![Page 1: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/1.jpg)
REPORT ON THEon the
FORT HOPE MINE CLAIMOPIKEIGEN LAKE PROJECT
Fort Hope Area, Ontario
NTS 52P/0951 0 37'North Latitude
880 04' West Longitude
SLAM EXPLORATION LTD.115 Whalen Street
Miramichi, New Brunswick E1V 3Y2
Prospecting completed on June 16, 17, 23, 24 of 2001 by Daniel Waswa and Loyd Roe
ReportBy
Michael R. Taylor, P.Geo. October 21,2002
52P09SE2003 2.23910 RICH LAKE 010
![Page 2: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/2.jpg)
TABLE OF CONTENTS
Page SUMMARY.........................................................................................................................!INTRODUCTION ..............................................................................................................1LOCATION, ACCESS and PHYSIOGRAPHY.................................................................. 1PROPERTY DESCRIPTION.............................................................................................3HISTORY..........................................................................................................................5REGIONAL GEOLOGY....................................................................................................6GEOLOGY OF FORT HOPE GOLD MINE CLAIM...........................................................6PROSPECTING PROGRAM............................................................................................6RESULTS.......................................................................................................................10CONCLUSIONS..............................................................................................................^RECOMMENDATIONS...................................................................................................^BIBLIOGRAPHY.............................................................................................................11
List of Figures
Figure 1 Location Map .................................................................................................2Figure 2 Claim Map......................................................................................................4Figure 3 Regional Geology...........................................................................................?Figure 4 Fort Hope Gold Mine-Mine Workings.......................................................... 8Figure 5 Prospecting Map............................................................................................9
List of Tables
Table 1 Opikeigen Lake Project Claims......................................................................3
Appendix
Appendices
Rock Sample Analyses - Procedures
115 Whalen St Miramichi, NB E1V 3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 3: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/3.jpg)
SUMMARY
The Fort Hope Gold Mine claims include three claims for a total of 14units comprising part of the Opikeigen Lake property, a block of 148 contiguous claims jointly owned by Slam Exploration Ltd. of Miramichi, New Brunswick and Pure Gold Minerals Inc. of Vancouver, BC. In addition to the old Fort Hope Gold Mine, the property covers six zones of gold mineralization known as Zones 29, 12, 41, 41-Extension, Rond Lake and Rich Lake occurrences.
These gold occurrences are hosted in highly sheared felsic and mafic volcanic rocks of the Uchi greenstone belt, aligned along an easterly trending axis over a strike length of 10 km. The Fort Hope Mine and the Rich Lake zone was discovered early in this century, the rest were discovered by Noramco Exploration Ltd. in the late 1980's.
In 2001 an exploration program including prospecting and rock sampling was conducted on the Fort Hope Mine claims. The purpose of this program was to search for new outcrops in the area to the southeast of the Fort Hope mine.
An outcrop of gabbro was found near the south boundary of the property. Seven samples of pyritic gabbro and quartz vein material were collected and submitted to X-Ral Laboratories in Don Mills, Ontario. None of the samples contain anomalous gold.
It is concluded that further work be done in conjunction with exploration on the contiguous Opikeigen claims. The assessment file data from previous exploration on the Fort Hope Gold Mine should be compiled.
115 Whalen St. Miramichi, NB E1V3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 4: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/4.jpg)
INTRODUCTION
The Opikeigen Lake Property is jointly owned by Slam Exploration Ltd. of Miramichi, New Brunswick and Pure Gold Minerals Inc. of Vancouver, British Columbia. This report summarizes results of exploration on claims 1230767 to 1230769 known as the Fort Hope Mine claims during June, 2001. On behalf of Slam Exploration, prospecting was conducted by Daniel Waswa and Loyd Roe, both residents of Fort Hope on June 16, 17, 23, 24 of 2001. Nine samples were collected. Seven samples were submitted for laboratory analysis.
