elop

men

t Ser

vice

s0

Sof

twar

e lic

ensi

ng, a

pplic

atio

ns,

Inno

vatio

n G

rant

exp

ansi

on fu

nds

19,2

0019

,200

19,2

00

179

35F

acul

ty/S

taff

Dev

elop

men

tE

Inst

ruct

iona

l Dev

elop

men

t Ser

vice

sP

Pro

fess

iona

l Tec

hnic

al-I

nstr

uctio

nD

esig

n S

peci

alis

t40

,000

40,0

00

179

49F

acul

ty/S

taff

Dev

elop

men

tE

Inst

ruct

iona

l Dev

elop

men

t Ser

vice

sC

Inst

ruct

iona

l Dev

elop

men

t Cen

ter

new

com

pute

rs a

nd te

chno

logy

for

facu

lty

13,0

0013

,000

13,0

00

180

Fac

ulty

/Sta

ff D

evel

opm

ent

NIR

T N

etw

ork

Ser

vice

s U

pgra

des

CR

epla

ce s

erve

rs: B

lack

boar

d 1

&2,

Web

, App

licat

ion,

Dom

ain,

Prin

t 2

90,5

00

181

36F

acul

ty/S

taff

Dev

elop

men

tE

Mul

timed

ia W

orks

tatio

nsP

Pro

fess

iona

l Tec

hnic

al-M

edia

Gra

phic

s T

echn

icia

ns (

2/2/

2)52

,000

52,0

0052

,000

181

37F

acul

ty/S

taff

Dev

elop

men

tE

Mul

timed

ia W

orks

tatio

nsC

40 c

ompu

ters

, vid

eo p

roje

ctor

san

d ca

bine

ts21

6,00

021

6,00

0

181

Fac

ulty

/Sta

ff D

evel

opm

ent

EM

ultim

edia

Wor

ksta

tions

0In

stal

latio

n, s

oftw

are

licen

sing

,ap

plic

atio

ns, a

nd s

uppl

ies

87,2

0087

,200

182

25F

acul

ty/S

taff

Dev

elop

men

tE

Ope

n A

cces

s C

ompu

ter

Cen

ters

C60

Com

pute

rs a

nd v

ideo

pro

ject

s,sw

itche

s an

d ca

blin

g ea

ch y

ear

133,

100

97,4

00

182

25F

acul

ty/S

taff

Dev

elop

men

tE

Ope

n A

cces

s C

ompu

ter

Cen

ters

PP

rofe

ssio

nal T

echn

ical

-Com

pute

rS

uppo

rt T

echs

(3/

2/2)

60,0

0060

,000

182

Fac

ulty

/Sta

ff D

evel

opm

ent

EO

pen

Acc

ess

Com

pute

r C

ente

rs0

Sof

twar

e lic

ensi

ng a

ndap

plic

atio

ns a

nd h

ourly

sta

ff17

2,70

012

5,00

0

183

43F

acul

ty/S

taff

Dev

elop

men

tN

Tea

chin

g A

sses

smen

t Cen

ter

PC

lass

ified

-Adm

inis

trat

ive

Ass

ista

nt25

,000

183

43F

acul

ty/S

taff

Dev

elop

men

tN

Tea

chin

g A

sses

smen

t Cen

ter

PP

rofe

ssio

nal T

echn

ical

-Tea

chin

gA

sses

smen

t Spe

cial

ist

48,0

00

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 14

02/0

3/03

9:0

0AM

Page 73: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

IDR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

183

Fac

ulty

/Sta

ff D

evel

opm

ent

NT

each

ing

Ass

essm

ent C

ente

r0

Con

sum

able

Sup

plie

s20

00,

183

Fac

ulty

/Sta

ff D

evel

opm

ent

NT

each

ing

Ass

essm

ent C

ente

r0

Tra

vel (

in a

nd o

ut o

f dis

tric

t)1,

250

184

41Li

brar

y S

ervi

ces

NE

qual

ize

Sta

ffP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

(1/

1/1)

28,0

0028

,000

184

41Li

brar

y S

ervi

ces

NE

qual

ize

Sta

ffP

Fac

ulty

184

41Li

brar

y S

ervi

ces

NE

qual

ize

Sta

ffP

Fac

ulty

184

41Li

brar

y S

ervi

ces

NE

qual

ize

Sta

ffP

Pro

fess

iona

l Tec

hnic

al-L

ibra

ryA

ssis

tant

(1/

1)25

,000

25,0

00

184

41Li

brar

y S

ervi

ces

NE

qual

ize

Sta

ffP

Pro

fess

iona

l Tec

hnic

al-T

ech

Sup

port

32,0

00

185

40Li

brar

y S

ervi

ces

EG

ener

al C

olle

ctio

n0

Prin

t and

e-b

ooks

15,0

0015

,000

15,0

00

186

Libr

ary

Ser

vice

sE

Hea

lth S

cien

ceC

New

she

lvin

g, fu

rnitu

re,

tech

nolo

gy75

,000

186

Libr

ary

Ser

vice

sE

Hea

lth S

cien

ce0

Prin

t mat

eria

ls to

dup

licat

e, c

reat

ean

d eq

ualiz

e co

llect

ions

at E

VC

and

RV

S

20,0

00

187

8

Libr

ary

Ser

vice

sE

Libr

ary

Ren

ovat

ions

FF

urni

ture

, she

lvin

g, n

ew e

ndpa

nels

, cen

ter

aisl

es, b

race

s an

dco

mpu

ter

stat

ions

for

NR

G, R

GC

,R

VS

, CY

P

Incl

uded

in c

ampu

s re

nova

tions

188

Libr

ary

Ser

vice

sN

LRS

Dis

tanc

e Le

arne

r S

ervi

ceC

Sup

port

cam

pus

equi

pmen

t and

whe

n ne

eded

sup

port

ing

equi

pmen

t site

s

65,0

00

189

Libr

ary

Ser

vice

sN

LS S

erve

rC

Rep

lace

/Upd

grad

e U

nix

Ser

ver

tom

eet e

-res

ourc

e ne

eds

45,0

00

190

Libr

ary

Ser

vice

sE

New

Mat

eria

ls0

Prin

t and

e-b

ooks

50,0

0020

,000

191

8Li

brar

y S

ervi

ces

ER

VS

Bui

ld O

utF

Fur

nitu

re, t

echn

olog

y, s

helv

ing

Incl

uded

in R

VS

Cam

pus

Ren

ovat

ions

192

Libr

ary

Ser

vice

sE

Tec

hnic

al S

ervi

ce S

uppo

rtC

Cap

ital F

unds

for

add

to T

ech

Ser

vice

s fo

r ne

w m

ater

ials

7,50

07,

500

193

aoV

ideo

Ser

vice

sE

Add

ition

al S

taff

PP

rofe

ssio

nal T

echn

ical

-Tec

h S

taff

Ass

ista

nt28

,000

195

Vid

eo S

ervi

ces

ND

igita

l Vid

eo E

quip

men

tC

Dig

ital V

ideo

Equ

ipm

ent

110,

000

196

15V

ideo

Ser

vice

sE

IVC

Equ

ipm

ent f

or S

ervi

ce C

ente

rC

53,0

00

197

41Le

arni

ng L

abs

NE

ffici

ency

0S

oftw

are

5,00

07,

500

10,0

0019

816

Info

rmat

ion

Tec

hnol

ogy

E8%

incr

ease

0M

aint

enan

ce32

,000

35,0

0038

,000

199

Info

rmat

ion

Tec

hnol

ogy

NA

dmin

istr

ativ

e S

erve

r Le

ase

0M

aint

enan

ce90

,000

90,0

00

200

8In

form

atio

n T

echn

olog

yN

Cal

l Cen

ter

Inte

grat

ion

0P

rofe

ssio

nal D

evel

opm

ent

(rec

urrin

g)1,

500

*=P

(04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 15

02/0

3/03

9:0

0AM

Page 74: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

200

8In

form

atio

n T

echn

olog

yN

Cal

l Cen

ter

Inte

grat

ion

0T

elep

hone

(re

curr

ing)

1,08

020

08

Info

rmat

ion

Tec

hnol

ogy

NC

all C

ente

r In

tegr

atio

n0

CT

I Int

egra

tion/

Dev

elop

men

t10

0,00

020

08

Info

rmat

ion

Tec

hnol

ogy

NC

all C

ente

r In

tegr

atio

n0

IVR

Dev

elop

men

t30

,000

200

8In

form

atio

n T

echn

olog

yN

Cal

l Cen

ter

Inte

grat

ion

CP

rogr

am S

crip

ting

15,0

0030

,000

15,0

0020

08

Info

rmat

ion

Tec

hnol

ogy

NC

all C

ente

r In

tegr

atio

nC

IVR

Upd

grad

e35

,000

200

8A

CC

Net

Tel

ecom

NC

all C

ente

r In

tegr

atio

nP

(3)

