  • 8/9/2019 Report Slop MB

    1/4

    Report

    Spent Wash Material Balance Trial from Evaporator to New & Old Slop Boilers

    Trial No. 1: Slop Transfer from Evaporator tank to New slop Boiler tank

    Trial was conducted for 1 hour. During trial duration the evaporator plant was not

    running and no feeding of slop to Old slop tank.

    At Slop Boiler II End:

    Trial Duration 1 !r.

    "nitial Slop "" Tank #evel $.%& '

    (inal Slop "" Tank #evel &.%$ '

    Slop )eceived in Slop "" Tank *+., '&

    Slop -onsumption )ate ., '&/!r.

    Total Slop )eceived , '&

    At Evaporator End:

    "nitial Evaporator Tank #evel &.$ '

    (inal Evaporator Tank #evel $.10 '

    Slop Supplied to Slop "" Tank .& '&

    Di2erence .,, '& i.e less received 34 Slop Boiler

    Trial Duration 1 !r.

    "nitial Slop "" Tank #evel $.%& '

    (inal Slop "" Tank #evel &.%$ '

    Slop )eceived in Slop "" Tank ,$.$, '&

    Slop -onsumption )ate ., '&/!r.

    Total Slop )eceived ,+., '&

    "nitial Evaporator Tank #evel &.$ '

    (inal Evaporator Tank #evel $.10 '

    Slop Supplied to Slop "" Tank .& '&

  • 8/9/2019 Report Slop MB

    2/4

    Trial No. $: Slop Transfer from Evaporator plant 5via (T6 to New slop Boiler tank

    Trial was conducted for * hour 7 $, minutes. During trial duration the evaporator

    plant was running 7 was suppl4ing direct feed to Slop "" tank 34passing Evaporator

    Tank also no feeding of slop to Old slop tank.

    At Slop Boiler II End:

    At Evaporator End:

    "nitial Evaporator Tank #evel &.$ '

    (inal Evaporator Tank #evel $.10 '

    Slop Supplied to Slop "" Tank .& '&

    Di2erence .0 '& i.e. e8cess received 34 slop 3oiler

    Trial No. &: Slop Transfer from Evaporator tank to Old slop Boiler tank

    Trial Duration * hour 7 $, minutes

    "nitial Slop "" Tank #evel $.,1 '

    (inal Slop "" Tank #evel &.,$ '

    Slop )eceived in Slop "" Tank ,&.& '&

    Slop -onsumption )ate $., '& 9 .% '&/!r. rate

    Total Slop )eceived +.0 '&

    Totalier "nitial )eading 1&&%

    Totalier ;nal )eading 1*%&

    Slop Supplied to Slop "" Tank & '&

  • 8/9/2019 Report Slop MB

    3/4

  • 8/9/2019 Report Slop MB

    4/4

    Trial was conducted for & hour 7 ,% minutes. During trial duration the evaporator

    plant was running 7 was suppl4ing direct feed to Slop " tank 34passing Evaporator

    Tank also no feeding of slop to Newslop tank.

    At Slop Boiler I End:

    At Evaporator End:

    "nitial Evaporator Tank #evel &.$ '

    (inal Evaporator Tank #evel $.10 '

    Slop Supplied to Slop "" Tank .& '&

    Di2erence $1.% '& i.e. e8cess received 34 slop 3oiler

    Trial Duration & hour 7 ,% minutes

    "nitial Slop " Tank #evel $., '

    (inal Slop " Tank #evel ,.+ '

    Slop )eceived in Slop " Tank %.+0 '&

    Slop -onsumption )ate $0.$ 9 ., '&/!r.

    Total Slop )eceived 0+.% '&

    Totalier "nitial )eading 1*%&

    Totalier ;nal )eading 1*1

    Slop Supplied to Slop "" Tank 0 '&