LOCATION, ACCESS and PHYSIOGRAPHY
The Opikeigen Lake Property is located in northern Ontario, approximately 145 kilometers east of the town of Pickle Lake and 13 kilometers northwest of Fort Hope (Figure 1). The claims lie within the eastern portion of the Uchi Lake Greenstone Belt, roughly bounded by the southern shoreline of Opikeigen Lake on the north and Rond Lake on the east.
Access to the property is via floatplane from Pickle Lake or, alternately, by ferry from Fort Hope, 40 minutes away. Fort Hope is serviced daily with commercial Beechcraft and Caravan flights originating from Thunder Bay, Ontario.
Much of the topography in the vicinity of Fort Hope consists of wet bogs or thick muskeg. Topographic relief is generally low to flat-lying with the exception of a few drumlinoid ridges. Most of the property is covered by muskeg or esker-like glacial features composed of sand and boulders. Outcrop exposures are few.
115 Whalen St. Miramichi, NB E1V 3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 5: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/5.jpg)
Opikeigen Lake Property
\ \
Zones 29,12,41 ,- , .Gold Occurrences ^ametoong
^ First NationGifford Lake
Rich Lake
Reserve Lake^ v ;' Tidsit ' Lake
Ontario
Figure l
SLAMI EXPLORATION LTC
Opikeigen Lake Property Location Map
NTS: 52P/9Date: January, 2000Scale: as shown
Drawn by: MRT.Revised: October, 2001File: georegion.car
![Page 6: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/6.jpg)
PROPERTY DESCRIPTION
The Fort Hope Mine Claims are comprised three claims numbered 1230767 to 1230769 for a total of 14 units. The claims are part of the Opikeigen Lake Gold property, a contiguous group of of 149 claims (Figure 2) totalling 175 units. The claims are shown on Ontario claim maps G-388 (Rich Lake) and G-361 (Opikeigen Lake) and are listed in Table 1 below. The claims are jointly owned 50 07o each by Slam Exploration Ltd. of Miramichi, New Brunswick and Pure Gold Minerals Inc. of Vancouver, British Columbia. Slam can earn an additional 3007o interest by spending an extra S240,000 on exploration expenditures prior to August 31, 2004.
Table 1: OPIKEIGEN LAKE PROJECT CLAIMS
Claim NumbersTR791401 -TR79144D
TB854901 - TB854952TB855101 -TB855104
TB855105TB855106
TB855107-TB855108TB855109-TB855110TB855111-TB855112TB855113-TB855140TB855141 -TB855142TB855143-TB855153
TB1240476TB1 230767
TB1 230768TB1 230769Total Units
Claim Units40
52411222
28211
164
64
175
Expiry DateAnril?S ?Df)3
April 25, 2003April 25, 2003April 25, 2004April 25, 2003April 25, 2004April 25, 2003April 25, 2004April 25, 2003April 25, 2004April 25, 2003
Mar 14, 2002December 7, 2002
May 24, 2003May 24. 2003
115 Whalen St Miramichi, NB E1V3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 7: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/7.jpg)
88000'
Opikeigen Lake
Rond Lake
O 2km
Figure 2
SLAMS EXPLORAItON ITS
Opikeigen Lake Property Claim Map
NTS: 52 P/9Dale: October, 2002
"Scale: as shown
Drawn by: MRT Revised:File: clalm.cdr
![Page 8: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/8.jpg)
HISTORY
Exploration in the Fort Hope area began with the discovery of the Fort Hope Gold Mine occurrence in 1927. A shaft was sunk on an auriferous quartz vein located near a sheared contact between pillow basalts and mafic volcanic flows, some 300 metres south of the Opikeigen Lake property boundary. Over 100 metres of lateral development followed. Two vein systems referred to as the "Shaft" vein and the"California" vein were explored in trenches and underground. Grab samples from the Shaft vein were reported to be as high as 9.37 ounces/ton (321 grams/tonne - Wallace, 1978). however, the vein pinched-out a short distance from the shaft. Work was discontinued in 1928 with no recorded gold production. The mine has since been periodically (1934, 1946, 1958) dewatered, explored and taken through feasibility studies but the property has remained idle since 1959.
