Page 1: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Report to TACReport to TAC

September 2008September 2008

Page 2: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

In BriefIn Brief Working Group ReportsWorking Group Reports

CMWG – CSC’s 2010CMWG – CSC’s 2010 MWG – SMOGRR007MWG – SMOGRR007 MCWGMCWG QMWG QMWG VCWGVCWG

Task ForcesTask Forces GATFGATF NQSTFNQSTF Joint Generation re-interconnection Joint Generation re-interconnection TFTF

Other ReportsOther Reports NOGRR 025NOGRR 025 PRR 818PRR 818

Page 3: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsCMWGCMWG

2010 Commercially Significant 2010 Commercially Significant Constraints (CSC)Constraints (CSC)

WMS Recommendation: WMS Recommendation: Scenario WN2-4ZScenario WN2-4Z

(ERCOT Recommendation)(ERCOT Recommendation)

4 Zones4 ZonesW_N: Dynamic Stability interfaceN_W: Dynamic Stability interfaceN_S: Lake Creek-Temple/Tradinghouse-Temple Pecan Creek 345-kV double circuitS_N: Lake Creek-Temple/Tradinghouse-Temple Pecan Creek 345-kV double circuitN_H: Singleton-Obrien/ Singleton-TH Wharton 345-kV double circuit

Page 4: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsCMWGCMWG

Scenario WN2-4Z Scenario WN2-4Z Clustered using the pre-contingency 2010 DSA Clustered using the pre-contingency 2010 DSA

SUM1 base case. This is a 4 zone scenario SUM1 base case. This is a 4 zone scenario with the 2009 CSCs for N_S, S_N, and N_H; with the 2009 CSCs for N_S, S_N, and N_H; the N_W and the W_N CSC were modeled as the N_W and the W_N CSC were modeled as the Dynamic Stability interface . the Dynamic Stability interface .

The Stability Limit monitored lines are:The Stability Limit monitored lines are: Graham – Cook FieldGraham – Cook Field Jacksboro – BowmanJacksboro – Bowman Graham – TonkawaGraham – Tonkawa Bowman – GrahamBowman – Graham Comanche Switch – Red CreekComanche Switch – Red Creek Graham – Long CreekGraham – Long Creek

Page 5: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsCMWGCMWG

WMS – Vote for ERCOT RecommendationWMS – Vote for ERCOT Recommendation 24 votes all segments represented24 votes all segments represented 1 Opposed / 20 In Favor1 Opposed / 20 In Favor 3 Abstentions: IPM, Industrial Consumer & IOU3 Abstentions: IPM, Industrial Consumer & IOU 95.1% 95.1% (6.417) in favor 4.9% (0.333) opposed(6.417) in favor 4.9% (0.333) opposed

RECOMMEND: TAC Approve WMS RECOMMEND: TAC Approve WMS Recommendation ERCOT Recommendation ERCOT 20090817a20090817a

Page 6: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsMWGMWG

SMOGRR007SMOGRR007, Synchronization of Settlement , Synchronization of Settlement Metering Operating Guide with PRR804, Metering Operating Guide with PRR804, Revisions to Section 21 Appeal ProcessRevisions to Section 21 Appeal Process Revises Section 10, Process for Settlement Metering Revises Section 10, Process for Settlement Metering

Operating Guide Revisions, to provide that Operating Guide Revisions, to provide that if a motion to if a motion to approve a revision request fails, the revision request shall approve a revision request fails, the revision request shall be deemed rejected by the body considering it and subject be deemed rejected by the body considering it and subject to appeal, unless at the same meeting that body later votes to appeal, unless at the same meeting that body later votes to recommend approval, remand, or referto recommend approval, remand, or refer the revision the revision request. request.

This SMOGRR also proposes formatting and administrative This SMOGRR also proposes formatting and administrative changes.changes.

WMS voted unanimously to approve MWG WMS voted unanimously to approve MWG recommendation. recommendation.