Cal

l Cen

ter

Age

nts

full-

time,

clas

sifie

d75

,000

200

8In

form

atio

n T

echn

olog

yN

Cal

l Cen

ter

Inte

grat

ion

PH

ourly

(re

curr

ing)

55,0

00

201

17In

form

atio

n T

echn

olog

yE

Cam

pus

Net

wor

kC

10 C

isco

354

8 S

witc

hes

and

hard

war

e ea

ch y

ear

45,0

0045

,000

45,0

00

201

17In

form

atio

n T

echn

olog

yE

Cam

pus

Net

wor

kC

18 1

0 G

ig M

odul

es90

,000

202

17In

form

atio

n T

echn

olog

yN

Dis

aste

r R

ecov

ery

0A

DS

M L

icen

ses

(20)

30,0

0020

217

Info

rmat

ion

Tec

hnol

ogy

ND

isas

ter

Rec

over

y0

Tap

e C

artr

idge

s (4

0)4,

816

202

Info

rmat

ion

Tec

hnol

ogy

ND

isas

ter

Rec

over

yC

Del

l Sto

rage

Are

a N

etw

ork

70,0

0020

2In

form

atio

n T

echn

olog

yN

Dis

aste

r R

ecov

ery

CU

ltrim

Tap

e Li

brar

y (2

)92

,841

203

49In

form

atio

n T

echn

olog

yE

DS

3 lin

e at

SV

C0

Ope

ratin

g Le

ase

180,

000

180,

000

180,

000

204

Info

rmat

ion

Tec

hnol

ogy

NF

IBC

Gen

erat

orC

Gen

erat

or75

,000

204

Info

rmat

ion

Tec

hnol

ogy

NH

BC

Gen

erat

or0

Mai

nten

ance

6,00

06,

000

205

47In

form

atio

n T

echn

olog

yN

Inst

itutio

nal R

ecor

ds0

Con

vers

ion

50,0

0050

,000

206

50In

form

atio

n T

echn

olog

yN

Net

wor

ked

Info

rmat

ion

Sto

rage

0In

stal

latio

n C

onsu

lting

15,0

0020

6In

form

atio

n T

echn

olog

yN

Net

wor

ked

Info

rmat

ion

Sto

rage

CD

ell S

erve

rs12

0,00

080

,000

206

Info

rmat

ion

Tec

hnol

ogy

NN

etw

orke

d In

form

atio

n S

tora

geC

PC

to r

un s

erve

rs1,

500

1,50

0

206

Info

rmat

ion

Tec

hnol

ogy

NN

etw

orke

d In

form

atio

n S

tora

geP

Sys

tem

Adm

inis

trat

or-P

rof/T

ech

52,0

0052

,000

207

Info

rmat

ion

Tec

hnol

ogy

NpS

erie

s 67

0 A

dmin

istr

ativ

e S

erve

rC

pSer

ies

670

mai

nten

ance

(rec

urrin

g)54

,000

208

59In

form

atio

n T

echn

olog

yN

Ser

vice

Veh

icle

01,

000

1,00

01,

000

208

Info

rmat

ion

Tec

hnol

ogy

NS

ervi

ce V

ehic

leC

17,0

00

209

9In

form

atio

n T

echn

olog

yN

Voi

ce O

ver

Inte

rnet

Pro

toco

lC

150

each

120

04 IP

Pho

nes

each

year

52,5

0052

,500

52,5

00

209

9In

form

atio

n T

echn

olog

yN

Voi

ce O

ver

Inte

rnet

Pro

toco

lC

Gat

eway

Car

ds (

3)16

,000

209

9In

form

atio

n T

echn

olog

yN

Voi

ce O

ver

Inte

rnet

Pro

toco

lC

Upg

rade

exi

stin

g so

ftwar

e3,

000

209

13In

form

atio

n T

echn

olog

yN

Voi

ce O

ver

Inte

rnet

Pro

toco

lP

Pro

fess

iona

l Tec

hnic

al-

Tec

hnic

ian

40,0

0040

,000

40,0

00

210

Info

rmat

ion

Tec

hnol

ogy

NW

eb-b

ased

uni

fied

mes

sagi

ngsy

stem

CS

oftw

are/

Har

dwar

e12

0,00

0

211

8C

ampu

ses

ES

tude

nt L

ife S

pace

FE

xpan

d R

VS

Stu

dent

Com

mon

sA

rea

100,

000

211

8

Cam

puse

sE

Stu

dent

Life

Spa

ceF

Rec

onfig

ure

exis

ting

spac

e on

all

cam

puse

s to

cre

ate

stud

y al

cove

s20

0,00

0

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 16

02/0

3/03

9:0

0AM

Page 75: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

211

aC

ampu

ses

ES

tude

nt L

ife S

pace

CO

utdo

or fu

rnitu

re fo

r ea

chca

mpu

s30

,000

212

51S

peci

al C

ampu

s E

vent

sE

Stu

dent

Act

iviti

es0

Cam

pus

Eve

nts

30,0

0045

,000

60,0

0021

33

Fac

ilitie

sE

Cyp

ress

Cam

pus

Exp

ansi

onF

Add

new

bui

ldin

g &

par

king

1,60

0,00

020

,000

,000

213

8F

acili

ties

EC

ypre

ss C

ampu

s R

enov

atio

nF

Ren

ovat

e ex

istin

g bu

ildin

g fo

rcu

rric

ulum

cha

nges

500,

000

214

1F

acili

ties

EH

ealth

Car

eers

Bui

ldin

gF

Hea

lth C

aree

rs B

uild

ing

Pha

se II

6,00

0,00

08,

000,

000

215

8F

acili

ties

EE

astv

iew

Cam

pus

Ren

ovat

ions

FR

enov

ate

exis

ting

build

ing

asne

eded

for

curr

icul

um c

hang

es25

0,00

0

215

9F

acili

ties

EE

astv

iew

Cam

pus

Sur

face

Par

king

FS

urfa

ce P

arki

ng L

ot fo

r 35

0 C

ars

150,

000

1,35

0,00

0

216

8

Fac

ilitie

sN

Life

/Saf

ety

Initi

ativ

eF

Upg

rade

sec

urity

, acc

ess

cont

rol

and

fire

alar

m s

yste

ms,

Indo

or A

irQ

ualit

y, L

ab V

entil

atio

n

500,

000

500,

000

500,

000

217

5

Fac

ilitie

sE

Nor

thrid

ge C

ampu

s-S

tude

nt C

ente

rF

Con

stru

ct &

furn

ish

new

bui

ldin

gfo

r ex

pand

ed s

tude

nt s

ervi

ces,

stud

ent l

ife, a

nd o

ffice

s

500,

000

6,00

0,00

0

217

8F

acili

ties

EN

orth

ridge

Cam

pus

Ren

ovat

ions

FR

enov

ate

exis

ting

build

ings

as

need

ed fo

r cu

rric

ulum

cha

nges

250,

000

217

9F

acili

ties

EN

orth

ridge

Cam

pus

FS

urfa

ce P

arki

ng L

ot fo

r 15

0 C

ars

600,

000

217

9F

acili

ties

EN

orth

ridge

Cam

pus

Par

king

Str

uctu

reF

Con

stru

ct 3

50-c

ar p

arki

ngst

ruct

ure

500,

000

218

8

Fac

ilitie

sN

Pin

nacl

e C

ampu

sF

Ren

ovat

e ex

istin

g bu

ildin

g as

need

ed fo

r cu

rric

ulum

cha

nges

-P

hoto

grap

hy

250,

000

250,

000

218

8F

acili

ties

NP

inna

cle

Cam

pus

FIn

crea

se s

pace

for

stud

ent l

ife85

0,00

0

218

9F

acili

ties

Pin

nacl

e C

ampu

sF

Con

stru

ct n

ew s

urfa

ce p

arki

ng lo

tfo

r 25

0 ca

rs65

0,00

0

219

6F

acili

ties

Rio

Gra

nde

Cam

pus

FP

urch

ase

Cam

pus

2,00

0,00

0

219

7

Fac

ilitie

sN

Rio

Gra

nde

Cam

pus

FM

ain

Bui

ldin

g &

Ann

exR

enov

atio

n-in

clud

es S

tude

ntC

omm

ons,

Lab

Ren

ovat

ion,

Fac

ulty

Offi

ces,

Cla

ssro

oms

&H

ealth

/Saf

ety

Issu

es

3,00

0,00

06,

000,

000

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 17

0210

3/03

9:0

0AM

Page 76: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

219

7

Fac

ilitie

sN

Rio

Gra

nde

Offi

ces

over

Par

king

FR

io G

rand

e F

acul

ty O

ffice

s to

be

cons

truc

ted

over

par

king

gar

age

500,

000

2,70

0,00

0

219

9F

acili

ties

ER

io G

rand

e C

ampu

sF

Par

king

Str

uctu

re fo

r 12

00 C

ars

300,

000

5,20

0,00

09,

000,

000

220

4

Fac

ilitie

sN

Riv

ersi

de C

ampu

sF

Bui

ldin

g D

Rep

lace

men

t or

Ren

ovat

ion-

incl

udes

spa

ce fo

rS

tude

nt L

ife, S

tude

nt S

ervi

ces,

Cla

ssro

oms,

Lab

s

500,

000

6,00

0,00

03,

500,

000

220

8

Fac

ilitie

sE

Riv

ersi

de C

ampu

sF

Ren

ovat

e ex

istin

g bu

ildin