A brief staking rush followed the discovery of the Fort Hope Mine and additional gold showings were discovered, including the Rich Lake occurrence, which is situated within the Opikeigen Lake property, and the Reserve Lake Deposit, located 15 kilometres southeast of the property, within the Eabametong First Nations Reserve. A composite sample from the Rich Lake occurrence was reported to grade 0.13 opt (4.46 gpt) and Q.65% WOa (Wallace, 1978). The Reserve Lake deposit, which has been explored periodically from the 1930's to 1984, has an estimated resource of 150,000 tons (136,050 tonnes) grading 0.28 opt (9.6 gpt). The Fort Hope area has been the subject of numerous government mapping programs, notably: Burwash (1929), Prest (1942) and Wallace (1978).
Noramco Exploration Ltd. explored the Opikeigen Lake property between 1986 and 1989. At that time the Fort Hope Mine was staked by a third party. Noramco completed extensive ground and airborne geophysical surveys including magnetometer, VLF-EM, HLEM and induced polarization (IP) surveys, humus geochemistry, prospecting, geological mapping, trenching and channel sampling. Several of the IP targets were drilled, resulting in discovery of the Zone 12 and Zone 29 gold occurrences. Prospecting and detailed mapping led to the discovery of Zone 41, the Zone 41 Extension and the Rond Lake occurrence. A total of 52 diamond drill holes, totalling 9811.8 metres, tested mineralization in the Rich Lake occurrence, zones 12, 29, and 41 and other targets.
Gold mineralization was intersected in Zone 12 and defined over a strike length of 40 metres and to a depth of 200 metres. Four drill intersections ranged between 7.0 and 27.2 metres in width and returned 1.37 gpt to 6.22 gpt gold. Numerous narrower intervals contained much higher gold concentrations. Results from Zone 29 returned 1.0 to 2.1 gpt gold over generally broad intervals (up to 12.3 metres, averaging 5.52 metres) over a strike length of 450 metres. The best result was 1.66 gpt gold over 12.3 metres.
115 Whalen St. Miramichi, NB E1V 3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 9: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/9.jpg)
REGIONAL GEOLOGY
The Opikeigen Lake Property is situated within the Uchi Subprovince of the Superior Province, a subdivision of the Canadian Shield. The Uchi Subprovince is a 600- kilometre long greenstone belt that extends from Lake Winnipeg to the Hudson Bay Lowlands, hosting the Pickle Lake, Rice Lake, and world-famous Red Lake gold mining camps. In the Opikeigen Lake Area (Figure 3), the 15 kilometre wide greenstone belt is bounded on the north by the duff Lake Stock and on the south by migmatite and paragneiss (Wallace, 1978). The belt is composed of east-trending metavolcanic and metasedimentary rocks, believed to be isoclinally folded and metamorphosed to upper amphibolite grade metamorphism (Wallace, 1978). Based upon aeromagnetic interpretation, Wallace (1978) indicates that an east-west trending anticlinal fold axis extends from Opikeigen Creek, between Rond and Opikeigen Lakes, to the Lilypad Lakes area, west of the property. This theory is supported by 'tops' indicators found in pillow lavas found along the margins of the belt.
GEOLOGY OF THE FORT HOPE GOLD MINE CLAIM
The Fort Hope Gold Mine claim is underlain mainly by a thick succession of mafic flows and pillow basalts with minor mafic tuffs and intermediate pyroclastic units. These mafic flows are bounded to the north by a ductile shear zone which controls the gold-bearing mineralization in Zones OL12, 29 and 41. The Shaft Vein and California Vein are hosted in a shear near the contact between basalt flows and mafic agglomerates and tuffs. Grab samples from the Shaft vein were reported to be as high as 9.37 ounces/ton (321 grams/tonne - Wallace, 1978). Significant gold values were obtained from both surface and underground workings as shown on Figure 4.