RECOMMEND: TAC Approve SMOGRR007 as RECOMMEND: TAC Approve SMOGRR007 as recommended by WMSrecommended by WMS

Page 7: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsQMWGQMWG

AWS Truewind Outage Scheduler Tool AWS Truewind Outage Scheduler Tool AWS and ERCOT have established the ERCOT AWS and ERCOT have established the ERCOT

Wind Plant Availability WebsiteWind Plant Availability Website Log in credentials have been mailed to all WGR Log in credentials have been mailed to all WGR

QSE’sQSE’s Market notice sent indicating August 19Market notice sent indicating August 19 thth for for

inclusion of the data inclusion of the data

Not too cumbersome with some practice…. may Not too cumbersome with some practice…. may be able to make some improvement with user be able to make some improvement with user feedback.feedback.

Page 8: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsQMWGQMWG

Wind Generation Forecast accuracy Wind Generation Forecast accuracy analysisanalysis

QMWG to do more analysis of histograms and AWS data.

Concerns raised regarding use of 80/20 forecast versus 50/50

Page 9: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsQMWGQMWG

Ancillary Services Discussion TopicsAncillary Services Discussion Topics Market Participants request that ERCOT address Market Participants request that ERCOT address

the following issues and consider making revisions the following issues and consider making revisions to the Ancillary Services methodology for 2010.to the Ancillary Services methodology for 2010.

Net Load MethodologyNet Load Methodology Use of trailing 90 days dataUse of trailing 90 days data Load forecasting error or biasLoad forecasting error or bias Wind forecasting – WGRPP at 80%Wind forecasting – WGRPP at 80%

Ramp Rates for WGRs in the Nodal Ramp Rates for WGRs in the Nodal Market Market

Nodal protocols do not limit the ramp rate of WGR’s or Nodal protocols do not limit the ramp rate of WGR’s or any Resources.any Resources.

PRR 771 limited the ramp rate in the ZonalPRR 771 limited the ramp rate in the Zonal

Page 10: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsMCWGMCWG

Review options for shared short-pay Review options for shared short-pay fundfund Three options identified – still under

discussion Expanded loss mutualization Expanded loss mutualization

under discussion ERCOT presented Potential Future ERCOT presented Potential Future

Exposure Model to CWG and MCWGExposure Model to CWG and MCWG Work towards PRR’s to provide to Work towards PRR’s to provide to

WMS for reviewWMS for review

Page 11: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsVCWGVCWG

White Paper: Units with no Maintenance White Paper: Units with no Maintenance History History Limited to Previously Commissioned units that are Limited to Previously Commissioned units that are

sold to another Entity within the last two yearssold to another Entity within the last two years Unit will be capped by a Proxy ResourceUnit will be capped by a Proxy Resource

If no Proxy Resource exists ERCOT will use Resource Actual If no Proxy Resource exists ERCOT will use Resource Actual Fuel Volumes and Generic Startup for O & M.Fuel Volumes and Generic Startup for O & M.

Whitepaper endorsed by WMSWhitepaper endorsed by WMS

White Paper: Treatment of Maintenance Labor White Paper: Treatment of Maintenance Labor CostsCosts Please comment on draft whitepaper – issued still Please comment on draft whitepaper – issued still

under discussion at VCWGunder discussion at VCWG

Page 12: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsVCWGVCWG

NPRR174NPRR174 – FIP Modifications in Verifiable Startup – FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals Exceptional Fuel Costs During RUC Intervals TAC tabled to come up with value of Y, ERCOT provided TAC tabled to come up with value of Y, ERCOT provided

comments (081209), gave formula and flowchart; the comments (081209), gave formula and flowchart; the Resource entities will receive fuel costs at 110% of FIP, if Resource entities will receive fuel costs at 110% of FIP, if costs within deadband do not get to recoup costs, but can costs within deadband do not get to recoup costs, but can recoup any costs above value of Y up to actual cost.recoup any costs above value of Y up to actual cost.