gs a

sne

eded

for

curr

icul

um c

hang

es50

0,00

0

220

9F

acili

ties

ER

iver

side

Cam

pus

FP

arki

ng S

truc

ture

for

400

Car

s75

0,00

0

221

2F

acili

ties

ES

outh

Aus

tin C

ampu

sF

Con

stru

ct b

uild

ing

for

new

Sou

thA

ustin

Cam

pus

1,50

0,00

018

,000

,000

1,50

0,00

0

222

18F

acili

ties

NP

roje

ct M

anag

emen

tP

3rd

Pro

ject

Man

ager

53,0

0022

218

Fac

ilitie

sN

Pro

ject

Man

agem

ent

PA

dmin

istr

ativ

e A

ssis

tant

Ill

35,0

0022

310

Fac

ilitie

sN

Bui

ldin

gs &

Gro

unds

PC

lass

ified

-Cus

todi

al85

,000

63,0

00

223

10F

acili

ties

NB

uild

ings

& G

roun

dsP

Cla

ssifi

ed-M

aint

enan

ceT

echn

icia

n30

,000

223

10F

acili

ties

NB

uild

ings

& G

roun

dsP

Plu

mbi

ng T

echn

icia

n30

,000

223

10F

acili

ties

EB

uild

ings

& G

roun

dsP

Rec

lass

ify S

uper

viso

rs to

Pro

f/Tec

h15

,000

223

10F

acili

ties

NB

uild

ings

& G

roun

dsP

Spr

inkl

er T

echn

icia

n30

,000

224

16F

acili

ties

NR

isk

Man

agem

ent

PA

dmin

istr

ativ

e A

ssis

tant

II26

,000

224

16F

acili

ties

NR

isk

Man

agem

ent

PR

ecla

ssify

EH

S M

anag

er5,

000

225

11F

acili

ties

NC

ampu

s P

olic

eP

New

Sec

urity

Offi

cers

(8

in F

Y04

,4

in F

Y05

& 1

in F

Y06

)20

0,00

010

0,00

025

,000

225

Fac

ilitie

sE

Cam

pus

Pol

ice

0T

rain

ing

50,0

0050

,000

225

Fac

ilitie

sE

Cam

pus

Pol

ice

CE

quip

men

t15

,000

15,0

00

226

8F

acili

ties

NC

lass

room

Con

vers

ions

FC

onve

rt s

ome

clas

sroo

ms

at e

ach

cam

pus

to a

ctiv

e le

arni

ng50

0,00

0

227

8

Fac

ilitie

sN

Def

erre

d M

aint

enan

ce/C

apita

lR

enew

alF

Est

ablis

h pr

ogra

m to

com

plet

eba

cklo

g of

def

erre

d m

aint

enan

ce&

rep

lace

equ

ipm

ent

1,50

0,00

01,

500,

000

228

14G

rant

Dev

elop

men

tE

xpan

d G

rant

Writ

ing

Pro

ject

sP

Gra

nt W

riter

45,0

00

229

19C

ampu

s A

dmin

istr

ativ

e S

uppo

rtS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Adm

inis

trat

ive

Ass

ista

nt II

28,0

00

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 18

02/0

3/03

9:0

0AM

Page 77: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Pni

ority

*D

epar

tmen

tD

escr

iptio

nC

Det

ails

FY

04F

Y05

FY

06

229

19

Cam

pus

Adm

inis

trat

ive

Sup

port

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

II(E

veni

ng/W

eeke

nd)(

75%

)

20,0

00

229

19C

ampu

s A

dmin

istr

ativ

e S

uppo

rtS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Adm

inis

trat

ive

Ass

ista

nt II

I30

,000

229

19C

ampu

s A

dmin

istr

ativ

e S

uppo

rtS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Dup

licat

ion

Cle

rk(E

veni

ng/W

eeke

nd)

(75%

)16

,000

229

19C

ampu

s A

dmin

istr

ativ

e S

uppo

rtS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Dup

licat

ion

Cle

rk-L

ead

27,0

00

229

19C

ampu

s A

dmin

istr

ativ

e S

uppo

rtS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-Cam

pus

Man

ager

48,0

00

229

19C

ampu

s A

dmin

istr

ativ

e S

uppo

rtS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-E

veni

ng/W

eeke

nd S

uper

viso

r(7

5%)

27,0

00

230

19F

acili

ties

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-B

uild

ing

Atte

ndan

t (2)

52,0

00

230

19F

acili

ties

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-B

uild

ing

Atte

ndan

t(E

veni

ng/W

eeke

nd)

(75%

)20

,000

230

19F

acili

ties

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-M

aint

enan

ceT

echn

icia

n30

,000

230

19F

acili

ties

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al-C

ampu

sP

olic

e O

ffice

r28

,000

230

19

Fac

ilitie

sS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-Cam

pus

Pol

ice

Offi

cer

(Eve

ning

/Wee

kend

)(7

5%)

23,0

00

230

19F

acili

ties

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al-C

ampu

sP

olic

e S

erge

ant

35,0

00

231

19B

usin

ess

Ser

vice

sS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Cas

hier

26,0

00

232

19R

eten

tion

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

I26

,000

232

19

Ret

entio

nS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Adm

inis

trat

ive

Ass

ista

nt I

(Adm

issi

ons

&R

ecor

ds)(

Eve

ning

/Wee

kend

)(75

%)

20,0

00

232

19

Ret

entio

nS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PC

lass

ified

-Adm

inis

trat

ive

Ass

ista

nt II

(A

dmis

sion

s an

dR

ecor

ds)

32,0

00

232

19R

eten

tion

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al -

Adv

isin

gS

peci

alis

ts (

2)64

,000

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 19

02/0

3/03

9:0

0AM

Page 78: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity*

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

232

19

Ret

entio

nS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

- A

dvis

ing

Spe

cial

ists

(Eve

ning

/Wee

kend

)(75

%)

25,0

00

232

19R

eten

tion

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al -

Cou

nsel

or55

,000

232

19

Ret

entio

nS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-A

dmis

sion

s an

d R

ecor

dsC

oord

inat

or

40,0

00

232

19R

eten

tion

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al-

Ass

essm

ent S

peci

alis

ts (

2)52

,000

232

19R

eten

tion

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al-D

ean

ofS

tude

nts

75,0

00

232

19R

eten

tion

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al-F

inan

cial

Aid

Spe

cial

ist

34,0

00

232

19

Ret

entio

nS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

sssi

onal

-Tec

hnic

al-S

peci

alS

ervi

ces

(OS

D)

Sup

ervi

sor

36,0

00

233

19In

form

atio

n T

echn

olog

yS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-Sen

ior

Tec

hnic

ian

(CIS

)34

,000

233

19In

form

atio

n T

echn

olog

yS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-T

echn

icia

n (C

IS)

31,0

00

233

19In

form

atio

n T

echn

olog

yS

ervi

ces

for

Sou

th A

ustin

Cam

pus

PP

rofe

ssio

nal-T

echn

ical

-T

echn

icia

n (C

IS)

(Eve

ning

/Wee

kend

) (7

5%)

25,0

00

234

19A

cade

mic

-Bio

logy

/Che

mis

try

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

s-S

cien

ce L

ab S

uppo

rtP

Cla

ssifi

ed-L

ab A

ssis

tant

(Eve

ning

/Wee

kend

)(75

%)