PROSPECTING PROGRAM
The area southeast of the Fort Hope Mine site was prospected by Daniel Waswa and Loyd Roe, both residing in Fort Hope, Ontario. Several north-south prospecting traverses were completed as shown on Figure 5.
Nine samples were collected and sent to the Slam Exploration office at 115 Whalen Street, Miramichi, New Brunswick. The samples were comprised of quartz vein material and gabbro with pyrite mineralization in the gabbro wallrocks. Seven samples numbered 688052 to 688058 were submitted to X-Ral Laboratories in Don Mills, Ontario for gold assay. Results are included in Appendix l.
115 Whalen St. Miramichi, NB E1V 3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 10: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/10.jpg)
- 19 -
Opikeigen Lake Property4
Zones 29,12,41 .- , . 4 Gold Occurrences Eabametoong
First Nation4 ^-,
ifford Lake ;-
Reserve Lake1it 4
Fort Hope Gold Mine
Ref. Map 2237Fort Hope-Lansdowne SheetGeological Compilation Series
LEQEND
Pre-Cambrian
| 4 [ Felsic Intrusive Rocks
| 3 [ Metasedirnents
[::2"| Felsic Volcanic Rocks
f^Tj Mafic Volcanic Rocks
Figure 3
SMWI EXPLORATION LIB
Opikeigen Lake Property Regional Geology Map
NTS: 52 P/9Date: January .2001Scale: as shown
Drawn by: MRT.Revised:File: georegion.cdr
![Page 11: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/11.jpg)
C 13704
"California Vein'
0.03/1 B 0.01/U 0.06/1.1 152/1.3
1D3/1D 0.17/1* 0.01/l D 4*5/1.3
Surface workings.
Underground workings.
Assay results (Troy ounces of gold per ton/feet).
Reference: Wallace, 1978Figure 4
SLAMi EXPLORAHON LTD. S
Opikeigen Lake PropertyFort Hope Gold Mine
Mine WorkingsNTS: 52P/9
Date: June, 2001
Scale: 1:5000
Drawn by: SLG.
File: geol.cdr
![Page 12: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/12.jpg)
1230769
791414
1230767
2b
FORT HOPE GOLD MINE
California Vein
CO CD
oCOCNI
l7914131
l l
I-H-
791409
791
' - 1000S2b Pillow Basalt QV Quartz Vein
- Prospecting Traverse
X Sample Location
VJ Outcrop
- - m VLF Conductor Axis
1200S
408
-1400S
791407
-1600S Prosepcting completed by:
Property Boundary
Meters
Loyd Roe
June 16,17,23,24, 2001
Figure 5
Opikeigen Lake Property Prospecting Map
688058688059
Date OcttJ*, 2002
Scale: 1; 5000
Drawn bV :
File: FHGM5000.cdr
![Page 13: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/13.jpg)
10
RESULTS
The observed outcrop is part of a gabbro unit located near the south boundary of the property. Although the gabbro samples were mineralized with pyrite and some samples contained quartz vein material, no anomalous gold values were reported by the laboratory.
CONCLUSIONS
Exploration in the Opikeigen Lake area dates back to the 1927 discovery of the Fort Hope Mine gold occurence which borders the Opikeigen property. Surface trenching and an exploration shaft with some lateral development indicate high grade but erratic gold values in two narrow vein systems, the Shaft vein and the Calfornia vein.
The 2001 prospecting program conducted by Slam Exploration Ltd. covered an area east of the Fort Hope Gold Mine site. Quartz veins and pyrite mineralization were observed in an outcrop of gabbro to the southeast of the mine site. No anomalous gold mineralization was detected in the seven samples submitted for assay.