WMS endorsed ERCOT comments to NPRR174 and WMS endorsed ERCOT comments to NPRR174 and recommended initial value of Y = 10%recommended initial value of Y = 10%

Draft Nodal Verifiable Cost AffidavitDraft Nodal Verifiable Cost Affidavit REs and QSEs please have your legal depts. review - REs and QSEs please have your legal depts. review -

WMS will vote in September for October TACWMS will vote in September for October TAC

Page 13: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Working Group ReportsWorking Group ReportsActive Task ForcesActive Task Forces

Generation Adequacy Task ForceGeneration Adequacy Task Force Adrian Pieniazek and Dan Woodfin, Co-Adrian Pieniazek and Dan Woodfin, Co-

ChairsChairs Nodal Quick Start Task ForceNodal Quick Start Task Force

Seth Cochrane and Tom Jackson, Co-ChairsSeth Cochrane and Tom Jackson, Co-Chairs Joint ROS/WMS Multiple Joint ROS/WMS Multiple

Interconnection Task ForceInterconnection Task Force Leadership for WMS: Bob WittmeyerLeadership for WMS: Bob Wittmeyer

Page 14: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Other WMS activityOther WMS activity NOGRR 025NOGRR 025

WMS considered Nodal Operating Guide Revision Request (NOGRR) 025. After discussion, WMS unanimously voted to endorse NOGRR025 as amended by the 7/30/09 ERCOT comments and as revised by WMS, including the selection of “Option 2” in Section 9.4.5, Resource-specific Non-Spinning Reserve

WMS also reviewed the list the reports provided by ERCOT in its 8/11/09 comments.

WMS unanimously voted to recommend that TAC be added to the list of parties that may request reports

WMS unanimously voted to endorse the list with the request that three of the reports that ERCOT recommended be delayed until after the TNMID instead be made available for testing during market trials (i.e., green), or upon request on a limited basis if ERCOT has concerns about making such reports available for testing during market trials (i.e., yellow). WMS also requests that ERCOT provide additional information regarding the priorities and cuts it has chosen in making its report availability determination

Page 15: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

Other WMS activityOther WMS activity PRR 818PRR 818

WMS considered Protocol Revision Request (PRR) 818. After discussion, WMS unanimously voted to endorse PRR818 as amended by the 8/18/09 Topaz Power Group comments, which avoid unintended consequences of amending definition of offline and online.

RMR Exit Strategy CriteriaRMR Exit Strategy Criteria RMR exit for Permian Basin units, recommended that

towers be double circuit capable, towers were due to be replaced. Rather than replace twice – RMR Exit Delayed.

WMS to prepare whitepaper to address RMR Exit Strategy Criteria

Nodal Trading Points other than Nodal Trading Points other than HubsHubs Venus & Marion are no longer schedulable points in Venus & Marion are no longer schedulable points in

NodalNodal Assigned to QMWGAssigned to QMWG

Page 16: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007

WMS 2009 GoalsWMS 2009 GoalsItemItem

WMS WMS input/direction input/direction

needed byneeded by

Nodal Market TransitionNodal Market Transition On-goingOn-going

Nodal Verifiable Cost MethodologyNodal Verifiable Cost Methodology On-going (VCWG)On-going (VCWG)

Approved Zonal PRRs – Analysis and Approved Zonal PRRs – Analysis and PrioritizationPrioritization Q1-Q2Q1-Q2

Consideration of timely, economic Consideration of timely, economic improvements to Zonal Marketimprovements to Zonal Market Before Q4Before Q4

Determine CSCs for 2010Determine CSCs for 2010 Q3 (CMWG)Q3 (CMWG)

Market Issues Related to:Market Issues Related to:

Credit issuesCredit issues On-going (MCWG)On-going (MCWG)

EILS and AS MarketsEILS and AS Markets On-goingOn-going

Integrating advanced meters & other demand Integrating advanced meters & other demand response into Ancillary Service Marketsresponse into Ancillary Service Markets On-going (DSWG)On-going (DSWG)

Wind & related renewable technology integrationWind & related renewable technology integration On-going On-going (QMWG/RTWG)(QMWG/RTWG)

Page 17: Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007