18,0

00

234

19A

cade

mic

-Bio

logy

/Che

mis

try

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

s-S

cien

ce L

ab S

uppo

rtP

Cla

ssifi

ed-L

ab A

ssis

tant

III

27,0

00

234

19A

cade

mic

-Bio

logy

/Che

mis

try

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

s-S

cien

ce L

ab S

uppo

rtP

Cla

ssifi

ed-L

ab A

ssis

tant

IV30

,000

235

19Le

arni

ng L

abs

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Ins

truc

tiona

lA

ssoc

iate

(3)

(50

%)

50,0

00

235

19Le

arni

ng L

abs

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Pro

fess

iona

l-Tec

hnic

al-M

anag

er36

,000

236

19A

sses

smen

tS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Tes

ting

Cen

ter

PC

lass

ified

-Tes

ting

Ass

ista

nt22

,000

236

19A

sses

smen

tS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Tes

ting

Cen

ter

PC

lass

ified

-Tes

ting

Ass

ista

nt(E

veni

ng/W

eeke

nd)(

75%

)17

,000

236

19A

sses

smen

tS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Tes

ting

Cen

ter

PP

rofe

ssio

nal-T

echn

ical

-S

uper

viso

r36

,000

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 20

02/0

3/03

9:0

0AM

Page 79: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

237

19A

cade

mic

-Pro

gram

Sup

port

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

III

30,0

00

237

19A

cade

mic

-Pro

gram

Sup

port

Ser

vice

s fo

r S

outh

Aus

tin C

ampu

sP

Cla

ssifi

ed-T

echn

ical

Offi

ceA

ssis

tant

I24

,000

238

19In

stru

ctio

nal R

esou

rce

Tec

hS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Libr

ary/

Med

iaP

Cla

ssifi

ed-A

dmin

istr

ativ

eA

ssis

tant

III

30,0

00

238

19In

stru

ctio

nal R

esou

rce

Tec

hS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Libr

ary/

Med

iaP

Cla

ssifi

ed-L

ibra

ry A

ssis

tant

(Eve

ning

/Wee

kend

)(75

%)