RECOMMENDATIONS
Further exploration is recommended in conjunction with proposed exploration on the contiguous Opikeigen claims to the north. Results of previous exploration should be compiled and added to the database for the Opikeigen property.
Prospecting completed by:
Daniel Waswa Loyd Roe
Report Prepared by:
Mrchael R. Taylor, PGeo. Miramichi, NB October 21, 2002
115 Whalen St. Miramichi, NB E1V3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 14: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/14.jpg)
11BIBLIOGRAPHY
Burwash, E.M.(1929)"Geology of the Fort Hope Gold Area"; Ontario Department of Mines, Vol. 38, Part 2, pp 1-28.
Eastwood, A. M. (2001)"Assessment Report on the 2000 Diamond Drill Program, Opikeigen Lake Property" for Slam Exploration Ltd., April, 2001
LeMaitre, R. (1997)"Opikeigen lake Project Assessment Report, 1997 Exploration Program"; by Slam Exploration Ltd., November 1997.
Prest, V.K., (1942)"Geology of the Fort Hope Area"; Ontario Department of Mines, Vol. 51, Part 3, 28 p.
Thurston, P.C., and Carter, M.W., (1970)"Operation Fort Hope"; Ontario Department of Mines and Northern Affairs. M.P. 42, 64 p.
Taylor, M., (1989)"Opikeigen Lake Project Final Report -1988 Exploration Program"; Noramco Exploration Inc.
Tulonen, P., (1988)"Opikeigen Lake Project (1439) 1987 Exploration Report"; Noramco Exploration Inc.
Vickers, A., (1999)"Logistical and Interpretive Geophysical Report on the Opikeigen Lake Property", Slam Exploration Ltd. Ontario Ministry of Mines and Northern Affairs, Assessment Files, Sudbury, Ontario.
Wallace, H..(1978)"Geology of the Opikeigen Lake Area"; Ontario Geological Survey, Report 185, pp. 58
115 Whalen St. Miramichi, NBE1V3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 15: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/15.jpg)
12
Appendix l
ROCK SAMPLE ANALYSES
115 Whalen St. Miramichi, NB E1V3Y2 Telephone (506)627-1353 Fax (506) 627-1328 email: [email protected]
![Page 16: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/16.jpg)
OCT-12-2001 FRI 03:23 PH XRAL LABS FAX NO. 4164454152 P, 01/04
XRAL XRAL LaboratoriesA Division of SGS Canada Inc.
188& l''Slid Struct Don Mills, Ontario Cnnnd.-i MSB 3M Tn!c|)hnni! (4l 6) 115' 5755
To:
CERTIFICATE OF ANALYSIS
Work Order: 063999
Slam Exploration Attn: Mike Taylor
626 NCW CASTLE BLVDMIRAMICHINEW BRUNSWICK. CANADA EW 2L3
Date 10/07/01
Copy 1 to
P.O. No. Project No, No. of Samples Dalo Submitted Report Composes
7 RocK 28/06/01 Cover Sheet plus Pages 1 to 3
Distribution of unused material: .,,.,,,+nHiii Pulps: Discorded After 90 Days Unless nstructed Rejects: Discarded After 90 Days Unless Instructed!!l
Certified By
Dr. Hugh de Souza, General Manager XRAL Laboratories
ISO 9002 REGISTERED
Ruport Fooior:
Subject to SGS General Terns and Conditions
L.N.R, - Listed no, reived W. - jj^fcjrnt
MNF - Composition of this samplo makns detection Impossible by this mothod M alter a result denotes ppb to ppm conversion, V* denotes ppm to K conversion
Mumucr or the SGS Group (Societe Genfirala de Surveillance)
![Page 17: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/17.jpg)
XRAL XRAL LaboratoriesA Division of SGS Canada inc.
