Reprocessing and Product Distribution: Collection 6 and future plans. Edward Masuoka Code 619 [email protected]. Total Volume of MODIS Terra/Aqua Products Distributed by Fiscal Year. Note: 1) only half way through FY 12 (expect >4PB in 2012) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Reprocessing and Product Distribution:  Collection 6 and future plans

Reprocessing and Product Distribution: Collection 6 and future plans

Edward MasuokaCode 619

[email protected]

MODIS Science Team Meeting May 7, 2012 1

Page 2: Reprocessing and Product Distribution:  Collection 6 and future plans

2

Total Volume of MODIS Terra/Aqua Products Distributed by Fiscal Year

MODIS Science Team Meeting May 7, 2012

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120.0

500.0

1,000.0

1,500.0

2,000.0

2,500.0

3,000.0

3,500.0

4,000.0

TERRA AQUA

Fiscal Year

Dist

ributi

on V

olum

e (T

B)

Note: 1) only half way through FY 12 (expect >4PB in 2012) 2) numbers exclude distribution via disk drives

Page 3: Reprocessing and Product Distribution:  Collection 6 and future plans

3

Number of Terra/Aqua Products files

MODIS Science Team Meeting May 7, 2012

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120

50,000

100,000

150,000

200,000

250,000

TERRA AQUA

Fiscal Year

Num

ber o

f Pro

duct

s Dist

ribut

ed (1

000s

)

Expect >250M product files distributed in 2012

Page 4: Reprocessing and Product Distribution:  Collection 6 and future plans

4

Number of distinct MODIS users

MODIS Science Team Meeting May 7, 2012

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

TERRA AQUA

Fiscal Year

Num

ber o

f Use

rs

Note: only half way through FY 12

Page 5: Reprocessing and Product Distribution:  Collection 6 and future plans

MODIS Science Team Meeting May 7, 2012

5

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120

500

1,000

1,500

2,000

2,500

Distribution Volume of Terra MODIS ProductsGESDISC LPDAAC MODAPS MODAPSNRT NSIDC OBPG ORNL PODAAC

Fiscal Year

Dist

ributi

on V

olum

e (T

B)

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120

200400600800

1,0001,2001,4001,600

Distribution Volume of Aqua MODIS ProductsGESDISC LPDAAC MODAPS MODAPSNRT NSIDC OBPG ORNL PODAAC

Fiscal YearDist

ributi

on V

olum

e (T

B)

Page 6: Reprocessing and Product Distribution:  Collection 6 and future plans

MODIS Science Team Meeting May 7, 2012

6

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

Number of Terra MODIS UsersGESDISC LPDAAC MODAPS MODAPSNRT NSIDC ORNL PODAAC

Fiscal Year

Num

ber o

f Use

rs

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY120

5,000

10,000

15,000

20,000

25,000

Number of Aqua MODIS UsersGESDISC LPDAAC MODAPS MODAPSNRT NSIDC ORNL PODAAC

Fiscal Year

Num

ber o

f Use

rs

Page 7: Reprocessing and Product Distribution:  Collection 6 and future plans

MODIS Reprocessing

C4 2003 C5 2007 C6 20120

20

40

60

80

100

120

515

100

MODAPS – Level 1, Land and Atmosphere OBPG – Ocean products

2003 2007 20120

100200300400500600700800

20x forward processing 50x reprocessing string 80x test strings100x reprocessing string waiting on disk

Complete reprocessing of all Ocean missions to produce uniform suite of products underway at 700x

Page 8: Reprocessing and Product Distribution:  Collection 6 and future plans

MODIS Science Team Meeting May 7, 2012

8

Test Systems – Atmosphere/Land• Integration and Test system at Wisconsin

identically configured to our software transfer group’s I&T system

• Science test string for Atmospheres (mtvs6) used to test individual changes to PGEs, 40x processing rate, tests involve processing multiple months

• Science test string for Land (mtvs5), 40x processing rate, tests involve processing multiple years up to the entire data record

Page 9: Reprocessing and Product Distribution:  Collection 6 and future plans

MODIS Science Team Meeting May 7, 2012

9

C-6 Lessons Learned

• Separate strings for each discipline are essential to avoid delays in testing which impact development and integration of PGEs.

• Atmosphere’s science tests involving single changes to a PGE have proven an effective approach to algorithm development.

• Developing individual test plans for science testing and communicating them to operations is an area that still needs improvement.

Page 10: Reprocessing and Product Distribution:  Collection 6 and future plans

MODIS Science Team Meeting May 7, 2012

10

Future Vision

• Collection 7 defined with Science Team• Long-term data records AVHRR-MODIS-VIIRS • Standards for metadata to support provenance• Documentation improved for long-term archive• Continued expansion of product formats • More cross DAAC orders filled• Common web services across DAACs• Virtualization to support 32bit PGEs and older OS