20,0

00

238

19In

stru

ctio

nal R

esou

rce

Tec

hS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Libr

ary/

Med

iaP

Cla

ssifi

ed-P

rinci

pal L

ibra

ryA

ssis

tant

26,0

00

238

19In

stru

ctio

nal R

esou

rce

Tec

hS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Libr

ary/

Med

iaP

Pro

fess

iona

l-Tec

hnic

al-C

ompu

ter

Sup

port

Sen

ior

Tec

hnic

ian

32,0

00

238

19In

stru

ctio

nal R

esou

rce

Tec

hS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Libr

ary/

Med

iaP

Pro

fess

iona

l-Tec

hnic

al-L

ibra

rian

50,0

00

238

19In

stru

ctio

nal R

esou

rce

Tec

hS

ervi

ces

for

Sou

th A

ustin

Cam

pus-

Libr

ary/

Med

iaP

Pro

fess

iona

l-Tec

hnic

al-M

edia

Gra

phic

s A

ssis

tant

28,0

00

300

Inst

ruct

iona

l Sup

port

Ser

vice

sE

Onl

ine

test

ing

in te

stin

g ce

nter

sC

15 c

ompu

ters

22,5

0030

0In

stru

ctio

nal S

uppo

rt S

ervi

ces

EO

nlin

e te

stin

g in

test

ing

cent

ers

C15

car

rels

15,0

0030

0In

stru

ctio

nal S

uppo

rt S

ervi

ces

EO

nlin

e te

stin

g in

test

ing

cent

ers

CO

nlin

e te

stin

g so

ftwar

e15

,000

301

Soc

ial a

nd B

ehav

iora

l Sci

ence

sN

Geo

grap

hic

Info

rmat

ion

Sys

tem

sde

dica

ted

lab

0S

oftw

are

Site

Lic

ense

12,0

00

301

Soc

ial a

nd B

ehav

iora

l Sci

ence

sN

Geo

grap

hic

Info

rmat

ion

Sys

tem

sde

dica

ted

lab

C24

com

pute

rs, 2

-3 c

olor

prin

ters

,pl

otte

r an

d sc

anne

r36

,000

302

Libr

ary

Ser

vice

sN

Cro

ss-d

atab

ase

sear

chin

gC

Inno

pac

Met

a F

ind

softw

are

purc

hase

25,0

00

302

Libr

ary

Ser

vice

sN

Cro

ss-d

atab

ase

sear

chin

g0

Inno

pac

Met

a F

ind

softw

are

annu

al m

aint

enan

ce3,

744

3,74

4

303

Libr

ary

Ser

vice

sE

Wire

less

Onl

ine

Pub

lic A

cces

sC

atal

og (

OP

AC

)C

Inno

pac

AirP

ac s

oftw

are

purc

hase

11,5

00

304

Libr

ary

Ser

vice

sE

Onl

ine

publ

ic a

cces

sco

mpu

ters

/EV

CC

15 w

orks

tatio

ns30

,000

305

Libr

ary

Ser

vice

sE

Ext

erna

l dat

abas

e lin

king

CIn

nopa

c W

eb B

ridge

sof

twar

epu

rcha

se9,

500

305

Libr

ary

Ser

vice

sE

Ext

erna

l dat

abas

e lin

king

0In

nopa

c W

eb B

ridge

sof

twar

em

aint

enan

ce1,

428

306

Con

tinui

ng E

duca

tion

EW

et s

aw a

nd ta

ble

saw

CW

et a

nd ta

ble

saw

pur

chas

e1,

600

307

Con

tinui

ng E

duca

tion

EC

lass

room

Equ

ipm

ent

C3

in-c

lass

dat

a pr

ojec

tors

& 1

port

able

dat

a pr

ojec

tor

12,0

00

308

Con

tinui

ng E

duca

tion

EE

xpan

sion

of c

ompu

ter

lab

capa

bilit

ies

- w

irele

ssC

16 la

ptop

s w

ith b

ay a

nd w

irele

ssse

rver

30,0

00

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 21

02/0

3/03

9:0

0AM

Page 80: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

IDR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity*

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

308

Con

tinui

ng E

duca

tion

EE

xpan

sion

of c

ompu

ter

lab

capa

bilit

ies

- w

irele

ssC

2 se

rver

s40

,000

309

Aca

dem

ic-M

athe

mat

ics

EC

ompu

ter

clas

sroo

m R

GC

C12

des

ks &

cha

irs, 1

2 co

mpu

ters

,12

hoo

ds, 1

prin

ter

w/ c

able

s an

dw

iring

, 12

copi

es M

inita

b &

12

copi

es O

DE

Arc

hite

ct

33,0

00

310

Aca

dem

ic-M

athe

mat

ics

EP

erm

anen

t com

pute

r pr

ojec

tion

equi

pmen

t in

mat

h cl

assr

oom

sC

7 co

mpu

ters

, pro

ject

ors,

cab

inet

san

d w

iring

38,5

00

311

Aca

dem

ic-M

athe

mat

ics

ES

oftw

are

Lice

nse

CS

oftw

are

5,00

0

312

Aca

dem

ic-V

isua

l Com

mun

icat

ions

EE

xpan

d C

ompu

ter

Dra

win

g La

bsC

2 C

ompu

ter/

Dra

win

g la

bs80

,000

80,0

0080

,000

314

Aca

dem

ic-E

lect

roni

csE

Dig

ital S

igna

l Pro

cess

ing

Lab

CE

quip

men

t59

,000

1,00

031

4A

cade

mic

-Ele

ctro

nics

Aca

dem

ic-E

lect

roni

csE E

Dig

ital S

igna

l Pro

cess

ing

Lab

PC

equ

ipm

ent u

pgra

des

0 C

Equ

ipm

ent

Equ

ipm

ent

5,00

078

,000

22,0

001,

50(T

)31

531

5A

cade

mic

-Ele

ctro

nics

EP

C e

quip

men

t upg

rade

s0

Equ

ipm

ent

5,00

05,

000

316

Aca

dem

ic-E

lect

roni

csE

Equ

ipm

ent U

pgra

deC

Equ

ipm

ent

15,0

0082

,000

28,0

0031

6A

cade

mic

-Ele

ctro

nics

EE

quip

men

t Upg

rade

0E

quip

men

t5,

000

5,00

031

7A

cade

mic

-Ele

ctro

nics

EW

ide

Are

a N

etw

ork

Upg

rade

CE

quip

men

t12

0,00

025

,000

50,0

0031

7A

cade

mic

-Ele

ctro

nics

EW

ide

Are

a N

etw

ork

Upg

rade

0E

quip

men

t12

,000

12,0

0012

,000

318

Aca

dem

ic-E

lect

roni

csE

LAN

Equ

ipm

ent U

pdgr

ade

CE

quip

men

t68

,000

14,0

0075

,000

318

Aca

dem

ic-E

lect

roni

csE

LAN

Equ

ipm

ent U

pdgr

ade

0E

quip

men

t5,

000

5,00

05,

000

319

Aca

dem

ic-E

lect

roni

csN

Pro

gram

mab

le L

ogic

Con

trol

ler

Cla

ssro

om L

abC

Equ

ipm

ent

38,0

0015

,000

22,0

00

319

Aca

dem

ic-E

lect

roni

csN

Pro

gram

mab

le L

ogic

Con

trol

ler

Cla

ssro

om L

ab0

Equ

ipm

ent

4,00

04,

000

4,00

0

320

Aca

dem

ic-E

lect

roni

csN

Adv

ance

d P

rogr

amm

able

Log

icC

ontr

olle

r C

lass

room

Lab

CE

qipm

ent

42,0

0025

,000

45,0

00

320

Aca

dem

ic-E

lect

roni

csN

Adv

ance

d P

rogr

amm

able

Log

icC

ontr

olle

r C

lass

room

Lab

0E

quip

men

t8,

000

8,00

010

,000

321

Aca

dem

ic-E

lect

roni

csE

Rep

lace

Equ

ipm

ent

CE

quip

men

t62

,000

321

Aca

dem

ic-E

lect

roni

csE

Rep

lace

Equ

ipm

ent

CE

quip

men

t78

,000

321

Aca

dem

ic-E

lect

roni

csE

Rep

lace

Equ

ipm

ent

CE

quip

men

t72

,000

322

Vid

eo S

ervi

ces

EIV

C M

aint

enan

ce0

Mai

nten

ance

con

trac

t ren

ewal

48,5

0032

2V

ideo

Ser

vice

sE

IVC

Mai

nten

ance

0M

aint

enan

ce c

ontr

act r

enew

al12

,000

322

Vid

eo S

ervi

ces

EIV

C M

aint

enan

ce0

Mai

nten

ance

con

trac

t ren

ewal

89,0

0032

3V

ideo

Ser

vice

sN

Cab

le T

V w

iring

0W

iring

79,0

00

324

Vid

eo S

ervi

ces

EIV

C N

etw

ork

Upg

rade

CU

pgra

de H

.323

brid

ge a

nd fi

rew

all

50,0

00

325

Rec

ords

Man

agem

ent

ER

ecor

ds R

eten

tion

CS

oftw

are

20,0

0032

5R

ecor

ds M

anag

emen

tE

Rec

ords

Ret

entio

n0

Sof

twar

e su

ppor

t3,

500

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 22

02/0

3/03

9:0

0AM

Page 81: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

325

Rec

ords

Man

agem

ent

ER

ecor

ds R

eten

tion

CS

cann

ers

60,0

0032

5R

ecor

ds M

anag

emen

tE

Rec

ords

Ret

entio

n0

Equ

ipm

ent M

aint

enan

ce9,

000

326

Aca

dem

ic-B

iolo

gyE

Vid

eo c

aptu

re e

quip

men

tC

Equ

ipm

ent

93,6

0032

7A

cade

mic

-Bio

logy

EW

ater

bat

hsC

Agi

tatin

g w

ater

bat

hs16

,800

328

Aca

dem

ic-B

iolo

gyE

DN

A la

bsC

Equ

ipm

ent

69,2

0032

9A

cade

mic

-Bio

logy

EP

hysi

olog

y so

ftwar

eC

iWor

x so

ftwar

e25

,900

330

Aca

dem

ic-B

iolo

gyE

Ele

ctro

phor

esis

equ

ipm

ent

CE

quip

men

t73

,200

331

Aca

dem

ic-B

iolo

gyE

Ice

mac

hine

Cic

e m

achi

ne3,

500

332

Aca

dem

ic-B

iolo

gyE

Lapt

op C

ompu

ters

CLa

ptop

com

pute

rs80

,000

333

Aca

dem

ic-B

iolo

gyE

Dig

ital d

ocum

enta

tion

syst

emC

Upg

rade

s32

,000

334

Aca

dem

ic-B

iolo

gyE

Dig

ital c

amer

asC

Dig

ital c

amer

as8,

000

335

Aca

dem

ic-B

iolo

gyE

Larg

e ca

paci

ty A

utoc

lave

CLa

rge

capa

city

aut

ocla

ve60

,000

336

Aca

dem

ic-B

iolo

gyE

Ref

riger

ated

cen

trifu

ges

CR

efrig

erat

ed c

entr

ifuge

s36

,800

337

Aca

dem

ic-B

iolo

gyE

Ben

ch T

op A

utoc

lave

sC

Ben

ch T

op A

utoc

lave

s22

,400

338

Aca

dem

ic-B

iolo

gyE

Dig

ital s

pect

roph

otom

eter

sC

Dig

ital s

pect

roph

otom

eter

s35

,400

339

Aca

dem

ic-B

iolo

gyE

Dis

sect

ing

mic

rosc

opes

CD

isse

ctin

g m

icro

scop

es46

,800

339

Aca

dem

ic-B

iolo

gyE

Dis

sect

ing

mic

rosc

opes

CD

isse

ctin

g m

icro

scop

es15

,600

339

Aca

dem

ic-B

iolo

gyE

Dis

sect

ing

mic

rosc

opes

CD

isse

ctin

g m

icro

scop

es31

,200

340

Aca

dem

ic-B

iolo

gyE

pH m

eter

sC

pH m

eter

s9,

600

341

Aca

dem

ic-P

hysi

cal S

cien

ces

ES

cien

ce L

ab E

quip

men

tC

Equ

ipm

ent

18,1

0018

,100

342

Aca

dem

ic-P

hysi

cal S

cien

ces

EG

eolo

gica

l map

sC

Equ

ipm

ent

6,00

034

3A

cade

mic

-Phy

sica

l Sci

ence

sE

Lapt

op fo

r F

ield

Obs

erva

tions

CLa

ptop

/Equ

ipm

ent

2,20

0

344

Aca

dem

ic-P

hysi

cal S

cien

ces

EC

lass

room

Tec

hnic

al E

quip

men

tC

Equ

ipm

ent

33,0

0033

,000

345

Vid

eo S

ervi

ces

ED

igita

l Vid

eo E

quip

men

tC

DV

-Cam

Equ

ipm

ent

68,0

0034

5V

ideo

Ser

vice

sE

Dig

ital V

ideo

Equ

ipm

ent

CD

V-C

am E

quip

men

t37

,000

345

Vid

eo S

ervi

ces

ED

igita

l Vid

eo E

quip

men

tC

DV

-Cam

Equ

ipm

ent

346

Vid

eo S

ervi

ces

EP

rodu

ctio

n W

orks

tatio

n C

ompu

ters

CC

ompu

ter

wor

ksta

tions

9,99

7

348

Vid

eo S

ervi

ces

EIV

C li

ghtin

gC

Ligh

ting

38,0

00

349

Vid

eo S

ervi

ces

ED

igita

l con

vers

ion

of H

BC

cont

rolro

omC

Equ

ipm

ent

96,0

00

350

Vid

eo S

ervi

ces

EE

xpan

d D

igita

l Edi

ting

CE

quip

men

t49

,000

351

Vid

eo S

ervi

ces

ED

igita

l con

vers

ion

vide

o ro

uter

sC

Equ

ipm

ent

76,0

0035

2V

ideo

Ser

vice

sE

Dig

ital c

onve

rsio

n of

stu

dio

CE

quip

men

t17

4,00

0

353

Inte

rnet

Ser

vice

sE

Col

d F

ustio

n w

eb a

pplic

atio

n se

rver

CS

erve

r H

ardw

are

19,0

35

353

Inte

rnet

Ser

vice

sE

Col

d F

ustio

n w

eb a

pplic

atio

n se

rver

CC

old

Fus

ion

Ser

ver

softw

are

4,60

0

353

Inte

rnet

Ser

vice

sE

Col

d F

ustio

n w

eb a

pplic

atio

n se

rver

P1/

2 S

ys A

dmin

- P

rof T

ech

17,0

00

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 23

02/0

3/03

9:0

0AM

Page 82: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

IDR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

354

ITF

DE

Net

wor

k pr

inte

rs fo

r co

mpu

ter

cent

ers

and

IDC

sC

13 !a

ster

prin

ters

eac

h ye

ar26

,000

26,0

00

355

ITF

DE

Sof

twar

e Li

cens

eC

Sof

twar

e25

,000

25,0

0025

,000

356

ITF

DE

Exp

and

dist

ribut

ion

of d

igita

lm

ater

ials

CS

oftw

are-

Upg

rade

to R

eal S

erve

rH

elix

Inte

rnet

(3)