Work Order: G63999 Date: 10/07/01 FINAL
O CD—3
rv) CDCD
Eteniecl. Method. Det.LJni. Units.
6S3052 686053 688054 6S80SS 6S&056
688057 68SOSB *DiJp 688052
AuFA30I
lppb
43335
24
CO
ro
ea03
o
CO 45^ *^en
en ro
Member of ttie SGS Group (Sotiete Generate de Sur\-2illance)CDro
![Page 18: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/18.jpg)
ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES
Transaction No:
Recording Date:
Approval Date:
Client(s):
303685
Survey Type(s):
W0240.01176
2002-JUL-15
2002-NOV-15
Work Report Summary
Status: APPROVED
Work Done from: 2001-JUN-16
to: 2001-JUN-24
SLAM EXPLORATION LTD.
ASSAY PROSP
Work Report Details:
Perform Applied Claim# Perform Approve Applied Approve
TB 1230767 3800 S750 S4.130 33,142
TB 1230768 33,330 32,392 SO SO
Assign ReserveAssign Approve Reserve Approve Due Date
SO O SO SO 2003-DEC-07
33,330 2,392 SO SO 2003-MAY-24
S4.130
External Credits:
Reserve:
S3.142 34,130 53,142 33,330 32,392 SO SO
SO
SO Reserve of Work Report#: W0240.01176
SO Total Remaining
Status of claim is based on information currently on record.
52P09SE2003 2.23910 RICH LAKE 900
2002-Nov-21 13:57 Armstrong-d Page 1 of 1
![Page 19: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/19.jpg)
Ministry ofNorthern Developmentand Mines
Date:2002-NOV-19
MICHAEL ROBERT TAYLOR SLAM EXPLORATION LTD. 115 WHALEN ST MIRAMICHI, NEW BRUNSWICK E1V3W5 CANADA
Ministere duDeveloppement du Nord etdes Mines Ontario
GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5
Tel: (888) 415-9845 Fax:(877)670-1555
Dear Sir or Madam
Submission Number: 2.23910 Transaction Number(s): W0240.01176
Subject: Approval of Assessment Work
We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
Based on the information provided with this submission, a total of S3142.00 is approved for the work reported.
If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.
Yours Sincerely,
Ron Gashinski
Senior Manager, Mining Lands Section
Gc: Resident Geologist
Slam Exploration Ltd. (Claim Holder)
Assessment File Library
Slam Exploration Ltd. (Assessment Office)
Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:17729
![Page 20: REPORT ON THE on the · 2017. 1. 17. · REPORT ON THE on the FORT HOPE MINE CLAIM OPIKEIGEN LAKE PROJECT Fort Hope Area, Ontario NTS 52P/09 51 0 37'North Latitude 880 04' West Longitude](https://reader033.vdocuments.us/reader033/viewer/2022051811/60287653a4a0010d094ed77f/html5/thumbnails/20.jpg)
MINING LAND TENURE
MAP
11 :S7h Eastern
PLAN
0-0388
Date l Time of Issue Fat 6 2002
TOWNSHIP l AREA
RiCH LAKE AREA
ADMINISTRATIVE DISTRICTS J DIVISIONSMining Division Thunder Bay
Land Titles/Registry Dlvhlon KENORA
Minimlry of Natural R*sourc.J District NIPIGON
l: .WM5I? t
L wl L-'j ,
CANO TENURE WITHDRAWALS
ifSti IMPORTANT NOTICES
LAND TENURE.WITHDRAWAL DESCRIPTIONS
IMPORTANT NOTICESiMlii 4141 (Md* n*Mton*r.)M4lFmir un*HM^oiP*l Itat ritvet
General Inform B iron and Limita tiersiwrti vdJftlvi* TMM tie Ctin*,*fir.t*t**i iwid imutt md
torri w.attt4t re*W rtr pratt* AM Mbyl***** *~- dMnvni^jwl H
"Oo fi01wM O
Ul I-" O
10 O O