25,2

00

356

ITF

DE

Exp

and

dist

ribut

ion

of d

igita

lm

ater

ials

CH

ardw

are-

Del

l ser

ver/

SA

N25

,000

356

ITF

DE

Exp

and

dist

ribut

ion

of d

igita

lm

ater

ials

CS

oftw

are-

Rea

l Ser

ver

Hel

ixIn

tern

et8,

400

,

3,57

ITF

DE

Exp

and

cam

pus

digi

tal p

rodu

ctio

nC

Har

dwar

e-6

stat

ions

& 6

cam

cord

ers

each

yea

r49

,200

49,2

0049

,200

'

358

AC

CN

et T

elec

omE

IP D

istr

ibut

ion

Com

mun

icat

ions

Sys

tem

CE

quip

men

t-IP

PB

X

358

AC

CN

et T

elec

omE

IP D

istr

ibut

ion

Com

mun

icat

ions

Sys

tem

CE

quip

men

t-18

00 te

leph

ones

359

AC

CN

et T

elec

omE

Incr

ease

d IP

ban

dwid

th0

45M

bps

inte

rnet

ban

dwid

th(r

eocc

urin

g)10

8,00

0

360

AC

CN

et T

elec

omE

Net

wor

k E

quip

men

t for

Hea

lthC

aree

rs B

uild

ing

Pha

se 2

0M

aint

enan

ce (

reoc

curr

ing)

3,00

0

361

AC

CN

et T

elec

omN

Net

wor

k co

nnec

tivity

and

equ

ipm

ent

Sou

th A

ustin

Cam

pus

0M

aint

enan

ce (

reoc

curr

ing)

3,00

0

363

AC

CN

et T

elec

omE

Wid

e A

rea

Net

wor

k U

pgra

de-0

C3

to 0

C19

2C

Cis

co O

NS

1545

4 S

onet

sw

itche

san

d ca

rds

(1 o

f 3)

500,

000

363

AC

CN

et T

elec

omE

Wid

e A

rea

Net

wor

k U

pgra

de-0

C3

to 0

C19

2C

Cis

co O

NS

1545

4 S

onet

sw

itche

san

d ca

rds

(2 o

f 3)

500,

000

363

AC

CN

et T

elec

omE

Wid

e A

rea

Net

wor

k U

pgra

de-0

C3

to 0

C19

20

Mai

nten

ance

(re

occu

rrin

g)35

,000

364

AC

CN

et T

elec

omN

Sec

ure

wire

less

acc

ess

poin

tsC

Cis

co A

CS

(se

rver

)8,

000

364

AC

CN

et T

elec

omN

Sec

ure

wire

less

acc

ess

poin

tsC

Acc

ess

poin

ts60

,000

364

AC

CN

et T

elec

omN

Sec

ure

wire

less

acc

ess

poin

ts0

Ele

ctric

al/n

etw

ork

wiri

ng13

,500

364

AC

CN

et T

elec

omN

Sec

ure

wire

less

acc

ess

poin

tsC

Acc

ess

poin

ts60

,000

364

AC

CN

et T

elec

omN

Sec

ure

wire

less

acc

ess

poin

ts0

Ele

ctric

al/n

etw

ork

wiri

ng13

,500

364

AC

CN

et T

elec

omN

Sec

ure

wire

less

acc

ess

poin

ts0

Mai

nten

ance

(re

occu

rrin

g)2,

500

365

Rec

ords

Man

agem

ent

NF

orm

s m

anag

emen

t/ele

ctro

nic

form

sC

Sof

twar

e60

,000

365

Rec

ords

Man

agem

ent

NF

orm

s m

anag

emen

t/ele

ctro

nic

form

s0

Sof

twar

e su

ppor

t (re

occu

ring)

15,0

00

365

Rec

ords

Man

agem

ent

NF

orm

s m

anag

emen

t/ele

ctro

nic

form

sP

1 P

rof-

Tec

hR

ecla

ssify

and

conv

ert 5

0% to

full-

time

25,0

00

366

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e C

ashi

erC

Key

boar

ds1,

200

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 24

02/0

3/03

9:0

0AM

Page 83: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

366

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e C

ashi

erC

Sof

twar

e6,

000

366

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e C

ashi

er0

Tra

inin

g5,

000

366

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e C

ashi

er0

Mai

nten

ance

(re

ccur

ring)

900

367

Info

rmat

ion

Tec

hnol

ogy

EIT

Dis

aste

r R

ecov

ery

- S

yste

ms

CS

erve

r U

pgra

des

10,0

0010

,000

367

Info

rmat

ion

Tec

hnol

ogy

EIT

Dis

aste

r R

ecov

ery

- S

yste

ms

0C

ontr

act S

ervi

ces

(rec

urrin

g)36

,000

367

Info

rmat

ion

Tec

hnol

ogy

EIT

Dis

aste

r R

ecov

ery

- S

yste

ms

CT

ape

Libr

ary

200,

000

367

Info

rmat

ion

Tec

hnol

ogy

EIT

Dis

aste

r R

ecov

ery

- S

yste

ms

0T

rain

ing

15,0

0036

7In

form

atio

n T

echn

olog

yE

IT D

isas

ter

Rec

over

y -

Sys

tem

s0

Mai

nten

ance

15,0

0036

8In

form

atio

n T

echn

olog

yE

HR

Sca

nner

CS

cann

er15

,000

368

Info

rmat

ion

Tec

hnol

ogy

EH

R S

cann

er0

Mai

nten

ance

(re

curr

ing)

2,25

0

369

Info

rmat

ion

Tec

hnol

ogy

NK

now

ledg

e B

ase

Rep

ortin

g S

yste

mC

Sof

twar

e12

2,00

0

369

Info

rmat

ion

Tec

hnol

ogy

NK

now

ledg

e B

ase

Rep

ortin

g S

yste

mC

Ser

ver

22,0

00

369

Info

rmat

ion

Tec

hnol

ogy

NK

now

ledg

e B

ase

Rep

ortin

g S

yste

m0

Con

sulti

ng20

,000

369

Info

rmat

ion

Tec

hnol

ogy

NK

now

ledg

e B

ase

Rep

ortin

g S

yste

m0

Con

sulti

ng20

,000

369

Info

rmat

ion

Tec

hnol

ogy

NK

now

ledg

e B

ase

Rep

ortin

g S

yste

mP

DB

Adm

inis

trat

or-P

rof/T

ech

55,0

00

370

Info

rmat

ion

Tec

hnol

ogy

NM

icro

film

to D

igita

l Con

vers

ion

CM

icro

film

rea

der

32,0

0037

0In

form

atio

n T

echn

olog

yN

Mic

rofil

m to

Dig

ital C

onve

rsio

n0

Mai

nten

ance

(re

curr

ing)

5,00

037

0In

form

atio

n T

echn

olog

yN

Mic

rofil

m to

Dig

ital C

onve

rsio

nC

Ser

ver

20,0

0037

0In

form

atio

n T

echn

olog

yN

Mic

rofil

m to

Dig

ital C

onve

rsio

nP

Hou

rly (

recu

rrin

g)30

,000

371

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e H

R S

ervi

ces

CS

oftw

are

2,70

037

1In

form

atio

n T

echn

olog

yE

Onl

ine

HR

Ser

vice

s0

Con

trac

t Ser

vice

s30

,000

371

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e H

R S

ervi

ces

0T

rain

ing

6,00

0

371

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e H

R S

ervi

ces

PH

R R

epor

ts S

peci

alis

t - P

roffT

ech

38,0

00

371

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e H

R S

ervi

ces

PIT

Web

Pro

gram

mer

- P

rof/T

ech

42,0

00

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

0C

ontr

act p

rogr

amm

ing

36,0

00

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

0F

ees-

Com

pass

(re

curr

ing)

100,

000

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

0S

oftw

are-

Wor

k F

low

s fr

omD

atat

el5,

700

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

CS

erve

r R

epla

cem

ent

84,0

00

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

CV

ideo

Con

fere

ncin

g E

quip

men

t10

,800

*=F

1'04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el

0=O

pera

ting

C=

Cap

ital E

quip

men

tF

=F

acili

ties

(Bon

d)P

age

2502

/03/

03 9

:00A

M

Page 84: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

0C

ontr

act p

rogr

amm

ing

12,0

00

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

0M

aint

enan

ce12

,600

372

Info

rmat

ion

Tec

hnol

ogy

EO

nlin

e S

tude

nt S

ervi

ces

Inte

grat

ion

PR

SS

Rep

rots

Spe

cial

ist -

Pro

f/Tec

h38

,000

373

Info

rmat

ion

Tec

hnol

ogy

NO

nlin

e T

ech

Sup

port

CS

oftw

are

32,0

0040

,000

373

Info

rmat

ion

Tec

hnol

ogy

NO

nlin

e T

ech

Sup

port

CS

erve

r19

,000

373

Info

rmat

ion

Tec

hnol

ogy

NO

nlin

e T

ech

Sup

port

0C

onsu

lting

5,00

037

4In

form

atio

n T

echn

olog

yN

Onl

ine

Auc

tion

of P

Cs

to P

ublic

CH

ard

Driv

e D

uplic

ator

6,50

037

4In

form

atio

n T

echn

olog

yN

Onl

ine

Auc

tion

of P

Cs

to P

ublic

CD

iagn

ostic

Sof

twar

e1,

500

374

Info

rmat

ion

Tec

hnol

ogy

NO

nlin

e A

uctio

n of

PC

s to

Pub

lic0

Con

trac

t Ser

vice

s (r

ecur

ring)

5,00

0

375

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt S

ervi

ces

scan

ning

sta

tions

CS

cann

er15

,000

375

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt S

ervi

ces

scan

ning

sta

tions

0M

aint

enan

ce (

recu

rrin

g)2,

250

375

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt S

ervi

ces

scan

ning

sta

tions

PC

lass

ified

for

stud

ent r

ecor

dsin

put

28,0

00

376

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt ID

Req

uest

Sys

tem

CP

rinte

rs38

,000

376

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt ID

Req

uest

Sys

tem

CS

oftw

are

Inte

rfac

e5,

000

376

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt ID

Req

uest

Sys

tem

0M

aint

enan

ce (

recu

rrin

g)60

037

6In

form

atio

n T

echn

olog

yN

Stu

dent

ID R

eque

st S

yste

m0

Sup

plie

s (r

ecur

ring)

11,5

0037

7In

form

atio

n T

echn

olog

yN

HB

C G

ener

ator

CG

ener

ator

40,0

0037

7In

form

atio

n T

echn

olog

yN

HB

C G

ener

ator

0M

aint

enan

ce6,

000

6,00

0

378

HR

-Pay

roll

NO

nlin

e N

onre

side

nt T

ax C

ompl

ianc

eC

Sof

twar

e (r

ecur

ring)

4,00

0

378

HR

-Pay

roll

NO

nlin

e N

onre

side

nt T

ax C

ompl

ianc

e0

Con

sulti

ng1,

000

379

SM

TN

Hig

hly

Aut

omat

ed S

yste

m (

HA

S)

CM

AT

EC

pro

duct

50,0

0038

0S

MT

N4

Poi

nt P

robe

CE

quip

men

t8,

500

381

SM

TE

Mod

u-La

b W

et P

roce

ss S

tatio

n an

dS

tand

Alo

ne S

tatio

nC

Equ

ipm

ent

19,1

00

382

SM

TE

Sup

ply

de-io

nize

d w

ater

to la

bsC

De-

ioni

zed

Wat

er G

ener

ator

and

Rev

erse

Osm

osis

Filt

er4,

000

383

Son

ogra

phy

EU

ltras

ound

uni

tC

Equ

ipm

ent

80,0

00

384

Libr

ary

Ser

vice

sE

E-R

esou

rce

Dat

abas

es/M

ater

ials

0F

ees-

Tex

Sha

re a

nd e

-boo

kco

llect

ions

320,

000

385

Dis

tanc

e Le

arni

ngE

Pro

gram

Exp

ansi

on0

Leas

ing

and

Fee

s fo

r IT

V a

ndP

CM

Cla

sses

40,0

00

385

Dis

tanc

e Le

arni

ngE

Pro

gram

Exp

ansi

on0

Leas

ing

and

Fee

s fo

r IT

V a

ndP

CM

Cla

sses

20,0

00

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 26

02/0

3/03

9:0

0AM

Page 85: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity*

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

385

Dis

tanc

e Le

arni

ngE

Pro

gram

Exp

ansi

on0

Leas

ing

and

Fee

s fo

r IT

V a

ndP

CM

Cla

sses

20,0

00

386

Dis

tanc

e Le

arni

ngE

Pro

gram

Impr

ovem

ent

PIV

C H

ourly

Sup

port

20,0

0038

6D

ista

nce

Lear

ning

EP

rogr

am Im

prov

emen

tP

IVC

Hou

rly S

uppo

rt10

,000

386

Dis

tanc

e Le

arni

ngE

Pro

gram

Impr

ovem

ent

PIV

C H

ourly

Sup

port

10,0

00

387

Aca

dem

ic-V

isua

l Com

mun

icat

ions

EF

acul

ty D

evel

opm

ent

0A

ssis

t fac

ulty

in m

aint

aini

ngcu

rren

cy o

f ski

lls12

,000

388

Aca

dem

ic-P

hysi

cal S

cien

ces

EE

xpan

d m

ath-

scie

nce

cour

seof

ferin

gs0

Equ

ipm

ent

1,00

01,

000

1,00

0

388

Aca

dem

ic-P

hysi

cal S

cien

ces

EE

xpan

d m

ath-

scie

nce

cour

seof

ferin

gsP

Adj

unct

Fac

ulty

6,00

06,

000

6,00

0

389

Aca

dem

ic-P

hysi

cal S

cien

ces

EE

xpan

d G

eolo

gy a

nd P

hysi

csco

urse

offe

rings

CE

quip

men

t -S

uppl

ies,

lab

equi

pmen

t, fu

rnitu

re30

,000

389

Aca

dem

ic-P

hysi

cal S

cien

ces

EE

xpan

d G

eolo

gy a

nd P

hysi

csco

urse

offe

rings

PS

cien

ce L

ab A

ssis

tant

(s)

25,0

00

390

Aca

dem

ic-P

hysi

cal S

cien

ces

EIn

crea

se G

eolo

gy c

ours

e of

ferin

gsC

Equ

ipm

ent-

stor

age

cabi

nets

and

supp

lies

6,00

0

390

Aca

dem

ic-P

hysi

cal S

cien

ces

EIn

crea

se G

eolo

gy c

ours

e of

ferin

gs0

Sup

plie

s2,

500

2,50

02,

500

390

Aca

dem

ic-P

hysi

cal S

cien

ces

EIn

crea

se G

eolo

gy c

ours

e of

ferin

gs-P

Sci

ence

Lab

Ass

ista

nt25

,000

25,0

0050

,000

391

Aca

dem

ic-P

hysi

cal S

cien

ces

EH

ire fu

ll-tim

e fa

culty

in A

stro

nom

yP

Phy

sics

/Ast

rono

my

FT

Fac

ulty

60,0

0060

,000

60,0

00

392

Aca

dem

ic-P

hysi

cal S

cien

ces

EC

reat

e ad

ditio

nal l

ab s

pace

at C

YP

for

geol

ogy

and

phys

ics

CE

quip

men

t-su

pplie

s, la

beq

uipm

ent,

and

furn

iture

50,0

00

392

Aca

dem

ic-P

hysi

cal S

cien

ces

EC

reat

e ad

ditio

nal l

ab s

pace

at C

YP

for

geol

ogy

and

phys

ics

0S

uppl

ies

5,00

05,

000

392

Aca

dem

ic-P

hysi

cal S

cien

ces

EC

reat

e ad

ditio

nal l

ab s

pace

at C

YP

for

geol

ogy

and

phys

ics

PS

cien

ce L

ab A

ssis

tant

s50

,000

25,0

00

393

Aca

dem

ic-P

hysi

cal S

cien

ces

EC

reat

e ad

ditio

nal l

ab s

pace

at P

INfo

r ge

olog

y an

d ph

ysic

s0

Sup

plie

s5,

000

5,00

0

393

Aca

dem

ic-P

hysi

cal S

cien

ces

EC

reat

e ad

ditio

nal l

ab s

pace

at P

INfo

r ge

olog

y an

d ph

ysic

sP

Sci

ence

Lab

Ass

ista

nt(s

)25

,000

25,0

00

394

Aca

dem

ic-P

hysi

cal S

cien

ces

EP

rovi

de s

uppo

rt to

Geo

logy

facu

lty/la

bsP

50%

Sci

ence

Lab

Ass

ista

nt12

,250

12,2

5012

,250

395

Aca

dem

ic-V

isua

l Com

mun

icat

ions

EE

xpan

d pr

ogra

mP

(1)

Ful

l-tim

e F

acul

ty40

,000

395

Aca

dem

ic-V

isua

l Com

mun

icat

ions

EE

xpan

d pr

ogra

mP

(2)

Ful

l-tim

e F

acul

ty80

,000

395

Aca

dem

ic-V

isua

l Com

mun

icat

ions

EE

xpan

d pr

ogra

mP

(1)

Adm

in A

sst

28,0

00

395

Aca

dem

ic-V

isua

l Com

mun

icat

ions

EE

xpan

d pr

ogra

mP

(1)

Ful

l-tim

e F

acul

ty40

,000

396

Aca

dem

ic-P

hysi

cal S

cien

ces

NB

uild

pla

neta

rium

and

com

mun

ityce

nter

0S

uppl

ies

and

mai

nten

ance

10,0

0010

,000

10,0

00

*=F

Y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 27

02/0

3/03

9:0

0AM

Page 86: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

396

Aca

dem

ic-P

hysi

cal S

cien

ces

NB

uild

pla

neta

rium

and

com

mun

ityce

nter

PT

echn

icia

n25

,000

25,0

0025

,000

397

Vid

eo S

ervi

ces

EH

ourly

con

vers

ions

PM

aste

rcon

trol

ope

rato

rs17

,000

17,0

00

398

Vid

eo S

ervi

ces

EM

usic

lice

nse

fee

0Li

cens

e fe

es a

nd C

Ds

1,50

0

399

Vid

eo S

ervi

ces

ED

igita

l Tap

e0

Dig

ital T

ape

5,00

0

400

Vid

eo S

ervi

ces

EA

N li

nk fo

r P

IN m

aste

rcon

trol

toT

ime

War

ner

0I-

net F

ee6,

000

401

Inte

rnet

Ser

vice

sE

Cus

tom

er S

ervi

ce Im

prov

emen

tP

50%

Inte

rnet

Ser

vice

s T

ech-

Cla

ssifi

ed15

,000

402

AC

CN

et T

elec

omE

Com

mun

icat

ions

Eng

inee

rP

Com

mun

icat

ions

Eng

inee

rs-

Pro

f/Tec

h50

,000

403

AC

CN

et T

elec

omE

Tel

ecom

mun

icat

ions

Tec

h II

PT

elec

omm

unic

atio

ns T

ech

II-P

rof/T

ech

40,0

00

404

AC

CN

et S

ervi

ces

NIT

Sec

urity

Aud

it0

Con

sulti

ng S

ervi

ces

(IR

T/IT

)30

,000

404

AC

CN

et S

ervi

ces

NIT

Sec

urity

Aud

it0

Con

sulti

ng S

ervi

ces

(Net

wor

k)30

,000

405

AC

CN

et S

ervi

ces

EIn

crea

se s

uppo

rt s

taff

PS

r. N

et M

anag

er-P

rofff

ech

70,0

0040

5A

CC

Net

Ser

vice

sE

Incr

ease

sup

port

sta

ffP

Vid

Net

Man

ager

-Pro

fffec

h60

,000

405

AC

CN

et S

ervi

ces

EIn

crea

se s

uppo

rt s

taff

P(3

) N

etw

ork

Tec

hnic

ians

-C

lass

ified

120,

000

406

AC

CN

et S

ervi

ces

EH

ire IT

Sec

urity

Man

ager

PIT

Sec

urity

Man

ager

-Pro

f/Tec

h65

,000

407

Info

rmat

ion

Tec

hnol

ogy

EH

ire T

echn

olog

y T

rain

erP

IT T

rain

er-P

rofff

ech

45,0

00

408

Info

rmat

ion

Tec

hnol

ogy

EH

ire S

r. C

ompu

ter

Sup

port

Tec

hP

Sr.

Com

pute

r S

uppo

rt T

ech-

Pro

f/Tec

h38

,000

409

Info

rmat

ion

Tec

hnol

ogy

ED

atat

el C

onsu

lting

/Tra

inin

g0

Tra

inin

g4,

800

409

Info

rmat

ion

Tec

hnol

ogy

-E

Dat

atel

Con

sulti

ng/T

rain

ing

0C

onsu

lting

9,00

018

,000

18,0

00

409

Info

rmat

ion

Tec

hnol

ogy

ED

atat

el C

onsu

lting

/Tra

inin

g0

Tra

vel

6,00

06,

000

6,00

0

410

Info

rmat

ion

Tec

hnol

ogy

E24

/7 H

elp

Des

k S

uppo

rt0

-Con

trac

t Ser

vice

s (r

ecur

ring)

36,0

00

410

Info

rmat

ion

Tec

hnol

ogy

E24

7 H

elp

Des

k S

uppo

rt0

Tra

inin

g5,

000

411

Info

rmat

ion

Tec

hnol

ogy

NS

tude

nt E

mai

l Acc

ount

s0

Con

trac

t Ser

vice

s (r

ecur

ring)

250,

000

TO

TA

L18

,608

,314

62,4

82,3

8765

,453

,820

PP

erso

nnel

Tot

al2,

820,

400

5,41

6,60

63,

340,

370

0O

pera

ting

Tot

al1,

727,

792

2,49

7,71

51,

879,

750

CC

apita

l Equ

ipm

ent T

otal

3,67

4,12

26,

158,

066

3,55

0,25

0F

Fac

ilitie

s T

otal

10,3

86,0

0048

,410

,000

56,6

83,4

50

Aca

dem

ic S

ub T

otal

2,92

2,56

21,

326,

884

1,38

9,68

4A

sses

smen

t Sub

tota

l0

165,

000

75,0

00C

ampu

ses

30,0

0030

0,00

00

*=F

y04

Prio

rity

E=

Exp

ansi

onN

=N

ew

P=

Per

sonn

el0=

Ope

ratin

gC

=C

apita

l Equ

ipm

ent

F=

Fac

ilitie

s (B

ond)

Pag

e 28

02/0

3/03

9:0

0AM

Page 87: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

DR

AF

TM

aste

r P

lan

Sum

mar

yD

RA

FT

Prio

rity*

Dep

artm

ent

Des

crip

tion

CD

etai

lsF

Y04

FY

05F

Y06

Con

tinui

ng E

duca

tion

Sub

tota

l43

,600

51,0

0011

,000

Dis

tanc

e Le

arni

ng S

ubto

tal

172,

000

125,

000

104,

000

Dis

tric

t-W

ide

300,

000

450,

000

400,

000

Fac

ilitie

s S

ubto

tal

9,76

5,00

048

,347

,000

48,3

47,0

00F

acul

ty/S

taff

Dev

elop

men

tS

ubto

tal

108,

400

1,38

3,55

087

0,30

0

Fou

ndat

ion

Ski

lls S

ubto

tal

23,0

0017

9,50

022

9,50

0In

form

atio

n T

echn

olog

y S

ubto

tal

1,97

8,89

61,

765,

541

638,

600

Inst

ruct

ion

450,

000

500,

000

1,37

5,00

0In

stru

ctio

nal R

esou

rce

Sub

tota

l20

,000

973,

500

169,

000

Inte

rnat

iona

l Sub

tota

l62

,300

113,

300

63,3

00Le

arni

ng L

abs

5,00

093

,500

10,0

00Li

brar

y S

ervi

ces

Sub

tota

l14

5,00

0,23

5,74

449

7,17

2R

eten

tion

Sub

tota

l37

6,19

41,

508,

185

590,

724

Spe

cial

Cam

pus

Eve

nts

30,0

0045

,000

60,0

00V

ideo

Ser

vice

s S

ubto

tal

507,

997

467,

000

89,0

00W

orkf

orce

Sub

Tot

al51

9,73

03,

363,

583

1,60

4,34

0

PS

outh

Aus

tin0

1,43

5,00

00

PN

on-S

outh

Aus

tin P

erso

nnel

2,82

0,40

03,

981,

606

3,34

0,37

0

P=

P a

rson

nel

*=F

y04

Prio

rity

0=O

pera

ting

E=

Exp

ansi

onC

=C

apita

l Equ

ipm

ent

N=

New

F=

Fac

ilitie

s (B

ond)

Pag

e 29

02/0

3/03

9:0

0AM

Page 88: Reproductions supplied by EDRS are the best that can be madeDistrict-wide Renovations 49 ... to offer and maintain a balance of the core mission elements required by State law and

U.S. Department of EducationOffice of Educational Research and Improvement (OERI)

National Library of Education (NLE)Educational Resources Information Center (ERIC)

NOTICE

Reproduction Basis

E KIKEiksflical loam mlfl Cerdei

This document is covered by a signed "Reproduction Release (Blanket)"form (on file within the ERIC system), encompassing all or classes ofdocuments from its source organization and, therefore, does not require a"Specific Document" Release form.

This document is Federally-funded, or carries its own permission toreproduce, or is otherwise in the public domain and, therefore, may bereproduced by ERIC without a signed Reproduction Release form (either"Specific Document" or "Blanket").

EFF-089 (1/2003)